Powered By Kitlog Pro v2.0
Hans Marchners Web Site
Savannah S
All
Work Logs Found:
81
Category Work Time:
709 Hours
Date
Hours
Work Log Summary
Details
10-04-2014
2.00
Ready for the final inspection
Details
10-03-2014
2.00
Propeller installation and control
Details
10-01-2014
6.00
Pitot tube and landing light
Details
09-23-2014
4.00
Roof and windows etc
Details
09-22-2014
5.00
Wings attachment and controls
Details
09-21-2014
5.00
Painting 6, Stripes
Details
09-12-2014
20.00
Painting 5, the fuselage
Details
09-09-2014
10.00
Painting 4
Details
09-04-2014
40.00
Painting 3
Details
08-25-2014
40.00
Painting 2
Details
08-04-2014
60.00
Painting 1, preparation
Details
07-23-2014
0.50
First engine run
Details
07-18-2014
10.00
Radio and Transponder installation
Details
06-04-2014
50.00
Purging of lubrication system
Details
05-06-2014
10.00
EFIS & GPS installation
Details
04-19-2014
3.00
Engine cowling
Details
04-17-2014
12.00
Airbox installation
Details
04-15-2014
10.00
Throttle and cables assembly
Details
04-08-2014
5.00
Wiring engine electric plant 2
Details
03-13-2014
10.00
Wiring engine electric plant 1
Details
03-02-2014
5.00
Oil cooling system
Details
02-28-2014
8.00
Water cooling system
Details
02-22-2014
6.00
Motor installation 2
Details
02-21-2014
10.00
Motor installation 1
Details
12-21-2013
0.20
Christmas
Details
12-18-2013
4.00
Doors 3
Details
12-15-2013
1.00
Sealing of firewall
Details
12-12-2013
4.00
Wiring 3
Details
11-25-2013
10.00
wiring 2
Details
11-20-2013
5.00
Trim wiring
Details
11-15-2013
10.00
Wiring 1
Details
10-15-2013
5.00
Cabin heating system
Details
10-10-2013
10.00
Brakes and tubes assembly
Details
10-08-2013
5.00
Engine mount
Details
09-18-2013
5.00
Fuel reservoir and fuel lines
Details
09-15-2013
5.00
Main wheels and spring
Details
09-05-2013
5.00
Forward wheel and gear
Details
08-27-2013
4.00
Control column
Details
08-25-2013
15.00
Flaperon control
Details
08-24-2013
5.00
Pedal and rudder control
Details
08-18-2013
4.00
Cockpit 2
Details
08-17-2013
5.00
Pedal and brakes
Details
06-19-2013
5.00
Cockpit 1
Details
06-10-2013
5.00
Firewall and cabin frame 2
Details
06-05-2013
10.00
Firewall and cabin frame 1
Details
05-15-2013
10.00
Front fuselage assembly
Details
04-27-2013
5.00
Rear fuselage assembly 2
Details
04-23-2013
10.00
Rear fuselage assembly 1
Details
04-17-2013
3.00
Rear frame work
Details
04-13-2013
5.00
Assembly of flaperons control
Details
04-10-2013
3.00
assembly of doors 2
Details
04-09-2013
3.00
Assembly of doors 1
Details
03-29-2013
1.00
Solid rivetting
Details
03-25-2013
3.00
Left wing tip
Details
03-23-2013
5.00
Left wing strobe attachment
Details
03-22-2013
2.00
Left wing fuel system 2
Details
03-22-2013
5.00
Left wing attchments
Details
03-21-2013
10.00
Left wing fuel system 1
Details
03-15-2013
10.00
Left wing
Details
03-14-2013
10.00
right wing fuel system 2
Details
03-14-2013
10.00
Right wing fuel system 1
Details
03-12-2013
5.00
r wing Strobe light
Details
03-06-2013
5.00
Right wings skin
Details
02-05-2013
5.00
Right wing frame
Details
01-25-2013
4.00
Fin tip and strobe
Details
01-19-2013
5.00
Flaperons (ailerons and flaps)
Details
01-13-2013
5.00
elevator and stabiliser wing tips
Details
01-11-2013
4.00
Elevator trim assembly 2
Details
01-10-2013
3.00
Elevator trim assembly 1
01-08-2013
5.00
Elevator assembly 2
Details
01-07-2013
5.00
Stabiliser assemley 2
Details
12-28-2012
5.00
Elevator assembly 1
Details
12-27-2012
5.00
Stabiliser assembly 1
Details
12-24-2012
5.00
Rudder assembly
Details
12-13-2012
1.00
Fin assembly2
Details
12-13-2012
5.00
Fin Assembly1
Details
12-05-2012
10.00
Inventory
Details
10-23-2012
20.00
License to Build "Amatörbyggnadstillstånd"
Details
10-16-2012
20.00
Building a workbench
Details
09-01-2012
1.00
Kitlog pro software
Details
07-14-2012
40.00
Preparation of the garage
Details
SITE NAVIGATION
Contact Builder
Savannah S Home
Category
# Logs
# Hours
All
81
709
Avionics
2
20
Engine
11
120
Fuselage
28
165
Miscellaneous
6
92
None
1
1
Paint
6
175
Prop
1
2
Wings
26
134
Copyright © 2001-2024 Matronics. All Rights Reserved.