My RV-8 Project
Work Logs Found: 239
Category Work Time: 854 Hours
 Date
Hours
Work Log Summary

Details

 03-01-2014
4.00
Rear throttle and matching panel
Details
       

 02-28-2014
8.00
Setting toe
Details
       

 02-27-2014
3.00
Weight and Balance day
Details
       

 02-26-2014
3.00
Pitot/static/transponder test day
Details
       

 02-24-2014
5.00
wing hinge pin secured
Details
     

 02-23-2014
6.00
Intersection fairings
Details
       

 02-22-2014
6.00
wing root fairings
       

 01-15-2014
2.00
Fit the spinner on Scott
Details
     

 01-14-2014
2.00
Plenum lid
Details
       

 01-12-2014
2.00
Spark plug wire routing
Details
       

 01-11-2014
4.00
Wheel pants day 4
Details
       

 01-10-2014
3.00
Wheel pants day 3
Details
       

 01-10-2014
3.00
Girl in back right side panel
Details
       

 01-10-2014
2.00
Bottom baffle safety wiring
Details
       

 01-09-2014
7.00
Wheel pants day 2
Details
       

 01-08-2014
6.00
Wheel pants day 1
Details
       

 01-06-2014
4.00
Windscreen fiberglass day 5
Details
       

 01-06-2014
2.00
Cowl fiberglass day
Details
       

 01-04-2014
4.00
Windscreen fiberglass day 4
Details
       

 01-01-2014
3.00
Windscreen fiberglass day 3
Details
       

 12-31-2013
3.00
Upper Cowl Pin access
Details
       

 12-30-2013
5.00
Oil door day 4
Details
       

 12-29-2013
5.00
Oil door day 3
Details
       

 12-28-2013
1.00
Crankcase evacutation valve
Details
       

 12-27-2013
1.00
Elevator trim connector
Details
       

 12-22-2013
3.00
GTN650 GPS Antenna
Details
       

 12-22-2013
1.00
Engine ground
Details
       

 12-22-2013
6.00
Air Oil Separator install and G3X GPS antenna
Details
       

 12-21-2013
4.00
Windscreen fiberglass day 2
Details
       

 12-20-2013
3.00
Windscreen fiberglass
Details
       

 12-18-2013
4.00
Final panel install, and defroster
Details
       

 12-15-2013
3.00
Vetterman exhaust hangers
Details
       

 12-14-2013
1.00
Reversed the fuel feed on the Bendix
Details
       

 12-13-2013
4.00
Installed gear brake lines...filled system
Details
       

 12-11-2013
5.00
Installed red cube, spider and stainless lines
Details
       

 12-09-2013
3.00
Installed rudder pedals and brake lines
Details
       

 12-07-2013
3.00
Finished installing alternator
Details
       

 12-04-2013
4.00
Pmag wiring...part 2
Details
       

 12-02-2013
8.00
Intake install day 3
Details
       

 11-30-2013
2.00
Baggage door support
Details
       

 11-27-2013
5.00
Intake install day 2
Details
       

 11-23-2013
6.00
Intake install day 1
Details
       

 11-20-2013
4.00
Wired Pmags and Pressure Transducers
Details
       

 11-16-2013
3.00
Plenum day 5
Details
       

 11-13-2013
4.00
Oil cooler mount
Details
       

 11-11-2013
5.00
Baggage door day 4
Details
       

 11-09-2013
4.00
Baggage door day 3
Details
       

 11-06-2013
4.00
Baggage door day 2
Details
       

 11-04-2013
4.00
Baggage door day 1
Details
       

 11-02-2013
5.00
Plenum day 3
Details
       

 11-01-2013
5.00
Plenum day 2
Details
       

 10-29-2013
4.00
Plenum day 1
Details
       

 10-28-2013
5.00
Baffles day 5
Details
       

 10-23-2013
4.00
Baffles day 4
Details
       

 10-20-2013
4.00
Baffles day 3
Details
       

 10-19-2013
4.00
Baffles day 2
Details
       

 10-16-2013
5.00
Baffles day 1
Details
       

 10-13-2013
6.00
Cowl Day 5
Details
       

 10-12-2013
5.00
Cowl Day 4
Details
       

 10-09-2013
5.00
Cowl Day 3
Details
       

 10-06-2013
5.00
Cowl Day 2
Details
       

 10-05-2013
7.00
Cowl Day 1
Details
       

 09-25-2013
6.00
Forward Top Skin
Details
       

 09-08-2013
7.00
Throttle quadrant
Details
       

 09-07-2013
3.00
Mixture control bracket
Details
       

 09-06-2013
4.00
Throttle cable bracket
Details
       

 09-05-2013
3.00
Installed left foot panel
Details
       

 09-04-2013
4.00
Installed Mountain High oxygen system
Details
       

 08-30-2013
3.00
Added 12v socket for pilot and panel strip light
Details
       

 08-20-2013
3.00
Heater and Oil Cooler control cables
Details
       

 08-16-2013
3.00
Installed Voltage regulator
Details
       

 08-09-2013
5.00
G3X Config
Details
       

 08-03-2013
3.00
More engine wiring
Details
       

 07-31-2013
3.00
FWF wiring
Details
       

 07-29-2013
2.00
Pmag install
Details
       

 07-23-2013
1.00
Governor line
Details
       

 07-22-2013
3.00
Installed Jihostrag governor for whirlwind prop
Details
       

 07-17-2013
8.00
Installed G3X screens and did a LOT of config
Details
     

 07-05-2013
3.00
Installed the GTN650!
Details
     

 06-29-2013
2.00
Vetterman Exhaust installed
Details
       

 06-07-2013
3.00
Pulling a jug!
Details
       

 05-25-2013
2.00
Transported engine to hanger and HUNG IT
Details
       

 05-24-2013
4.00
Engine assembly day 3
Details
       

 05-23-2013
3.00
Engine assembly day 2
Details
       

 05-22-2013
3.00
Engine assembly day one
Details
       

 05-08-2013
3.00
More empennage fiberglass
Details
       

 05-07-2013
4.00
Empennage Fiberglass
Details
       

 05-03-2013
6.00
Painted engine case, pushrod tubes and sump
Details
       

 05-01-2013
10.00
Bolted and wheels installed
Details
       

 04-30-2013
5.00
Left Grove Gear Leg and Brake Line
Details
       

 04-29-2013
5.00
Right Grove Gear Leg and Brake Line
Details
       

 04-27-2013
5.00
Moved to Airport!
Details
       

 04-22-2013
3.00
AOA display
Details
       

 04-21-2013
1.00
Canopy Skirt day 13
Details
       

 04-20-2013
2.00
Drilled Canopy frame for rollers
Details
       

 04-19-2013
4.00
Canopy Skirt Sikaflexed to canopy!
Details
       

 04-18-2013
3.00
Canopy Skirt day 11
Details
       

 04-17-2013
2.00
Glare shield vinyl and defroster
Details
       

 04-17-2013
4.00
Empennage glass day 2
Details
       

 04-17-2013
3.00
Canopy Skirt day 10
Details
       

 04-16-2013
3.00
Canopy Skirt day 9
Details
       

 04-15-2013
4.00
Empennage glass
Details
       

 04-15-2013
4.00
Canopy Skirt day 8
Details
       

 04-14-2013
2.00
GPS penetration, G3X screen wires
Details
       

 04-13-2013
6.00
Canopy Skirt day 7
Details
       

 04-12-2013
6.00
Canopy Skirt days 5&6
Details
       

 04-09-2013
6.00
Canopy Skirt day 4
Details
       

 04-08-2013
5.00
Canopy Skirt day 3
Details
       

 04-07-2013
6.00
Canopy Skirt day 2
Details
       

 04-06-2013
5.00
Canopy Skirt day 1
Details
       

 04-05-2013
1.00
Engine Mount Continued
Details
     

 04-04-2013
2.00
Firewall Penetration
Details
       

 04-02-2013
4.00
Fuel pump cover
Details
       

 04-02-2013
0.50
Engine Mount
Details
     

 04-01-2013
0.50
Off the rotisserie!
Details
       

 03-31-2013
4.00
Sikaflex day
Details
       

 03-26-2013
3.00
Rear seat heater
Details
       

 03-25-2013
3.00
Front seat heater
Details
       

 03-20-2013
4.00
Extra switches part 2
Details
     

 03-17-2013
3.00
Sikaflex....startstop
Details
     

 03-11-2013
1.00
Extra switches
Details
       

 03-10-2013
1.00
Rudder pedal extensions
Details
       

 03-10-2013
2.00
Rudder cable covers
Details
       

 03-10-2013
1.00
Added individual brake reservoirs
Details
       

 03-09-2013
4.00
The big cut
Details
       

 03-08-2013
3.00
Harness Lacing
Details
       

 03-08-2013
2.00
CO Guardian 452 Remote installed
Details
       

 03-05-2013
12.00
Canopy cutting...and cutting
Details
       

 02-25-2013
2.00
The Canopy work begins
Details
       

 02-24-2013
3.00
Canopy frame fit..
Details
       

 02-23-2013
1.00
VPX - It's alive!
Details
       

 02-23-2013
1.00
PAR100ex test
Details
     

 02-22-2013
2.00
Battery ground
Details
       

 02-20-2013
0.00
Canopy has arrived
Details
     

 02-20-2013
4.00
Battery and solenoids
Details
       

 02-18-2013
1.00
Stripped accessory case and baffles
Details
     

 02-18-2013
3.00
RG-400 and rewire PAR100ex
Details
       

 02-18-2013
2.00
Panel Pitot and Static
Details
       

 02-17-2013
8.00
GSU73 ADAHARS connector
Details
       

 02-15-2013
4.00
Flap mechanism cover
Details
       

 02-15-2013
4.00
Battery access hatch
Details
       

 02-14-2013
5.00
Grove Gear Test fit
Details
       

 02-13-2013
4.00
Do it all over day....
Details
     

 02-12-2013
8.00
Fuselage side rails, windscreen hoop and canopy ra
Details
       

 02-11-2013
4.00
Lighting Conroller installed
Details
       

 02-10-2013
5.00
Center slide built and installed
Details
       

 02-09-2013
3.00
AFS AOA Sport box installed
Details
       

 02-05-2013
1.00
Pitot/Static lines through the panel
Details
       

 02-05-2013
2.00
Panel terminal strip
Details
       

 02-04-2013
1.00
Riveted panel surround to the fuselage
Details
       

 02-02-2013
1.00
Wired Dynon D6 and installed its battery
Details
       

 02-01-2013
5.00
Left wing flap
Details
     

 01-31-2013
2.00
Panel ground point
Details
       

 01-30-2013
2.00
Wired the EI Commander
Details
       

 01-30-2013
6.00
Right wing flap
Details
       

 01-30-2013
3.00
bulkhead fitting for vent scat tube
Details
       

 01-29-2013
3.00
Wing skin victory roll
Details
     

 01-29-2013
4.00
TCW backup batter installed
Details
       

 01-28-2013
9.00
Right wing bottom skin
Details
       

 01-28-2013
2.00
GSU73 Connector J731 complete
Details
       

 01-27-2013
4.00
Radio stack is finished
Details
       

 01-26-2013
1.00
GTN650 P1004 connector completed
Details
     

 01-25-2013
4.00
Wired Par100ex
       

 01-25-2013
2.00
I bought an engine
Details
     

 01-25-2013
2.00
Finished GTN650 P1003 connector
Details
     

 01-24-2013
2.00
Mounted and wired PAR100ex remote radio
       

 01-23-2013
3.00
Started radio stack wiring
Details

 01-22-2013
3.00
Ran some wiring today
Details
       

 01-22-2013
2.00
Adahars and remote radio tray
       

 01-21-2013
3.00
Rear access panel
Details
     

 01-20-2013
7.00
Radio stack part deux
Details
       

 01-19-2013
4.00
Radio stack
Details
       

 01-17-2013
6.00
Finished wiring switch panel
Details
       

 01-12-2013
6.00
Wiring switch bank
Details
       

 12-31-2012
3.00
Wired Infinity connectors
Details
       

 12-19-2012
4.00
Headset Jacks and Ipod jack for GIB
Details
       

 12-12-2012
3.00
Wired the Infinity grip
Details
     

 12-08-2012
2.00
Finished up GTX23es remote transponder
Details
       

 12-05-2012
1.00
Installed the keep alive fuse block
Details
     

 12-04-2012
1.00
GTX23es Remote transponder wiring
Details
     

 12-02-2012
2.00
Safe Air Ports and connections
Details
       

 12-02-2012
2.00
Final magnetometer mount
Details
       

 12-01-2012
4.00
Landing gear tower modification
Details
       

 11-30-2012
4.00
Panel assembly
Details
       

 11-29-2012
5.00
Instrument test fit and dynon flush mount mod
Details
       

 11-28-2012
0.00
The Panel has arrived!
Details
       

 11-28-2012
3.00
Moved gear tower support
Details
       

 11-27-2012
4.00
Various small wiring details and SafeAir static po
Details
       

 11-26-2012
4.00
Install GX Pilot Pitch Servo
Details
       

 11-25-2012
3.00
GX Pilot Roll Servo
Details
       

 11-24-2012
2.00
Magnetometers mounted
Details
       

 11-20-2012
3.00
Magnetometer mount
Details
       

 11-11-2012
3.00
Ran VPX-Pro main power line, cleaned up bundling
Details
       

 11-10-2012
3.00
AFS AOA wing kit
Details
       

 11-08-2012
2.00
Built Magnetometer shelf in fuselage
Details
       

 11-07-2012
2.00
Battery hold down
Details
       

 11-06-2012
6.00
GIB 12v sockets and terminal strip wiring
Details
       

 11-05-2012
5.00
Do-over day.
Details
       

 11-03-2012
8.00
Cockpit rail and front seat back support
Details
       

 11-01-2012
3.00
Painted assembled and started wiring switch consol
Details
       

 10-30-2012
3.00
Routed wiring bundles and zip tied
Details
       

 10-29-2012
2.00
Built the VPX-pro J2 connector
Details
       

 10-27-2012
5.00
Built VPX J1 and started running wires
Details
       

 10-26-2012
4.00
Wired J8, J10 and J12 on Vertical power
Details
       

 10-24-2012
3.00
Finalized panel plan
Details
     

 10-18-2012
2.00
Rockrack switches
Details
       

 10-17-2012
4.00
Switch console
Details
       

 10-14-2012
5.00
Forward fuselage skin
Details
       

 10-14-2012
3.00
Forward baggage door hinge support and side suppor
Details
       

 10-13-2012
4.00
Infinity Grip Install
Details
       

 10-12-2012
3.00
POS12 Flap position sensor
Details
       

 10-08-2012
5.00
Panel and switch layout
Details
       

 10-06-2012
3.00
Ran wiring for flap motor and finished panel struc
Details
       

 10-01-2012
2.00
Panel fit and firewall bend
Details
       

 09-29-2012
4.00
Andair fuel pump
Details
       

 09-28-2012
5.00
Vertical Power is bolted in!
Details
       

 07-09-2012
4.00
Throttle/Mixture cables, rear throttle linkage, fu
Details
       

 07-06-2012
4.00
Installed HID lights in wings
Details
       

 07-04-2012
4.00
Rear Seat back and ground for Whelen shielded line
Details
       

 07-04-2012
5.00
Andair fuel selector valve
Details
       

 06-28-2012
3.00
Pilot seat
Details
       

 06-25-2012
3.00
Pitch AutoPilot and Rear seat throttle
Details
       

 06-22-2012
5.00
Interior paint day
Details
       

 06-21-2012
2.00
Whelen Power supply mounted
Details
     

 06-20-2012
5.00
Wiring day
Details
       

 06-18-2012
3.00
Wing wiring
Details
       

 06-17-2012
1.00
Installed Dynon Autopilot Servo
Details
     

 06-15-2012
1.00
Disassembled for interior paint
Details
     

 06-14-2012
2.00
Installed ELT
Details
       

 06-13-2012
2.00
Installed electric roll trim
Details
     

 06-09-2012
4.00
Finished trim tab and pitch trim
Details
       

 06-07-2012
3.00
Lower rudder fiberglass work
Details
       

 06-04-2012
2.00
Assembled rear seat floor skins
Details
     

 05-31-2012
0.00
New rivet finder comes home
Details
     

 05-26-2012
9.00
Nut plate day
Details
       

 05-26-2012
1.00
More nutplates
Details
     

 05-25-2012
6.00
Cabin Details
Details
       

 05-23-2012
2.00
Built rotisserie for fuselage out of engine stand
Details
       

 05-22-2012
0.00
Purchased KitLog Pro
Details