Powered By Kitlog Pro v2.0
HAKAN'S WEB SITE
rv7a
All
Work Logs Found:
317
Category Work Time:
1124 Hours
Date
Hours
Work Log Summary
Details
12-30-2015
2.00
fairings
12-30-2015
2.00
fairings
12-19-2015
2.00
Mods
12-19-2015
2.00
12-19-2015
2.00
10-06-2015
1.00
FLIGHT TEST
09-28-2015
20.00
10-24-2014
1.00
Antenna test
10-12-2014
1.00
05-29-2013
5.00
DAR inspection
Details
05-04-2013
12.00
Condition inspection
Details
04-30-2013
1.00
Oil change
Details
04-30-2013
1.00
New brake lines
Details
04-30-2013
0.50
ID plate
Details
04-30-2013
1.50
Bleeding the brakes
Details
04-28-2013
3.00
Compression and timing check
Details
04-27-2013
3.00
Transition training
Details
04-21-2013
4.00
Weight and balance
Details
04-20-2013
3.00
Replacing static ports
Details
04-20-2013
3.00
Interior
Details
04-19-2013
1.00
Installing fire extinguisher
Details
04-17-2013
2.00
Right wing flap installed
Details
04-17-2013
4.00
Installing ailerons
Details
04-15-2013
1.00
Right wing and wingtip in place
Details
04-15-2013
1.00
Final right wing bolts and torque
Details
04-15-2013
2.00
Balancing the ailerons
Details
04-13-2013
3.00
Right wing installed
Details
04-11-2013
4.00
riveting rear spar in place
Details
04-11-2013
3.00
Preparing new rear spar
Details
04-07-2013
1.00
Wing flap indicator
Details
04-07-2013
0.50
Left wing on
Details
04-06-2013
5.00
Undrilling the rear spar
Details
04-06-2013
3.00
Rear spar removal
Details
04-05-2013
3.00
Static leak test and wing tip lights
Details
04-05-2013
3.00
Flap pushrod installation
Details
04-03-2013
2.00
Mishap...
Details
04-02-2013
2.00
Weather strip seals
Details
04-02-2013
1.00
Step anti slip
Details
04-02-2013
5.00
Installing left wing
Details
04-02-2013
1.00
Harnesses
Details
03-30-2013
3.00
Installing rudder and cables
Details
03-30-2013
3.00
Installing cowl fasteners
Details
03-30-2013
1.00
Connected the tail lights
Details
03-30-2013
2.00
Added heat protection
Details
03-28-2013
2.00
Re-attaching the antennas
Details
03-28-2013
2.50
Elevator re-balance
Details
03-28-2013
2.00
Elevator attach and control rod
Details
03-27-2013
2.00
Attached the horizontal and vertical tail
Details
03-26-2013
3.00
Aircraft in hangar
Details
03-23-2013
5.00
Preparing the hangar
Details
03-22-2013
3.00
Paint almost done
Details
03-16-2013
6.00
In the paint shop 2
Details
03-08-2013
2.00
In the paint shop
Details
02-27-2013
4.00
To the paint shop !
Details
02-02-2013
2.00
Sound dampening tape
Details
01-31-2013
1.50
Nuts for main landing gear
Details
01-31-2013
1.50
New main gear axle nuts installation
Details
01-20-2013
2.00
Spar covers
Details
01-20-2013
1.00
Engine plenum
Details
01-19-2013
1.00
Tank selector
Details
01-19-2013
2.00
Rivnuts for interior panels
Details
01-19-2013
10.00
Hardware for assembly
Details
01-19-2013
1.00
Co-pilot stick installation
Details
01-18-2013
1.00
Pilot stick labels
Details
01-18-2013
2.00
Aileron trim decal
Details
01-07-2013
12.00
wing fairing nutplates
Details
01-06-2013
5.00
Aligning wing fairings
Details
12-17-2012
2.00
More primer
Details
12-16-2012
3.00
Super Fil and sanding
Details
12-15-2012
3.00
Nose gear leg fairing
Details
12-14-2012
3.00
Wing fairings
Details
12-10-2012
3.00
Interior arrived
Details
12-09-2012
4.00
More primer
Details
12-08-2012
7.00
Fitting wheel pants
Details
12-06-2012
5.00
Bondo and primer
Details
12-06-2012
3.00
Added nutlpates to nose wheel fairing
Details
12-05-2012
8.00
Body work on fiberglass parts
Details
12-02-2012
6.00
Wheel fairing fixes
Details
12-02-2012
4.00
Nose gear leg fairing
Details
12-02-2012
2.00
Main leg fairing reinforcement
Details
12-02-2012
2.00
Cowl flap fairing
Details
12-01-2012
6.00
Sanding wheel pants
Details
11-30-2012
2.00
Started the body work on the main gear fairings
Details
11-30-2012
6.00
main gear leg fairings
Details
11-30-2012
5.00
Cowl flap alignment fairing
Details
11-28-2012
2.00
Main wheel fairing outer attach
Details
11-28-2012
4.00
Bonding intersection fairings
Details
11-27-2012
2.00
Nose gear upper intersection fairing
Details
11-26-2012
8.00
Flanges on wheel pants fairings
Details
11-25-2012
4.00
Wheel fairings
Details
11-25-2012
1.00
Wheel fairing nutplates
Details
11-25-2012
6.00
Main wheel pants
Details
11-19-2012
4.00
Nose gear fairing reinforcements
Details
11-18-2012
10.00
Nose gear intersection fairing
Details
11-17-2012
6.00
Nose gear wheel pant
Details
11-16-2012
2.00
Nose gear break out force
Details
11-15-2012
10.00
installing the lower empennage fairing
Details
11-14-2012
3.00
Primer
Details
11-14-2012
4.00
Nutplates for exhaust fairing
Details
11-13-2012
1.00
Safety wire on gascolator
Details
11-12-2012
2.00
Rudder cable fairing
Details
11-11-2012
2.00
Oil door
Details
11-11-2012
5.00
More body work
Details
11-10-2012
2.00
Exhaust fairing
Details
11-10-2012
6.00
Cowling body work
Details
11-09-2012
3.00
Nutplates for empennage fairing
Details
11-08-2012
3.00
Attachment clip for horizontal fairing
Details
11-07-2012
4.00
Empennage nutplates
Details
11-05-2012
6.00
Access door frame
Details
11-02-2012
8.00
Oil access dor on cowling
Details
11-01-2012
6.00
Empennage fairing
Details
10-31-2012
8.00
Exhaust exit fairing 3
Details
10-29-2012
3.00
Exhaust exit fairing 2
Details
10-28-2012
5.00
Exhaust exit fairing 1
Details
10-20-2012
2.00
Cowl flap vernier attachment bracket
Details
10-20-2012
1.00
Cowl flap functional test
Details
10-20-2012
2.00
Cowl fastener part 2
Details
10-19-2012
2.00
Preliminary attachment of cowl flap
Details
10-19-2012
3.00
Cowl attachments fasteners
Details
10-18-2012
2.00
Cowl flap part 2
Details
10-17-2012
5.00
Cowl flap
Details
10-14-2012
1.00
Main bulkhead cap strips/covers
Details
10-14-2012
2.00
Glare sheild padding
Details
10-14-2012
8.00
Empennage fairing
Details
10-14-2012
3.00
Cowl flap cutout
Details
10-13-2012
2.00
Sun shades
Details
10-11-2012
1.00
Canopy handles
Details
10-11-2012
3.00
Aileron spring trim system
Details
10-09-2012
6.00
Sticks and stick grips
Details
10-08-2012
3.00
Fitting engine plenum inlets
Details
10-07-2012
6.00
Plenum inlets
Details
10-06-2012
1.00
Removed canopy protective film
Details
10-06-2012
4.00
FAB drain line
Details
10-05-2012
3.00
Oil return lines
Details
10-05-2012
2.00
FAB fuel drain
Details
09-30-2012
4.00
Engine run-up 2
Details
09-30-2012
8.00
Engine plenum modification
Details
09-28-2012
6.00
Molding grooves for inlet
Details
09-22-2012
5.00
Engine startup
Details
09-20-2012
4.00
Air filter box complete
Details
09-19-2012
6.00
Cowl inlet
Details
09-17-2012
10.00
Air filter box
Details
09-11-2012
8.00
Canopy frame 3
Details
09-05-2012
8.00
Canopy skirt 2
Details
09-03-2012
2.00
Fwd cowl attach
Details
09-02-2012
8.00
Windshield fairing
Details
09-01-2012
8.00
Canopy skirt
Details
08-27-2012
2.00
Bonded windshield fairing
Details
08-26-2012
9.00
Trimming lower cowl
Details
08-26-2012
6.00
Trimmed windshield fairing
Details
08-26-2012
2.00
Cowl side strips
Details
08-24-2012
4.00
Windshield bonded
Details
08-23-2012
2.00
Preparing windshield for bonding
Details
08-23-2012
2.00
Bond prepping the windshield
Details
08-22-2012
2.00
Upper fwd fuselage skin and air vents
Details
08-21-2012
2.00
Canopy handles
Details
08-20-2012
2.00
Alternator safety wire and carb heat muff
Details
08-18-2012
2.00
preparing the canopy for bonding
Details
08-18-2012
2.00
Bonding the canopy to the frame
Details
08-16-2012
3.00
fitting upper cowl
Details
08-15-2012
3.00
Upper fwd skin riveting
Details
08-15-2012
3.00
Started riveting the front upper skin 2
Details
08-15-2012
3.00
Started riveting the front upper skin 1
Details
08-12-2012
1.50
Painting canopy frame
Details
08-07-2012
7.00
Trimming the windshield
Details
08-06-2012
2.50
The big cut
Details
08-06-2012
3.00
Canopy trial
Details
08-05-2012
1.00
Initial fit of tail fairing
Details
08-05-2012
3.00
Cowl attachment strips
Details
08-04-2012
3.00
Windshield and canopy fairings
Details
08-03-2012
8.00
started fitting the cowl
Details
08-02-2012
1.00
New starter
Details
08-01-2012
2.00
Trimming canopy
Details
07-31-2012
2.00
heater muff
Details
07-30-2012
8.00
Cowl extension
Details
07-28-2012
0.50
Removed starter motor
Details
07-28-2012
1.50
Prop arrives!
Details
07-28-2012
7.00
Canopy tracks
Details
07-28-2012
2.00
Canopy anchor blocks
Details
07-28-2012
2.00
Anchor block and frame attach
Details
07-27-2012
6.00
Cowl exit ramps
Details
07-27-2012
5.00
Canopy frame
Details
07-24-2012
2.00
Exhaust brackets
Details
07-24-2012
1.00
Cockpit side covers
Details
07-22-2012
4.00
Cowl exit ramp
Details
07-21-2012
3.00
Rear canopy track
Details
07-20-2012
5.00
Oil cooler
Details
07-20-2012
3.00
Brake lines
Details
07-17-2012
2.00
Backup washers for the roll over bar
Details
07-16-2012
3.00
Trim tab brackets
Details
07-16-2012
4.00
Roll over bar pre-installation
Details
07-16-2012
3.00
Baggage compartment 2
Details
07-16-2012
3.00
Baggage compartment
Details
07-15-2012
6.00
Main wheels
Details
07-15-2012
0.50
Alternator wire
Details
07-14-2012
2.00
Wing drain fittings
Details
07-14-2012
3.00
Trimmed the right step
Details
07-14-2012
1.00
Step installation
Details
07-14-2012
2.00
Main gear brakes
Details
07-14-2012
3.00
Fuel vent inlets
Details
07-13-2012
0.50
Engine ground strap
Details
07-12-2012
3.00
Nose wheel preliminary installation
Details
07-11-2012
2.00
Primer solenoid installed
Details
07-10-2012
1.00
Manifold pressure sensor
Details
07-10-2012
4.00
Dual throttle linkage and micture
Details
07-09-2012
1.00
Fuel flow sensor
Details
07-09-2012
4.00
CHT and EGT wires
Details
07-07-2012
3.00
Skyview displays
Details
07-07-2012
0.50
CHT probes
Details
07-06-2012
2.00
Fuel and oil pressure
Details
07-06-2012
3.00
Engine installation
Details
07-05-2012
3.00
Engine mount installation
Details
07-04-2012
8.00
Displays and engine controls
Details
06-27-2012
12.00
Engine baffles
Details
06-25-2012
0.50
Step fastener countersunk
Details
06-23-2012
1.50
Turn and bank
Details
06-09-2012
8.00
James plenum and baffles
Details
06-08-2012
2.00
Marker beacon antenna
Details
06-07-2012
5.00
marker beacon receiver
Details
06-07-2012
3.00
hour meter
Details
06-06-2012
2.00
right wing test fit and fuel lines
Details
06-04-2012
2.00
Left wing, fuel lines and fwd wing attach
Details
06-03-2012
2.00
ignition harness
Details
06-02-2012
4.00
VHF antennas
Details
06-01-2012
1.00
Transponder antenna
Details
05-27-2012
2.00
Main landing gears
Details
05-24-2012
4.00
Headset plugs
Details
05-24-2012
0.50
attached standby alternator
Details
05-22-2012
3.00
Left step installation
Details
05-21-2012
2.00
Stby alternator install
Details
05-19-2012
4.00
Finished riveting the wing
Details
05-17-2012
3.00
First electrical power up
Details
05-16-2012
2.00
VOR antenna connection
Details
05-16-2012
3.00
Standby alternator and music wires
Details
05-16-2012
1.00
RPM for Dynon
Details
05-16-2012
3.00
Mic and push to talk
Details
05-16-2012
1.00
Amp Hi and Loo detection
Details
05-12-2012
4.00
Started riveting lower left wing skin
Details
05-12-2012
1.00
EMS system CHT and EGT wires
Details
05-12-2012
2.00
Antenna coax installation
Details
05-11-2012
8.00
Installed avionics
Details
05-10-2012
2.00
EMS tray
Details
05-10-2012
2.00
EMS module and display batteries
Details
05-09-2012
5.00
Parking brake
Details
05-08-2012
0.50
Center tunnel
Details
05-07-2012
1.00
Holes for engine controls
Details
05-07-2012
1.00
Cleaning carburator
Details
05-05-2012
4.00
Control subpanel and support panel installation
Details
05-03-2012
1.00
Throttle control subpanel decals
Details
05-03-2012
10.00
Switch wiring
Details
05-03-2012
2.00
Relocation of brake reservoir
Details
05-03-2012
0.50
Pitch trim rod adjustment
Details
05-03-2012
3.00
Final installation of rudder pedals and brake cyl.
Details
05-02-2012
3.00
Decals for new throttle sub panel
Details
05-02-2012
5.00
Added passenger brake pedals, cylinders and lines
Details
05-01-2012
9.00
Daisy-chain wiring for switches
Details
05-01-2012
3.00
Canon plug for electrical turn and bank
Details
04-30-2012
4.00
New controls subpanel
Details
04-30-2012
4.00
Buzzing the electrical system
Details
04-29-2012
3.00
Rudder return springs
Details
04-29-2012
1.00
Map box handle and magnet
Details
04-29-2012
5.00
Center tunnel modification
Details
04-27-2012
2.00
Sub panel riveting
Details
04-27-2012
8.00
Avionics tray support
Details
04-26-2012
4.00
Lower rudder fairing bondo and sanding
Details
04-26-2012
2.00
ELT installation complete
Details
04-24-2012
8.00
Reinstalling Adahrs and OAT
Details
04-24-2012
6.00
Readjusting the lower rudder fairing
Details
04-22-2012
1.00
Rudder cable check
Details
04-22-2012
4.00
Adahrs installed
Details
04-21-2012
4.00
Preliminary instl of pitot/aoa tube
Details
04-21-2012
2.00
ELT installation
Details
04-21-2012
4.00
Auto pilot and Adahrs attachement to network hub
Details
04-21-2012
8.00
Adahrs installation
Details
04-20-2012
3.00
Installed cabin air vents
Details
04-19-2012
15.00
Wiring
Details
04-18-2012
7.00
Instrument panel done
Details
04-17-2012
3.00
Adahrs installation has begun
Details
04-15-2012
4.00
Started connecting the wires and pitot wires and t
Details
04-15-2012
2.00
Assembled the electrical pitch trim
Details
04-14-2012
6.00
Painting of various panels
Details
04-12-2012
4.00
Finished map box
Details
04-11-2012
9.00
More VPX wiring
Details
04-11-2012
2.00
Engine arrives!
Details
04-09-2012
2.00
Started making the pitot tube attachment
Details
04-09-2012
4.00
Custom map box
Details
04-08-2012
6.00
Upper fwd access panels part 2
Details
04-08-2012
8.00
Upper fwd access panels 1 of 2
Details
04-08-2012
7.00
Pitot and static line hookups and VPX pro install
Details
04-07-2012
2.00
Riveting the subpanel to the main panel
Details
04-07-2012
3.00
Installing avionic trays
Details
04-06-2012
1.00
Pitch autopilot servo electrical connection
Details
04-06-2012
5.00
Finished the electrical connections to the wings
Details
04-06-2012
3.00
Added all the pitot, static and AOA lines
Details
04-05-2012
4.00
Working on the new instrument panel
Details
04-04-2012
4.00
Installing autopilot pitch servo
Details
04-03-2012
1.50
Waterproof connectors
Details
04-03-2012
4.00
Adding electrical fuel pump and bypass line
Details
04-02-2012
6.00
Adding more wires to the aft fuselage
Details
04-01-2012
6.00
More wiring
Details
04-01-2012
6.00
More wiring
Details
04-01-2012
8.00
More electrical wiring
Details
04-01-2012
2.00
Markups of the wiring diagram
Details
04-01-2012
1.00
First avionics equipment
Details
04-01-2012
3.00
Access panels in fwd upper nose
Details
03-29-2012
2.00
Tip lights
Details
03-29-2012
4.00
Step cutout
Details
03-29-2012
2.00
Brake lines
Details
03-27-2012
4.00
Main fuel lines
Details
03-27-2012
1.00
Finished the Strobe wire rear fuselage routing
Details
03-26-2012
4.00
Routed strobe wires through fuselage
Details
03-26-2012
2.00
Main fuel lines from wing and fuel vent lines.
Details
03-25-2012
1.00
Installed strobe harness
Details
03-25-2012
2.00
Attaching main landing gear mounts
Details
03-24-2012
4.00
Soldered nav light
Details
03-23-2012
2.00
Fuel line from selector valve
Details
03-22-2012
3.00
Kit arrives at home
Details
SITE NAVIGATION
Contact Builder
320/360 Home
rv7a Home
Category
# Logs
# Hours
All
317
1129
Avionics
27
92
Electrical
36
144
Empennage
18
58
Engine
32
116
Flight controls
4
9
Fuel
12
28
Fuselage
109
375
Interior
3
8
Landing gear
31
127
Miscellaneous
25
88
Prop
2
21
Wings
18
63
Copyright © 2001-2024 Matronics. All Rights Reserved.