KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
Work Logs Found: 1925
Category Work Time: 3930 Hours
 Date
Hours
Work Log Summary

Details

 10-01-2023
2.00
Repaired a Leaks in the Leftt Tank 3rd Bay
Details
       

 10-01-2023
2.00
Repaired a Leaks in the Leftt Tank 3rd Bay
Details
       

 10-01-2023
0.00
Repaired a Leaks in the Leftt Tank 3rd Bay
Details
       

 02-01-2023
1.00
Replaced Left Tank Fuel Guardian Sensor
Details
       

 07-19-2022
3.00
Attached the Rear Spar Inboard Stiffeners
Details
       

 07-18-2022
4.00
Assembled and Drilled W-1007 C/D/E Doublers
Details

 07-17-2022
2.00
Riveted the Inboard Aileron Hinges together
Details

 07-15-2022
2.50
Assembled SB 16-03-28 for Inboard Hinge Bracket
Details

 07-09-2022
3.50
Riveted Ribs to Left Spar
Details

 07-08-2022
1.00
Inserted Bolt Hardware to the Ribs of the Left Spa
Details

 07-07-2022
2.50
Clecoed the Ribs to the Left Spar
Details

 07-06-2022
2.00
Riveted the Flap Hinges to the #3 and #8 Ribs
Details

 07-05-2022
10.00
Scuffed/Washed/Primed Ribs
Details

 06-24-2022
2.50
Attached Ribs to Left Spar, Drilled #12 Holes
Details

 06-23-2022
1.00
Deburred and Smoothed Left Spar Flap Hinge Bracket
Details

 06-21-2022
3.00
Drilled Torque Tube and Flap Brackets to Ribs
Details

 06-19-2022
1.50
Dimpled the lower flanges of the right spa ribs
Details

 06-17-2022
1.50
Dimpled lower flanges of the left spar ribs
Details

 06-16-2022
2.50
Deburred the edges of the ribs
Details

 06-15-2022
4.00
Finished Fluting all ribs
Details

 06-14-2022
1.00
Fluting W-1010 + 1011 + 1012 Ribs
Details

 06-13-2022
1.00
Separated and Processed W1029 C and W1029D
Details

 06-12-2022
0.00
Constructed a Wing Tank Cradle
Details

 06-10-2022
0.00
Removed the RV-8A Left Fuel Tank
Details

 06-09-2022
10.00
Started/Completed Right Spar Preparation
Details

 06-06-2022
2.50
Countersunk Holes on Left Spar Flanges
Details

 06-04-2022
4.00
Riveted the nutplates to the left spar flanges
Details

 06-02-2022
3.00
Drilled and Countersunk the Left Spar
Details

 06-01-2022
2.00
Fabricated the J-Channels for the Left Spar
Details

 05-31-2022
1.00
Reviewed Spar Plans
Details

 05-30-2022
1.00
Strart of the RV-14A Project
Details

 05-29-2015
1.00
Mid Cabin Fuselage Flooding
Details
       

 01-04-2015
0.50
Installed Rudder Cable Guides in Aft Fuselage
Details
       

 01-04-2015
4.00
Aft Fuselage Acccess Pnel Installatin
Details
       

 01-02-2015
4.00
Installed Fuel Pump Access Panel
Details
       

 12-22-2014
10.00
Engine Skipping
Details
     

 09-17-2014
1.50
Sanded the Awl Fair Around the Oil Door
Details

 09-17-2014
1.00
Re-Installed the Vertical Power Control Unit
Details

 09-15-2014
1.00
Filed the Nose Wheel Turn Limiter
Details

 09-13-2014
2.00
Fitting Oil Door to Cowling
Details
       

 09-12-2014
2.00
Fit Oil Door to Cowling
Details
       

 09-06-2014
1.00
Replaced the Left Tank Access Panel Cork Seal
Details

 09-04-2014
0.00
Engraved Identification Plate Shedding Black Areas
Details
     

 08-28-2014
2.50
Autopilot Testing
Details

 08-21-2014
2.40
Flew Up to Birmingham for Repairman Certificate
Details

 08-14-2014
2.00
Test Flight With 150# Pax
Details

 08-13-2014
1.00
Ken Curtis' First Flight
Details
       

 08-12-2014
1.00
Installed Electrical Terminals Cover
Details
     

 08-10-2014
1.00
Karen's Second Flight Over Penacola Beach
Details
       

 08-08-2014
1.00
Tom's Sunset First Flight Over Pensacola Beach
Details
       

 08-06-2014
1.00
Karen's First Flight in N988RV
Details
     

 08-03-2014
6.00
Sanded the Cowling and Squeeged Epoxy Layers
Details
       

 08-01-2014
5.50
Flew First Long Cross Country Flight
Details

 07-31-2014
2.50
Installed a Latch In the Oil Door
Details

 07-31-2014
1.00
First Passenger Flight with Tim
Details
     

 07-30-2014
2.00
Creating Cowling Oil Access Door
Details
       

 07-30-2014
3.50
Completed Phase I Flight Test Period
Details

 07-28-2014
3.00
Landing Peter Prince Airport (2R4)
Details

 07-27-2014
2.00
Back to Flight Testing After Engine Repair
Details

 07-26-2014
2.00
Mapped the ECU AFRs According to Instructions
Details

 07-25-2014
2.00
Attached the Propeller to the Engine
Details

 07-24-2014
2.00
Calibrated the SDS ECU to the Magnet Position
Details

 07-19-2014
3.00
PSRU Spline and PSRU Re-installed
Details
       

 07-16-2014
3.00
Re-Built Engine Back on the Aircraft
Details
       

 07-15-2014
1.00
Working on Main Wheel Fairings Leg Transitions
Details
       

 07-14-2014
4.00
Replacement Valve Spacers Received
Details

 07-14-2014
2.00
Installed a Cowl Flap Position Sensor
Details
       

 07-09-2014
3.00
Wet sanded the Cowl Flap and Nose Gear Fairings
Details
     

 07-08-2014
4.00
Sanded Cowl Flap and Nose Gear Fairings
Details
     

 07-07-2014
1.00
Covered Cowl Flap Exterior with Microballoons
Details
     

 07-06-2014
0.50
Sprayed UV Smooth Prime on the Cowling Halves
Details
       

 07-06-2014
4.00
More Wet Sanding of the Cowling
Details

 07-04-2014
4.00
Wet Sanded Cowling Epoxy Layers
Details
     

 07-04-2014
2.00
Engine Re-assembly Continues
Details
       

 07-03-2014
1.00
Installed New Valve Spacers and Measured Gaps
Details

 06-27-2014
3.00
Gears and Timing Chains Installed
Details
     

 06-27-2014
0.25
Converted Surface Corrosion on the Flywheel
Details
     

 06-27-2014
3.00
Aft Cover in Place
Details
       

 06-25-2014
2.00
Heads on Short Block
Details
       

 06-25-2014
0.00
Got the Heads Back From the Machine Shop
Details
     

 06-23-2014
0.00
Received the Replacement Short Block
Details
       

 06-23-2014
2.00
Brought the Heads In to be Machined
Details
       

 06-22-2014
6.00
Removed the Heads
Details
       

 06-21-2014
6.00
Disassembled the Engine
Details

 06-20-2014
5.00
Removed the Engine From the Aircraft
Details
       

 06-19-2014
2.00
Removed the PSRU
Details
       

 06-19-2014
0.25
PSRU Spline Removal From Flywheel Pilot Bearing
Details

 06-18-2014
3.00
Drained the Coolant and Oil
Details

 06-13-2014
1.00
Compression Testing of Engine
Details
       

 06-12-2014
0.00
Slow Loss of Oil Pressure
Details

 06-12-2014
0.00
Fuel Guardian Optical Low Fuel Alert System Test
Details

 06-09-2014
1.00
Takeoff/Departure Stall Demonstration
Details

 06-09-2014
3.00
Approach Into Atmore Airport
Details

 06-08-2014
2.00
Trimmed to Fit and Installed Main Wheel Fairings
Details
       

 06-07-2014
0.50
Replaced the VoiceFlight VAS Switch
Details
     

 06-05-2014
2.00
Images of ADS-BTraffic Displayed on EFIS
Details

 06-03-2014
0.00
Short Flight To Test Fairing Installation
Details

 06-02-2014
2.00
Installed the Nose Gear/Main Leg Fairings
Details
       

 06-01-2014
1.00
Flight Along Pensacola on a Nice Day
Details

 06-01-2014
1.00
Clean Stall Sppeed Determination
Details

 06-01-2014
2.00
Calibrated the Advanced Flight System AoA
Details

 05-30-2014
0.00
Cowl Flap Operates Well After Reinforcement
Details
       

 05-29-2014
0.00
Wrong Switch for VoiceFlight System
Details
     

 05-29-2014
1.00
Reinforced the Engine Cowl Flap
Details

 05-29-2014
0.00
Fuel Gaurdian PTT/Reset Button Not Working
Details

 05-29-2014
0.00
Advanced Flight System AoA Has No Audio
Details
     

 05-23-2014
0.00
NavWorx ADS-B In/Out GRT Display
Details
     

 05-22-2014
0.00
First Flight of N988RV
Details

 05-09-2014
1.00
Low and Medium Speed Taxi Testing Performed
Details

 05-07-2014
0.00
Flew 2.3 Hrs in Prep for Transition Training
Details

 05-06-2014
1.50
Angled the Dual GRT EFISs Upward
Details
       

 05-01-2014
0.00
Complete My BFR and PNFC Checkout
Details

 04-27-2014
2.00
Secured Interior Panels Post-Inspection
Details
       

 04-27-2014
1.00
Installed Wing Fuselage Gap Channel Seal
Details
       

 04-25-2014
0.00
Flew 1.0 hours in C-172P at PNFC
Details

 04-19-2014
2.00
Attached Tool Box to Fwd Baggage Comp. Floor
Details
       

 04-18-2014
2.00
Assembled the Van's Practice Toolbox
Details
       

 04-14-2014
0.00
N988RV Received Its Airworthiness Certificate
Details
     

 04-12-2014
2.00
Prepped and Inspected the Aircraft for Inspection
Details

 04-11-2014
1.00
Made Log Entries Needed for Inspection
Details

 04-11-2014
0.00
Engine Serial Number
Details
     

 04-11-2014
0.00
Documents Notarized for Airworthiness Inspection
Details

 04-11-2014
1.00
Checked ELT For Expiration Data
Details
       

 04-06-2014
0.50
Installed New Seattle Avionics Maps and Plates
Details
       

 04-01-2014
0.00
Sun 'n Fun through 4/6
Details
       

 03-31-2014
1.50
Installed Tank Brackets on Aft Baggage Lt Sidewall
Details
     

 03-20-2014
2.00
Installed Princeton Fuel Senders on Both Tanks
Details
       

 03-17-2014
2.00
Performed Compression and Leak Down Tests
Details

 03-11-2014
1.00
Taxi Tested Aircraft/Burned In The Brakes
Details

 03-10-2014
2.00
Completed Weighing the Aircraft
Details
       

 03-10-2014
0.00
Bottom Wing Skin Dent from Jack
Details
       

 03-08-2014
2.00
Fit the Cowl Flap/Adjusted Flap Linkages
Details
       

 03-07-2014
1.00
Installed the Cowl Flap Mechanism on Firewall
Details

 03-06-2014
2.00
Sanded the Interior Around the Glued NACA Vents
Details

 03-05-2014
1.00
Need to Change the Fuel Tanks Sender Units
Details

 03-05-2014
1.50
Glued the NACA Ducts to the Left Cowling Half
Details

 03-04-2014
3.00
Engine Intake NACA Openings Cut in Lt Cowl Half
Details
       

 03-03-2014
2.00
Planning Preparation for Engine Intake Inlets
Details

 03-01-2014
1.00
Glued a Stiffener in the Right Wing Tip
Details
     

 02-28-2014
2.00
Started the Pre-Airworthiness Inspection
Details

 02-28-2014
1.00
Attached the Left Wing Tip Fairing
Details
       

 02-27-2014
1.00
Installed the Tail Inspection Covers
Details

 02-25-2014
2.00
Finished Checklists/Setup the G430W & GTX 327
Details

 02-24-2014
2.00
Entered Checklists into the VP System
Details

 02-23-2014
2.00
Sanding Cowling/Avionics Setup
Details

 02-22-2014
2.00
Sanding Cowling/Avionics Setup
Details

 02-20-2014
1.50
Sanding Cowling/Avionics Setup
Details

 02-18-2014
2.00
Worked on Setup/Programming of the Avionics
Details

 02-17-2014
1.00
Secured and Marked Wing to Fuselage Fuel Lines
Details

 02-15-2014
3.00
Tested Fuel System In Nose Down and Up Positions
Details
       

 02-15-2014
0.00
Tested Fuel System In Nose Down and Up Position
Details
       

 02-14-2014
1.00
Fabricated Wing Jacking Point Fittings
Details
       

 02-13-2014
0.50
Awl Fair to Part of Left Cowling
Details
       

 02-13-2014
2.00
Awl Fair Applied to Right Cowling Half
       

 02-11-2014
2.00
Tested Fuel Flow in the Level Position
Details

 02-10-2014
0.50
Registration Number Applied to the Tail
Details
       

 02-10-2014
0.25
Mounted the Aircraft Data Plate
Details
     

 02-10-2014
0.00
Installed Newly Engraved Fuel Caps
Details
     

 02-10-2014
0.25
Installed an Extra Data Plate on Last Cabin Bulkhe
Details
       

 02-08-2014
0.00
Results of Newsgroups Opinions About Gear Chatter
Details

 02-08-2014
2.00
Had the Propeller Dynamically Balanced
Details
       

 02-07-2014
2.00
Testing the Supply Capability of the Fuel System
Details

 02-07-2014
1.00
Adjusted the Max and Min Propeller PRM
Details
     

 01-26-2014
1.00
Attempted to Adjust the Maximum Propeller Speed
Details

 01-24-2014
0.25
Mid-Cabin Labels
Details
       

 01-24-2014
0.10
Labelled the Fire Extinguisher Location
Details
       

 01-24-2014
0.25
Labeled the Throttle
Details
       

 01-24-2014
0.50
Labeled the Pilot's Control Stick
Details
       

 01-24-2014
0.25
Installed Required Information in the Rear Cockpit
Details
       

 01-23-2014
1.00
Labeled the Co-Pilot Control Stick
Details
       

 01-21-2014
1.50
Repositioned the Ground Adjustable Rudder Pedals
Details
     

 01-21-2014
1.50
Fixed Right Console Switches Problem
Details
       

 01-20-2014
1.00
Troubleshooting Improper Console Switch Function
Details
       

 01-18-2014
1.00
Started Engine and Tested Propeller
Details
       

 01-16-2014
0.50
Rewired the Prop Controller Connector
Details
       

 01-15-2014
1.00
Received the Prop Controller Loaner
Details

 01-13-2014
0.00
Labeled Center and Left Side of Instrument Panel 3
       

 01-13-2014
0.00
Labeled Center and Left Side of Instrument Panel 2
Details
       

 01-13-2014
2.00
Labeled Center and Left Side of Instrument Panel
Details
       

 01-11-2014
2.00
Changed the Prop Controller Connector Wiriing
Details
     

 01-10-2014
2.00
Tested the Propeller Motor
Details
       

 01-09-2014
1.00
Labeled the Fuel Guardian and Voice Flight
Details
       

 01-07-2014
1.50
Installed Tailpipe Hangers
Details
       

 01-06-2014
0.00
Talked to MT Propeller USA Electric Prop Guru
Details

 01-03-2014
2.00
Connected Right Wing Tank to Fueage
Details
       

 01-02-2014
1.00
Installed Wiring Conduit to Cabin Interior Bundles
Details
       

 01-02-2014
0.50
Installed the Halon Fire Extinguisher
Details
       

 12-31-2013
1.50
Replaced Cabin Floor and Pilot Seat Supports
Details

 12-30-2013
2.00
Installed Lines Between Right Tank and Fuselage
Details
       

 12-29-2013
2.00
Repaired the Vent Lines at the Fuselage Bulkhead
Details
       

 12-26-2013
1.00
Checked the Propeller Wiring and Voltages
Details

 12-23-2013
0.00
Called MT Propeller USA
Details

 12-22-2013
0.00
Installed the MT Propeller 4
Details

 12-22-2013
0.00
Installed the MT Propeller 3
Details
       

 12-22-2013
0.00
Installed the MT Propeller 2
Details
       

 12-22-2013
5.00
Installed the MT Propeller
Details
       

 12-20-2013
3.00
Tested and Adjusted the Autopilot Roll Servo
Details
       

 12-19-2013
0.00
Discovered Twisted Fuel Vent Lines Inside Cabin
Details

 12-18-2013
1.00
Tightened Left Tank Fuel Fittings
Details

 12-17-2013
0.25
Installed the Fuel Tank Drain Fairings
Details
       

 12-17-2013
1.00
Installed T-Bolt Clamps to the Tailpipe Hangers
Details
       

 12-14-2013
0.50
Re-Fabricated the Left Tank Supply Line
Details
       

 12-14-2013
2.00
Attached the Coax Cable to the Bob Archer Antenna
Details
       

 12-11-2013
0.50
Secured Right Tip Lights Wires Along VOR Antenna
Details
       

 12-11-2013
0.50
Installed Flaps AN4-11 Bolts and Cotter Pins
Details
       

 12-08-2013
0.00
Wired the Wing Tip Lights 2
Details
       

 12-08-2013
2.00
Wired the Wing Tip Lights
Details
       

 12-07-2013
2.00
Made Reflective Plates for Nav/Strobe Lights
Details
     

 12-06-2013
4.00
Sanded the UV Smooth Prime on the Wing Tips
Details

 12-03-2013
1.00
Reinstalled Faps and Safety Wired the Hinge Pins
Details
     

 12-03-2013
0.00
Checked the Rigging of the Ailerons 2
Details
       

 12-03-2013
2.00
Checked the Rigging of the Ailerons
Details
       

 12-02-2013
2.50
Removed the Mechanical Aileron Stops
Details
     

 11-30-2013
2.00
Changed the Flaps' Connecting Rods To Avery's
Details
       

 11-28-2013
2.00
Attached the Wing Tip HID Light Power Supplies
Details

 11-27-2013
1.50
Installed Terminal Block on End of Each Wing
Details
       

 11-27-2013
0.25
Found Out the Airbox Sensor Nut Size
Details
       

 11-25-2013
2.00
Installed the Airbox
Details
       

 11-25-2013
1.00
Changed the Taxi Light From Halogen to HID Light
Details
       

 11-24-2013
3.00
Cut and Fit Airbox on the Left Side of Engine
Details

 11-23-2013
0.00
Installed Tailpipes and Fabricated Muffler Brace 2
Details
     

 11-23-2013
2.50
Installed Tailpipes and Fabricated Muffler Brace
Details
       

 11-21-2013
0.50
Installed Rear Spar Bolts
Details
       

 11-10-2013
2.00
Installed Missing Bolts on Each Weldment
Details

 11-09-2013
8.00
My Plane Got Winged Today!!!
Details
       

 11-08-2013
8.00
Installed Four Close Tolerance Bolts in Each Wing
Details

 10-24-2013
2.00
The Boys Got the Left Wing Off
Details
     

 10-22-2013
3.00
Attempted to Attach the Left Wing
Details

 10-19-2013
0.00
Rear Stick Boot in Place
Details
       

 10-19-2013
0.00
Moved the Aircraft to the Airport #2
Details
       

 10-19-2013
0.00
Moved Aircraft to the Airport
Details
       

 10-17-2013
2.00
Installed Rudder Fairing & Position Light/Strobe
Details
       

 10-16-2013
1.00
Installed MT Propeller Brushes and Mount
Details
       

 10-15-2013
4.00
Installed the Cowl Flap Linear Actuator
Details
       

 10-14-2013
1.00
Installed a Replacement VoiceFlight VAS Switch
Details
     

 10-09-2013
3.00
Split and Fit Cowling Oil Cooler Duct
Details
       

 10-08-2013
1.00
Attached Oil Cooler Duct Section to Cowling Inlet
Details
       

 10-07-2013
2.00
Update Garmin G430W and the VoiceFlight System
Details

 10-06-2013
0.50
Tapped One End Of Second cowl Flap Linkage
Details

 10-05-2013
2.00
Adjusted the length of the Cowl Flap Linkage
Details
       

 10-04-2013
2.00
Made Cowl Flap Linkage
Details
       

 10-03-2013
0.00
Got Cowl Flap Tube and Arms Back From Welder
Details
       

 10-02-2013
1.50
Re-attached/Reinforced Coolant Ducts
Details
       

 10-01-2013
0.50
Took Cowl Flap Tube and Arms to the Welder
Details
     

 09-30-2013
0.50
Re-installed the Altenator
Details
       

 09-30-2013
0.25
Re-attached Throttle Cable Support to Throttle Bod
Details
       

 09-30-2013
0.50
Filled the Engine Oil and Coolant Reservoir
Details
     

 09-29-2013
1.00
Re-attached the Fuel Rails and Banjo Connector
Details
       

 09-29-2013
0.50
Re-attached the Coolant Hoses on the Engine Top
Details
       

 09-29-2013
1.00
Adjusted the length of the heater hoses
Details
       

 09-28-2013
3.00
Re-installed the Timing Chain and the Cover
Details

 09-25-2013
2.00
Installed the Right Cowl Flap Bearing and Doubler
Details
       

 09-25-2013
1.00
Installed Left AVCS Modification on Engine
Details
     

 09-24-2013
1.00
Removed Old Sealant From Timing Chain Cover
Details
     

 09-24-2013
1.50
Installed the Right Re-worked AVCS Modification
Details
       

 09-24-2013
2.50
Installed Left Cowl Flap Bearing and Doubler
Details
       

 09-21-2013
2.00
Assembled the Cowl Flap Bearings
Details
       

 09-19-2013
3.00
Removed the Timing Chain Cover
Details
       

 09-19-2013
0.00
Removed AVCS from Both Sides of Engine
Details
       

 09-18-2013
2.50
Started Process to Change the AVCS System Parts
Details
       

 09-17-2013
0.50
Drilled Hole in Lip Above Oil Cooler Inlet for Nut
Details

 09-16-2013
2.00
Fine Sanding of the Right Cowling Front Side
Details

 09-15-2013
1.00
Glass Tacked the Radiator Duct to Glass Box
Details

 09-14-2013
1.00
Riveted the Cowl Flap Hinge to Cowling
Details
       

 09-14-2013
1.00
Made a Glass Box on the Interior of the Radiators
Details
     

 09-14-2013
1.00
Glassed a Lip Across the Cowling Split
Details
     

 09-14-2013
0.50
Drilled a Cotter Pin Hole in the Nose Gear
Details
       

 09-14-2013
1.00
Attached Stiffeners to the Cowl Flap Opening
Details
       

 09-13-2013
1.50
Glassed the Cooling Duct to the Cowling Opening
Details
       

 09-12-2013
3.00
Applied Glass to Forward End of Cooling Ducts
Details
       

 09-10-2013
3.00
Applied 9 Oz Glass Layer Over Part of Honeycomb
Details
       

 09-09-2013
3.00
Applied 9 Oz Glass Layer Over Part of Honeycomb
Details

 09-08-2013
4.00
Applied 9 Oz Glass Layer Over Part of Honeycomb
Details
       

 09-07-2013
3.00
Installing Honeycomb to the Cowling Interior
Details
       

 09-06-2013
3.00
Applied Nomex Honeycomb to the Cowling Interior
Details
       

 09-04-2013
6.00
Applied One Layer 9 Oz Glass to Cowling Interior
Details
     

 09-03-2013
3.00
Sanded the Interior of the Cowling
Details
       

 09-02-2013
3.50
Witness Sanded the Cowling and Re-applied Micro
Details

 08-31-2013
1.50
Sanding the Oil Cooler Inlet Shape
Details
       

 08-31-2013
1.50
Finished Installation of the Empennage Fairings
Details
       

 08-30-2013
2.00
Sanding Oil Cooler Inlet and Left Bottom of Cowlin
Details

 08-30-2013
2.00
Installing Empennage Fairings
Details
       

 08-30-2013
0.00
Installed Empennage Fairings
Details
       

 08-29-2013
2.00
Fit the Cowl Flap to the Cowling
Details
       

 08-28-2013
2.00
Washed Fiberglass Dust Off of Aircraft
Details
       

 08-27-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-26-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-25-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-24-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-23-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-22-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-21-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-20-2013
2.00
Sanding and Shaping of the Cowling
Details

 08-19-2013
5.00
Sanded the Top, Front Cone and Sides
Details
       

 08-18-2013
3.00
Installed Three Skybolts on Lower Front of Cowling
Details
       

 08-18-2013
0.00
Cowling Bottom Front Skybolts in Place
Details
       

 08-17-2013
4.00
Drilled the Cowling Holes for the Skybolt Fastener
Details
       

 08-16-2013
2.00
Sanded the Nose Ring and Re-applied Micro
Details
       

 08-15-2013
0.50
Sanded the Cowling Level with the Firewall
Details
     

 08-15-2013
3.00
Installed the Firewall Skybolt Fasteners
Details
       

 08-15-2013
1.00
Applied 2 Layers of Glass to the Cowling Nose Ring
Details
       

 08-14-2013
2.00
Tacked the Cowling Nose Ring to the Cowling
Details
       

 08-13-2013
3.00
Made a Form for Making a New Cowling Nose Ring
Details
       

 08-13-2013
1.00
Layed Some Glass Mat on Cowling Rt Firewall Edge
Details
       

 08-12-2013
1.50
Reinforced the Cowling Firewall Edge
Details

 08-12-2013
1.00
Finish Sanded the Empennage Fairing
Details

 08-11-2013
2.00
Sprayed on UV Smooth Prime to Empennage Fairings
Details

 08-11-2013
2.00
Applied UV Smooth Prime to Empennage Fairings
Details

 08-10-2013
2.50
Sanded the Empennage Fqirings
Details

 08-10-2013
1.00
Sanded and Re-applied Micro to Rt Side of Cowling
Details

 08-09-2013
3.00
Worked on the Fit on Both Side of the Cowling
Details
       

 08-09-2013
1.00
Applied Awl Fair to the Empennage Fairings
Details
       

 08-08-2013
4.00
Applied Micro to Cowling Right Aft Lower Corner
Details
       

 08-07-2013
3.00
Altered the Fit of Cowling Right Lower Aft Corner
Details
     

 08-06-2013
6.00
Cut the Cowling Aft Edge To Match the Firewall
Details
       

 08-05-2013
4.00
Drilled & Riveted Skybolt Brackets to the Firewall
Details

 08-04-2013
0.50
Started to Position the Skybolt Fastener Brackets
Details
     

 08-04-2013
0.50
Re-installed the Cleaned and Balanced Injectors
Details

 08-04-2013
0.25
Re-Attached the Nose Wheel with New Bearings
Details

 08-04-2013
3.00
Moved the Coolant Tank Medially and Forward
Details
       

 08-03-2013
0.00
Return from Oshkosh
Details

 07-29-2013
0.00
Oshkosh!
Details

 07-26-2013
1.00
Pulled the Injectors and Sent for Cleaning
Details

 07-24-2013
2.00
Fine Sanding of Cowling on the Aircraft.
Details

 07-23-2013
2.00
Continued Sanding the Cowling Off of the Aircraft
Details

 07-22-2013
2.50
Sanded the Bottom Front of the Cowling
Details

 07-20-2013
2.50
Sanding of the Front of the Cowling
Details

 07-19-2013
1.00
Lightly Sanded the Front Outboard of the Inlets
Details

 07-18-2013
3.00
Sanded the Front of the Cowling
Details

 07-17-2013
3.00
More Sanding of the Cowling Top
Details

 07-15-2013
4.00
Sanded Cowling Top and Front with Fine Sponge
Details

 07-14-2013
3.00
Rough Sanded Micro on about 2/3 of Cowling
Details

 07-13-2013
2.00
Applied Micro Over the Entire Cowling Top & Sides
Details
       

 07-12-2013
3.00
Fine Sanded Micro on Entire Cowling Top
Details
     

 07-11-2013
3.00
Fine Sanded the Right Forward Corner
Details

 07-10-2013
4.00
Sanded the Cowling Top, Re-applied Light Micro
Details

 07-09-2013
3.00
Sanded the Cowling Top and Re-applied Micro
Details
       

 07-08-2013
2.00
Sanded Cowling Top Forward Corner
Details
       

 07-06-2013
1.50
Shaped and Installed the Canopy Handle
Details
       

 07-06-2013
1.50
Sanded the Top and Sides of the Cowling
Details
       

 07-04-2013
2.00
Installed the Flanges and Pins for the Skybolts
Details
       

 07-03-2013
6.00
Sanded Cowling and Installed Skybolt Fasteners
Details
     

 07-02-2013
8.00
Sanded the Front and Sides of the Cowling
Details
       

 07-01-2013
2.00
Sanded Left Side and Bottom of the Cowling
Details

 06-30-2013
3.00
Sanded and Re-Applied Filler
Details

 06-29-2013
3.00
Sanded and Re-Applied Filler
Details

 06-28-2013
2.50
Sanded the Contour of the Cowling Forward Bottom
Details

 06-27-2013
3.00
Sanded Cowling Bottom and Forward Corners
Details

 06-26-2013
4.00
Sanded the Right Forward Bottom Corner
Details
       

 06-25-2013
3.00
Sanded the Bottom Forward Corners of the Cowling
Details

 06-24-2013
3.00
Sanded the Bottom Forward Corners of the Cowling
Details
       

 06-22-2013
3.00
Fit the Nose Gear Fairings
Details
       

 06-21-2013
1.00
Sized the Nose Gear Leg Fairing
Details

 06-20-2013
3.00
Sanded Cowling Bottom and Forward Corners
Details

 06-18-2013
3.00
Cut and Removed the Forward Half of the Hinge
Details
       

 06-17-2013
2.00
Installed the Hinge in the Bottom of the Cowling
Details
     

 06-15-2013
3.00
Sanded Hinge Edges While on the Aircraft
Details
       

 06-14-2013
1.00
Applied Micro/Flox/Epoxy to Bottom Hinge Lines
Details
       

 06-13-2013
5.00
Glassed Cooling Inlet Flanges
Details
       

 06-12-2013
2.50
Cut Opening for the Cowl Flap
Details
       

 06-11-2013
2.00
Glassed the Bottom Centerline With 3 Plys of Glass
Details
       

 06-10-2013
1.00
Applied 9 Oz. 8 Harness Glass to Oil Cooler Inlet
Details
       

 06-09-2013
0.50
Tried to Install an Already Modified Rear Boot Cov
Details

 06-09-2013
4.00
Sanded Micro on Oil Cooler Inlet
Details
       

 06-09-2013
0.50
Re-Installed Modified Pilot Lap Belts
Details
     

 06-09-2013
0.50
Installed the Oxygen Outlet for the Passenger
Details
       

 06-08-2013
5.00
Shaping Oil Cooler Inlet
Details
       

 06-07-2013
6.00
Sanding and Fitting Oil Cooler Inlet Box
Details

 06-06-2013
4.00
Shaped Oil Cooler Inlet Box Form
Details
       

 06-05-2013
5.00
Cut, Sanded and Shaped the Oil Cooler Inlet Plug
Details
     

 06-04-2013
2.00
Glued Layers of Pink Styrofoam Sheet Together
Details

 06-03-2013
1.50
Drilled Attachment Holes for the Oil Cooler Duct
Details

 06-02-2013
1.00
Built up the Oil Cooler Duct Flange with 9 oz glas
Details

 06-01-2013
2.00
Riveted the Hinge Half to the Left Cowling Half To
Details
       

 05-31-2013
2.00
Drilled the Left Cowling Half Top Hinge to Cowling
Details
       

 05-30-2013
2.00
Cut and Sanded the Left Cowling Top Center Line
Details
     

 05-27-2013
2.00
Attached Hinge Half to the Right Cowling Half
Details
     

 05-26-2013
2.00
Cut Right Cowling Half Top Center Line Edge
Details
     

 05-25-2013
1.50
Applied 3 More Layers of Glass to the Front Corner
Details
     

 05-24-2013
3.50
Applied Clay to Cowling Front Bottom Corners
Details

 05-23-2013
1.50
Installed Aluminum Strips for Backing to Corners
Details
       

 05-22-2013
3.00
Worked on Right Side Bottom Relieving Stresses
Details
       

 05-21-2013
3.00
Worked on Shaping the Bottom Front Of Cowling
Details
       

 05-20-2013
3.00
Re-did the Left Cowling Opening Using Styrofoam
Details
       

 05-18-2013
2.00
Cut and Sanded the Foam, Applies Clay and Micro
Details
       

 05-17-2013
1.00
Used Spray Foam to Fill the Void for Shaping
Details
     

 05-16-2013
2.00
Cut the Left Side From Firewall to Front Corner
Details
     

 05-15-2013
2.00
Centerline Split the Bottom of the Cowling
Details
       

 05-14-2013
3.00
Applied 3 Layers of Glass to the Cowling Bottom
Details

 05-13-2013
3.00
Finished Molding Clay, Applied 2 Ply 9 oz Glass
Details
       

 05-12-2013
4.00
Cut Front Bottom Cowling, Installed Foam Sheets
Details

 05-10-2013
3.00
Layed 2 Ply 9oz Glass Transverse the Cowl Bottom
Details
       

 05-10-2013
1.50
Apply 2 ply 9oz Glass to Cowling Aft Bottom
Details
       

 05-09-2013
1.50
Shaped the Foam Frame for the Cowling Bottom
Details
     

 05-07-2013
1.00
Assembled Foam Framing to Shape Cowling Bottom
Details
       

 05-05-2013
1.00
Made Some Relief Cuts in the Cowling Bottom
Details
       

 05-02-2013
2.00
Got the Cowling Sides Attached to the Firewall
Details
       

 05-02-2013
0.00
Got the Cowling Sides Attached to the Firewall
Details
       

 05-01-2013
0.00
Fit the Cowling Halves to the Prop Disc and Firewa
Details
       

 05-01-2013
0.00
Fit the Cowling Halves to the Prop Disc and Firewa
Details
       

 05-01-2013
0.00
Fit the Cowling Halves to the Prop Disc and Firewa
Details
       

 05-01-2013
4.00
Fit the Cowling Halves to the Prop Disc and Firewa
Details
       

 04-28-2013
2.00
Primer Painted Windscreen Fairing and Skirt
Details
       

 04-26-2013
2.00
Made a 13.5" Prop Disc for Mounting the Cowling
Details
       

 04-24-2013
1.50
Sanded the Windscreen Transitions
Details
       

 04-21-2013
2.00
Sanding and Re-Application Of UV Smooth Prime
Details

 04-20-2013
2.00
Sanded and Re-Applied UV Smooth Prime
Details

 04-19-2013
2.00
Sanded UV Smooth Prime then Re-Sprayed
Details

 04-18-2013
1.00
Sprayed 3 Coats of UV Smooth Prime
Details
       

 04-17-2013
3.00
Final Wet Sanding of the Epoxy Coated Skirts
Details
       

 04-15-2013
2.50
Wet Sanded the Skirts to 400 Grit
Details
       

 04-08-2013
1.50
Applied 3 Coats of Straight Epoxy
Details
       

 04-07-2013
1.00
Sanded the Transition Around the Handle
Details

 04-06-2013
3.00
Glued Canopy Shut!
Details
       

 04-05-2013
2.00
Sanded the Handle Fiberglass Tube to Length
Details
     

 04-03-2013
3.00
Sanded the Right and Left Windscreen Transitions
Details
       

 04-02-2013
2.50
Sanded Right and Left Transition Areas
Details

 04-01-2013
3.00
Sanded Right Transition, Re-applied Flox Mixture
Details
       

 03-30-2013
6.00
Sanded the Right Side Canopy Skirt Transition
Details
       

 03-29-2013
4.00
Applied Fiberglass and Carbon Fiber to Windscreen
Details
       

 03-28-2013
2.50
Pulled the Tape and Plastic Off Windscreen
Details
       

 03-27-2013
2.50
?Final Sanded Windscreen Fairing
Details

 03-26-2013
1.50
Sanded Windscreen Fairing and Spot Epoxied
Details

 03-25-2013
1.00
Light Sanding of Windscreen Fairing with 150 Grit
Details

 03-24-2013
2.00
Sanded and Filled Fairing Epoxy Coating
Details

 03-23-2013
3.00
Sanded the Epoxy Top Coat, Filled and Re-sanded
Details
       

 03-21-2013
3.00
Detail Sanded Fairing, Applied Black Epoxy Coat
Details
       

 03-20-2013
3.00
Sanded to Bottom Yellow Tape Layer
Details

 03-19-2013
3.00
Spot Sanded, Spot Filled and Re-Sanded
Details

 03-18-2013
4.00
Sanded Down to the Orange Tape
Details
       

 03-17-2013
2.00
Sanded Down to White Tape Again
Details

 03-16-2013
5.00
Sanded down to the Orange Tape
Details
       

 03-15-2013
0.00
2nd Sanding of Fairing to Shape 2
Details
       

 03-15-2013
3.00
2nd Sanding of Fairing to Shape
Details
       

 03-14-2013
6.00
Sanded Entire Windscreen Fairing
Details
       

 03-13-2013
1.00
Applied Blackened Epoxy/Microballoon/Flox
Details
       

 03-12-2013
2.50
Sanded the Bow of the Windscreen Fairing
Details
       

 03-11-2013
1.50
Sanded the Right Bottom of Windscreen Fairing
Details
       

 03-10-2013
1.50
Sanded the Left Side of Bottom Fairing Layup
Details
       

 03-09-2013
0.50
Separated the Canopy from the Bow Fiberglass
Details
       

 03-08-2013
3.00
Glassed the Bow of the Windscreen
Details
       

 03-07-2013
3.00
Glassed the Bottom of the Windscreen Fairing
Details
       

 03-06-2013
1.00
Sanded the Fillet and the Filler
Details
       

 03-05-2013
3.50
Sanded Top Skin and Windscreen With 60 Grit
Details
       

 03-04-2013
3.00
Taped the Windscreen, Top Skin & Canopy
Details
       

 03-02-2013
1.00
Drilled the Canopy Frame/Rollers Attachment Holes
Details
       

 03-01-2013
3.50
Rough Shaped and Fit the Canopy Handle to Skirt
Details
       

 03-01-2013
0.00
Rough Shaped and Fit the Canopy Handle to Skirt
Details
       

 02-27-2013
2.00
Removed Tape and Residue from the Right Side
Details
       

 02-26-2013
1.00
Touchup Painted the Interior of the Canopy Skirt
Details

 02-26-2013
2.00
Removed Tape and Residue on the Aft Top Skin
Details
     

 02-25-2013
1.00
Added Cosmetic Layer to the Windscreen
Details

 02-24-2013
2.00
Glued the Windscreen in Place with SikaFlex
Details
       

 02-24-2013
2.00
Glued the Canopy Skirts with SikaFlex
Details
       

 02-24-2013
0.00
Glued Skirt to Canopy Frame
Details
       

 02-23-2013
3.50
Primed and Top Coat Painted the Inside of Skirt
Details

 02-22-2013
2.00
Taped the Windscreen,Bow,Top Skin for SikaFlex
Details
       

 02-18-2013
2.00
Super Glued 1/8" Spacers to the Rollover Bar
Details
       

 02-16-2013
2.00
Installed Baggage Door Latch Blocks
Details
       

 02-16-2013
1.00
Installed "SeaDog SS Hatch Spring" Door Stay
Details
       

 02-15-2013
1.00
Installed Baggage Door Lock and Latch Bars
Details
       

 02-15-2013
0.50
Fire Barrier Sealed Top Skin/Firewall Union
Details
       

 02-15-2013
1.00
Drilled/Riveted Top Skin Support Ribs
Details
       

 02-15-2013
2.00
Drilled and Riveted Baggage Door Hinge
Details
       

 02-13-2013
0.50
Sent the Pilot Lap Belt To Hooker for Short Anchor
Details
       

 02-13-2013
2.00
Riveted the Right F-804N Bulkhead Cap
Details
     

 02-11-2013
1.00
Wet Sanded the Glare Shield and Re-painted
Details

 02-10-2013
1.50
Installed Hand Holds in the Rollover Bar
Details
       

 02-10-2013
1.00
Fit the Windscreen to the Rollover Bar
Details

 02-09-2013
1.00
Wet Sanded the Forward Top Skin Glare Shield
Details
     

 02-07-2013
0.50
Installed the Instrument Panel LED Light Strip
Details
       

 02-06-2013
1.50
Painted the Fwd Top Skin Glare Shield Flat Black
Details

 02-03-2013
5.00
Riveted The Forward Top Skin
Details
       

 02-02-2013
0.25
Secured the GPS Antennae
Details
       

 02-02-2013
0.00
Rear Seat Belt Installation
Details
       

 02-02-2013
2.00
Installed the Rear Seat Back and Seat Belts
Details
       

 02-02-2013
1.00
Installed the Flaps Actuator Bar
Details
       

 02-02-2013
1.50
Adjusted the Rear Seat Heater Harness Mounting
Details

 02-01-2013
3.00
Installed Aft Baggage Compartment Shelf
Details
       

 01-31-2013
2.50
Installed Large Stein's Passenger Vent Outlet
Details
       

 01-30-2013
1.00
Painted the Glare Shield of the Forward Top Skin
Details
       

 01-29-2013
4.00
Configured GRT EFISs for ADS-B
Details

 01-28-2013
2.00
Secured the Anchor Block to F-807-1 Bulkhead
Details
       

 01-28-2013
1.00
Called NavWorx
Details

 01-27-2013
2.00
NavWorx ADS-B Configuration
Details

 01-24-2013
1.00
Tapped Andair Fuel Selector Bolt Holes to AN4
Details
       

 01-24-2013
2.00
Installed the F-829-1 Front Seat Floor
Details
     

 01-23-2013
3.00
Installed the F-830-1 Left Seat Floor
Details
       

 01-22-2013
0.75
Installed Rear Passenger Vent Tubing
Details
       

 01-22-2013
3.00
Installed F-831-1 Right Seat Floor
Details

 01-21-2013
0.00
Installed the Heated Seats' Harnesses 2
Details
       

 01-21-2013
4.00
Installed the Heated Seats' Harnesses 1
Details
       

 01-18-2013
2.00
Removed the Floor Panels
Details

 01-18-2013
2.00
Removed Cabin Floor Panels
Details

 01-17-2013
1.50
Painted Miscellaneous Fuselage Parts
Details

 01-16-2013
1.50
Installed Tiedowns on Aft Baggage Compartment
Details

 01-14-2013
1.00
Painted the Interior Surface of Forward Top Skin
Details

 01-13-2013
1.50
Painted Fwd Baggage Shelf and Access Panels
Details

 01-12-2013
1.00
Drilled Electrical Bay Cover & Shelf for Nutplates
Details

 01-10-2013
2.50
Fabricated Forward Electrical Compartment Cover
Details
       

 01-06-2013
2.00
Wired the Instrument Panel LED Light Strip
Details
       

 01-06-2013
1.00
Garmin GPS 18x is Working Great
Details
       

 01-05-2013
3.00
Installed VoiceFlight USB Update Port
Details
       

 01-02-2013
0.00
Riveted the Access Panel Rings to Top Skin - 1
Details
       

 01-02-2013
1.00
Riveted the Access Panel Rings to Top Skin
Details
       

 01-02-2013
1.50
Bent to Fit the Avionics Access Panels Covers
Details
       

 01-01-2013
1.00
ProSeal Applied Between the Top Skin and Ring
Details

 12-29-2012
2.00
Fabricated Cover for Right Avionics Access Panel
Details
     

 12-29-2012
4.00
Drilled, Deburred, Countersunk Access Panel Parts
Details
       

 12-28-2012
4.00
Made a Cover for the Left Side Access Panel
Details
       

 12-27-2012
2.00
Match Drilled the Access Panel Reinforcement
Details
       

 12-26-2012
3.00
Fabricated Reinforcement Ring for Access Panels
Details
       

 12-25-2012
1.50
Filed the Edges of the Forward Access Panels
Details
       

 12-25-2012
0.00
Discovered Geometry of theTwo Panels Differ
Details
       

 12-24-2012
1.00
Cut the Radius in Corners of the Access Openings
Details

 12-23-2012
1.00
Cut Forward Top Skin Access Openings
Details
       

 12-22-2012
1.50
Fit Windscreen Relative to Planned Access Panels
Details
       

 12-21-2012
1.00
Added Power Switch for the VoiceFlight
Details
       

 12-20-2012
1.00
Installed Defroster Vent in Forward Top Skin
Details
       

 12-19-2012
1.00
Installed the VoiceFlight Voice Activation Switch
Details

 12-17-2012
0.50
Bent the Edge of the Forward Top Skin
Details
       

 12-16-2012
0.50
Removed Forward Top Skin For Access Panels
Details

 12-14-2012
2.00
Sanded Bottom Edge of Windscreen to Fit Top Skin
Details
       

 12-13-2012
1.00
Drilled a Positioning Hole In Top of the Windscree
Details
       

 12-12-2012
1.50
Initial Fitting of the Windscreen
Details
       

 12-10-2012
1.00
Sanded Yesterday's Transition Micro
Details

 12-09-2012
1.50
Sanded the Reinforcement Glass on the Lt Lip
Details

 12-08-2012
1.50
Pulled the Peel Ply from Yesterdays Lip Glassing
Details

 12-07-2012
2.00
Sanded the Skirt Interior with 400 Grit
Details

 12-06-2012
1.00
Interior Skirt Pinhole Sealing with Epoxy/Acetone
Details
       

 12-05-2012
2.00
Lightly Finish Sanded the Skirt Exterior Sides
Details
     

 12-04-2012
4.00
Sanded the Exterior of the Left Skirt
Details

 12-03-2012
4.00
Sanded the Right Skirt Exterior
Details
     

 12-02-2012
3.50
Sanded the Left Skirt Exterior
Details
     

 12-01-2012
2.00
Applied Micro and Cabosil to the Skirt Exterior Si
Details
       

 11-30-2012
1.00
Started Sanding the Liquid Shim
Details
       

 11-29-2012
1.00
Reapplied Liquid Shim to Canopy Frame/Skirt
Details

 11-28-2012
2.00
Sanded Aft Skirt Tip to Shape
Details
       

 11-26-2012
3.00
Sanded Aft Skirt Microballoon Application
Details
       

 11-25-2012
3.00
Sanded Aft Skirt Then Applied Microballoons Again
Details
       

 11-23-2012
3.00
Sanded the Top Of the Aft Skirt to a Better Taper
Details
       

 11-22-2012
1.00
Sanded Aft Canopy Skirt Interior
Details

 11-21-2012
2.00
Sanded Aft Inside of Skirt
Details
       

 11-20-2012
3.00
Trimmed the Skirt Aft Top Edge
Details
       

 11-20-2012
0.00
Trimmed the Skirt Aft Top Edge
Details
       

 11-19-2012
3.00
Sanded the Skirt Side's Lip Transitions
Details
       

 11-18-2012
3.00
Established a Contour Line for the Upper Aft Skirt
Details
       

 11-17-2012
3.00
Sanded the Left Transitional Area
Details
       

 11-16-2012
3.00
Sanded the Right Transitional Area of the Skirt
Details
       

 11-15-2012
3.00
Sanded the Aft Transitional Areas of the Skirt
Details
       

 11-14-2012
3.00
Sanded the Upper Lips of the Skirt
Details

 11-13-2012
4.50
Sanded Aft Skirt Using Spray Can Paint as Witness
Details
     

 11-12-2012
1.00
Applied Microballoon Slurry to Aft Skirt
Details
     

 11-11-2012
3.50
Sanded the Aft Skirt and Applies 2 ply Glass
Details
     

 11-10-2012
3.50
Sanded Aft Skirt and Applied Micro/Cotton Epoxy
Details
     

 11-09-2012
2.00
Sanded the Aft Canopy Skirt
Details
     

 11-09-2012
4.00
Fit and Gap Sealed Top & Bottom Empennage Fairings
Details
       

 11-09-2012
0.00
Empennage Fairings Fitted
Details
       

 11-08-2012
2.50
Fitted and Glassed the Empennage Fairings Union
Details
       

 11-07-2012
4.00
Trimmed the Aft Top Edge of the Skirt
Details
       

 11-06-2012
3.50
Cut and Shaped Aft Skirt to Clear Empennage Fairin
Details
       

 11-05-2012
3.50
Sanded Aft Skirt and Re-Applied Loose Slurry
Details
       

 11-04-2012
2.00
Sanded Inside of Skirt and Re-Applied Epoxy Slurry
Details
       

 11-03-2012
1.50
Sanded and Shaped Interior of Aft Skirt
Details
       

 11-01-2012
2.00
Added Gap Seal to Bottom of Aft Skirt
Details
     

 10-31-2012
1.50
Sanded Sides and Aft End of Canopy Skirt
Details
     

 10-30-2012
0.00
Results of Aft Canopy Skirt Gap Filling
Details
       

 10-29-2012
1.00
Added Microballoon, Flox and CaboSil to Aft Skirts
Details
     

 10-28-2012
2.00
Applied Filler to Skirt Tops and Clecoed to Canopy
Details
       

 10-26-2012
3.00
Sanded the Recently Glassed Fracture Line Glass
Details
       

 10-25-2012
0.00
Finished 4 Day Project of Building a Kayak Trailer
Details
       

 10-21-2012
2.00
Sanded the Skirts Interior Fracture Line Micro Fil
Details

 10-10-2012
0.00
Vacation to New England

 10-07-2012
1.50
Glassed the Inside Aft Joint of the Canopy Skirts
Details
       

 10-05-2012
1.00
Removed the Canopy Skirts to Glass the Inside Lip
Details

 10-04-2012
1.00
Re-glassed the Canopy Skirts Aft Joint
Details

 10-03-2012
3.00
Formed Clay Mold and Applied Aft Skirt Fiberglass
Details
       

 10-02-2012
1.00
Cut Posterboard Contours of Each Skirt Aft End
Details
       

 09-26-2012
1.00
Applied a Layer of 9 Oz. Glass and Peel Ply
Details
       

 09-25-2012
0.50
Filled Small Void in Skirt Joint with Super Fil
Details

 09-24-2012
0.25
Checked the Skirt vs. Empennage Clearance
Details
       

 09-23-2012
2.00
Sanded Aft End of Skirts and the Left Side Repair
Details
       

 09-22-2012
2.00
Sanded the Left Canopy Skirt
Details
       

 09-21-2012
1.50
Sanded the Right Canopy Skirt Liquid Shim
Details
       

 09-21-2012
0.50
Applied Liquid Shim to the Left Canopy Skirt
Details
       

 09-20-2012
1.00
Liquid Shim Applied to the Right Canopy Skirt
Details
       

 09-19-2012
1.00
Micro Balloon & Flox Gap Seal To Right Skirt Lip
Details
       

 09-18-2012
1.50
Heat Formed the Upper Lip of Both Canopy Skirts
Details
       

 09-17-2012
0.00
Sanded Filler and Adjusted the Skirt Top Lip 2
Details
       

 09-17-2012
4.00
Sanded Filler and Adjusted the Skirt Top Lip
Details
       

 09-15-2012
0.00
Filled the Fracture lines of the Canopy Skirts 2
       

 09-15-2012
6.00
Filled the Fracture lines of the Canopy Skirts
Details
       

 09-14-2012
0.00
Fitting the Canopy Skirt 3
Details
       

 09-14-2012
4.00
Fitting the Canopy Skirt 2
Details
       

 09-13-2012
2.00
Match Drilled the Skirts to the Canopy Frame
Details
       

 09-13-2012
1.00
Fit the Skirts
Details
       

 09-13-2012
2.00
Drilled the Canopy Frame with a #40 Bit
Details
       

 09-12-2012
4.00
Troubleshot the Com Problems
Details

 09-10-2012
3.00
Rewired the Grounds of the Copilot Stick Grip
Details

 09-08-2012
1.00
Trimmed GPS Antennae Shims and Installed
Details
       

 09-08-2012
1.00
Tested the Intercom and the Radios First Time
Details

 09-07-2012
1.50
Re-fabricated the GPS Antennae Shims
Details
       

 09-06-2012
1.50
Formed a Shim for the GPS Antennae
Details
       

 09-05-2012
0.75
Fabricated Fiberglass HS Bottom Gap Seal
Details
       

 09-05-2012
0.75
Drilled Holes in Aft Top Skin for the GPS Antennae
Details
     

 09-04-2012
2.00
Installed Main Fuel Pump Disconnect Switch
Details
       

 09-03-2012
1.50
Wired the VoiceFlight Wires to the Pilot's Com Jac
Details
     

 08-31-2012
3.00
Wired the VoiceFlight Box
Details
       

 08-31-2012
0.25
Installed the Cowl Flap Switch
Details
     

 08-31-2012
0.50
Adjusted the Installation of the Avionics Post Gro
Details
       

 08-31-2012
0.75
Adjusted the Heights of the Starboard Switch Panel
Details
     

 08-30-2012
0.00
Removed Rudder and Vertical Stabilizer 2
Details
       

 08-30-2012
4.00
Removed Rudder and Vertical Stabilizer
Details
       

 08-29-2012
2.00
Laced Forward Baggage Compartment Wires
Details
       

 08-26-2012
1.00
Set Nose Wheel Breakout Force
Details
       

 08-24-2012
1.00
Fabricated Pull Attachment for Setting Breakout
Details
       

 08-23-2012
1.00
Installed Oxygen Supply Line to Mid Cabin
Details
       

 08-21-2012
2.00
Attached Doubler Plates to Baggage Comp. Floor
Details
       

 08-20-2012
1.50
Started Installation of the Oxygen System
Details
       

 08-17-2012
1.00
Attached VoiceFlight Box to Forward Avionics Bulkh
Details
     

 08-16-2012
0.00
Installed Hat Shelf Access Door Latch
Details
       

 08-16-2012
1.00
Installed Hat Shelf Access Door Latch
Details
       

 08-15-2012
2.00
Riveted Stiffeners/Door Supports Around Opening
Details
       

 08-14-2012
2.00
Fabricated and Installed Rear Stick Connector Moun
Details
       

 08-13-2012
2.00
Made Hat Shelf Access Door in Aft Baggage Compartm
Details
       

 08-13-2012
0.50
Glassed the Right Side of the Empennage Fairing
Details
       

 08-12-2012
2.50
Modified the VS/HS Empennage Fairing
Details
       

 08-11-2012
2.00
Installed Nutplates for the HS/VS Fairing
Details
       

 08-10-2012
1.00
Trim Fitted the Large Empennage Fairing
Details
       

 08-10-2012
0.50
Sprayed Empennage Fairing Pieces
Details

 08-09-2012
2.00
Sanded the Empennage Fairings
Details
       

 08-08-2012
1.00
Sprayed the Empennage Fairings with White Primer
Details

 08-07-2012
3.00
Sanded UV Smooth Prime from Empennage Fairings
Details
     

 08-06-2012
1.00
Applied 3 Thin Rolled Layers of UV Smooth Prime
Details
       

 08-04-2012
3.00
Sprayed Primer of the Empennage Fairings
Details
       

 08-03-2012
2.00
Sanded Awl Fair Smooth on Empennage Fairings
Details
     

 08-02-2012
3.00
Sanded Empennage Fairings with Foam Blocks
Details
       

 08-01-2012
2.00
Sanded the Awl Fair with 120 Grit Paper
Details
       

 07-31-2012
3.50
Sanded Empennage Fairings with 120 Grit Paper
Details

 07-30-2012
6.00
Applied Microballoon Slurry to Empennage Fairings
Details
       

 07-23-2012
0.00
OSHKOSH 2012
Details

 07-21-2012
1.50
Sanded Rudder Bottom Fairing with 120 Grit
Details
       

 07-19-2012
2.00
Sanded Rudder Bottom Fairing
Details
       

 07-18-2012
1.50
Applied Microballoon Slurry to Rudder Bottom Fairi
Details
       

 07-16-2012
1.50
Finished Assembly of a Downdraft Box
Details
       

 07-14-2012
1.50
Installed Rudder Hardware and Attached Cables
Details
       

 07-13-2012
1.50
Adjusted the Rudder Alignment with Top Fairings
Details
       

 07-12-2012
1.50
Test Fit the Rudder to the Empennage
Details
       

 07-12-2012
0.50
Applied 2 Layers of Glass to Rudder Horn Opening
Details

 07-11-2012
0.50
Applied a Layer of Glass to Rudder Horn Opening
Details
       

 07-10-2012
1.00
Drilled, Countersunk Lower Rudder Cap
Details

 07-09-2012
1.00
Fit the Lower Rudder Cap to the Rudder
Details
       

 07-08-2012
2.00
Made Backing Strips for the Rudder Upper Cap
Details
       

 07-07-2012
0.25
Trimmed/Sanded the Fiberglass from the HS Tips
Details
       

 07-07-2012
1.00
Started Closure of the VS Tip Aft Opening
Details
       

 07-06-2012
1.00
Polished the VS Prior to Installation
Details

 07-06-2012
1.00
Layed 3 Sheets of Glass to Inside of the HS Tips
Details
       

 07-06-2012
2.00
Attached the VS to the Empennage
Details
       

 07-05-2012
1.50
Riveted the VS Attachment Plate and Spacer to VS
Details
     

 07-05-2012
1.00
Removed Lead from the Elevator Counterweights
Details
       

 07-05-2012
0.25
Countersunk the Tips' Attachment Holes
Details

 07-05-2012
1.50
Began Closure of the Aft Opening Of the HS Tips
Details
       

 07-04-2012
1.50
Made Backing Strips for the Fiberglass Tips
Details

 07-03-2012
2.00
Fit Fiberglass Horizontal Stabilizer and Elevator
Details
       

 07-02-2012
2.00
Installed the Pitch Servo
Details
       

 07-02-2012
0.00
Installed Pitch Servo 2
Details
       

 06-30-2012
1.00
Installled Hardware on Horizontal Stabilizer
Details
       

 06-29-2012
1.50
Attached the Elevators without Permanent Hardware
Details
       

 06-27-2012
1.50
Polished the Horizontal Stabilizer
Details
     

 06-26-2012
2.50
Polished a Stain Off of the Elevators
Details
       

 06-24-2012
0.25
Mounted the Canopy onto the Slide and Rails.
Details
       

 06-24-2012
1.00
Installed the Black Anodized Canopy Rails
Details
       

 06-22-2012
1.00
Installed the Canopy Slide Rail on the Aft Fuselag
Details
       

 06-19-2012
0.25
Riveted Rear Passenger Shoulder Straps Anchors
Details
       

 06-19-2012
2.00
Re-installed Battery Tray and Connected Cables
Details
       

 06-18-2012
1.50
Changed GRT EFIS Tiny 4-40 Screws to Large Ones
Details
       

 06-16-2012
0.00
Worked to Organize Left Side of Avionics Bay 2
Details
       

 06-16-2012
2.00
Worked to Organize Left Side of Avionics Bay 1
Details
       

 06-15-2012
0.00
Finished the Throttle Cable Installation 3
Details
     

 06-15-2012
0.00
Finished the Throttle Cable Installation 2
Details
       

 06-15-2012
3.00
Finished the Throttle Cable Installation 1
Details
       

 06-14-2012
1.50
Cut a Hole in the Firewall for the Throttle Cable
Details
       

 06-14-2012
0.50
Attached the Horizontal Stabilizer to the Fuselage
Details
       

 06-12-2012
1.50
Attached Throttle Cable to the Throttle Lever
Details
       

 06-11-2012
1.00
Started Throttle Cable Installation
Details

 06-09-2012
1.50
Re-connected Aft Electrical Wiring to VP CU
Details
       

 06-08-2012
5.00
Riveted the Aft Top Skin to the Fuselage
Details
       

 06-08-2012
0.00
Riveted the Aft Top Skin to the Fuselage
Details
       

 06-08-2012
0.00
Riveted the Aft Top Skin to the Fuselage
Details
       

 06-06-2012
0.50
Installed 2 Mini LED Lights in Aft Fuselage
Details
       

 06-06-2012
1.00
Cut 3/4" Plywood for Aft Fuselage
Details
       

 06-06-2012
1.50
Clecoed the Aft Top Skin onto the Fuselage
Details
       

 06-04-2012
2.00
Removed the Battery Tray and Secured Cables
Details
       

 06-03-2012
0.00
Wired Cabin LED Lights to Ships Power 2
Details
       

 06-03-2012
0.50
Wired Cabin LED Lights to Ships Power
Details
       

 06-02-2012
3.50
Soldered Wiring to LED Strips for the Cabin Lights
Details
       

 06-02-2012
0.00
Soldered Wiring to LED Strips for the Cabin Lights
Details
       

 06-01-2012
1.00
Installed Repaired Verical Power Control Unit
Details

 05-31-2012
1.00
Installed the Front Seat Ramp
Details
       

 05-30-2012
2.00
Moved the Rt MX150L Connector and Patched Hole
Details
       

 05-30-2012
1.00
Installed the Fuselage Floor Panels with Clecoes
Details
       

 05-29-2012
1.00
Fitted the Floors into the Fuselage
Details

 05-28-2012
1.50
Riveted Stiffeners to Forward Part of Floor Panels
Details
     

 05-28-2012
0.50
Installed Knife Splices in the Flap Motor Wires
Details
     

 05-25-2012
1.00
Installed Rt and Lt Console Covers
Details
       

 05-25-2012
1.00
Fabricated a Mount for the Rear Cool Air Vent
Details
       

 05-24-2012
0.50
Stuck Pitot and AoA Tubes Through Lt Fuselage
Details

 05-24-2012
0.50
Installed Heaater Hoses in Forward Electrical Bay
Details
     

 05-23-2012
2.00
Wired the MX-150L 12 Position Socket Lt Fuselage
Details
       

 05-22-2012
1.00
Corrected Rt Wing MX-150L Electrical Connector
Details
     

 05-19-2012
1.00
Installed Molex MX-150L Socket in Lt Mid Fuselage
Details
     

 05-18-2012
1.00
Installed 3 Position Molex Socket Rt Mid Fuselage
Details
       

 05-17-2012
1.50
Installed a Molex MX-150L Socket in Fuselage Wall
Details
       

 05-16-2012
0.50
Ran The VOR Coax Throught the Rt Fuselage Wall
Details
       

 05-15-2012
1.00
Installed the Two Communication Antennae
Details
       

 05-10-2012
1.00
Wired the IBBS Info Light
Details
       

 05-09-2012
1.50
Used the Inline Ammeter to Check the Pumps
Details

 05-09-2012
1.50
Really Fixed the Fuel Totalizer This Time
Details
       

 05-08-2012
1.00
Troubleshot Fuel Pump High Current Draw
Details

 05-08-2012
1.00
Installed a IBBS LED Indicator Light in the Panel
Details
     

 05-07-2012
2.00
Troubleshot High Current Levels on Fuel Pumps
Details

 05-07-2012
1.00
Re-Installed TCW IBBS
Details

 04-15-2012
0.50
Removed IBBS for shipping
Details

 04-15-2012
2.00
Found Out the GRT HX Can't Read IBBS Voltages
Details

 04-14-2012
1.00
Re-installed the Electrical Bay Bulkhead Screws
Details

 04-14-2012
1.00
Measured For Flex Hoses for the Fuel Pumps
Details
       

 04-13-2012
1.00
Installed Bolts in Right Side Pedal Adjustment Hol
Details
       

 04-12-2012
1.00
Installed the TCW IBBS Master Cutoff Switch
Details
       

 04-11-2012
1.00
Loosened Screws for the Electrical Bay Bulkhead
Details

 04-11-2012
1.00
Installed Fuel Selector Valve and Its Fuel Lines
Details
     

 04-11-2012
0.50
Corrected Fuel Totalizer Wiring on #1 Injector
Details
       

 04-10-2012
1.50
Installed Output Lines from the Pumps to the Firew
Details
       

 04-09-2012
2.00
Installed the New Walbro Fuel Pumps
Details
       

 03-25-2012
2.00
Installed the Blue Sea Sockets and Plugs
Details
       

 03-25-2012
0.00
External View of the Charger Connections
Details
       

 03-24-2012
3.00
Fabricated Doublers for the External Charger Plugs
Details
     

 03-23-2012
1.00
Removing the Fuel Pumps, a Terminal Snaps Off
Details

 03-22-2012
3.00
Tested Fuel Line Segments for Sources of Air
Details

 03-21-2012
1.00
Sent the ADS-B Back for Hardware and Software
Details
     

 03-20-2012
2.00
The VP Serial 7 Input to the GRT EFISs Missing
Details

 03-20-2012
0.50
Removed the ADS-B for Return for Upgrade
Details

 03-19-2012
1.00
Return to Troubleshoot Missing ELT GPS Signal
Details

 03-18-2012
3.00
Checked ELT GPS Signal without success
Details

 03-17-2012
2.00
Unable to configure the ADS-B
Details

 03-15-2012
3.00
Configured the GRT HX Displays and the VP System
Details

 03-14-2012
2.00
Investigated Absence of Fuel Totalizer Value on EI
Details

 03-13-2012
4.00
Troubleshooting Fuel Pumps High Current Draw
Details

 03-10-2012
3.00
Configured the EIS and GRT HX EFIS Displays
Details

 03-06-2012
1.00
Troubleshoot Alternator Field Fault
Details

 03-04-2012
0.50
Starter and Fuel Pumps Working
Details

 03-03-2012
0.00
Unstalled Panel USB Plugs
       

 03-03-2012
1.50
Trimmed Coolant Reservoir Hose
Details

 03-03-2012
3.00
Installed 3 USB Plugs in the Instrument Panel
Details
       

 03-03-2012
1.00
Fixed a Leak at the Left Master Cylinder AN Fittin
Details

 03-02-2012
0.00
Secured Heater Hoses
Details
       

 03-02-2012
1.00
Changed the PSRU Oil and Installed Magnetic Plug
Details

 03-02-2012
2.00
Attached Coolant Hoses to the Heater
Details
       

 03-01-2012
1.50
Changed the Engine Oil and Filter
Details

 02-28-2012
1.50
Wired the Cowl Flap Control Switch
Details
       

 02-27-2012
3.00
Connected Engine Wires to Terminal and Connector
Details
       

 02-26-2012
2.00
Fabricated and Mounted Engine Electrial Terminal
Details
       

 02-25-2012
1.00
Filled the Brake System with Royco 782
Details
       

 02-22-2012
3.00
Reinstalled Electrical Compartment Sidewall
Details
       

 02-21-2012
2.50
Mounted ECU in the Fwd. Electrical Compartment
Details
       

 02-16-2012
2.00
Fabricated Cover for Fwd. Electrical Compartment
Details
       

 02-12-2012
4.00
Wired EIS to Eggenfellner Subaru 9 pin Connector
Details
       

 02-12-2012
0.00
Wired EIS to Eggenfellner Subaru 9 pin Connector
Details
     

 02-10-2012
2.00
Attached D-sub Connector to Manifold Press. Sensor
Details
       

 02-09-2012
2.50
Installed Two Engine Grounds to the Firewall
Details
       

 02-09-2012
0.50
Attached Fat Ground to the Firewall
Details
       

 02-08-2012
1.00
Attached the Fat Ground to the Firewall
Details
       

 02-07-2012
4.00
Attached Avionic Grounds and Fuel Pumps' Ground
Details
       

 02-06-2012
2.00
Ran the Fuel Pump Grounds to the Forrest of Tabs
Details
       

 02-06-2012
1.50
Installed Firewall to Bulkhead Fuel Return Line
Details
       

 02-05-2012
2.50
Secured Ground Wires in Forward Cabin
Details
     

 02-04-2012
1.50
Fuel Supply Line Firewall Forward
Details
       

 02-02-2012
1.50
Ran Firesleeved 3/8" Fuel Return Line
Details
       

 02-02-2012
0.50
Covered the Crossover Tube with Firesleeve
Details
     

 01-22-2012
4.50
Secured the Fuel Pressure Regulator to Firewall
Details
       

 01-22-2012
2.00
Mounted the EIS Fuel Pressure Sensor
Details
       

 01-22-2012
0.25
Mounted Manifold Pressure Sensor to Firewall
Details
       

 01-22-2012
1.50
Installed Firesleeve on the Firewall Penetration
Details
     

 01-15-2012
3.50
Ran Fat Wire to Starter Contactor and Starter
Details
       

 01-13-2012
0.50
Test Fit Airbox and Filter to Engine Mount
Details
       

 01-13-2012
1.00
Attached ANL Fuse Holder and Starter Contactor
Details
       

 01-13-2012
1.50
Attached Airbox Flange to Airbox
Details
       

 01-12-2012
0.00
Fabricated Airbox
Details
       

 01-12-2012
2.50
Assembled, Modified and Fit the Airbox
Details
       

 01-11-2012
0.50
Mounted the Coolant Reservoir to the Firewall
Details
     

 01-10-2012
1.00
Ran Engine Cables Through the Firewall
Details
       

 01-09-2012
1.50
Made a Copper Bar to Attach Starter Relay to ANL
Details
     

 01-03-2012
0.50
Patched Extra Firewall Penetrations
Details
       

 01-03-2012
2.00
Made Several Firewall Penetrations
Details
       

 01-03-2012
0.00
Made Several Firewall Penetrations
Details
       

 01-03-2012
0.25
Attached the Forrest of Tabs to the Firewall
Details
     

 01-02-2012
0.50
Attached the Andar Firewall Pass Through Filter
Details
       

 01-01-2012
1.50
Cut Firewall Opening for Fuel Filter Pass Through
Details
       

 12-31-2011
0.25
Cut Firewall Pass Through From SS Hand Rail
Details
       

 12-28-2011
2.00
Riveted Fat Wire Firewall Pass Through to Firewall
Details
       

 12-27-2011
0.50
Drilled Holes for the Fat Wire Firewall Pass Throu
Details

 12-22-2011
0.50
Installed the Anti-Splat Stiffener on Nose Gear Le
Details
       

 12-22-2011
4.00
Attached the Engine to the Fuselage
Details
       

 12-20-2011
0.75
Flipped the Engine Vertical
Details
       

 12-20-2011
3.25
Drilled the Nose Gear Retaining Bolt Hole
Details
       

 12-19-2011
1.50
Split the Right Wheel Fairing
Details

 12-19-2011
3.00
Put the Nose Gear Together
Details
       

 12-18-2011
1.50
Right Lower Intersection Fairing Glassed
Details
       

 12-16-2011
0.25
Taped the Fairing Mold to Keep Clay from Sticking
Details
       

 12-15-2011
4.00
Fabricated Right Lower Intersection Fairing
Details
       

 12-14-2011
4.00
Separated the Left Wheel Fairing Halves
Details
       

 12-14-2011
0.50
Re-checked the Rt Gear Leg Fairing Position
Details
       

 12-13-2011
3.00
Glassed the Left Lower Intersection Fairing
Details
       

 12-12-2011
1.50
Trimmed the Left Intersection Fairing Some More
Details
       

 12-11-2011
2.50
Trimmed and Shaped Lt Intersection Fairing
Details
       

 12-09-2011
2.50
Carved/Shaped the Left Lower Intersection Fairing
Details
       

 12-07-2011
1.50
Applied Clay to Left Wheel Fairing Intersection
Details
       

 12-06-2011
2.50
Checked Left Gear Leg Fairing after Installation
Details
       

 12-05-2011
3.00
Sanded and Shaped the Left Gear Leg Stiffener
Details
       

 12-04-2011
3.00
Finished Riveting the Leg Gear Fairing Hinges
Details
       

 12-03-2011
1.50
Riveted Half of Leg Fairing Hinges
Details

 12-02-2011
3.00
Removed the Hinges from the Leg Fairings
Details

 12-01-2011
0.50
Right Leg Fairing Too Tight After Glass Applicatio
Details

 11-30-2011
5.00
Shaved and Sanded the Stiffeners to Fit the Fairin
Details
       

 11-29-2011
0.25
Checked the Right Leg Fairing Alignment
Details

 11-28-2011
3.00
Bonded a Leg Stiffener to the Right Leg
Details
       

 11-27-2011
1.00
Confirmed Leg Fairing Alignment with a String
Details
       

 11-26-2011
0.00
Attempting to Level the Gear Leg Fairing - 2
       

 11-26-2011
1.50
Attempting to Level the Gear Leg Fairing
Details
       

 11-25-2011
2.50
Riveted the U-808 Brackets to the Wheel Fairing
Details
       

 11-24-2011
2.50
Fit and Drilled the Right Wheel Fairing
Details
       

 11-23-2011
2.50
Drilled and Clecoed Left Wheel Fairing to U-810
Details
       

 11-22-2011
2.50
Fit the Aft Half of the Left Wheel Pant to the Whe
Details
       

 11-21-2011
3.00
Fit the Aft Half of the Right Wheel Pant to the Wh
Details
       

 11-20-2011
2.50
Drilled Wheel Pants Halves Attachment Holes
Details
       

 11-19-2011
2.00
Fitted Left Wheel Pant Halves Together
Details
     

 11-18-2011
2.00
Fitted Two Halves of a Wheel Fairing Together
Details
       

 11-17-2011
0.50
Trimmed the Rough Edges of the Glass Layups
Details
     

 11-16-2011
2.00
Carved Excess Epoxy Flox from Fairings
Details
     

 11-15-2011
0.50
Applied Epoxy Flox to the Tongue of the Fairings
Details
       

 11-14-2011
2.00
Finished the Fairing Hinges Installation
Details
       

 11-08-2011
3.50
Cut Clearances in the Fairings for the Brake Lines
Details

 11-07-2011
1.00
Cut Template for the Main Gear Fairings from Plans
Details
       

 11-06-2011
1.50
Taped Brake Lines with Split Tubing Spacers
Details

 11-05-2011
1.00
Installed the Brake Line to the Right Wheel
Details
       

 11-05-2011
1.00
Installed the Brake Line to the Left Wheel
Details
       

 11-04-2011
1.00
Installed the Right Main Wheel
Details
       

 11-02-2011
2.00
Installed the Left Main Wheel
Details
       

 11-01-2011
0.50
Installed Wheel onto a Rim
Details
     

 10-31-2011
1.00
Installed First Tire on a Wheel
Details
       

 10-30-2011
4.00
Mounted the Brakes and Wheels on Gear Axels
Details
       

 10-29-2011
1.50
Assembled Brakes for Mounting on the Axles
Details
       

 10-28-2011
1.00
Corrosion Treated and Primed Wheel Fairing Mounts
Details
     

 10-27-2011
1.50
Made U-408 Spacers and Assembled Brake Parts
Details
       

 10-26-2011
2.50
Installed the Landing Gear Legs
Details
       

 10-25-2011
1.00
Put Fuselage on Tall Sawhorse for Gear Installatio
Details
       

 10-23-2011
4.00
Fabricated a Connection from Pre-Filter to Pumps
Details
       

 10-22-2011
2.50
Tried Fabricating Pre-Filter to Pump Connection
Details

 10-19-2011
1.50
Modified the Fuel Filter Mount for Better Access
Details
       

 10-17-2011
1.50
Removed the Pre-Pumps Filter from the Aircraft
Details

 10-06-2011
1.00
More Fuel Plumbing Decision Making
Details

 10-04-2011
1.50
Installed Coter Pins on the Brake Pedal Assemblies
Details

 10-02-2011
0.50
Re-Installed the Brake Peddles and Extensions
Details
       

 09-27-2011
0.25
Re-applied Enamel to the Brake Pedals and Extensio
Details
     

 09-26-2011
2.50
Assembled Brake Pedals and Extensions
Details
     

 09-25-2011
1.00
Sprayed Black Appliance Enamel on Pedals
Details

 09-24-2011
2.00
Primer Painted the Brake Pedals and Extensions
Details

 09-22-2011
0.50
Removed the Rudder Pedals
Details
       

 09-22-2011
1.50
Fabricated Rudder Pedal Extensions
Details
       

 09-20-2011
1.00
Attached TNC Connector For G430W GPS
Details
       

 09-18-2011
7.00
Fixed the G-430W Backup Power Problem
Details
       

 09-17-2011
6.00
Tested EFISs OK. Checked Backup Power System
Details

 09-15-2011
3.00
Finished EFIS/AHRSs CPC Connectors Installation
Details
       

 09-14-2011
2.50
Re-wired the EFISs and AHRSs Secondary Power
Details

 09-12-2011
4.00
Finished Avionics Installation and Power Up
Details
       

 09-11-2011
2.50
Re-installed Avionics in Panel and Secured Wires
Details
       

 09-07-2011
1.00
Wired the ADS-B Fault Light
Details
       

 09-06-2011
0.75
Installed AHRSs and Pitot/Static Connections
Details
       

 09-06-2011
0.25
Adel Secures Gretz and VP Cables
Details
       

 09-06-2011
0.25
Added a Red Switch Guard to the Engine Kill Switch
Details
       

 09-04-2011
1.00
Ran Cowl Flap Power Wire to Throttle Area
Details

 09-01-2011
0.50
Connected G430W GPS Antenna to Rack
Details
     

 09-01-2011
1.50
Connected Fuel Guardian and Autopilot Wires
Details
     

 08-28-2011
0.50
Primed the AHRS Mount
Details

 08-28-2011
1.00
Installed the ADS-B Fault Light in the Panel
Details
     

 08-28-2011
0.50
Installed Rivnuts to Attach the AHRS Mount
Details

 08-28-2011
1.00
Installed a Stud Grounding Block on the Brace
Details
     

 08-27-2011
1.50
Clecoed the Forward Top Skin in place
Details
       

 08-26-2011
2.50
Connected Antennae to the Avionics
Details
       

 08-25-2011
1.50
Fabricated a Mount of the VOR Antenna Splitter
Details
       

 08-23-2011
1.00
Connected Cowl Flap Wire to the Autopilot Terminal
Details

 08-22-2011
1.50
Soldered an Extension on the Prop Motor Cable
Details

 08-21-2011
4.00
Built the Prop Contoller Harness
Details
       

 08-20-2011
1.00
Ran the Cabin Light Wires Down the Right Side
Details

 08-20-2011
1.00
Ran Power Wire to the Prop Controller
Details
     

 08-20-2011
2.00
Ran Panel Dimmer Source Grounds to the Terminal
Details

 08-20-2011
2.00
Ran EIS Out Wire from EFIS towards the EIS
Details

 08-20-2011
0.50
Connected TCW IBBS Info wire to the GRT EFIS
Details

 08-19-2011
2.00
Installed the Left and Right Pilot Map Lights
Details
       

 08-18-2011
2.00
Attached the Left Pilot Map Light Mount
Details
       

 08-17-2011
2.50
Installed Passenger Map Light on Left Side
Details
       

 08-16-2011
2.50
Ran Map Light Wires
Details

 08-15-2011
2.50
Finished Pitot/Static Installation To the EIS
Details
       

 08-14-2011
6.00
Wired the Autopilot Terminal
Details
       

 08-12-2011
2.00
Wired Gretz Heated Pitot Tube Output to VP Sys.
Details
       

 08-11-2011
1.00
Mounted Gretz to VP Conversion Circuit Board
Details
       

 08-08-2011
2.00
Connected ELT Power, Ground and Shield
Details
       

 08-06-2011
2.50
Straightened/Organized more wiring
Details

 08-06-2011
1.00
Reversed the Antenna Pigtail Direction
Details
       

 08-06-2011
1.00
Connected the AFS AoA to the Pitot/Static System
Details
       

 08-06-2011
0.00
Connected GPS Serial Output to the ELT - Cont.
Details
       

 08-06-2011
2.00
Connected GPS Serial Output to the ELT
Details
       

 08-05-2011
5.00
Worked on several tasks that need to be done.
Details
     

 08-05-2011
3.00
Wired the EIS System
Details
       

 08-02-2011
0.50
Moved the avionics terminal bar down 3/4".
Details

 07-30-2011
0.00
Back from Oshkosh
Details
       

 07-24-2011
0.00
Off to Oshkosh!!!
Details

 07-12-2011
2.00
Soldered the Mini DIN Connector for GPS to ELT
Details
       

 07-12-2011
0.00
Soldered the Mini DIN Connector for GPS to ELT
Details
       

 07-12-2011
1.00
Laced the ELT Related Wires
Details
       

 07-10-2011
1.00
Painted the Baggage Compartment Shelf
Details
     

 07-10-2011
1.00
Installed the ELT Antenna
Details
       

 07-09-2011
3.00
Cut the Panel for the ELT Remote Panel Control
Details
       

 07-08-2011
1.00
Ran the ELT Cables Forward Along Right Side
Details
       

 07-07-2011
1.00
Flipped the ELT Securing Bands
Details
       

 07-06-2011
3.00
Replaced the ELT Mounting Plate
Details
       

 07-03-2011
2.00
Installed 6D Bulkhead Fitting in F-802A-L
Details
       

 07-03-2011
0.00
Attached Fuel Return Line to F-802A-L Fitting
Details
       

 06-30-2011
0.50
Put Nutplates on the Fuel Valve Mounting Plate
Details
     

 06-26-2011
8.00
Installed the 100 Micron Fuel Filter
Details
       

 06-26-2011
0.00
Installed Hoses for the Andair Valve Outlet and In
Details
       

 06-25-2011
1.50
Riveted the EIS Tray to the Forward Right Panel
Details
       

 06-25-2011
1.00
Fabricated 100 Micron Fuel Filter Bracket
Details
       

 06-24-2011
0.50
Top Coated the EIS Tray Dawn Patrol Grey
Details

 06-23-2011
2.00
Primed EIS Tray After Drilling to Right FWD Panel
Details
     

 06-15-2011
1.50
Modified the EIS Tray
Details
       

 06-14-2011
2.50
Fabricated the EIS Tray
Details
       

 06-11-2011
2.00
Wired the Engine Critical Power CommonTerminal
Details
     

 06-04-2011
1.00
Installed Mic and Headphone Jacks
Details
       

 06-02-2011
2.50
Soldered Wires to the Mike and Headset Plugins
Details
       

 05-30-2011
1.50
Wired the Tank Sensors for the Fuel Guardian
Details
       

 05-28-2011
2.00
Ran Pitot/Static Lines to the AHRS
Details
       

 05-28-2011
6.00
Organized Wires on the Left Side of the Panel
Details
     

 05-28-2011
0.00
Organized Wires
Details
       

 05-26-2011
1.00
Ran the Magnetometer Wires Through the Panel
Details
     

 05-26-2011
2.00
Ran Backup Power Wires to the AHRSs
Details
       

 05-25-2011
1.50
Organized Panel Wires
Details
       

 05-24-2011
1.50
Put the Avionics Trays Back on the Panel
Details
       

 05-24-2011
1.50
Laced More Wires Behind the Panel
Details

 05-22-2011
1.50
Painted the Panels Rustoleum Graphite Gray
Details
     

 05-22-2011
4.00
Organized Avionics Wires Behind the Panel
Details

 05-22-2011
1.00
Cut Panel Holes for the Air Vents
Details
       

 05-21-2011
1.00
Prepared to Cut Panel Holes for the Air Vents
Details

 05-19-2011
8.00
Still Organizing Avionics Wires
Details
       

 05-15-2011
8.00
Installed and Wired the TCW IBBS
Details
       

 05-14-2011
6.50
Organizing Panel Wires
Details

 05-13-2011
2.50
Polished the Right Wing
Details

 05-10-2011
6.00
Organized Panel Wires
Details
       

 05-10-2011
0.00
Organized Panel Wires
Details
       

 05-09-2011
1.50
Worked on Organizing Avionics Wiring on Right Side
Details
       

 05-09-2011
1.50
Soldered the SL-40 Antenna Pigtail in Place
Details
       

 05-09-2011
0.00
Soldered the SL-40 Antenna Pigtail in Place
Details
       

 05-06-2011
1.00
Wired the Pitch Servo
Details
     

 05-06-2011
2.50
Soldered 10K Ohm Resistors in Keep Alive Wires
Details
       

 05-06-2011
2.50
Removed the Instrument Panel Equipment
Details
       

 05-05-2011
0.10
Replaced the Elevator Bellcrank Bolt
Details
     

 05-05-2011
4.50
Exchanged the TruTrak Servos with GRT Servos
Details
       

 05-05-2011
0.00
Exchanged the TruTrak Servos with GRT Servos
Details
       

 05-05-2011
0.00
Exchanged the TruTrak Servos with GRT Servos
Details
       

 05-04-2011
0.00
Canopy Rails to Ft. Walton To Be Anodized
Details

 05-03-2011
0.00
Cosmetic Adhesive to Canopy
Details
       

 05-03-2011
3.00
Applied the Cosmetic Surface of the Adhesive
Details
       

 05-02-2011
3.00
Glued the Canopy to the Frame
Details
       

 05-02-2011
0.00
Glued the Canopy to the Frame
Details
       

 05-01-2011
2.50
Final Taped Canopy Areas To Be Glued
Details
       

 04-28-2011
1.50
Superglued 1/8" Spacer Chips on the Canopy Frame
Details
       

 04-27-2011
1.50
Taped Canopy Edges
Details

 04-25-2011
2.00
Trimmed and Dressed the Canopy Edges
Details
       

 04-24-2011
1.00
Trimmed Some Excess Off of the Canopy Sides
Details

 04-23-2011
8.00
Made "The Big Cut" in the Canopy
Details
       

 04-23-2011
0.00
Made "The Big Cut" in the Canopy
Details
       

 04-23-2011
0.00
Made "The Big Cut" in the Canopy
Details
       

 04-23-2011
0.00
Made "The Big Cut" in the Canopy
Details
       

 04-22-2011
3.00
Second Day of Canopy Trimming
Details
       

 04-21-2011
2.50
Started Trimming the Front of the Canopy
Details
       

 04-21-2011
0.00
Started Trimming the Front of the Canopy
Details
       

 04-19-2011
2.50
Drilled and Attached C-803 Rails to F-816
Details
       

 04-18-2011
0.00
Made a Canopy Frame Stand
Details
       

 04-16-2011
0.00
Brought the Canopy to the Shop from the Hangar
Details

 04-15-2011
2.00
Bent the Canopy Frame to the Fuselage
Details
     

 04-13-2011
1.00
Checked the Canopy Frame Alignment to Fuselage
Details
       

 04-12-2011
2.00
Drilled Slider Block for Pivot Pin and Cotter Pin
Details
       

 04-11-2011
1.00
Broke out the Canopy Frame from the Attic
Details
       

 04-10-2011
1.00
Temporarily Attached the Slider Rail to the Skin
Details
       

 04-10-2011
3.00
Riveted the Canopy Slider Cap to the Spacer
Details
       

 04-10-2011
3.00
Cut/Fit the Roller Rails for the Canopy Frame
Details
       

 04-08-2011
2.00
Drilled Holes in the C-804 Slider Cap
Details
       

 04-06-2011
0.00
Updated Finishing Kit Instructions in the Manual
Details

 04-02-2011
6.00
Receiving Fault Message on the Backup B Panel
Details

 04-02-2011
1.50
Checked and Corrected Heater Fan Wiring
Details

 04-01-2011
2.00
Programming G430W and GRT EFISs
Details

 03-31-2011
0.00
Sun 'N Fun Big Storm
       

 03-30-2011
0.00
Sun 'N Fun

 03-27-2011
1.50
Programmed the GRT EFISs until Battery Died
Details
       

 03-23-2011
1.50
Programming the VP-200
Details

 03-22-2011
1.50
Installed an Inline Fuse for the Fuel Guardian Lig
Details
       

 03-21-2011
0.50
Changed the Engine Oil and Ran the Engine
Details

 03-20-2011
1.00
Wired Inline Fuse Holders for the Fuel Guardian
Details

 03-19-2011
1.50
Ran the Pitot/Static Lines for the Avionics and Ao
Details

 03-16-2011
1.00
Corrected Light Wiring of Fuel Guardian
Details

 03-14-2011
1.00
Farmiliarized Myself with Programming the VP-200
Details
     

 03-12-2011
1.00
Updated the GRT EFISs Nav Data
Details

 03-11-2011
2.00
Found the Cause of the AHRSs Failures
Details
       

 03-10-2011
2.50
Started testing elctrical circuits
Details
       

 03-09-2011
2.00
Linked the Forward Grounds Together
Details
       

 03-08-2011
2.00
Re-routed Starter Cable Through Floor Rib
Details
       

 03-04-2011
8.00
Installed the AHRSs Mounting Platform
Details
       

 03-02-2011
1.00
Made Left Side of the AHRS Mount
Details
       

 02-28-2011
1.50
Ran Five 20ga. Wires from the Hub to the Firewall
Details
       

 02-27-2011
2.00
Wired the Grounding Hub
Details
       

 02-27-2011
3.00
Installed and Wired the Panel Grounding Hub
Details
       

 02-26-2011
3.00
Wired GNS 430W to the Avionics Power Terminal
Details
       

 02-26-2011
1.00
Mounted the Fuel Guardian
Details
       

 02-20-2011
1.00
Wired the Heater Fan to the Switch
Details
       

 02-20-2011
2.00
Wired the AFS Sport Angle of Attack Indicator
Details
       

 02-20-2011
4.00
Wired Power for Avionics to the Terminal
Details
       

 02-20-2011
0.50
Started to Run Mic and Headphone Wires
Details
       

 02-20-2011
1.00
Soldered Wires to AoA Test and Dimmer Buttons
Details
       

 02-14-2011
2.00
Wired Power Side of the Lighting Terminal
Details
       

 02-13-2011
3.00
Wired the Bottom Row of Avionics Power Terminal
Details
       

 02-12-2011
8.00
Worked on Wiring the Left Side of the Panel
Details
       

 02-11-2011
1.50
Attached TCW IBBS to the Baggage Bulkhead
Details
       

 02-08-2011
1.00
Installed the Instrument Panel in the Aircraft
Details
       

 02-06-2011
2.00
Switched Front Stick Grip Direction on the Stick
Details

 02-06-2011
1.00
Re-Installed the Front Control Stick
Details
       

 02-06-2011
1.00
Installed Connector on Rear Stick Fuselage Cable
Details
       

 02-06-2011
2.50
Corrected the Wiring of the Grips PTT Switches
Details
       

 02-06-2011
1.50
Attached D-sub Connector on Rear Stick Cable
Details
       

 02-04-2011
2.50
Trimmed the F-803B L&R to Clear Installed Avionics
Details
       

 02-03-2011
4.00
Installed Avionics in the Panel
Details
       

 02-03-2011
2.00
Attached Cables to the Aft End of Avionics Trays
Details
       

 02-02-2011
0.25
Drilled Holes for the AoA Button Switches
Details
       

 02-02-2011
1.75
Cut Hole the Panel for the MT Propeller Contoller
Details
       

 01-29-2011
2.00
Cut the Opening for the Advanced Flight AoA
Details
       

 01-28-2011
3.00
Cut the Panel Opening for the Bottom EFIS
Details
       

 01-27-2011
3.00
Cut the Upper GRT HX Opening in the Panel
Details
       

 01-24-2011
1.00
Put D-sub Connector on the Front Stick Cable
Details
       

 01-24-2011
1.00
Installed the Rear Stick Grip on the Stick
Details

 01-23-2011
2.00
Installed the Grips Back on the Sticks
Details
       

 01-18-2011
1.00
Re-Riveted Antennae Doublers to Fuselage
Details

 01-17-2011
3.00
Removed all of the Antennae Doubler Installations
Details
       

 01-16-2011
4.00
Used Hangers to Finish the Switch Panel Wiring
Details
       

 01-15-2011
6.00
Wired the Switch Panel on the Fwd Rt Side
Details
       

 01-12-2011
5.00
Installed the Fuel Guardian Lights in the Panel
Details
       

 01-11-2011
3.00
Installed Other Rear Pedal Linkage Bar
Details
       

 01-10-2011
2.00
Mounted a Flaps Microswitch for the Advanced AoA
Details
       

 01-08-2011
3.00
Cut Mounting Holes for the TruTrak Turn and Bank
Details
       

 01-06-2011
2.00
Match Drilled the Avionics Mounting Rail To Panel
Details
       

 01-04-2011
2.50
Attached the Avionics Mounting Rail to Avionics
Details
       

 01-03-2011
2.00
Re-routed switch panel wires from the panel
Details
       

 01-02-2011
3.00
Wired the Switches of the Rt Forward Switch Panel
Details
       

 12-31-2010
0.50
Put BNC Connector on the Transponder Cable
Details
       

 12-31-2010
1.00
Made Hangers for the ADS-B GPS Antenna Cable
Details
       

 12-28-2010
8.00
Cut the Holes for the Vertical Power Display Unit
Details
       

 12-27-2010
1.50
Drew Verical Power Display Unit Opening
Details
     

 12-26-2010
2.50
Made 16 Nuts for the Avionics Mounting Rail
Details
     

 12-26-2010
0.50
Duct Taped the Avionics Trays Together
Details
       

 12-26-2010
3.00
Cut the Avionics Stack Opening in the Panel
Details
       

 12-20-2010
1.50
Drew GRT EFIS Positions on the Panel

 12-18-2010
2.00
Instrument Panel Planning and Photos
Details
       

 12-18-2010
0.00
Instrument Panel Planning and Photos
       

 12-17-2010
1.50
Made Hangers for the Bundles in Aft Lt Mid Section
Details
     

 12-16-2010
1.00
Ran the ADS-B GPS Cable
Details
       

 12-15-2010
2.50
Installed the ADS-B cable 37 pin D-Sub Connector
Details
       

 12-13-2010
0.00
Views of Rudder Cable Crossing Close to Longeron
Details
       

 12-13-2010
0.00
Installed Rudder Cable Rub Blocks
Details
       

 12-13-2010
2.50
Fabricated/Installed Rub Blocks for Rudder Cables
Details
       

 12-12-2010
1.50
Installed Wiring Hangers in the Aft Section
Details
       

 12-12-2010
0.25
Installed the Transponder Antenna
Details

 12-12-2010
1.00
Installed the ADS-B UAT Antenna and Cable
Details
       

 12-11-2010
2.00
Installed Split Conduit on Aft Section Wire Bundle
Details
       

 12-10-2010
2.00
Drilled a Tail Light Hole Through the Aft Bulkhead
Details
       

 12-08-2010
1.00
Put Shells on the Magnetometer D-Dub Connectors
Details
       

 12-06-2010
1.00
Routed the Magnetometer Bundles
Details
       

 12-05-2010
2.00
Laced the Remaining Magnetometer Wiring Bundle
Details

 12-04-2010
2.50
Laced One of the Magnetometer Wire Bundles
Details

 11-30-2010
1.00
Took Fuselage Off of Rotisserie
Details
       

 11-28-2010
4.00
Riveted the Flap Fairings to the Fuselage
Details
       

 11-27-2010
3.00
Installed a Doubler for the Right Flap Fairing
Details
     

 11-26-2010
1.50
Made Paper Template for the Step Hole
Details
       

 11-24-2010
2.00
Dimpled Skins and Riveted Antenna Doublers
Details
       

 11-22-2010
3.00
Riveted the Step to the Fuselage.
Details
       

 11-22-2010
0.00
Riveted the Step to the Fuselage
Details
       

 11-21-2010
4.00
Fabricated the Transponder Antenna Doubler Plate
Details
       

 11-20-2010
1.00
Attached the FastStack Pro-X Hub to Panel
Details
       

 11-19-2010
3.00
Fabricated Doubler Plates for the Commo Antennae
Details
       

 11-19-2010
3.00
Attached Aft Skin Stiffener to Fore & Aft Bulkhead
Details
       

 11-18-2010
1.50
Re-routed #6 Cable to the Aft Power Terminal
Details
       

 11-17-2010
1.00
Drilled and Dimpled the ADS-B Antenna Doubler
Details
       

 11-16-2010
1.50
Fabricated the ADS-S Antenna Doubler
Details
     

 11-13-2010
3.00
Secured Wires of the Left Side
Details
       

 11-13-2010
4.00
Laced the Wires of the Left Side
Details
       

 11-12-2010
3.00
Re-laced the Right Side Wires that Needed It
Details
       

 11-12-2010
2.00
Installed the Dual Magnetometers
Details
       

 11-12-2010
1.00
Changed the Heater Fan Switch Installation
Details
       

 11-10-2010
0.50
Drilled Mounting Holes in the Magnetometers
Details
       

 11-10-2010
0.50
Drew a Template for the Magnetometer Installation
Details
       

 11-08-2010
1.50
Organized Forward Right Cabin Wires
Details
       

 11-07-2010
2.00
Ran the RG-400 Cables for the Antennae
Details
       

 11-07-2010
0.50
Ran Fuel Level Cables from the Panel Area
Details
       

 11-07-2010
2.00
Organized the Wires/Cables of Rt Fwd Cabin Floor
Details
       

 11-07-2010
1.50
Installed a Backup Fuselage Ground Wire
Details
     

 11-06-2010
3.00
Installed Switches in the Fwd Right Switch Panel
Details
       

 11-04-2010
2.50
Ran Battery Backup Wires From the Right Aft Side
Details
       

 11-02-2010
3.00
Ran Autopilot Servo Wires
Details
       

 10-27-2010
1.50
Mounted the ADS-B to the Mounting Panel
Details
       

 10-26-2010
2.50
Finished the ADS-B Mount
Details
       

 10-25-2010
3.00
Started Fabrication of NavWorx ADS-B Mount
Details
       

 10-18-2010
1.00
Removed the Front Top Skin for Storage
Details

 10-17-2010
1.00
Installed Remainder of the Throttle Hardware
Details

 10-07-2010
2.00
Spot Polished the Wings to Remove Corrosion
Details

 10-06-2010
1.00
Stiffener Made for the F-804C-AL Bulkhead
Details
     

 10-05-2010
2.50
Rebuilt the Front Throttle with Longer Bolts
Details
       

 10-05-2010
0.00
Modified Front Throttle for Clevos Pin Access
Details
     

 10-03-2010
1.50
Polished 0.5 of the light corrosion on Rt Wing
Details

 09-27-2010
0.50
Riveted Nutplates to the Aft Deck
Details
       

 09-26-2010
6.00
Rough Connected the Front and Rear Throttle
Details
       

 09-23-2010
1.00
Made Spacer For the Front Throttle
Details
       

 09-14-2010
1.00
Connected the Rear and Front Throttles
Details
       

 09-13-2010
1.00
Holes for the Rear Throttle Connection Rod
Details
       

 09-12-2010
1.50
Tapped the Rear Throttle Connecting Rod
Details
       

 09-12-2010
2.00
Mounted the Front Throttle
Details
       

 09-12-2010
0.25
Installed the Bearing and Clevis Rod Ends
Details
       

 09-12-2010
1.00
Installed Nutplated for the Tip Lenses
Details
       

 09-12-2010
1.00
Drilled/Clecoed for Horizontal Stabilizer Nutplate
Details
       

 09-12-2010
0.50
Added Nutplates to the Fuselage Tank Brackets
Details
       

 09-11-2010
3.00
Moved the Wings to the Hangar
Details
       

 09-10-2010
1.00
Riveted Under Wing NACA Vent to Right Wing
Details
       

 09-09-2010
1.00
Prosealed the Under Wing NACA Vent to Rt Wing
Details
       

 09-07-2010
1.50
Checked the Operation of the Fuel Guardian
Details
       

 09-06-2010
2.00
Riveted Nutplates to the Rt Wing Inboard Edges
Details

 09-03-2010
2.00
Dimpled and Countersunk Top Skin Holes
Details
       

 09-02-2010
1.50
Drilled, Deburred & Dimpled Rt Wing Inboard Edge
Details
       

 09-01-2010
1.00
Re-Surface Converted the Left Flap
Details
       

 08-31-2010
2.00
Finished Installation of Rt Wing Fairing Nutplates
Details
       

 08-31-2010
1.00
Cut the Slot in the Rt Tank Attachment Bracket
Details
       

 08-30-2010
4.00
Drilled, Dimpled & Countersunk Rt Inboard Wing
Details
       

 08-28-2010
1.00
Removed the Left Wing Flap and Rolled the Edge
Details

 08-25-2010
2.50
Fit the Left Tip Lens
Details
       

 08-24-2010
1.50
Fitting the Right Tip Lens
Details
       

 08-24-2010
1.00
Fitted the Right Tip Lens
Details
       

 08-23-2010
2.00
Installed the Light Assembly in the Left Tip
Details
       

 08-21-2010
0.00
View of 70 Degree Spacers on Rt. Tip Lights
Details
     

 08-21-2010
1.00
Fitted the Light Assembly to the Right Tip
Details
       

 08-20-2010
5.00
Worked on the Installation of the Tip Lights
Details
       

 08-18-2010
1.50
Started the Installation of the Tip Lights
Details
     

 08-17-2010
1.50
Finished the Installation of the Tip Nutplates
Details
     

 08-06-2010
2.50
Installed 2/3 of Nutplates on the Left Tip
Details
       

 08-05-2010
1.00
Installed the Archer VOR Antenna in Right Tip
Details
       

 08-05-2010
1.50
Installed half of the Right Tip Nutplates
Details

 08-03-2010
1.50
Fiberglass the Aft Inside of the Tips
Details
       

 08-03-2010
1.50
Countersunk the Left Tip Holes
Details

 08-02-2010
1.50
Countersunk Right Wing Tip Holes
Details
       

 07-26-2010
0.00
To Oshkosh until July 31
Details

 07-21-2010
1.00
Fuselage is back on the Rotisserie
Details

 07-20-2010
2.00
Removed the Wings from the Fuselage
Details
       

 07-19-2010
1.50
Drilled the Right Tip for Nutplate Installation
Details
       

 07-18-2010
1.00
Drilled the Left Tip for Nutplate Installation
Details

 07-17-2010
1.00
Drilled Right Wing Tip Attachment Hole to #26
Details
     

 07-16-2010
1.50
Cut the Right Tips Trailing Edge
Details
     

 07-15-2010
2.00
Matched Drilled Tip Edge Reinforcement Strips
Details
       

 07-14-2010
0.50
Remover Tape From the Tips' Exterior
Details
       

 07-13-2010
1.50
Riveted the Inside of the Baggage Door
Details
       

 07-13-2010
1.50
Re-Did the Tips Trailing Edges
Details
       

 07-12-2010
2.00
Cut and Epoxied the Tips Trailing Edges
Details
       

 07-09-2010
1.50
Drilled #26 Holes in the Tip for #6 Screws
Details

 06-27-2010
1.50
Fitted, Cut and Drilled Left Wing Tip
Details
       

 06-26-2010
2.00
Fitted, Drilled and Clecoed Right Wing Tip
Details
       

 06-22-2010
1.50
Final Drilled the Wing Fairing Holes to #19 Size
Details

 06-21-2010
3.00
Installed the Flap Fairings
Details
       

 06-21-2010
3.00
Finished Wing Fairings/Installed Flap Fairings
Details
       

 06-20-2010
4.00
Started Wing Fairing Fitting
Details
       

 06-18-2010
1.50
Re-checked the aileron neutral positions
Details

 06-17-2010
4.00
Installed the Aileron Stops after talking to Van's
Details

 06-16-2010
1.00
Checked the Ailerons' Range of Motion
Details

 06-15-2010
1.00
Openned the Rt. Fuselage Flap Control Rod Hole
Details

 06-14-2010
1.00
Opened Fuselage Hole for the Flap Control Rod
Details
       

 06-10-2010
1.00
Enlarged the Hole for the Flap Control Rod
Details
       

 06-08-2010
1.50
Replaced the Flap Control Rod mounting nuts
Details

 06-07-2010
2.00
Opened the Rt Flap Control Rod Hole
Details

 06-02-2010
2.00
Aligned the Ailerons in Neutral Trail Position
Details
       

 06-01-2010
0.50
Surface Converted the Fuselage Tank Brackets
Details
       

 06-01-2010
2.50
Started Rigging the Ailerons
Details
       

 06-01-2010
1.50
Installed the Left Tank to Fuselage Supply Line
Details
       

 05-31-2010
1.00
Drilled 1/4" hole in Forward Tank Supports
Details

 05-30-2010
0.50
Match drilled the Fuselage Center Skins and Wing
Details
       

 05-30-2010
0.00
Attached Rt Forward Tank Support Brackets
Details
       

 05-30-2010
2.00
Attached Lt Forward Tank Support rtackets
Details
       

 05-29-2010
0.00
Drilled the Right Rear Spar
Details
       

 05-29-2010
2.00
Drilled the Left Rear Spar
Details
       

 05-29-2010
0.00
Drilled the Left Rear Spar
       

 05-28-2010
0.25
Re-measured the wings
Details

 05-26-2010
1.00
Re-measured the wing required for rear spar drilli
Details

 05-25-2010
0.00
Drawing of the Flap Actuator Rod Attachment
Details
     

 05-25-2010
2.00
Attached Flap Actuator Rods to the Flaps
Details
       

 05-23-2010
2.00
Fit Lt Flap to the Fuselage
Details
       

 05-22-2010
2.00
Started fitting the Right Flap to the Fuselage
Details
       

 05-22-2010
0.00
Rt Flap Fitted to the Fuselage
Details
       

 05-21-2010
2.00
Made Flap Control Linkages
Details
       

 05-18-2010
0.25
Replaced Rt Tank to Fuselage Vent Line
Details
       

 05-17-2010
1.00
Installed Vent Line Between Rt Tank and Fuselage
Details
       

 05-17-2010
1.50
Installed Vent Line between Lt Tank and Fuselage
Details
       

 05-15-2010
0.25
Tip to Tail lengths were measured
Details
     

 05-15-2010
0.50
Set the wings' angle of incidence
Details
       

 05-15-2010
0.50
Leveled the fuselage
Details
       

 05-15-2010
2.00
Installed a Left Tank Return Line
Details
       

 05-15-2010
1.00
Connected the wings to the fuselage
Details
       

 05-15-2010
0.50
Checked the trueness of the wing
Details
     

 05-13-2010
0.50
Positioned the Wings on Saw Horses
Details
       

 05-12-2010
1.00
Moved Fuselage and Wings to House Garage
Details

 05-10-2010
0.50
Re-Installed the Heater
Details

 05-08-2010
2.00
Re-wired heater with Molex Pins and Plugs
Details
       

 04-27-2010
1.00
Powered up the Vertical Power System
Details
     

 04-20-2010
1.50
Re- laced wires of the CU that were removed
Details

 04-19-2010
0.25
Tested VP CU Serial Cables with the buzzer

 04-18-2010
4.60
Tested VP CU Plugs/Pins for correct wiring
Details

 04-17-2010
1.00
Assembled a circuit tester for the VP wiring
Details
       

 04-13-2010
0.00
Sun 'N Fun through 4/16

 04-02-2010
1.00
Secured ground cable in the mid-cabin
Details

 03-28-2010
2.00
Installled Conduit under the Front Throttle Mount
Details
       

 03-23-2010
1.00
Laced wires of the Left Mid Fuselage Floor
Details
       

 03-21-2010
2.00
Laced the wires along the right side, aft to front
Details
       

 03-21-2010
1.00
Laced the wires along the right side, aft to front
Details
       

 03-20-2010
1.50
Fixed wiring conflict with Flap Position Sensor
Details
       

 03-19-2010
1.00
Made #8 Power Cable to Aft Terminal Block
Details
       

 03-19-2010
1.50
Finished J-7 plug
Details
       

 03-18-2010
2.00
Finished wiring the J-7 Plug
Details
     

 03-16-2010
1.00
Put pins on the J-7 Pins 31, 32, 34 and 35
Details

 03-15-2010
1.00
Ran another power wire for the cowl flap control
Details
     

 03-02-2010
1.50
Started wiring the J-7 plug on the CU
Details
       

 02-28-2010
4.00
Ran spare switch wires from CU to behind panel
Details

 02-26-2010
1.00
Connected Flap Position Sensor wires to Cable
Details
       

 02-25-2010
1.50
Laced wires around the VP CU
Details
       

 02-24-2010
0.75
Ran Flap Position Sensor Cable to the VP CU
Details

 02-21-2010
7.00
Laces starter cable wires and CU wires
Details
       

 02-20-2010
4.00
Finished wiring grips' terminal
Details
       

 02-16-2010
1.00
Wired Servo outputs from the terminal strip
Details
       

 02-13-2010
0.25
Ran Front Stick Ground to Aft Ground Terminal
Details
       

 02-13-2010
3.75
Installed the Grips terminal strip
Details
       

 02-09-2010
2.50
Re-wired the Front/Aft grips at the terminal strip
Details
       

 02-08-2010
8.00
Wired the Front and Aft Grips together
Details
       

 02-07-2010
2.00
Mounted the stick grips' terminal strip
Details
       

 02-06-2010
1.50
Connected a 12 and 6 terminal strips together
Details

 02-03-2010
1.50
Ran Control Sticks' cable aft to VP CU
Details

 01-31-2010
6.00
Wired the Aft Stick Grip
Details
       

 01-30-2010
0.00
Ring used to guide wires around the grip boss
Details
     

 01-30-2010
10.00
Installed Infinity grip on Front Stick
Details
       

 01-26-2010
1.00
Ran 14 ga seat heater wire from Fused terminal
Details
     

 01-24-2010
7.00
Adjusted the flap position sensor setup
Details
       

 01-21-2010
1.50
Drilled mount and added Platenuts for Aft Terminal
Details
       

 01-17-2010
1.50
Installed/Fitted flap position sensor
Details
       

 01-17-2010
3.00
Fabricated a mount for the Aft Fused Terminal
Details
       

 01-17-2010
1.00
Crimped pins on Switch Panel plug wires
Details
     

 01-17-2010
0.50
Bent reinforcement washers for stick holes
Details
     

 01-06-2010
2.00
Fabricated a mount for the Flap Position Sensor
Details

 01-04-2010
1.00
Ran Remote Starter Switch wire from VP CU
Details

 01-01-2010
3.50
Ran the E-Bus Power for the VP CU
Details
       

 01-01-2010
0.50
Ran Ground Wires from VP CU
Details
     

 12-30-2009
2.00
Made cables for the Aft Ground Terminal Block
Details
       

 12-28-2009
2.50
Fabrication/Installation Aft Grounding Block Mount
Details
       

 12-20-2009
2.00
Made Cables from Contactor to Bus Block
Details
       

 12-16-2009
1.00
Fabricated/Installed the Bus Block Mount
Details
       

 12-16-2009
1.00
Fabricated/Installed the Bus Block Mount
Details
       

 12-15-2009
2.00
Bundled forward cabin wires
Details
       

 12-12-2009
3.50
Started bundling the VP CU wires
Details
       

 12-09-2009
1.50
Put shellbacks on the CU serial cables
Details
     

 12-06-2009
1.00
Running VP CU wires
Details
       

 12-06-2009
1.00
Running VP CU wires
Details
       

 12-06-2009
1.00
Ran wires for the J-4 and J-5 plugs
Details
       

 12-05-2009
3.50
Ran wires from the J-3 and J-6 VP CU plugs
Details
       

 12-03-2009
1.00
Electrical planning
Details

 12-01-2009
1.00
Finished wiring VP CU plugs
Details

 11-28-2009
1.75
Put d-sub connector on the aft SP cable
Details
       

 11-25-2009
2.00
Put d-sub connector on the aft end of the DU Cable
Details
       

 11-22-2009
1.00
Ran wires from VP CU to Flap Motor
Details
       

 11-22-2009
2.00
Ran wires from the Vertical Power Control Unit
Details
       

 11-21-2009
1.50
Attached Adel clamp mounting angles to floor ribs
Details
       

 11-19-2009
1.50
Ran wires for the Backup A & B switches
Details

 11-11-2009
0.00
To Disney for 5 days

 11-08-2009
3.00
Wired plugs of the VP CU

 11-07-2009
3.00
Continued to make VP CU Bundles
Details
     

 11-04-2009
1.50
Made wires for a Vertical Power Plug
Details

 10-29-2009
3.00
Made a new #6 cable for run from Battery to VP
Details
       

 10-28-2009
2.50
Adjusted Starter cable run
Details
       

 10-28-2009
1.00
Added Terminal to Starter Cable at Contactor
Details
       

 10-26-2009
2.00
Called Van's and talked to Joe about fat cable run
Details

 10-25-2009
2.50
Ran the Essential Engine Aux wires up left side
Details
       

 10-24-2009
4.00
Ran Engine Main (Always Hot) Wires up Left Side
Details
       

 10-22-2009
1.50
Put miniature d-sub connector on the roll trim cab
Details
       

 10-22-2009
1.50
Fashioned a miniature d-sub connector for roll tri
Details
       

 10-20-2009
1.00
Tested d-sub pins on the trim 26ga wires
Details

 10-07-2009
1.50
Wired most of the J-5 and started J-6 Plug
Details
     

 10-06-2009
1.50
Finished J-4 plug except for Ground Wire
Details
     

 10-05-2009
2.00
Wired the J-3 & 3/4 of J-4 VP Plugs
Details

 10-04-2009
1.00
Crimped connectors to the flap power wires
Details
       

 09-26-2009
2.00
Put AN-6D fittings on fuselage fuel line terminati
Details
       

 09-20-2009
1.50
Made the Right F-863A Bracket
Details
     

 09-18-2009
1.50
Finished the Left F-863A bracket
Details
       

 09-17-2009
1.00
Fabricated 1/2 of F-863A Tank Attachment Bracket
Details
       

 09-17-2009
0.50
Fabricated 1/2 of F-863A Tank Attachment Bracket
Details
       

 09-15-2009
3.00
Made/repaired some saw horses
Details
       

 09-13-2009
1.00
Preparing for temporary attachment of the wings
Details
       

 09-13-2009
0.50
Made a Drift pin for the wing attachment
Details
     

 09-09-2009
2.00
Measured wiring lengths for the VP loadsheet
Details

 08-16-2009
10.00
Started VP Load Planning Sheet
Details

 08-15-2009
2.50
Installed bilateral Static Sensor ports on aft fus
Details
       

 08-15-2009
0.00
Holes in center section for Static tubing run
Details
     

 08-08-2009
3.00
Riveted the F-807B-810B bulkheads to fuselage
Details
       

 08-07-2009
1.50
Riveted the Rail Receptacle to the F-807B
Details
     

 08-06-2009
1.50
Epoxy primed the Aft top skin interior
Details
       

 08-04-2009
1.00
Surface converted rail receptacle, anchors, gosset
Details

 07-24-2009
5.00
Filed and fit the F-858 shoulder anchors
Details
       

 07-22-2009
2.00
Fixed the F-808 bulkhead installation error
Details
       

 07-21-2009
2.00
Tapped the tiedown nutplates
Details
       

 07-21-2009
2.00
Fit the Canopy Rail Receptacle to Aft Skin
Details

 07-20-2009
2.00
Started homemade nutplates for tiedowns
Details
       

 07-19-2009
3.00
Finished installation of the Rear Pedals hardware
Details
       

 07-19-2009
2.00
Attached the Aft bulkheads tops
Details

 07-15-2009
1.50
Drilled/dimpled holes for Rear Pedal Guide nutplat
Details
       

 07-13-2009
2.00
Fit/drilled the F-8117 L&R Rear Pedal Guides
Details
       

 07-12-2009
2.00
Trimmed material from the F-8113 L&R
Details

 07-11-2009
0.50
Replace the elevator bellcrank center bolt
Details

 07-09-2009
2.00
Started Rear Rudder Pedal installation
Details
       

 07-06-2009
1.00
Secures Rudder Cables at aft exit hole
Details
     

 07-06-2009
1.50
Installed the Rudder Cables
Details
       

 07-05-2009
2.00
Installed the Flap Actuator
Details
       

 07-04-2009
1.00
Started the Flap Actuator installation
Details

 07-04-2009
2.00
Put PIGD Push-on terminals on Aux Fuse Block
Details
     

 07-03-2009
1.00
Ran a #6AWG Tefzel Cable to the VP CU
Details

 07-01-2009
1.50
Ran #8AWG Tefzel cable to the Fuse Blocks
Details

 06-29-2009
2.50
Mounted the Vertical Power Control Unit
Details
       

 06-29-2009
1.00
Installed the fuse blocks in the aft fuselage
Details
       

 06-28-2009
2.50
Installed heater in forward right corner
Details
       

 06-26-2009
2.50
Began heater installation
Details
       

 06-25-2009
1.00
Mounted the battery tray into the fuselage
Details
       

 06-22-2009
2.00
Made and attached 2 ground cables to the tray
Details
     

 06-21-2009
4.00
Finished making positive cables for battery tray
Details
       

 06-21-2009
0.00
Fathers' Day - Family gave me my Otto Pilot
Details
       

 06-20-2009
3.00
Attached 200A ANL holders to platforms
Details
       

 06-19-2009
1.50
Riveted the ANL fuse holder platform together
Details
       

 06-17-2009
1.00
Re-painted the battery hold downs
Details

 06-15-2009
2.50
Mounted battery contactors/Made ANL mounts
Details
     

 06-14-2009
2.00
Mounted Battery Tray Ground Bus Bar
Details
       

 06-13-2009
3.00
Made Spacers for the hold-down bolts
Details
       

 06-12-2009
2.00
Riveted the K1000-426 nutplates on battery tray
Details

 06-11-2009
1.00
Drilled 1/4" holes in the battery tray
Details

 06-07-2009
4.00
New ECU/First Engine Start
Details
       

 06-03-2009
0.00
Delivered the ECU to Jan Eggenfellner
Details

 06-01-2009
3.00
Continued coil combinations
Details

 05-31-2009
3.00
Can't stop blowing fuses
Details

 05-30-2009
2.00
Blowing 20A inline fuse when engine terminal on
Details
       

 05-29-2009
3.00
Daisy chain wired the terminal for engine start
Details
       

 05-28-2009
1.50
Safety wired the bolts of the TruTrak Roll Servo
Details
     

 05-27-2009
1.50
Tapped the housing of the Roll Servo
Details
       

 05-26-2009
1.00
Started to install TruTrak Roll Servo
Details

 05-25-2009
2.50
Riveted the roll servo bracket to Rt. Inbd Seat Ri
Details
       

 05-24-2009
3.00
Surface converted roll servo bracket and primed
Details

 05-22-2009
3.50
Started installation of the TruTrak Roll Servo
Details
       

 05-21-2009
4.00
Installed the Roll Trim Servo
Details
       

 05-19-2009
0.50
Installed Pitch Servo Control link
Details
     

 05-18-2009
1.00
Installed the Pitch Control Servo
Details
       

 05-17-2009
2.00
Installed the Trutrak Pitch Servo Bracket
Details
       

 05-16-2009
1.00
Replaced the Left Tank Access Plate
Details

 05-14-2009
1.00
Drilled the Left Tank Access Plate for the Guardia
Details

 05-13-2009
2.00
Re-screwed the Left Tank to the wing
Details

 05-08-2009
2.00
Replaced the Right Tank access plate
Details
     

 05-06-2009
1.00
Prosealed the sensor to the rght tank access plate
Details
       

 05-05-2009
0.50
Drilled a 0.47" hole in the right tank access plat
Details
     

 05-04-2009
1.00
Marked the Right Tank for sensor location
Details

 04-19-2009
4.00
Tried to remove Left tank for Fuel Guardian Instil
Details

 04-17-2009
1.00
Riveted F805B L+R and spacer and nutplates
Details

 03-29-2009
1.00
Sprayed epoxy primer to the aft fuselage interior
Details
       

 03-28-2009
4.00
Surface converted the interior of fuselage tail
Details
       

 03-27-2009
0.50
Added Gear oil to the PSRU
Details
       

 03-23-2009
0.25
Added 4 quarts of 5W-30 Oil to the engine
Details

 03-14-2009
1.50
Drilled and installed the battery mount
Details
       

 03-11-2009
2.00
Fitted the battery mount to the fuselage
Details
       

 03-07-2009
1.00
Painted battery mount glossy yellow
Details

 03-05-2009
1.50
Finished fitting the outboard angles to the mount
Details
       

 03-04-2009
1.00
Rough fit left outboard angle to battery mount
Details

 03-03-2009
2.00
Fit the battery mount to the fuselage
Details
     

 03-01-2009
4.50
Drilled, deburred, countersunk the battery mount
Details
       

 02-28-2009
5.00
Riveted the baggage door together
Details
       

 02-26-2009
2.50
Deburred, surface converted and sealed parts
Details

 02-24-2009
2.00
Assembled and drilled the baggabe door
Details
       

 02-22-2009
2.50
Fabricated F-837K latch pins for the baggage door
Details
       

 02-20-2009
0.50
Located the parts for the Baggage Door assembly
Details

 02-18-2009
0.50
Re-installed the Forward Top Skin
Details

 02-17-2009
5.00
Match drilled all parts of the Forward Top Skin
Details

 02-16-2009
0.50
Drilled the F-8104 Fwd Skin Support Ribs
Details
       

 02-15-2009
1.00
Installed Windscreen support
Details
     

 02-15-2009
5.50
Clecoed the front top skin in place
Details
       

 02-14-2009
2.50
Surface converted the Instrument panel parts
Details
     

 02-13-2009
2.50
Drilled the WD-814 Windscreen support in place
Details
       

 02-13-2009
3.50
Assembled the Instrument panel and subpanels
Details
     

 02-10-2009
2.00
Made a doubler plate for the battery mount
Details
       

 02-09-2009
1.00
Drilled holes in the Battery Mount to match ribs
Details
     

 02-08-2009
6.00
Connected F-846 pushrod to F-635 Elevator bellcran
Details
       

 02-07-2009
2.00
Connected F-839-2 to control to front & back stick
Details
       

 02-05-2009
1.00
Mounted the fuel pumps
Details
       

 02-02-2009
0.50
Altered pump cover for bolt clearances
Details

 01-29-2009
3.00
Mounted the pumps to fuselage
Details
       

 01-27-2009
1.00
Top coated the pump cover
Details

 01-27-2009
1.00
Surface converted and primed pump mount
Details

 01-25-2009
5.00
Fabricated a fuel pump mount
Details
       

 01-24-2009
2.00
Installed parking brake and torqued all lines
Details
       

 01-24-2009
2.00
Fabricated a cover for the fuel pumps
Details
       

 01-22-2009
1.50
Installed the left brake line
Details
     

 01-17-2009
2.00
Installed the pedals, reservoirs and lines in fuse
Details
       

 01-16-2009
2.00
Installed AN fittings in the gear weldments
Details
       

 01-16-2009
3.00
Fabricated a Parking Brake bracket
Details
       

 01-15-2009
10.00
Applied Fuel Lube to threads and torqued fittings
Details
       

 01-14-2009
8.00
Re-bent Right Supply line and secured the lines
Details
       

 01-13-2009
5.00
Bent Right tank return line
Details

 01-12-2009
5.00
Installed Left tank return/Bent right tank supply
Details
       

 01-12-2009
0.00
Additional Fuel system installation photos
Details
       

 01-11-2009
3.00
Bent the Left tank supply to the Andair Valve
Details
     

 01-02-2009
1.00
Riveted the rudder pedal angles to the floor
Details
       

 01-02-2009
1.00
Installed Right tank vent line in forward fuselage
Details
     

 01-01-2009
2.00
Installed the Left Tank cabin fuel vent line
Details
       

 01-01-2009
4.00
Finished Installation of the Andair valve
Details
       

 12-30-2008
3.50
Fabricated a bracket for the Andair Fuel Selector
Details
       

 12-28-2008
2.00
Re-assembled the fuel pump setup
Details
       

 12-27-2008
5.00
Assembled the Rudder Pedals and Master Cylinders
Details
       

 12-26-2008
2.00
Riveted the flap hinges to the wings
Details
       

 12-24-2008
1.00
Removed tape from seat support
Details
       

 12-15-2008
1.00
Removed the lower corner bolts from spar
Details

 12-13-2008
1.00
Topcoated F-866 access parts
Details

 12-11-2008
2.00
Riveted and primed F-866 with access door
Details

 12-09-2008
3.00
Drilled/dimpled/countersunk f-866 parts
Details

 12-07-2008
4.00
Fabricated F-866 door opening doubler
Details
       

 12-07-2008
4.00
Fabricated Avionics Door in F-866 bulkhead
Details
       

 12-06-2008
3.00
Sprayed interior topcoat - Dawn Patrol Grey
Details
       

 12-04-2008
6.00
Primed the cockpit interior
Details
       

 11-29-2008
8.00
Closed Bottom Outer panels/Installed Heated Pitot
Details
       

 11-27-2008
1.00
Taped the Front Seat Back Weldment
Details
       

 11-24-2008
0.50
Put male pins on wires for heated pitot connection
Details
       

 11-23-2008
1.00
Made molex connector for the heated pitot tube
Details
       

 11-23-2008
3.00
Built a rear rotisserie
Details
       

 11-21-2008
3.00
Closed Right Bottom Outbd wing skin panel
Details

 11-19-2008
2.50
Riveted the seat frames together
Details
     

 11-16-2008
0.00
Flange position for rear rotisserie stand
Details
     

 11-16-2008
1.50
Cut and drilled hardwood for the rear rotisserie
Details
       

 11-14-2008
1.00
Topcoat painted yesterday's primed parts
Details

 11-13-2008
2.00
Painted more interior parts and re-did some parts
Details

 11-11-2008
2.00
Painted re-primed parts from 11/09
Details

 11-10-2008
2.00
Painted primed seat parts from first priming
Details

 11-09-2008
3.00
Cleaned/Re-primed/etched earlier failed painting p
Details
     

 11-08-2008
3.00
Fixed the leading edge crack
Details
       

 11-06-2008
2.00
Added fan and filters to the paint booth
Details
       

 11-04-2008
3.00
Made PVC paint booth
Details

 11-02-2008
3.00
Removed the empennage from the fuselage
Details
       

 10-30-2008
3.00
Drilled the engine stand bolt holes to 5/8"
Details

 10-29-2008
2.00
Fit and drilled rotisserie angle irons
Details

 10-28-2008
3.00
Made angle irons for the rotisserie
Details

 10-27-2008
1.00
Drilled 1/4" engine mount holes in the firewall
Details
       

 10-26-2008
2.00
Fit Engine mount to firewall
Details

 10-25-2008
1.00
Bucking bar dropped into wing cracking leading edg
Details

 10-11-2008
3.00
Riveted 1/2 of Rt bottom outboard skin
Details

 10-08-2008
4.00
Poorly painted 1/2 of loose interior parts
Details

 10-05-2008
6.50
Primed/Sealed floors and loose parts
Details
       

 09-20-2008
2.00
BIG MISTAKE converting the Rudder Pedal parts
Details
       

 09-18-2008
1.50
Converted the Rudder Pedal WD steel parts
Details

 09-16-2008
2.50
Assembled Rudder pedal assembly
Details
       

 09-15-2008
1.00
Started to lift engine to drill mount holes
Details

 09-14-2008
3.00
Started the rudder pedal assembly
Details
       

 09-13-2008
3.00
Riveted the rudder stops in place
Details
     

 09-11-2008
0.50
Countersunk and primed rudder stops
Details

 09-10-2008
1.50
Hung rudder/cut rudder stops
Details
       

 09-09-2008
0.00
Rudder hitting VS on initial installation
Details
       

 09-09-2008
4.50
Finished trimming the up elevator stop
Details
       

 09-08-2008
2.00
Trimmed the Aft Deck and Aft Elevator Stop
Details

 09-06-2008
4.00
Fabricated and fit new F-811D forward stop
Details
       

 08-25-2008
0.00
Building EAA Benches
Details
       

 08-18-2008
2.50
Installed F-841 Pushrod
Details
       

 08-17-2008
0.00
Picked up my Eggenfellner H-6 Engine
Details
       

 08-13-2008
1.00
Temporarily installed F-839-2 + F-340 Pushrods
Details
       

 08-07-2008
2.50
Set the length of the F-829-2 pushrod
Details
       

 08-06-2008
3.00
Drilled Rear Control Stick/fit sticks to Control C
Details
       

 07-24-2008
2.50
Drilled Elevator horns for pushrod
Details
       

 07-22-2008
0.00
Temporary hinge pins from Avery's
Details
     

 07-22-2008
0.00
Elevator horns line up nearly perfectly
Details
       

 07-22-2008
1.00
Drilled the elevator hole attachment holes
Details
     

 07-22-2008
0.50
Attached the elevators to the HS
Details
       

 07-21-2008
1.00
Determined number of elevator washers needed
Details

 07-20-2008
4.00
Assembled the F-839/F-840/F-841 Pushrods
Details
       

 07-19-2008
0.75
Set Elevator Rod Bearing depth to 7/8"
Details
       

 07-17-2008
0.75
Made a rod bearing insertion wrench
Details
       

 07-16-2008
1.50
Drilled the four bolt holes in the HS front spar
Details
     

 07-14-2008
3.00
Drilled the Front Spar of the Vertical Stabilizer
Details
     

 07-13-2008
1.50
Leveling VS Fore and Aft
Details

 07-09-2008
2.50
Leveled the Vertical Stabilizer
Details
       

 07-08-2008
1.00
Installed VS Front Spar centering lines
Details
       

 07-08-2008
1.50
Drilled Vertical Stabilizer
Details
       

 07-08-2008
2.50
Attached, balanced VS rear spar
Details
       

 07-07-2008
2.00
Drilled the Rear Spar of the Horizontal Stabilizer
Details

 07-05-2008
3.00
Drilled holes in Horizontal Stabilizer to the fuse
Details
       

 07-04-2008
2.50
Finished re-assembly of the rear spar to HS
Details
       

 07-03-2008
6.00
Riveted the Rear Spar stiffeners to rear spar
Details
       

 07-02-2008
3.00
Drilled and primed the replacement HS-603PP
Details
     

 06-29-2008
4.00
Assembled, drilled, primed elevator bellcrank
Details
       

 06-27-2008
1.50
Torqued the installed Main Gear Weldment bolts
Details
       

 06-24-2008
0.50
Blind riveted nutplates to the F-898 L&R
Details

 06-21-2008
6.00
Disassembled the HS Rear Spar for repair
Details
       

 06-17-2008
1.00
Squared the Horizontal Stabilizer
Details
       

 06-17-2008
3.00
Drilled Horizontal Stabilizer upside down!
Details
       

 06-16-2008
2.00
Fabricated the F-864E Cable anchor
Details
       

 06-14-2008
2.50
Added nutplates to F-880A Fwd Seat Ramp
Details

 06-13-2008
2.00
Started to install Right mid longeron nutplates
Details
       

 06-11-2008
2.50
Assembled the F-8113 Mid-Cabin Assembly
Details
       

 06-09-2008
2.50
Assembled F-830C Fwd Seat Ramp & F-8112 L&R
Details
       

 06-03-2008
6.00
Dimpled and riveted stiffeners to floors
Details
       

 05-29-2008
3.00
Surface converted Aft Baggage floor
Details

 05-28-2008
2.00
Surface converted Seat Floor parts
Details

 05-25-2008
2.50
Disassembled the seat floors and deburred all part
Details

 05-24-2008
5.00
Attached and drilled the Floor Panels' stiffeners
Details
       

 05-18-2008
2.50
Assembled, drilled and deburred foot wells
Details

 05-16-2008
2.00
Drilled the Forward Seat Floor and F-805D
Details
       

 05-15-2008
2.50
Temporarily attached flap actuator bar to floor
Details
       

 05-14-2008
2.00
Drilled nutplate holes for the baggage ribs
Details
       

 05-13-2008
1.75
Installed Aft Seat Floors
Details
       

 05-09-2008
3.00
Installed the nutplates in the baggage ribs/F-807A
Details
       

 05-08-2008
1.25
Drilled nutplate holes in baggage ribs and F-807
Details

 05-06-2008
3.00
Drilled rear seat assembly; deburred seat floor pa
Details

 05-02-2008
3.50
Primed the step, deburred rear seat parts
Details
       

 04-28-2008
0.25
Matched drilled the Step Support Block
Details
     

 04-27-2008
3.00
Inventoried the Hardware of Fininshing Kit
Details

 04-26-2008
1.50
Inventoried Finishing kit
     

 04-20-2008
3.00
Assembled the Front Seat
Details
       

 04-19-2008
2.00
Fitted and drilled the step
Details
       

 04-17-2008
1.50
Re-worked the step to satisfaction
Details
       

 04-14-2008
4.00
Fit step to curve of the fuselage
Details

 04-08-2008
0.00
Sun 'N Fun April 8-13
Details

 04-07-2008
2.00
Started bolting Rt gear weldment to center section
Details
       

 04-05-2008
3.00
Fitted the right main gear weldment into place
Details
     

 04-03-2008
3.50
Fit Left gear weldment
Details
       

 03-30-2008
0.50
Opened Forward Bottom Skin Gear Holes
Details
       

 03-29-2008
3.50
Riveted the Cooling Ramp in place
Details
     

 03-27-2008
0.50
Riveted the Bottom Fwd Skin to Center Spar
Details
       

 03-25-2008
1.50
Riveted the Fwd Floor Ribs to the Fwd Floor
Details
       

 03-23-2008
1.00
Riveted the Lt Forward Floor Rib to Bottom Skin
Details

 03-22-2008
6.00
Clecoed the Forward Bottom Skin in place
Details
       

 03-19-2008
3.50
Back riveted the Aft Floor ribs and F-802U to skin
Details
       

 03-05-2008
1.50
Primed Fwd Bottom Skin and floor ribs
Details

 03-04-2008
2.50
Drilled/Deburred/Converted F-894 Fwd Bottom Skin
Details
     

 03-03-2008
2.50
Clecoed and drilled the F-894 Forward Bottom Skin
Details
       

 03-02-2008
2.50
Made F-896 & F-897 Reinforcement Angles
Details
       

 03-01-2008
0.50
Flipped the fuselage inverted
Details

 02-29-2008
2.50
Screwed/Bolted Seat Support weldments
Details
       

 02-28-2008
2.00
Cherry Max rivets shot in cockpit rail/Support wel
Details
       

 02-25-2008
6.00
Riveted the cockpit rails and finished support pla
Details
       

 02-24-2008
2.50
Riveted the F-805 Gossetts and F-805B supports
Details
       

 02-23-2008
3.00
Bolted rear seat belt brackets in place
Details
       

 02-19-2008
1.50
Riveted the F-818D Bellcrank Rib
Details
       

 02-08-2008
0.00
Aeroelectric Connection Seminar in Lawrenceville,
Details

 02-05-2008
3.00
Riveted the aft deck then flipped the fuselage ove
Details
       

 02-04-2008
1.50
Finished riveting the upper longerons
Details

 02-03-2008
4.50
Riveted upper longeron and baggage support ribs
Details

 02-01-2008
2.50
Finished riveting aft bottom and aft side skins
Details
       

 01-30-2008
3.50
Riveted the Aft Side and Foreward Bottom skins
Details
       

 01-29-2008
3.00
Riveted Left Mid skin to sub-structures
Details
       

 01-27-2008
3.50
Riveted Rt mid skin and around main spar openings
Details
       

 01-26-2008
5.00
Finished riveting the fwd skins to the sub-structu
Details
       

 01-13-2008
2.50
Clecoed the Fwd Bottom Skin in place
Details
       

 01-12-2008
3.00
Clecoed Aft Bulkheads to Aft Side Skins
Details
       

 01-11-2008
1.50
Finished riveting the F-811 and F-812 bulkheads
Details
       

 01-09-2008
1.50
Replace more of the poor rivets with Oops rivets
Details

 01-08-2008
2.00
Continued to rivet the F-811 and 812 bulkheads
Details

 01-07-2008
3.50
Riveted F-811C & two F-811B bars to F-811
Details
       

 01-05-2008
9.00
Clecoed the Aft Side Skins in place
Details
       

 01-03-2008
5.00
Prosealed/clecoed forward skins onto fuselage
Details
       

 01-01-2008
12.00
Riveted the bottom inboard skins
Details
       

 12-31-2007
4.00
Finished rear floor platenuts installation
Details
       

 12-29-2007
4.00
Finished drilling and dimpling nutplate holes
Details
       

 12-26-2007
3.00
Started nutplate installation for rear floor
Details
       

 12-24-2007
1.00
Riveted the upper forward holes of upper longerons
Details
       

 12-23-2007
2.50
Installed Mid Skins and Upper Longerons
Details
       

 12-22-2007
5.00
Installed the rear throttle assembly
Details
       

 12-20-2007
2.00
Drilled, converted, dimpled F-815C-R and F-820W
Details

 12-13-2007
4.00
Mid Fuselage assembly
Details

 12-12-2007
3.00
Started rear throttle installation
Details
       

 12-12-2007
3.00
Mid section assembly
Details
       

 12-11-2007
4.00
Riveted the F-814E Seat Ramp Supports
Details
       

 12-11-2007
0.50
Just received a Tungsten Bucking Bar
Details
     

 12-10-2007
1.50
Start fuselage final assembly
Details

 12-06-2007
3.50
Finished the surface conversion of fuselage parts
Details
     

 12-03-2007
2.00
Surface converted more fuselage parts
Details

 12-02-2007
6.50
Surface converted the upper longerons
Details

 12-01-2007
1.50
Dimpled the cockpit rails and trimmed aft longeron
Details
     

 11-30-2007
3.00
Dimpled all skins except the top tail skin
Details

 11-28-2007
2.00
Dimpled the seat rib assembly fore and aft
Details

 11-27-2007
3.50
Finished countersinking upper longeron
Details

 11-26-2007
1.50
Deburred the fwd & center section substructures
Details

 11-25-2007
3.00
Finished peeling and deburring aft skins

 11-22-2007
3.00
Continued the peeling and deburring aft skins
Details

 11-21-2007
2.00
Peeled vinyl and deburred F-891 & F-823 L+R skins
Details

 11-20-2007
2.00
Finished deburring substructure parts
Details

 11-19-2007
4.00
Started deburring substructure parts
Details

 11-15-2007
10.00
Fitted and drilled F-883A fuel valve bracket
Details
       

 11-12-2007
0.75
Countersunk Fwd floor/Center sect. common holes
Details

 11-11-2007
4.00
Drilled #19 and #12 WD 808 Seat back support
Details
       

 11-10-2007
4.00
Drilled front seat back support
Details
       

 11-06-2007
3.00
Attached/Aligned/drilled Cockpit rails
Details
       

 11-05-2007
1.50
Drilled the F-819 assembly
Details
       

 11-03-2007
1.00
Attached the tail top skin
Details
       

 10-15-2007
9.00
Drilled the Aft & Bottom skins, longerons & center
Details
       

 10-14-2007
8.00
Drilled forward 2/3 of fuselage
Details
       

 10-12-2007
2.00
Clamped the forward end of longerons
Details
       

 10-09-2007
2.00
Re-bent the left upper longeron
Details
       

 10-07-2007
3.00
Fit the upper longerons, re-bent the Rt longeron
Details
       

 10-03-2007
2.00
Attached the F-828 Aft Bottom Skin
Details
     

 10-02-2007
4.00
Attached tail side skins and bulkheads to fuselage
Details
       

 10-01-2007
1.00
Deburred tail side and bottom skins

 09-26-2007
2.00
Removed plastic from tail skin edges

 09-25-2007
2.50
Riveted the Seat Belt Assemblies together
Details
       

 09-24-2007
8.00
Primed aft bulkheads and riveted them together
Details
     

 09-22-2007
4.00
Drilled/converted the F-807/F-808/F-809 bulkheads
Details

 09-19-2007
3.50
Assembled F-811 Bulkhead, drilled and converted
Details

 09-17-2007
1.50
Shaped the F-811B
Details

 09-16-2007
3.00
Converted the F-812A&C and the tie down bar
Details

 09-13-2007
2.50
Made F-712E Rear Tie Down Bar
Details
       

 09-11-2007
2.00
Cut the F-800 parts bar and deburred the parts.
Details
     

 09-09-2007
2.00
Installed F-804 Doubler and F-848 L&R
Details

 09-08-2007
3.00
Attached the fwd side skins (F-891 L&R)
Details
       

 09-02-2007
2.50
Clecoed longeron clips to F-802A- L&R
Details
       

 09-01-2007
4.00
Drilled the lower longerons & Rt armrest #30 holes
Details
       

 08-31-2007
2.50
Put bend in the new F-823 for the right side
Details
       

 08-30-2007
0.25
Lower Longerons ready to drill per Bruce At Van's
Details

 08-29-2007
1.00
Removed blocks from under the firewall per Bruce
Details
       

 08-28-2007
0.50
Called Van's about WD-821 and lower longeron
Details
       

 08-27-2007
2.50
Clamped the lower longeron to gear weldment
Details
       

 08-26-2007
2.50
Clecoed the Fwd/Center/Mid Fuselage together
Details
       

 08-25-2007
2.00
Attached the Lt armrests and drilled them
Details
       

 08-21-2007
1.50
Clecoed the F-815 A&B L&R and F-815C L&R on
Details
       

 08-20-2007
1.50
Bent Lt F-823, cut a 2 5/8" hole in F-815A-R
Details
       

 08-18-2007
1.50
Fit the Rt lower longeron to the floor assembly
Details

 08-18-2007
6.50
Deburred parts for the Mid-Fuselage
Details
       

 08-17-2007
1.00
Drilled Fwd hole of floor to lower longeron to mou
Details

 08-16-2007
2.00
Bent the F-804H Center section side plates
Details
       

 08-14-2007
1.50
Went back and primed the Fwd Sub-Floor
Details

 08-12-2007
3.00
Riveted the F-826 & 827 Center Bottom Skins on
Details
     

 08-11-2007
4.00
Riveted F-814A L&R to F-814G, HPPX, + F-805D
Details
       

 08-09-2007
1.00
Riveted F-806 C,D,F + G to F-806B
Details
       

 08-07-2007
2.00
Primed the Seat Rib Subassembly
Details
       

 08-05-2007
3.00
Bent upper longerons' fwd downward deflection
Details
       

 08-04-2007
3.00
Bent aft end of Lt upper longeron, bent Rt longero
Details
       

 08-02-2007
2.00
Bent Left upper longeron forward section
Details
       

 08-01-2007
1.50
Bent right aux. longeron
Details
     

 07-31-2007
0.50
Bent the Right lower longeron
Details
       

 07-31-2007
1.50
Bent the F-898-L Auxillary Longeron
Details
       

 07-30-2007
2.50
Bent the left lower longeron
Details
       

 07-11-2007
1.00
Attached platenuts to aileron electric trim bracke
Details

 07-08-2007
3.00
Dimpled the ribs, converted and dimpled the skins
Details

 07-05-2007
2.50
Finished surface converting seat rib assembly
Details

 07-04-2007
4.00
Finished assembly of the Center Section
Details
       

 07-01-2007
2.00
Deburred the holes in the seat rib assembly
Details

 06-28-2007
1.50
Deburred the edges of the Seat Rib Assembly
Details

 06-27-2007
2.00
Drilled the F-826 & F-827 skins/Seat Rib Assembly
Details

 06-26-2007
1.50
Fluted the F-827 bottom skin
Details
     

 06-24-2007
0.50
Drilled aileron trim brackets to seat ribs
Details
       

 06-24-2007
3.00
Assembled and drilled the seat rib assembly
Details
       

 06-23-2007
1.00
Fabricated F-805D L&R Brackets
Details
       

 06-23-2007
1.00
Drilled #12 bolt holes in the F-806 C/D/E parts
Details
     

 06-19-2007
1.50
Fabricated the F-806E spacers
Details
       

 06-18-2007
1.00
Countersunk F-814C, drilled the F-806B assembly
Details

 06-14-2007
1.00
Sealed the center section parts
Details

 06-13-2007
1.50
Drilled top of F-804B and disassembled section
Details

 06-12-2007
2.00
Temporarily Attached F-804 A&B
Details
       

 06-12-2007
0.25
Made feeler guage to check F806 A&B spacer gap
Details
     

 06-08-2007
2.50
Riveted the F-804G Vertical Bars in place
Details

 06-06-2007
2.00
Rivet F-804B Aft Center Section Assembly
Details
       

 06-05-2007
3.50
Assembled the F-804B
Details
       

 06-03-2007
3.00
Rivet F-804C-FL & FR to F802A
Details
       

 06-01-2007
6.00
Drilled landing gear and weldments with reamer
Details
     

 05-31-2007
2.50
Made F-804M Seat belt lug spacers
Details
       

 05-29-2007
0.50
Studied plans

 05-22-2007
3.00
Flange material removal from F-804A
Details
       

 05-21-2007
2.00
Drilled rudder cable holes center section F-804 A&
Details
     

 05-20-2007
2.50
Riveted Firewall to the Fwd Floor
Details
       

 05-18-2007
3.00
Converted the Fwd Fuse. Sub Assembly parts
Details

 05-17-2007
1.50
Countersunk and dimpled F-866D/F-866A/Floor
Details

 05-16-2007
3.00
Fwd fuselage sub structure assembled
Details
       

 05-12-2007
4.00
Constructed the cooling ramp
Details
       

 05-11-2007
2.00
Converted/sealed Fwd subfloor assembly
Details
       

 05-10-2007
1.50
Countersunk/dimpled fwd subfloor parts
Details

 05-09-2007
3.00
Finished Firewall, fwd subfloor assembly drilled/d
Details
       

 05-07-2007
3.50
Started riveting the firewall assembly
Details
       

 05-05-2007
0.50
F-801C-1 elongated holes
Details
       

 05-05-2007
7.50
Assembled the firewall for riveting
Details
       

 05-04-2007
3.00
Assembled the firewall for drilling
Details
       

 05-03-2007
2.00
Deburred the firewall and its attachments
Details
     

 05-01-2007
1.50
Read instructions and gathered parts
Details

 04-30-2007
3.00
Drilled, deburred, dimpled W-822 access plates
Details
       

 04-28-2007
2.00
Organized Fuselage parts
Details

 04-26-2007
3.00
Put bottom skins on wings and stowed fuseage parts
Details

 04-25-2007
3.00
Fabricated the anti-hangup tank access bracket
Details
       

 04-17-2007
2.00
Flared Pitot tube tubing and connected it
Details
       

 04-12-2007
2.00
Mounted the pitot tube circuit board
Details
       

 04-10-2007
2.00
Fit pitot tube to the mast
Details
       

 04-09-2007
2.50
Installed the AOA sensors
Details
       

 04-07-2007
0.50
Marked the wing for the AFS AOA
Details
       

 04-01-2007
1.00
Bent the pitot system tube into the mast
Details
       

 03-15-2007
2.50
Pitot tubing and conduit tubing installed
Details
       

 03-14-2007
0.50
Attached the Gretz pitot backing plate
Details
     

 03-11-2007
5.00
Started Gretz Pitot tube installation
Details
       

 03-11-2007
0.50
Opening pitot mast hole
Details
       

 02-25-2007
4.00
Attached the Rt flap
Details
       

 02-22-2007
2.00
Atached the Rt aileron push-pull tubes
Details
       

 02-21-2007
2.00
Left flap attached to the wing
Details
       

 02-19-2007
2.50
Tried fitting the Lt flap with wing in the cradle
Details

 02-18-2007
0.25
Put the Lt wing back in the cradle
Details

 02-17-2007
2.50
Can't attach Lt Flap because of edge distance
Details
       

 02-15-2007
2.50
Attached the Lt aileron to wing
Details
       

 02-14-2007
1.50
Attached the Lt W-816 Push/Pull tube to bellcrank
Details
       

 02-11-2007
2.50
Reemed the aileron bellcrank brass bushings
Details
       

 02-10-2007
2.00
Attached the rod ends to the push/pull tubes
Details
       

 02-07-2007
0.50
Primed the outside of the large tubes
Details

 02-07-2007
1.50
Cut the aileron push/pull tubes
Details
     

 02-04-2007
7.00
Finished the Rt flap
Details
     

 02-03-2007
7.00
Finished conversion and sealing of Rt flap parts
Details

 02-01-2007
3.00
Converted Rt flap parts
Details

 01-31-2007
1.00
Disassembled the right flap, deburred ribs and spa
Details

 01-27-2007
7.00
This finished the Left flap
Details
       

 01-26-2007
8.00
Riveted the Lt flap together
Details
       

 01-24-2007
1.00
Made V-cradle for the flap contruction
Details

 01-23-2007
2.00
Fabricated Rt FL406B, converted bracket pieces
Details
     

 01-22-2007
1.50
Dimpled the Lt Flap parts
Details

 01-21-2007
8.00
Surface converted the Lt Flap, deburred, dimpled
Details
     

 01-20-2007
1.00
Deburred left flap skeleton
Details

 01-19-2007
1.00
Drilled the Left FL406 A + B according to plans
Details
       

 01-18-2007
1.50
Re-cut FL406C pieces
Details

 01-17-2007
1.50
Fine shaped the FL406B and bent the 406A
Details

 01-14-2007
2.00
Started fabrication of FL 406 A+B+C
Details
       

 01-10-2007
3.00
Drilled flap top skins
Details

 01-06-2007
3.00
Drilled flap ribs/skins and attached/drilled hinge
Details
       

 01-04-2007
2.50
Started the flaps
Details
       

 01-04-2007
0.50
Drilled flap ribs
       

 01-01-2007
0.25
RTV used in the ailerons
Details
       

 01-01-2007
8.00
Finished the Ailerons
Details
       

 12-26-2006
3.50
Deburred/dimpled/converted aileron skins/ribs
Details

 12-23-2006
8.00
Converted/sealed aileron spars & A-408
Details
       

 12-22-2006
3.00
Drilled aileron spar re-inforcement plates & hinge
Details
       

 12-20-2006
2.50
Formed and drilled the A-408
Details

 12-17-2006
0.50
Bent the aileron skins
Details
       

 12-16-2006
4.00
Riveted stiffeners to aileron skin and sealed
Details
       

 12-14-2006
2.00
Dimpled aileron stiffeners and skins
Details
     

 12-11-2006
1.50
Surface converted the right aileron stiffeners
Details
     

 12-10-2006
9.00
Cut, drilled, and deburred aileron stiffeners/skin
Details
     

 12-09-2006
5.50
Riveted the flap braces and gap seals in place
Details
       

 12-08-2006
1.00
Dimpled the aileron gap seals and top skin attachm
Details

 12-07-2006
1.00
Dimpled the flap braces/countersunk the W-707 D
Details
     

 12-06-2006
3.00
Surface converted and seal braces and gap seals
Details

 12-05-2006
2.00
Deburred the flap braces and the aileron gap seals
Details

 12-04-2006
2.00
Fitted the aileron gap seal and flap braces
Details
       

 12-02-2006
4.00
Attached the aileron hinges to the rear spar
Details
       

 11-29-2006
2.25
Riveted the aileron hinges together
Details
       

 11-28-2006
3.50
Drilled the aileron hinges, surface converted them
Details
       

 11-25-2006
0.50
Wings placed in the wing cradle
Details
       

 11-25-2006
2.00
Riveted the top left outboard skin on
Details
       

 11-21-2006
0.50
Riveting the top inboard skins (Cont.)
Details
       

 11-21-2006
4.00
Riveted on the inboard top skins
Details
       

 11-19-2006
4.50
Attached the Lt tank and installed tie down loops
Details
       

 11-18-2006
3.00
Leak tested the right tank
Details
       

 11-16-2006
2.00
Repaired the right tank baffle leaks
Details
       

 11-14-2006
4.00
Checked the right tank for leaks
Details
       

 11-12-2006
3.50
Riveted the Leading Edges to the spars
Details
       

 11-08-2006
2.00
Riveted top rib holes to the spar; Clecoed LE to s
Details

 11-07-2006
1.00
Attached the right tank access plate
Details
       

 11-06-2006
4.00
Riveted the right tank baffle
Details

 11-05-2006
6.00
Sealed the right tank with the baffle panel
Details
       

 11-04-2006
6.00
Repaired the left tank leaks
Details
       

 11-04-2006
3.00
Pressure tested the left tank
Details
       

 11-03-2006
1.50
Sealed the left tank access plate
Details

 10-29-2006
1.00
Put foam strip on edge of Plexi lens
Details

 10-28-2006
7.00
Installed the right100W Halogen round taxi light
Details
       

 10-23-2006
3.00
Installed the Plexi lens on left light
Details
       

 10-17-2006
2.00
Mounted the HID Power supply on Left spar
Details
       

 10-17-2006
0.50
Installed HID Lamp and retainer bracket
Details
       

 10-14-2006
3.50
Cut LT LE for the Duckworks HID Landing Light
Details
       

 10-12-2006
4.00
Riveted the Right Leading edge together
Details
     

 10-11-2006
4.50
Riveted the Left leading edge together
Details

 10-10-2006
4.00
Scarf jointed the top skins; assembled Lt LE
Details
       

 10-08-2006
10.00
Sealed interior of surface converted skins
Details
     

 10-07-2006
5.00
Drilled the platenut holes for the Duckworks light
Details
     

 10-06-2006
0.50
Drilled the W-423 for the platenuts
Details
     

 10-04-2006
1.00
Cosmetic correction of black converted areas of sk
Details

 10-03-2006
2.00
Dimpled the skins
Details

 10-02-2006
1.50
Dimpled the skins
Details
     

 10-01-2006
9.00
Surface converted the wings' skins interior surfac
Details
     

 09-27-2006
2.00
Continued deburring skin holes

 09-25-2006
2.50
Remove vinyl from upper skins and deburred holes
Details
       

 09-19-2006
2.50
Dimpled the rear spar
Details
     

 09-18-2006
2.00
Dimpled the main ribs
Details
     

 09-17-2006
9.00
Readied the wing skeletons for the skins
Details
       

 09-16-2006
1.50
Deburred and dimpled LE ribs
Details
     

 09-14-2006
2.00
Dimpled the leading edge skins
Details
     

 09-13-2006
2.50
Deburred and surface converted leading edge skins
Details
       

 09-12-2006
1.00
Pulled the vinyl from the leading edge skins
Details

 09-10-2006
3.50
Riveted the Lt tank baffle and end attachment brac
Details

 09-09-2006
4.00
Installed the rear baffle of the left tank
Details
       

 09-08-2006
0.50
Checked the continuity of the fuel senders
Details

 09-07-2006
1.50
Prepped the left tank for closure
Details

 09-01-2006
2.00
Attached Lt tank outboard sender and vent line
Details
       

 08-30-2006
1.25
Installed the left tank fuel return line
Details
       

 08-30-2006
1.25
Fitted/installed Left tank vent line
Details
       

 08-29-2006
1.50
Installed the fuel return line in the right tank
Details
       

 08-29-2006
1.00
Attached right inboard sender plate
Details
       

 08-28-2006
0.75
Installed the right tank fuel return fitting
Details
       

 08-28-2006
0.75
Installed fuel return fitting in left fuel tank.
Details
       

 08-28-2006
1.50
Connected the terminals to the Rt inboard sender
Details
       

 08-27-2006
3.00
Installing capacitance fuel sender and fuel return
Details
       

 08-27-2006
0.50
Drilled the right tank fuel return hole
Details
     

 08-24-2006
3.00
Started the installation of the right capacitance
Details
       

 08-24-2006
0.25
SB 06-2-23 Safety wired the right tank fuel pickup
Details
       

 08-22-2006
2.00
Installed the vent line in the right tank
Details
       

 08-22-2006
0.50
Flared the vent line with the Parker flaring tool
Details
       

 08-22-2006
0.25
Drilled the fuel return line hole in the second ri
Details
       

 08-19-2006
2.00
Sealed the outboard tank rib machine hole
Details
       

 08-19-2006
2.00
Installed the T405 and two T-410s and sealed them
Details
       

 08-19-2006
4.00
Finished riveting ribs of right tank and sealing r
Details
       

 08-17-2006
3.00
Wet riveted half of the right tank
Details

 08-13-2006
0.50
Prosealed/riveted anti-rotation bracket right tank
Details
       

 08-13-2006
2.00
Installed anti-hangup bracket in the left tank
Details
       

 08-13-2006
6.00
Assembled the right tank and prosealed the ribs
Details
       

 08-12-2006
1.50
Service bulletin SB 06-2-23 compliance left tank
Details
     

 08-12-2006
2.00
Installed T-405 & T-410 to left tank nose
Details
       

 08-09-2006
2.00
Finished riveting left tank ribs with pneumatic sq
Details

 08-08-2006
2.50
Wet riveted the 5 left tank bottom middle ribs
Details

 08-07-2006
2.50
Riveted left tank ribs x 5 one side
Details
       

 08-06-2006
5.00
Prosealed the left tank ribs and skin together
Details
       

 08-05-2006
3.00
Installed flop tube left tank then removed it for
Details
       

 08-03-2006
3.00
Drilled the outboard T-410 pieces and installed ri
Details
       

 08-02-2006
1.00
MEK cleaned inside of left tank getting ready to i
Details

 07-24-2006
0.00
To OSH for Airventure 2006 until 06Jul30

 07-23-2006
4.00
Finished riveting the stiffeners, filler flange an
Details
       

 07-22-2006
5.50
Finished riveting the right tank stiffeners, cap f
Details

 07-21-2006
4.00
Finished proseal attaching stiffeners, gas cap and
Details
       

 07-20-2006
3.00
Started ProSealing the stiffeners to the right tan
Details
       

 07-13-2006
1.00
Cleaned tank stiffener areas to be Prosealed
Details

 07-12-2006
2.50
Sanded the surfaces that will be ProSealed
Details
       

 07-09-2006
5.00
Finished deburring and dimpling all of the tank ri
Details
       

 07-08-2006
2.50
Deburred and started dimpling left tank ribs
Details

 07-06-2006
4.00
Deburred and dimpled the right tank skin
Details
       

 07-05-2006
1.00
Drilled drain valves to skins
Details
       

 07-05-2006
4.00
Deburred and dimpled the left tank skin
Details
       

 07-03-2006
3.00
Fuel cap preparation for attachment
Details
       

 07-02-2006
1.50
Riveted the Platenuts to the tank rings
Details
       

 07-02-2006
1.00
Fabricated the Fuel Pickup Anti-Rotation Bracket
Details
       

 07-02-2006
2.00
Drilled the T-407 and T-408 pieces
Details
       

 07-02-2006
0.50
Cut opening in the T-703 ribs for the inspection h
Details
     

 06-26-2006
1.50
Trimmed the sender plates
Details
       

 06-25-2006
3.50
Preparing to install Capacative Fuel Quantity Send
Details
       

 06-25-2006
3.50
Preparing to install Capacative Fuel Quantity Send
Details
       

 06-21-2006
1.00
Disassembled the left tank
Details

 06-19-2006
4.00
Match drilled the left tank holes and machine coun
Details
       

 06-18-2006
2.00
Fitted left tank skins onto the ribs
Details
       

 06-17-2006
3.50
Finished the T-405 pieces by Scotchbrite buffing t
Details
       

 06-14-2006
1.50
Fabricated the T-405 Tank Attachment Angles
Details
       

 06-12-2006
1.00
Drilled screw attachment holes on the right tank t
Details

 06-07-2006
4.00
Fit the right tank skin to the ribs, drilled all h
Details
     

 06-04-2006
3.00
Installed right tank ribs and drilled ribs, bracke
Details
       

 06-03-2006
2.00
Fit tank skins to the spar and baffle
Details
       

 06-03-2006
2.00
Cut tank skin stiffeners for both tanks and drille
Details
       

 05-31-2006
1.00
Studied the tank construction plans
Details

 05-27-2006
1.50
Riveted the three inboard platenuts onto the spars
Details

 05-26-2006
2.00
Riveted the platenuts onto the Z-Brackets
Details
     

 05-26-2006
1.50
Attached the Z-brackets to the spars
Details
     

 05-25-2006
1.50
Drilled Platenut holes on the the Z-brackets
Details
       

 05-23-2006
1.50
Match hole drilled the Z-brackets
Details
     

 05-22-2006
0.50
Cleco attached the Z-brackets to the main spar aft
Details
     

 05-21-2006
3.00
Cut, drilled and deburred the tank attachment Z-br
Details
       

 05-20-2006
4.00
Fitted the skins to the left leading edge
Details
       

 05-19-2006
4.00
Fitted the right leading edge skins
Details
       

 05-15-2006
1.00
Sealed the leading edge nose ribs
Details

 05-12-2006
1.00
Finished drilling skins on the bottom of the left
Details

 05-10-2006
1.00
Matched hole drilled the left bottom skins after a
Details
     

 05-08-2006
2.00
Match hole drilled the skin holes on the right win
Details
     

 05-07-2006
1.00
Attached the bottom skins to the wings
Details

 05-04-2006
5.00
Fitted the top skins to the wing after studying pl
Details
       

 05-03-2006
1.00
Drilled the wing doublers
Details
     

 04-30-2006
4.00
Constructed the tank jig and the dimpler table
Details
       

 04-29-2006
1.00
Studied the plans
Details

 04-27-2006
2.00
Studied the plans
Details

 04-25-2006
2.00
Adjusted the outboard jig clearances
Details

 04-22-2006
6.00
Riveted the right wing and hung it on the jig
Details
       

 04-19-2006
4.00
Match drilled, deburred the right main ribs and sp
Details
       

 04-18-2006
3.00
Assembled the right wing main ribs and spars
Details
       

 04-16-2006
3.00
Riveted the left main ribs to the main spar
Details
       

 04-14-2006
2.00
Riveted the left main ribs to the rear spar
Details
       

 04-13-2006
4.50
Drilled, deburred the left wing main ribs
Details

 04-12-2006
2.00
Assembled the left main ribs and spar together
Details
       

 04-03-2006
2.00
Cut nuts off with Dremel tool; ordered new hardwar

 04-02-2006
1.00
Stripped the tie down attachment nuts
Details

 04-01-2006
2.50
Sealed and assembled the right rear spar

 03-31-2006
3.50
Sealed and assembled the left rear spar
       

 03-30-2006
1.50
Tank rib conversion of outer surfaces

 03-28-2006
1.50
Finished right inboard and outboard ribs

 03-27-2006
2.50
Right rib treatments

 03-26-2006
3.50
Right ribs converted

 03-25-2006
3.50
Inboard and outboard right ribs converted

 03-23-2006
3.50
ConversionTreatment of the left wing ribs
       

 03-21-2006
2.00
Treated the left rear spar

 03-19-2006
3.00
Treated the left rear spar parts
     

 03-18-2006
4.50
Sanchem treated the right rear spar
       

 03-15-2006
2.50
Drilled the rib conduit holes
       

 03-14-2006
2.00
Studied conduit construction

 03-12-2006
5.00
Finished wing jig instillation
       

 03-10-2006
2.50
Finished holes in the W-709, W-711 & W-712
       

 03-09-2006
2.00
Rib deburring
       

 03-08-2006
2.00
Edge deburred ribs W-711

 03-06-2006
1.50
Edge deburred part of W-711 left and right

 03-05-2006
4.50
Fluted the ribs and deburred W-709, W-711 & W-712
       

 03-01-2006
5.00
Clecoed, drilled, deburred the right rear spar par
Details
       

 02-28-2006
2.00
Studied instructions; Drilled attached left W-707

 02-11-2006
3.00
Deburred the tank ribs

 12-19-2005
3.00
Wing Shipment Inventory
       










Copyright © 2001-2024 Matronics. All Rights Reserved.