Date
|
Hours
|
Work Log Summary

|
Details

|
11-10-2012
|
60.00
|
Completed Flight Test and Sign Off
|
Details
|
  |
|
10-11-2012
|
7.00
|
Addressed test flight 1 squawks
|
Details
|
  |
|
10-10-2012
|
1.00
|
First Flight
|
Details
|
|
|
10-09-2012
|
2.00
|
DAR Inspection
|
Details
|
|
|
10-06-2012
|
4.00
|
Installed Data Plate and various items
|
Details
|
  |
|
10-05-2012
|
3.00
|
Met with DAR
|
Details
|
  |
|
10-04-2012
|
10.00
|
Inspected all controls and taxied aircraft
|
Details
|
  |
|
10-02-2012
|
10.00
|
Engine Runup and Taxi with cowling on
|
Details
|
|
|
10-01-2012
|
3.00
|
First Engine Run up Successful
|
Details
|
|
|
09-29-2012
|
4.00
|
Weighed Aircraft
|
Details
|
  |
|
09-23-2012
|
15.00
|
Finished up with assembly
|
Details
|
|
|
09-22-2012
|
6.00
|
Calibrated Fuel Sender
|
Details
|
  |
|
09-21-2012
|
22.00
|
Finished wing installation
|
Details
|
|
|
09-19-2012
|
10.00
|
Finished installation of wings
|
Details
|
|
|
09-18-2012
|
2.00
|
Re-installed flaps
|
Details
|
  |
|
09-18-2012
|
6.00
|
Installed Wings
|
Details
|
|
|
09-17-2012
|
2.00
|
Installed Pitot tube and aileron trim servo
|
Details
|
 |
|
09-17-2012
|
6.00
|
Finished empennage installation
|
Details
|
|
|
09-16-2012
|
9.00
|
Continued empannage install
|
Details
|
  |
|
09-15-2012
|
10.00
|
Moved to airport
|
Details
|
|
|
09-11-2012
|
15.00
|
Fixed a couple of minor paint issues
|
Details
|
  |
|
09-10-2012
|
2.00
|
Installed compass
|
Details
|
|
|
09-10-2012
|
2.00
|
Fabricated gust lock
|
Details
|
 |
|
09-03-2012
|
2.00
|
Installed Seats
|
Details
|
|
|
09-01-2012
|
9.00
|
Installed Sticks and misc
|
Details
|
|
|
08-31-2012
|
6.00
|
Modified Exhaust system bracket
|
Details
|
|
|
08-29-2012
|
2.00
|
Installed nose wheel pant
|
Details
|
  |
|
08-29-2012
|
2.00
|
Installed heat shield
|
Details
|
 |
|
08-28-2012
|
4.00
|
Installed the Aerosport Rudder Trim
|
Details
|
  |
|
08-28-2012
|
55.00
|
Completed Painting of Wheel Pants
|
Details
|
|
|
08-26-2012
|
14.00
|
Started on wheel pants
|
Details
|
|
|
08-24-2012
|
18.00
|
Painted Wing Tips
|
Details
|
|
|
08-22-2012
|
6.00
|
Finished up installing the insrument panel
|
Details
|
|
|
08-22-2012
|
46.00
|
Finished Painting Wings
|
Details
|
|
|
08-16-2012
|
20.00
|
Continued with Painting Prep
|
Details
|
  |
|
08-08-2012
|
3.00
|
Engine inspected by A/P, installed prop
|
Details
|
|
|
08-07-2012
|
30.00
|
Installing interior
|
Details
|
|
|
08-02-2012
|
1.00
|
Installed new linkage for prop govenor
|
Details
|
|
|
08-01-2012
|
12.00
|
Installed stick grips and adjusted torque tubes
|
Details
|
|
|
07-27-2012
|
140.00
|
Continued with painting
|
Details
|
  |
|
07-06-2012
|
2.00
|
Bleed Brakes
|
Details
|
|
|
07-04-2012
|
38.00
|
Finished up engine installation
|
Details
|
|
|
06-30-2012
|
20.00
|
Continued with Engine Installation
|
Details
|
|
|
06-28-2012
|
12.00
|
Finished Vert Stab Paint
|
Details
|
|
|
06-26-2012
|
52.00
|
Installing Engine Accessories
|
Details
|
|
|
06-14-2012
|
48.00
|
Finished painting the fuse
|
Details
|
|
|
06-09-2012
|
28.00
|
Painted bottom of Fuse
|
Details
|
|
|
06-02-2012
|
10.00
|
Painted base color on fuselage
|
Details
|
|
|
06-01-2012
|
9.00
|
Final Primed Fuselage
|
Details
|
|
|
05-30-2012
|
60.00
|
Finally Color
|
Details
|
|
|
05-29-2012
|
2.00
|
Paint Scheme completed in Photshop
|
|
 |
|
04-30-2012
|
6.00
|
Fuselage off to painter
|
Details
|
|
|
04-26-2012
|
33.00
|
Finish cowl baffle
|
Details
|
  |
|
04-18-2012
|
30.00
|
Finished trimming baffle aluminum
|
Details
|
|
|
04-15-2012
|
30.00
|
Worked on baffle seals
|
Details
|
|
|
04-12-2012
|
10.00
|
Primed Cowls
|
Details
|
|
|
04-11-2012
|
15.00
|
Skim coated cowl
|
Details
|
|
|
04-09-2012
|
7.00
|
Installed louvers in cowl
|
Details
|
|
|
04-08-2012
|
9.00
|
Worked on air inlet
|
Details
|
|
|
04-07-2012
|
30.00
|
Completed Filtered Air Box and started cowl air in
|
Details
|
|
|
04-03-2012
|
30.00
|
Continued with the cowling installation
|
Details
|
|
|
03-30-2012
|
48.00
|
Installed attachment hinges on cowl
|
Details
|
|
|
03-24-2012
|
26.00
|
Trimmed Cowling
|
Details
|
|
|
03-21-2012
|
30.00
|
Primed Wheel Pants and Fairings
|
Details
|
|
|
03-19-2012
|
5.00
|
Installed Tail
|
Details
|
|
|
03-16-2012
|
4.00
|
Installed engine on aircraft
|
Details
|
|
|
03-15-2012
|
38.00
|
Worked on Cowling
|
Details
|
|
|
03-09-2012
|
7.00
|
Completed Fab of the spinner
|
Details
|
|
|
03-08-2012
|
9.00
|
Began spinner fabrication
|
Details
|
|
|
03-07-2012
|
10.00
|
Installed Upper Click Loc Tabs
|
Details
|
|
|
03-06-2012
|
42.00
|
Completed Farings and Wheel Pants
|
Details
|
  |
|
02-29-2012
|
9.00
|
Began install of lower right intersection fairing
|
Details
|
|
|
02-28-2012
|
30.00
|
Began installation of the gear leg fairings
|
Details
|
|
|
02-18-2012
|
20.00
|
Installed Nose Strut Fairing
|
Details
|
|
|
02-14-2012
|
55.00
|
Finished Left and Front Wheel Pants
|
Details
|
|
|
02-07-2012
|
25.00
|
Installed right wheel pant
|
Details
|
|
|
02-03-2012
|
4.00
|
Assembled Right Wheel Pant
|
Details
|
|
|
02-02-2012
|
4.00
|
Reconfigured Fuse Stand
|
Details
|
  |
|
01-31-2012
|
10.00
|
Attached Axle and Nose Gear
|
Details
|
|
|
01-29-2012
|
6.00
|
Attached Landing Gear
|
Details
|
|
|
01-27-2012
|
9.00
|
Attached Engine Mount
|
Details
|
|
|
01-26-2012
|
10.00
|
Finished empenage farining
|
Details
|
  |
|
01-25-2012
|
6.00
|
Worked on Empennage Fairing
|
Details
|
|
|
01-15-2012
|
2.00
|
Fabricated hinge cover plate
|
Details
|
 |
|
01-13-2012
|
25.00
|
Attached Right Door
|
Details
|
|
|
01-09-2012
|
30.00
|
Finished up with the windows and priming
|
Details
|
|
|
01-04-2012
|
23.00
|
First Prime on Doors And fuse
|
Details
|
|
|
01-02-2012
|
52.00
|
Continued with final installation of windows
|
Details
|
|
|
12-26-2011
|
34.00
|
Continued with installation of front and side wind
|
Details
|
|
|
12-20-2011
|
6.00
|
Began installation of wind screen
|
Details
|
|
|
12-19-2011
|
9.00
|
Installed last interior panels
|
Details
|
 |
|
12-16-2011
|
45.00
|
Installed right and left window
|
Details
|
|
|
12-13-2011
|
9.00
|
Installed instrument panel
|
Details
|
|
|
12-12-2011
|
45.00
|
Installed Cabin Cover
|
Details
|
|
|
12-09-2011
|
10.00
|
Installed Aerosport interior panels
|
Details
|
 |
|
12-08-2011
|
9.00
|
Finished installing Glareshield
|
Details
|
|
|
12-07-2011
|
5.00
|
Fitted Windshield
|
Details
|
  |
|
12-06-2011
|
4.00
|
Epoxied Cabin Cover
|
Details
|
|
|
12-04-2011
|
3.00
|
Cut out interior Kydex
|
Details
|
 |
|
12-03-2011
|
36.00
|
Began re-assembly of cabin cover
|
Details
|
|
|
11-29-2011
|
20.00
|
Started assembling panel and interior
|
Details
|
|
|
11-27-2011
|
6.00
|
Painted interior pieces
|
Details
|
|
|
11-26-2011
|
7.00
|
Fabricated glare shield overlays
|
Details
|
|
|
11-25-2011
|
9.00
|
Finished Priming panel overlay
|
Details
|
|
|
11-23-2011
|
6.00
|
Attached upper fwd fuselage
|
Details
|
 |
|
11-22-2011
|
6.00
|
Primed center arm rest and various pieces
|
Details
|
 |
|
11-20-2011
|
30.00
|
Wired control stick and audio jacks
|
Details
|
|
|
11-15-2011
|
6.00
|
Wired Flap motor and position sensor
|
Details
|
|
|
11-14-2011
|
10.00
|
Continued with wiring
|
Details
|
|
|
11-11-2011
|
10.00
|
Dynon magnetometer
|
Details
|
|
|
11-10-2011
|
12.00
|
Installed Instrument Panel
|
Details
|
|
|
11-09-2011
|
30.00
|
Continued with firewall
|
Details
|
 |
|
11-01-2011
|
12.00
|
Installed Firewall Insulation
|
Details
|
|
|
10-30-2011
|
4.00
|
Installed remaining insulation
|
|
 |
|
10-29-2011
|
22.00
|
Panel Checkout
|
Details
|
 |
|
10-27-2011
|
64.00
|
Continued work on the wiring
|
Details
|
|
|
10-22-2011
|
70.00
|
Fired up Panel
|
Details
|
|
|
10-16-2011
|
110.00
|
Continue Panel Wiring
|
Details
|
|
|
10-12-2011
|
60.00
|
Last 12 days
|
Details
|
|
|
10-05-2011
|
9.00
|
Continued wiring of panel
|
Details
|
 |
|
10-04-2011
|
24.00
|
Continued with wiring
|
Details
|
|
|
09-28-2011
|
10.00
|
Started wiring the avionics harnesses
|
Details
|
|
|
09-27-2011
|
7.00
|
Completed wiring if Batteries
|
Details
|
|
|
09-26-2011
|
10.00
|
Cleaned up cables to rear of aircraft
|
Details
|
 |
|
09-23-2011
|
4.00
|
Installed Whelen Power Supply Bracket
|
Details
|
 |
|
09-22-2011
|
6.00
|
Fabricated Annunciator Panel
|
Details
|
|
|
09-20-2011
|
6.00
|
Mounted various avionics on panel
|
Details
|
|
|
09-19-2011
|
9.00
|
Painted instrument sub-panel
|
Details
|
  |
|
09-16-2011
|
10.00
|
Pulled wire
|
Details
|
|
|
09-15-2011
|
8.00
|
Completed Aux Batt Mount
|
Details
|
|
|
09-14-2011
|
10.00
|
Located various avionics and fabricated shelf
|
Details
|
|
|
09-13-2011
|
5.00
|
Cut out sub panel to accomodate radio stack
|
Details
|
  |
|
09-12-2011
|
2.00
|
Installed avionics fan
|
Details
|
 |
|
09-07-2011
|
10.00
|
Installed side panels and throttle quadrant
|
Details
|
|
|
09-06-2011
|
5.00
|
Completed installation of flap bracket
|
Details
|
|
|
09-05-2011
|
6.00
|
Began fabrication of Flap Position Assy
|
Details
|
|
|
09-03-2011
|
10.00
|
Continued installation of the inst. panel
|
Details
|
|
|
09-02-2011
|
9.00
|
Began installation of Instrument Panel
|
Details
|
|
|
08-28-2011
|
4.00
|
Attached right wing fairings
|
Details
|
|
|
08-27-2011
|
3.00
|
Attached Right Wing
|
Details
|
|
|
08-26-2011
|
6.00
|
Completed disassembly of wing attachment
|
Details
|
|
|
08-25-2011
|
10.00
|
Installed wing root fairings
|
Details
|
|
|
08-24-2011
|
24.00
|
Attached control surfaces and pushrods
|
Details
|
|
|
08-23-2011
|
12.00
|
Attached Left Wing
|
Details
|
|
|
07-24-2011
|
6.00
|
Completed Wing Root Fairings
|
Details
|
|
|
07-22-2011
|
9.00
|
continued with section 44
|
Details
|
|
|
07-21-2011
|
5.00
|
Began Wing attachment tasks
|
Details
|
|
|
07-20-2011
|
2.00
|
Built Flap Pushrod
|
Details
|
  |
|
07-19-2011
|
4.00
|
Installed connector on A/P and Pitot Heat
|
Details
|
|
|
07-18-2011
|
6.00
|
Installed connectors for aileron trim
|
Details
|
|
|
07-06-2011
|
7.00
|
Finished right and left wing tip
|
Details
|
|
|
07-05-2011
|
2.00
|
Attached Bellcrank to aileron pushrod
|
Details
|
 |
|
07-04-2011
|
6.00
|
Began attachment of right wing tip
|
Details
|
|
|
07-04-2011
|
2.00
|
Attached brackets to aileron and flap (R)
|
Details
|
  |
|
07-01-2011
|
17.00
|
Began with attachment of right wing tip
|
Details
|
|
|
06-30-2011
|
8.00
|
Completed riveting W-1005 (r)
|
Details
|
|
|
06-29-2011
|
5.00
|
Continued riveting W-1005 (R)
|
Details
|
 |
|
06-28-2011
|
6.00
|
Continued working on riveting W-1005 skin (R)
|
Details
|
 |
|
06-27-2011
|
6.00
|
Started attachment of lower wing skin (R)
|
Details
|
 |
|
06-25-2011
|
4.00
|
Attached right torque tube
|
Details
|
 |
|
06-24-2011
|
9.00
|
Completed match drilling and dimpling of w-1005
|
Details
|
 |
|
06-23-2011
|
2.00
|
Installed right fuel sender
|
Details
|
  |
|
06-22-2011
|
10.00
|
Match drilled J channel and W-1005 skin right side
|
Details
|
  |
|
06-21-2011
|
6.00
|
Installed left Torque Tube Assembly
|
Details
|
|
|
06-21-2011
|
2.00
|
Competed installation of Aileron Trim
|
Details
|
  |
|
06-20-2011
|
2.00
|
Attached Flap to wing (left)
|
|
 |
|
06-20-2011
|
10.00
|
Attached aileron brackets
|
Details
|
  |
|
06-19-2011
|
4.00
|
Completed wing access plates for w-1005L
|
Details
|
  |
|
06-17-2011
|
6.00
|
Completed attachment of lower outboard bottom skin
|
Details
|
|
|
06-16-2011
|
4.00
|
Completed right wingtip lighting
|
Details
|
  |
|
06-15-2011
|
4.00
|
Continued riveting of left bottom skin
|
Details
|
 |
|
06-14-2011
|
6.00
|
Competed installaion of wingtip lights
|
Details
|
  |
|
06-13-2011
|
8.00
|
Installed lens and left wing tip lighting
|
Details
|
|
|
06-13-2011
|
4.00
|
Began riveting lower wing skin
|
Details
|
 |
|
06-10-2011
|
5.00
|
Dimpled lower left wing skin
|
Details
|
  |
|
06-10-2011
|
4.00
|
Completed wire harness for left
|
Details
|
|
|
06-09-2011
|
10.00
|
Fit lower outboard left wing skin
|
|
|
|
06-08-2011
|
4.00
|
Installed Dynon Pitot
|
Details
|
|
|
06-06-2011
|
10.00
|
Installed left wing gap fairings
|
Details
|
|
|
06-04-2011
|
6.00
|
Fabricated left forward torque tube
|
Details
|
 |
|
06-03-2011
|
6.00
|
Assembled Aileron Trim
|
Details
|
|
|
06-02-2011
|
7.00
|
Fabricated aileron torque tubes
|
Details
|
|
|
06-01-2011
|
9.00
|
Installed stall warning switch and acces plate
|
Details
|
|
|
05-31-2011
|
3.00
|
Tested Left Fuel Tank for Leaks
|
Details
|
 |
|
05-31-2011
|
3.00
|
Installed Fuel Sender in Left Tank
|
Details
|
|
|
05-29-2011
|
4.00
|
Installed Right Door Window
|
Details
|
  |
|
05-26-2011
|
8.00
|
Finished trim on glass in Left Door
|
Details
|
|
|
05-24-2011
|
6.00
|
Fabricated Rudder Pulley Assembly
|
Details
|
|
|
05-23-2011
|
12.00
|
Installed glass in left door
|
Details
|
|
|
05-18-2011
|
6.00
|
Began final fitting and prep of door windows
|
Details
|
|
|
05-17-2011
|
2.00
|
Installed Heat selector boxes
|
Details
|
 |
|
05-16-2011
|
6.00
|
Assembled Oil Cooler Bracket
|
Details
|
 |
|
05-12-2011
|
4.00
|
Installed Fibrefrax ceramic insulation
|
Details
|
|
|
05-11-2011
|
6.00
|
Installed overhead vents and pnuematic strut brack
|
Details
|
|
|
05-10-2011
|
6.00
|
Re-installed latch system on doors
|
Details
|
 |
|
05-09-2011
|
10.00
|
Completed Paint on Overhead
|
Details
|
|
|
05-05-2011
|
60.00
|
Finished Painting the Inside of Doors
|
Details
|
|
|
05-03-2011
|
28.00
|
Finished Primer on outside of doors
|
Details
|
|
|
05-02-2011
|
6.00
|
Skim coated and filled outside left and right door
|
Details
|
|
|
04-25-2011
|
60.00
|
Completed primer of door inside panels
|
Details
|
|
|
04-23-2011
|
4.00
|
Applied primer to inside of Cabin Cover
|
Details
|
|
|
04-20-2011
|
32.00
|
Continued with Overhead Console Paint Prep
|
Details
|
|
|
04-19-2011
|
9.00
|
Began installation of Overhead console
|
Details
|
|
|
04-15-2011
|
30.00
|
Finished fitting the Door Seal
|
Details
|
|
|
04-08-2011
|
45.00
|
Continued finishing the cabin cover
|
Details
|
|
|
04-03-2011
|
10.00
|
Completed left door latch and installed
|
Details
|
|
|
04-02-2011
|
2.00
|
Added locking clip to right door latch
|
Details
|
 |
|
03-28-2011
|
9.00
|
Trimmed left and right door windows
|
Details
|
|
|
03-25-2011
|
8.00
|
Fabricated hinge cover for both doors
|
Details
|
|
|
03-24-2011
|
7.00
|
Began Trimming doors
|
Details
|
 |
|
03-22-2011
|
8.00
|
Bonded Left Door Skins
|
Details
|
|
|
03-21-2011
|
8.00
|
Prep'd left door for installation of Center Latch
|
Details
|
 |
|
03-18-2011
|
4.00
|
Completed Right Door installation of latch
|
Details
|
 |
|
03-17-2011
|
4.00
|
Continued installation of center latch
|
Details
|
  |
|
03-16-2011
|
12.00
|
Began installation of center latch
|
Details
|
|
|
03-15-2011
|
4.00
|
Installed door latch in right door
|
Details
|
|
|
03-11-2011
|
4.00
|
Installed right door hinge half
|
Details
|
|
|
03-11-2011
|
10.00
|
Finished Right door trimming
|
Details
|
|
|
03-10-2011
|
4.00
|
Assembled Door Latches
|
Details
|
|
|
03-09-2011
|
12.00
|
Trimmed doors and match drilled
|
Details
|
|
|
03-08-2011
|
10.00
|
Installed Cabin top
|
Details
|
|
|
03-07-2011
|
10.00
|
Installed center brace and support bracket
|
Details
|
|
|
03-05-2011
|
6.00
|
Completed final drilling of all attaching holes
|
Details
|
|
|
03-04-2011
|
9.00
|
Installed Cabin Cover and Match Drilled
|
Details
|
|
|
03-03-2011
|
11.00
|
Reinstalled Upper Fuse Comm Antenna
|
Details
|
|
|
03-01-2011
|
6.00
|
Sanding and Fitting door openings
|
Details
|
|
|
02-28-2011
|
12.00
|
Continued Sanding Cabin Cover
|
Details
|
  |
|
02-25-2011
|
6.00
|
Installed Transponder and Comm antenna
|
Details
|
|
|
02-25-2011
|
3.00
|
Assembled Mid-seat Rail Support
|
Details
|
|
|
02-17-2011
|
10.00
|
Finalized fitting of Cabin cover to Fuselage
|
Details
|
|
|
02-16-2011
|
14.00
|
Continued Trimming Cabin Cover
|
Details
|
  |
|
02-15-2011
|
10.00
|
Continued work on Cabin Cover installation
|
Details
|
|
|
02-14-2011
|
10.00
|
Began fitting of Cabin Cover
|
Details
|
  |
|
02-13-2011
|
4.00
|
Fuel Line Re-Do
|
Details
|
|
|
02-10-2011
|
5.00
|
Installed Rear NACA Ducts
|
Details
|
|
|
02-09-2011
|
12.00
|
Completed Rear Seat Backs
|
Details
|
|
|
02-08-2011
|
12.00
|
Completed Section 40 Flaps Installation
|
Details
|
|
|
02-08-2011
|
3.00
|
Began construction of rear seat backs
|
Details
|
|
|
02-07-2011
|
4.00
|
Partlially completed Flap torque tube installation
|
Details
|
 |
|
02-06-2011
|
7.00
|
Began flap system assembly
|
Details
|
|
|
02-05-2011
|
6.00
|
Finished Installation of controls
|
Details
|
|
|
02-04-2011
|
4.00
|
Completed installation of pedals and brake lines
|
Details
|
|
|
02-04-2011
|
5.00
|
Completed Brake Line and Brake Reservoir Installat
|
Details
|
 |
|
02-04-2011
|
5.00
|
Assembled and installed control stick base
|
Details
|
|
|
02-03-2011
|
14.00
|
Fabricated remaining pushrods for Aileron
|
Details
|
|
|
02-02-2011
|
6.00
|
Installed Rudder Cable Fairings
|
Details
|
|
|
02-02-2011
|
2.00
|
Fabricated Elevator Pushrod
|
Details
|
  |
|
02-01-2011
|
7.00
|
Routed left and right rudder cables through fuse
|
Details
|
|
|
01-31-2011
|
7.00
|
Installed Matco Parking Brake
|
Details
|
|
|
01-30-2011
|
2.00
|
Installed Safair1 Static Ports
|
Details
|
|
|
01-29-2011
|
6.00
|
Attached Brake Assemblies to WD1006
|
Details
|
 |
|
01-28-2011
|
14.00
|
Primed remaining panels and covers, painted rudder
|
Details
|
  |
|
01-28-2011
|
4.00
|
Assembled Brake Pedals
|
Details
|
  |
|
01-27-2011
|
18.00
|
Fabricated inspection panel
|
Details
|
|
|
01-26-2011
|
1.00
|
My old flight instructors visit
|
Details
|
|
|
01-24-2011
|
18.00
|
Fabricated Lines and Installed Fuel System
|
Details
|
|
|
01-23-2011
|
10.00
|
Fabricated and installed brake lines
|
Details
|
|
|
01-12-2011
|
3.00
|
Cut out Rear NACA vent slots
|
|
  |
|
01-11-2011
|
7.00
|
Completed Tunnel Covers
|
Details
|
|
|
01-10-2011
|
6.00
|
Installed Px seat floors
|
Details
|
|
|
01-10-2011
|
4.00
|
Final Riveted the PAX seat bottom
|
Details
|
 |
|
01-08-2011
|
2.00
|
Installed Left Baggage cover to Fuse
|
Details
|
 |
|
01-07-2011
|
7.00
|
Installed completed baggage door to fuselage
|
Details
|
|
|
01-07-2011
|
5.00
|
Completed baggage door
|
Details
|
|
|
01-06-2011
|
6.00
|
Ran additional conduit through baggage floor
|
Details
|
|
|
01-05-2011
|
6.00
|
Painted baggage door hardware
|
|
 |
|
01-04-2011
|
6.00
|
Completed initial assy of baggage door
|
Details
|
|
|
01-04-2011
|
1.00
|
Completed Baggage Bulkead Assy
|
|
  |
|
01-03-2011
|
12.00
|
Completed Baggage Close-Out
|
Details
|
|
|
01-02-2011
|
6.00
|
Installed right baggage cover to fuse
|
Details
|
|
|
12-31-2010
|
17.00
|
Riveted Baggage floor to fuse
|
Details
|
|
|
12-30-2010
|
8.00
|
Modified right baggage floor for inspection cover
|
Details
|
 |
|
12-29-2010
|
10.00
|
Fabricated comm antenna doubler and installed
|
Details
|
 |
|
12-28-2010
|
16.00
|
Assembled Baggage Door Frame
|
Details
|
  |
|
12-27-2010
|
8.00
|
Installed Insulation and ran conduit
|
Details
|
|
|
12-27-2010
|
4.00
|
Assembled Baggage Door
|
Details
|
|
|
12-23-2010
|
14.00
|
Prepared Baggage Floor Panels for Installation
|
Details
|
|
|
12-21-2010
|
15.00
|
Continued riveting the fuse to the tailcone
|
|
|
|
12-20-2010
|
12.00
|
Began Riveting of Fuse to Tailcone
|
Details
|
|
|
12-19-2010
|
17.00
|
Re-Attached Fuse
|
Details
|
 |
|
12-18-2010
|
14.00
|
Finished Prime of Fuse and Floor Panels
|
Details
|
|
|
12-17-2010
|
19.00
|
Built Paint Booth and Primed Fuse
|
Details
|
|
|
12-16-2010
|
15.00
|
Removed Tailcone and prepared for re-attachment
|
Details
|
  |
|
12-14-2010
|
12.00
|
Continued with Tailcon and Fuse Attachment
|
Details
|
|
|
12-13-2010
|
10.00
|
Began attachment of Tailcone to fuse
|
Details
|
|
|
12-10-2010
|
18.00
|
Dis-asembled Fuse QB
|
Details
|
|
|
12-08-2010
|
18.00
|
QB Fuse and Wing Kit Arrived
|
Details
|
|
|
12-01-2010
|
30.00
|
Added an equipment shelf in tail cone
|
Details
|
|
|
11-30-2010
|
40.00
|
Completed Vertical and Elevator Fairing glass work
|
Details
|
|
|
11-26-2010
|
12.00
|
Glassed in upper rudder fairing
|
Details
|
|
|
11-11-2010
|
5.00
|
Installed Nut Plates on lower Rudder Fairing
|
Details
|
|
|
11-05-2010
|
3.00
|
Closed Horizontal Stab tip fairing left side
|
Details
|
  |
|
11-03-2010
|
4.00
|
Continued Glassing the Horiz. tip fairings
|
Details
|
|
|
10-29-2010
|
2.00
|
Closed the Hor. Stab Fairing
|
Details
|
 |
|
10-28-2010
|
5.00
|
Fiberglass fairings
|
Details
|
|
|
10-25-2010
|
4.00
|
Inspection
|
Details
|
  |
|
10-25-2010
|
14.00
|
Attached Rudder
|
|
|
|
10-25-2010
|
16.00
|
Attached Elevator and Rudder tip Fairings
|
Details
|
|
|
10-23-2010
|
4.00
|
Attached Vert. Stab to Tail Cone
|
Details
|
|
|
10-22-2010
|
10.00
|
Fabricated four shims, attached and aligned elevat
|
Details
|
|
|
10-21-2010
|
6.50
|
Match Drill Elevator Horns
|
Details
|
|
|
10-20-2010
|
20.00
|
Installed Elevator on Horizontal Stab
|
Details
|
|
|
10-19-2010
|
17.00
|
Installed both Left and Right Elevators
|
Details
|
|