Date
|
Hours
|
Work Log Summary
|
Details
|
02-09-2014
|
3.30
|
Finished Drilling Gussets to Ribs, Debured, & Inst
|
Details
|
|
|
02-07-2014
|
2.80
|
Preped FWD Wing Ribs & Bent Gussets
|
Details
|
|
|
01-31-2014
|
1.50
|
Rivet Gussets on Aft Wing Ribs -01 thru -04
|
Details
|
|
|
01-30-2014
|
1.70
|
Debur and Prime Aft Rib Gussets
|
Details
|
|
|
01-29-2014
|
2.50
|
Finished Aft Rib Cutouts and Located Gussets
|
Details
|
|
|
01-27-2014
|
1.00
|
Cutting Clearance Notches in Aft Ribs 1-5
|
Details
|
|
|
01-23-2014
|
2.00
|
Bend Aft Rib Gussets
|
Details
|
|
|
01-20-2014
|
0.75
|
Moved Fuselage and Gather Part for Aft Wing Rib Wo
|
Details
|
|
|
01-19-2014
|
4.00
|
Reorganized and Cleaned Shop
|
Details
|
|
|
01-18-2014
|
4.70
|
Started Assembling Aft Spar Carry-Thru Structure
|
Details
|
|
|
01-16-2014
|
2.25
|
Drilled and Installed Taper Pin in New Mixer Pivot
|
Details
|
|
|
01-12-2014
|
3.00
|
Installed Taper Pins in Control Tree Assembly
|
Details
|
|
|
01-11-2014
|
2.00
|
Prepring & Reaming Control Tree Bushings
|
Details
|
|
|
01-08-2014
|
2.50
|
Assembling Control Sticks and Mixer
|
Details
|
|
|
01-01-2014
|
3.00
|
Installed Brackets for Master Cylinder
|
Details
|
|
|
12-30-2013
|
2.00
|
Fabricated Master Cylinder Attach Brackets
|
Details
|
|
|
12-29-2013
|
3.00
|
Started Installation of Hydraulic (AeroBrake) Kit
|
Details
|
|
|
12-28-2013
|
3.50
|
Installed Flap Drive Tube Assembly
|
Details
|
|
|
12-22-2013
|
6.15
|
Fabricated Stabilator Service Bulletin Parts & Ins
|
Details
|
|
|
12-21-2013
|
4.90
|
Started Pilot Drilling Stabiltor Fittings
|
Details
|
|
|
12-13-2013
|
1.50
|
Fitting Stabilators to Aft Fuselage
|
Details
|
|
|
12-09-2013
|
1.50
|
Drilled the Axles - And She is On the Ground!
|
Details
|
|
|
12-08-2013
|
3.50
|
Set Toe-In & Built Up Whell Assemblies
|
Details
|
|
|
11-24-2013
|
3.75
|
Started Fitting Main Gear Legs
|
Details
|
|
|
11-22-2013
|
4.10
|
Trimed Shims, Primed Mount Holes, and Installed Mo
|
Details
|
|
|
11-21-2013
|
4.50
|
Finished Fitting and Began Drilling Motor Mount
|
Details
|
|
|
11-18-2013
|
1.75
|
Began Fitting Motor Mount...Finally
|
Details
|
|
|
10-29-2013
|
2.00
|
Continuing on the Glarshield and Panel Fitting
|
Details
|
|
|
10-22-2013
|
2.00
|
Fitting Various Glarshield & Panel Parts
|
Details
|
|
|
10-20-2013
|
1.05
|
Fitting Glareshield
|
Details
|
|
|
10-16-2013
|
1.50
|
Glarshield Parts
|
Details
|
|
|
10-15-2013
|
2.85
|
Drilled New Tail Spring, Installed Tailwheel Assem
|
Details
|
|
|
10-07-2013
|
3.50
|
Installed Lower Fuel Tank Straps & Began Glareshie
|
Details
|
|
|
10-03-2013
|
3.00
|
Final Install of Rudder Pedals & Started Aft Spar
|
Details
|
|
|
10-01-2013
|
2.50
|
Fabrictaed 2nd Rudder Pedal Block and Fitted Pedal
|
Details
|
|
|
09-30-2013
|
1.00
|
Rudder Pedal Support Blocks
|
Details
|
|
|
09-27-2013
|
2.00
|
Drilled Tail Spring Rod
|
Details
|
|
|
09-24-2013
|
2.50
|
Trimed Seat Sling to Fit and Installed Hing Halves
|
Details
|
|
|
09-23-2013
|
2.20
|
Fitted, Drilled and Riveted Hinge Halves to Seat S
|
Details
|
|
|
09-22-2013
|
5.00
|
Continued Layout of Seat Sling and Made Cutouts
|
Details
|
|
|
09-18-2013
|
1.75
|
Seat Sling Layout
|
Details
|
|
|
09-17-2013
|
2.00
|
Fabricated Seat Hinge Halves and Pins
|
Details
|
|
|
09-16-2013
|
2.50
|
Installed Nutplates In Floor Supports for Hat Chan
|
Details
|
|
|
09-15-2013
|
0.75
|
Cut and Drilled Hat Channel
|
Details
|
|
|
09-05-2013
|
1.25
|
Installed Flap Detent Angle and Brackets
|
Details
|
|
|
09-04-2013
|
2.15
|
Fitted and Drilled Flap Angle and Attach Bracktets
|
Details
|
|
|
09-03-2013
|
0.75
|
Reivewed F08 Plans & Started Fabricating Flap Angl
|
Details
|
|
|
08-27-2013
|
1.30
|
Finished Deburring, Cleaning and Priming Seat Part
|
Details
|
|
|
08-26-2013
|
2.00
|
Updrilled Remaining Large Holes and Started Deburr
|
Details
|
|
|
08-25-2013
|
1.20
|
Continued Updrilling Seat Section Parts
|
Details
|
|
|
08-24-2013
|
0.75
|
Began Updrilling Lower Skin Pilot Holes
|
Details
|
|
|
08-23-2013
|
1.75
|
Pilot Drilled CTR Channels, Gussets, & Idler Assy.
|
Details
|
|
|
08-22-2013
|
2.10
|
Continued Fitting Lower Seat Attach Parts
|
Details
|
|
|
08-21-2013
|
1.50
|
Fitting Seat & Seat Belt Attach Parts
|
Details
|
|
|
08-20-2013
|
2.20
|
Fitted, Drilled, Primed & Assembled Seat Belt Atta
|
Details
|
|
|
08-19-2013
|
1.50
|
Finished Parts for Aft Lower Seat Area - F10
|
Details
|
|
|
08-18-2013
|
5.00
|
Still Making Parts for Aft Lower Section of FWD Fu
|
Details
|
|
|
08-16-2013
|
3.60
|
Continued Making F10 FWD Fuse Lower Parts
|
Details
|
|
|
08-08-2013
|
1.00
|
Made Idler Assembly Spacer Block and Assembled
|
Details
|
|
|
08-07-2013
|
2.25
|
Riveted Lower Firewall Hinges & Drilled Idler Arm
|
Details
|
|
|
08-06-2013
|
2.00
|
Installed Lower FWD Fuselage Skin
|
Details
|
|
|
08-05-2013
|
1.00
|
Priming Lower FWD Fuselage Skin
|
Details
|
|
|
07-19-2013
|
1.00
|
Finished Installing Side Panel Longeron Bolts
|
Details
|
|
|
07-18-2013
|
1.00
|
Installed Upper Longeron Splice Bolts & Upper Fire
|
Details
|
|
|
07-17-2013
|
1.20
|
Installed Splice Plate Attach Bolts
|
Details
|
|
|
07-16-2013
|
1.25
|
Continued Riveting FWD Fuselage
|
Details
|
|
|
07-15-2013
|
2.40
|
Reassembled and Began Riveting FWD Fuselage
|
Details
|
|
|
07-14-2013
|
1.45
|
Finished Cleaning and Painted LH side Panel
|
Details
|
|
|
07-13-2013
|
1.00
|
Preped LH Side Panel
|
Details
|
|
|
07-12-2013
|
1.20
|
Cleaned Deburred and Painted RH Side Panel
|
Details
|
|
|
07-11-2013
|
1.75
|
Finished Countersinking & Deburring Side Panels
|
Details
|
|
|
07-08-2013
|
1.00
|
Deburring & Dimpling FWD Fuse Parts
|
Details
|
|
|
07-07-2013
|
1.00
|
Dissambled and Deburred
|
Details
|
|
|
07-06-2013
|
4.10
|
Updrilled and Disassembled
|
Details
|
|
|
07-05-2013
|
3.00
|
Fitted and Drilled Stiffeners, Clips and Gussets
|
Details
|
|
|
07-04-2013
|
2.00
|
Fitted and Pilot Drilled Aft Zee Assembly
|
Details
|
|
|
07-03-2013
|
2.50
|
Fitted and Pilot Drilled FWD Zee Tunnel
|
Details
|
|
|
07-02-2013
|
2.20
|
Remade FWD Zee Tunnel
|
Details
|
|
|
06-30-2013
|
1.00
|
Finished Pilot Drilling Lower Skin to Lower Longer
|
Details
|
|
|
06-25-2013
|
2.10
|
Located & Drilled Lower Firewall, Pilot Drilled Sp
|
Details
|
|
|
06-24-2013
|
2.00
|
Pilot Drilling FWD Fuselage
|
Details
|
|
|
06-23-2013
|
2.75
|
Reconfigured Workshop and Continued Test Fitting F
|
Details
|
|
|
06-21-2013
|
1.00
|
Fitting FWD Fuselage Parts
|
Details
|
|
|
06-20-2013
|
2.50
|
Finished FWD Z Tunnel & Began Fitting Fuse Side Pa
|
Details
|
|
|
06-19-2013
|
2.00
|
Continued Laying Out and Cutting FWD Z Tunnel
|
Details
|
|
|
06-17-2013
|
2.00
|
Countersunk Aft Z Angle Parts & Primed
|
Details
|
|
|
06-15-2013
|
2.55
|
Drilled & Dimpled Aft Z Angle
|
Details
|
|
|
06-14-2013
|
2.20
|
Fabricated -08 clips and Fitted Aft Z Angle Parts
|
Details
|
|
|
06-12-2013
|
1.00
|
Gathered Parts for WIX-F16 - Z Angle
|
Details
|
|
|
06-11-2013
|
0.50
|
Made Bends in Lower Firewall
|
Details
|
|
|
06-10-2013
|
1.50
|
Fitted and Pilot Drilled Windshield Strap to Upper
|
Details
|
|
|
06-09-2013
|
1.25
|
Attached Filler Box to Upper Firewall Former
|
Details
|
|
|
06-08-2013
|
1.50
|
Bent Main Filler Box, Drilled and Riveted Assembly
|
Details
|
|
|
06-07-2013
|
1.25
|
Bent Firewall Filler Box
|
Details
|
|
|
05-30-2013
|
1.10
|
Finished F17 Clips, Began Marking Bends for Filler
|
Details
|
|
|
05-29-2013
|
1.00
|
Continued Making Gusset Plates
|
Details
|
|
|
05-28-2013
|
1.00
|
Started Fabricating Firewall Assembly Parts
|
Details
|
|
|
05-27-2013
|
1.50
|
Organized & Gathered Parts for Firewall
|
Details
|
|
|
05-21-2013
|
1.75
|
Cleaned and Primed LH Fuse. Panel Parts
|
Details
|
|
|
05-20-2013
|
1.00
|
Disassembled and Deburred LH Panel Parts
|
Details
|
|
|
05-19-2013
|
2.75
|
Finished Pilot Drilling LH Panel Parts & Updrilled
|
Details
|
|
|
05-18-2013
|
1.50
|
Continued Pilot Drilling LH Panel Parts
|
Details
|
|
|
05-12-2013
|
0.75
|
Continued Pilot Drilling LH Panel Parts to Skin
|
Details
|
|
|
05-11-2013
|
1.75
|
Started Pilot Drilling LH Side Panel
|
Details
|
|
|
05-09-2013
|
1.25
|
Installed Bolts in RH Panel
|
Details
|
|
|
05-08-2013
|
1.50
|
Riveted RH Side Panel
|
Details
|
|
|
05-07-2013
|
0.90
|
Clecoed RH Side Panel - Ready for Riveting
|
Details
|
|
|
05-06-2013
|
2.00
|
Deburred, Cleaned & Primed RH Side Panel Parts
|
Details
|
|
|
05-05-2013
|
3.50
|
Updrilled, Disassembled and Began Deburring RH Sid
|
Details
|
|
|
05-04-2013
|
2.00
|
Fitted and Drilled Gussets and Gear Support Struct
|
Details
|
|
|
05-02-2013
|
1.50
|
Continued RH Side Panel Buildup
|
Details
|
|
|
05-01-2013
|
1.50
|
Continued Pilot Drilling RH Side Panel Parts
|
Details
|
|
|
04-30-2013
|
2.00
|
Began Pilot Drilling RH FWD Fuselage Side Panel
|
Details
|
|
|
04-29-2013
|
1.00
|
Organized Parts for FWD Side Panel Buildup
|
Details
|
|
|
04-28-2013
|
3.00
|
Fabricated Upper Longeron Assemblies
|
Details
|
|
|
04-18-2013
|
1.25
|
Fabricated Cowling Attach Hinge and Firewall Angle
|
Details
|
|
|
04-17-2013
|
1.00
|
Continuing Misc FWD Fuselage Parts
|
Details
|
|
|
04-16-2013
|
2.00
|
Fabricating Misc Fwd Fuselage Parts
|
Details
|
|
|
04-15-2013
|
1.50
|
Fabricated -06 Angle Clips
|
Details
|
|
|
04-01-2013
|
1.70
|
Finished Flap Drive Tube Support
|
Details
|
|
|
03-31-2013
|
2.00
|
Making Parts For The FWD Side Walls
|
Details
|
|
|
03-30-2013
|
3.00
|
Installed Upper FWD Longeron Bolts & Riveted Cross
|
Details
|
|
|
03-29-2013
|
3.00
|
Riveted Remaining Formers & Turtle Deck Skin
|
Details
|
|
|
03-28-2013
|
2.75
|
Reassembled and Began Riveting Turtle Deck
|
Details
|
|
|
03-27-2013
|
2.00
|
Primed Turtle Deck Parts & Mating Surfaces
|
Details
|
|
|
03-26-2013
|
1.00
|
Continued Deburring & Tweaking Parts
|
Details
|
|
|
03-25-2013
|
1.00
|
Deburring Turtle Deck Parts
|
Details
|
|
|
03-24-2013
|
4.80
|
Fitted and Drilled #2 & 3 Formers and Updrilled Tu
|
Details
|
|
|
03-23-2013
|
2.20
|
Fitted LH & RH Attach Plates & Splice Plate
|
Details
|
|
|
03-22-2013
|
0.80
|
Fitted & Pilot Drilled LH & RH #1 Formers
|
Details
|
|
|
03-21-2013
|
2.10
|
Pilot Drilled Turtle Deck Skin & Fitted #5 Former
|
Details
|
|
|
03-20-2013
|
2.00
|
Riveted Turtle Deck Spline
|
Details
|
|
|
03-19-2013
|
1.80
|
Fitting & Drilling Turtle Deck Skin at Spline
|
Details
|
|
|
03-19-2013
|
0.50
|
Discovered Incorrect Cut Out Placement on Turtle D
|
Details
|
|
|
03-18-2013
|
1.20
|
Fitted,Drilled, & Primed Turtle Deck Spline
|
Details
|
|
|
03-17-2013
|
3.50
|
Fabricating Turtle Deck Parts
|
Details
|
|
|
03-16-2013
|
2.35
|
Started Gathering Parts for Turtle Deck Installati
|
Details
|
|
|
03-16-2013
|
0.75
|
Installed FWD Cross Tie Box Bolts
|
Details
|
|
|
03-15-2013
|
2.35
|
Finished Riveting Aft Lower Fuselage
|
Details
|
|
|
03-14-2013
|
1.80
|
Installing Rivets & Bolts in Tail Section of Aft F
|
Details
|
|
|
03-13-2013
|
1.90
|
Reassembling, Dimpling, & Riveting Aft Fuselage
|
Details
|
|
|
03-12-2013
|
2.00
|
Cleaned, Preped, & Primed Aft Fuselage Parts
|
Details
|
|
|
03-11-2013
|
2.25
|
Finished Deburring Aft Fuselage and Parts
|
Details
|
|
|
03-10-2013
|
3.20
|
Finished Updrilling, Started Disassembly, & Deburr
|
Details
|
|
|
02-28-2013
|
1.50
|
Up Drilled Aft Fuselage Components
|
Details
|
|
|
02-28-2013
|
2.00
|
Continued Updrilling Aft Fuselage Components
|
Details
|
|
|
02-27-2013
|
1.90
|
Finished Fitting & Pilot Drilling Aft Fuselage
|
Details
|
|
|
02-26-2013
|
1.50
|
Fitted & Drilled Aft Mount Assemblies & Aft Shear
|
Details
|
|
|
02-25-2013
|
2.00
|
Fitting & Drilliing "Y"Tail Structure
|
Details
|
|
|
02-24-2013
|
3.00
|
Fitted & Drilled Lower Cross Ties, Mixer Sturcture
|
Details
|
|
|
02-23-2013
|
3.00
|
Fitting & Drilling Lower Skin
|
Details
|
|
|
02-22-2013
|
0.00
|
New Right Angle Drill Arrived Today!
|
Details
|
|
|
02-15-2013
|
2.50
|
Fitting Aft Fuselage Components
|
Details
|
|
|
02-13-2013
|
1.90
|
Started Test Fitting Aft Fuselage Panels and Parts
|
Details
|
|
|
02-12-2013
|
2.00
|
Assembled "Y" Tail Structure
|
Details
|
|
|
02-11-2013
|
2.10
|
Updrilled, Deburred, Cleaned & Primed "Y" Tail Str
|
Details
|
|
|
02-10-2013
|
1.50
|
Fitted & Drilled Remaining "Y" Tail Components
|
Details
|
|
|
02-04-2013
|
1.75
|
BeganDrilling "Y" Tail Structure
|
Details
|
|
|
02-03-2013
|
3.75
|
Cutting, Laying Out & Drilling Channel
|
Details
|
|
|
02-02-2013
|
2.00
|
Make Aft Shear Web & Review Plans F22
|
Details
|
|
|
01-30-2013
|
2.20
|
Assembled LH & RH Mount Assemblies
|
Details
|
|
|
01-29-2013
|
1.50
|
Bending F23 Parts & Fitting RH Mount Assembly
|
Details
|
|
|
01-28-2013
|
1.20
|
Installed 3L Vertical Channel & Bent "Y" Tail Moun
|
Details
|
|
|
01-27-2013
|
4.25
|
Finished Cross Ties & Began Tail Mount Plans Sheet
|
Details
|
|
|
01-26-2013
|
3.00
|
Riveted Cross Tie Box and Fabricated Cross Ties
|
Details
|
|
|
01-25-2013
|
1.50
|
Fitted and Drilled Cross Tie Box
|
Details
|
|
|
01-22-2013
|
2.50
|
Riveted Aft Fuselage Mixer Mount Assemblies
|
Details
|
|
|
01-21-2013
|
1.20
|
Fitted & Updilled Remaining Mixer Mount Parts
|
Details
|
|
|
01-20-2013
|
3.50
|
Cut, Drill & Layout Mixer Structure
|
Details
|
|
|
01-19-2013
|
2.50
|
Studied Plans & Began making F25 Mixer Structure P
|
Details
|
|
|
01-18-2013
|
1.00
|
Riveted LH Aft Fuselage
|
Details
|
|
|
01-14-2013
|
1.00
|
Primed LH Aft Fuselage Parts
|
Details
|
|
|
01-13-2013
|
4.00
|
Updrilled LH Aft Fusleage Structure, Deburred and
|
Details
|
|
|
01-12-2013
|
2.90
|
Positioned & Pilot Drilled Aft Fuselage Structure
|
Details
|
|
|
01-09-2013
|
2.00
|
Finished Priming & Riveted RT Aft Fuselage Structu
|
Details
|
|
|
01-08-2013
|
3.00
|
Finished Deburring & Prepped for Prime
|
Details
|
|
|
01-06-2013
|
7.00
|
Fitted and Drilled Rt Aft Fuselage Skin
|
Details
|
|
|
01-04-2013
|
2.00
|
Bent FWD Edge of AFT Fuselage Skins
|
Details
|
|
|
01-01-2013
|
6.20
|
Made F27 Parts & Layed Out Fuselage Skin Holes
|
Details
|
|
|
12-30-2012
|
3.25
|
Finished Aft Verticals & Cut F27 Longerons
|
Details
|
|
|
12-28-2012
|
2.00
|
Asembled New Band Saw
|
Details
|
|
|
12-27-2012
|
3.00
|
Fabricated Aft Z Channel & #5 Verticals
|
Details
|
|
|
12-26-2012
|
0.70
|
Finished Making Aft Vertical Channels
|
Details
|
|
|
12-23-2012
|
2.00
|
Continued Making Aft Vertical Channels
|
Details
|
|
|
12-21-2012
|
2.00
|
Installed New Plans Table
|
Details
|
|
|
12-21-2012
|
1.90
|
Cut Aft Fusleage Verticals
|
Details
|
|
|
12-19-2012
|
2.20
|
Primed & Assembled Pulleys & Drilled/Assembled Fai
|
Details
|
|
|
12-18-2012
|
1.20
|
Studied Plans, Gathered Parts, Assembled Pulley Br
|
Details
|
|
|
12-18-2012
|
1.00
|
Minor Finish Work On Stabilators & Test Fitting
|
Details
|
|
|
12-17-2012
|
2.20
|
Piloted, Updrilled and Riveted Lower LH Stab Skin
|
Details
|
|
|
12-16-2012
|
8.00
|
Riveted LH Stabilator Structure & Drilled Top Skin
|
Details
|
|
|
12-13-2012
|
1.00
|
Deburred and Primed LT Stab Front Spar Buildup
|
Details
|
|
|
12-09-2012
|
7.50
|
Finished Riveting RT Stabilator, Cut Drilled Stab
|
Details
|
|
|
12-06-2012
|
1.50
|
Riveted Rt Stab Structure, Drilled Upper Stab Skin
|
Details
|
|
|
12-05-2012
|
2.15
|
Cleaned & Preped RT Stab Structure for Prime
|
Details
|
|
|
11-28-2012
|
2.25
|
Clamped RT Stab Frame, Squared, and Drilled Pilot
|
Details
|
|
|
11-27-2012
|
1.25
|
Drilled Inboard Leading Edge Rib and primed FWD Sp
|
Details
|
|
|
11-26-2012
|
1.75
|
Drilled and Deburred Rt FWD Stabilator Spar
|
Details
|
|
|
11-04-2012
|
2.00
|
Finished Stabilator Parts
|
Details
|
|
|
10-25-2012
|
1.00
|
Continuing with Stabilator Ribs
|
Details
|
|
|
10-22-2012
|
2.00
|
Riveted Rudder & Started Stabilator Ribs
|
Details
|
|
|
10-19-2012
|
2.50
|
Rivet Layout, Drilling & Deburring of Rudder Assy.
|
Details
|
|
|
10-16-2012
|
1.50
|
Cut Rudder Control Suface to Size
|
Details
|
|
|
10-15-2012
|
2.00
|
Cut Stabilator Ribs & Spars
|
Details
|
|
|
10-14-2012
|
4.00
|
Organized Hardware Kits
|
Details
|
|
|
10-11-2012
|
1.50
|
Fitted and Drilled Rudder Drive Horn Brackets
|
Details
|
|
|
10-04-2012
|
1.00
|
Organizing & Ordering Hardware Kits
|
Details
|
|
|
10-04-2012
|
1.50
|
Fabricated First Part & Gathered Components for Ru
|
Details
|
|
|
10-02-2012
|
0.50
|
Started Reviewing the Plans
|
Details
|
|
|
10-02-2012
|
3.00
|
Kit Arrived
|
Details
|
|
|
10-02-2012
|
1.50
|
Completed Bending Brake
|
Details
|
|
|
09-30-2012
|
1.00
|
Assembled New Drill Press
|
Details
|
|
|
09-24-2012
|
0.00
|
Purchasing the Kit
|
Details
|
|
|
09-23-2012
|
4.00
|
Fabricated Bending Brake Parts
|
Details
|
|
|
09-17-2012
|
0.10
|
Background
|
Details
|
|
|
09-16-2012
|
4.00
|
Air Compressor & Vise Installation
|
Details
|
|