Derek & Kims RV-9A Build Log
Work Logs Found: 350
Category Work Time: 1491 Hours
 Date
Hours
Work Log Summary

Details

 11-30-2014
40.00
Phase 1 Testing Complete
Details
       

 07-13-2014
250.00
Account Undocumented hours
Details

 07-12-2014
20.00
Airworthiness
Details
       

 07-04-2014
8.00
First Engine Start
Details
       

 06-01-2014
2.00
Registration & Data Plate
       

 06-01-2014
4.00
Misc.
       

 06-01-2014
2.00
Completed Airframe
       

 05-31-2014
3.00
Weight & Balance
Details
       

 05-25-2014
4.00
Windscreen Fairing
Details
       

 05-24-2014
4.00
windscreen fairing
Details
       

 05-24-2014
2.00
IFR Pitot Static Certification
Details
       

 04-13-2014
2.00
Mount Horizontal Stabilizer
       

 04-13-2014
2.00
Mount Horizontal Stabilizer

 04-12-2014
8.00
Move to Hangar
       

 04-05-2014
6.00
Move Wings to Hangar
Details
       

 03-30-2014
2.00
Test Fit
     

 03-29-2014
8.00
Interior Install
Details
       

 03-18-2014
2.00
Mount Prop
Details
       

 03-16-2014
40.00
Final Avionics Changes & Wiring
Details
       

 03-15-2014
2.00
cockpit lights
Details
       

 03-08-2014
10.00
Fiberglass Finishing
Details
       

 03-01-2014
2.00
Oil Cooler Brace
Details
     

 01-19-2014
4.00
Bleed the Brakes
Details
       

 01-18-2014
4.00
Spinner back plate fillers
Details
       

 01-12-2014
2.00
Front Baffle Seals
Details
       

 01-11-2014
4.00
Fairings
Details
       

 01-11-2014
4.00
baffle ducts
Details
       

 01-05-2014
4.00
Engine Wiring Complete
Details

 01-05-2014
4.00
Alternate Air Door
Details

 12-15-2013
4.00
Firewall Penetrations
Details
       

 12-15-2013
1.00
Cabin Heat Scat Tube
Details
       

 12-14-2013
1.00
Flywheel install
Details
       

 12-11-2013
4.00
Red Cube Mounting (fuel flow tansducer)
Details
       

 12-07-2013
4.00
Carb Heat
Details
       

 12-05-2013
2.00
GDL 39R ADS-B
Details
     

 11-26-2013
8.00
Cowl & Baffles
Details
       

 11-25-2013
8.00
Install Landing Gear
Details
       

 11-17-2013
10.00
Panel Wiring
       

 11-16-2013
10.00
Panel Wiring
Details
       

 11-10-2013
10.00
panel wiring
Details
       

 11-09-2013
10.00
Panel Wiring
Details
       

 10-27-2013
8.00
Panel Installation & Wiring
       

 10-26-2013
8.00
Panel Installation & Wiring
       

 10-23-2013
0.50
IPad Ram Mount
       

 10-20-2013
2.00
Magnetometer Install
       

 10-15-2013
16.00
Panel Arrived
Details
       

 10-13-2013
2.00
Filtered Air Box Finishing
Details
       

 10-13-2013
0.00
Filtered Air Box Finishing
Details
       

 10-06-2013
1.00
Installed upper plug wire grommets
Details
       

 10-06-2013
4.00
Baffle work
Details
       

 10-05-2013
0.00
Snout extension pics
Details
       

 10-05-2013
0.00
Filtered Airbox
Details
       

 10-05-2013
4.00
Filtered Air Box
Details
       

 10-05-2013
10.00
Filtered Air Box
       

 10-05-2013
4.00
Extend Lower Cowl Snorkel to FAB
Details
       

 10-02-2013
4.00
fabricate radius baffle gussets
Details
       

 09-29-2013
3.00
Front baffle to lower cowl fit
Details
       

 09-28-2013
8.00
Start Engine Baffles
Details
       

 09-15-2013
4.00
Fuel Overflow
Details
       

 09-14-2013
2.00
Fuel Line to Carb
Details
       

 09-14-2013
6.00
Exit Air Bracket
Details
       

 08-25-2013
4.00
Exhaust Hangers
Details
       

 08-24-2013
4.00
Oil Door
Details
       

 08-17-2013
4.00
Vetterman Exhaust
Details
       

 08-11-2013
8.00
Finish Cowl Attachments
Details
       

 08-10-2013
8.00
Fitting the Cowl
       

 08-04-2013
2.00
Oil Hoses
Details
       

 08-04-2013
3.00
Initial Cowl Fitting
Details
       

 08-04-2013
8.00
Cowl Finishing
Details
     

 07-28-2013
2.00
Cut Oil Door in Top Cowl
Details
       

 07-27-2013
4.00
Various Engine Line Routing
       

 07-20-2013
8.00
Installed Engine
Details
       

 07-19-2013
1.00
Install ADS-B Antenna
Details
     

 07-13-2013
4.00
Engine Arrives
Details
       

 07-12-2013
1.00
Registration Recieved
Details

 07-07-2013
2.00
Glare Shield Paint
Details
       

 07-07-2013
2.00
Cockpit Roll Bar Handles
Details
       

 06-30-2013
4.00
Wheel Pants Fitted
Details
       

 06-29-2013
4.00
Wheel Pant Reinforcing
Details
       

 06-29-2013
4.00
Wheel Pant Fitting
Details
       

 06-28-2013
2.00
Aligning Gear leg Fairings
       

 06-23-2013
3.00
Main Gear Fairings
Details
       

 06-22-2013
2.00
Gear Leg Fairing Hose Clamp Attach
Details
       

 06-22-2013
1.00
Gear Leg Brake Lines
Details
       

 06-09-2013
4.00
Main Gear Fairings
Details
       

 06-09-2013
0.00
Main gear fairing photos
       

 06-09-2013
0.00
gear fairing photos
       

 05-19-2013
2.00
Nose Gear Fairings
Details
       

 05-18-2013
4.00
Fitting Nose Gear Fairings
Details
       

 05-12-2013
0.00
Wheel Photos
       

 05-12-2013
2.00
Slider Latch
Details
       

 05-12-2013
4.00
Main gear wheels & Brakes
Details
       

 05-12-2013
1.00
Install landing Gear
Details
       

 05-11-2013
4.00
Slider Completion
Details
       

 05-11-2013
2.00
Nose Gear Assemble
Details
     

 05-05-2013
0.00
Slider Rear Skirts
Details
       

 05-05-2013
0.00
Riveting Slider Canopy & Handle
Details
       

 05-04-2013
16.00
Slider Skirts
Details
       

 04-28-2013
0.00
Slider Cont...
       

 04-27-2013
16.00
Sliding Canopy Construction
Details
       

 04-21-2013
0.00
Windscreen photos
       

 04-21-2013
8.00
Windscreen Fitting
Details
       

 04-20-2013
8.00
Drilling, Sanding, Fitting Slider Canopy
Details
       

 04-20-2013
0.00
Canopy Drilling
       

 04-14-2013
2.00
The "Big Cut"
Details
       

 04-14-2013
2.00
Fitting Canopy for the "Big Cut"
Details
       

 04-14-2013
2.00
Canopy Fitting & Trimming
       

 04-13-2013
6.00
Initial Canopy Cutting
Details
       

 04-07-2013
6.00
Started Canopy Slider Frame
       

 04-07-2013
0.00
Slider Frame Bending
Details
       

 04-07-2013
0.00
Bending lower canopy square tubes
       

 04-06-2013
4.00
Windshield Roll Bari Install
Details
       

 04-06-2013
0.00
Roll bar photos
       

 04-06-2013
1.00
Install Engine Mount Frame
Details
       

 03-24-2013
1.00
Install Transponder Antenna
Details
       

 03-24-2013
0.50
First BNC Crimp
Details
       

 03-17-2013
2.00
Fab Wing Attach Angles
Details
     

 03-04-2013
1.00
Install Tail Strobe
Details
       

 03-03-2013
1.00
Riveted Rear Fuselage
Details
       

 03-03-2013
5.00
Dimpled Front Top Skin
Details
       

 02-21-2013
2.00
Install Rudder Cable
Details
       

 02-20-2013
1.00
Vertical Stab Stiffener
Details
       

 02-17-2013
4.00
Panel Labeling
Details
       

 02-17-2013
12.00
Fitted Empennage
Details
       

 02-16-2013
4.00
Riveted Top Forward aft Skin
Details
       

 02-13-2013
2.00
Installed ACK E04 ELT
       

 02-10-2013
2.00
Master Relay & Starter Solenoid
Details
     

 02-10-2013
1.00
Internal Rudder Stop
Details
       

 02-09-2013
2.00
ELT Antenna Doubler
Details
       

 02-03-2013
2.00
Up Elevator Stop
Details
       

 02-02-2013
2.00
Install Avionics Trays
Details
       

 02-02-2013
2.00
Firewall Recess Riveting
Details
       

 02-01-2013
1.00
Installed "B" nuts
Details
       

 01-30-2013
1.00
Aileron pushrod boots
Details
       

 01-27-2013
4.00
Install Aileron Trim
Details
       

 01-26-2013
0.50
You've been Warned!
Details
       

 01-26-2013
2.00
Static Line
Details
       

 01-26-2013
2.00
Riveted Dorward Deck
Details
       

 01-26-2013
2.00
Control Cables
Details
       

 01-25-2013
1.00
Ordered Finish Kit today
Details

 01-25-2013
3.00
Install Manual Trim Cable
Details
       

 01-23-2013
1.00
Catto Prop Arrives
Details
       

 01-20-2013
1.00
Safety wire Gascolator screws
Details
     

 01-20-2013
1.00
Rudder Cable Exits
Details
       

 01-20-2013
2.00
Fuel Pump Lines
Details
       

 01-20-2013
12.00
Firewall Components
Details
       

 01-18-2013
1.00
Seats Arrive
Details
       

 01-18-2013
2.00
Reinstall Panel
Details
       

 01-12-2013
2.00
Painted Panel
Details
     

 01-11-2013
1.00
Firewall Forward Kit Arrives
Details
       

 01-06-2013
2.00
Panel and throttle brackets
Details
       

 01-06-2013
2.00
Cockpit Vents
Details
       

 01-05-2013
3.00
Panel / Vent Brackets
Details
       

 01-03-2013
3.00
Fit Forward Fuse and Top Skin
Details
       

 01-02-2013
2.00
Subpanel Structure
Details
     

 01-01-2013
8.00
Fuel & Brake Lines
Details
       

 01-01-2013
1.00
Brake / fuel Line Photos
       

 12-21-2012
1.00
Bug Screen over Fresh Air Inlets
Details
     

 12-18-2012
2.00
Re-Install Flap Motor
Details
       

 12-18-2012
3.00
Pitch Servo Install
Details
       

 12-17-2012
1.00
Fuel Valve Assembly
Details
       

 12-17-2012
3.00
Autopilot Pitch Servo Bracket
Details
       

 12-16-2012
1.00
Install ELT Bracket
Details
       

 12-16-2012
1.00
Install Brake Master Cylinder
Details
       

 12-15-2012
6.00
center cockpit floor
Details
       

 12-14-2012
4.00
Flap Motor Bracket install
Details
       

 12-13-2012
2.00
Flap Motor Bracket
Details
       

 12-10-2012
2.00
Riveted Baggage Floors
Details
       

 12-09-2012
3.00
Finish Seat Backs
Details
       

 12-08-2012
3.00
Start Drilling Seat Backs
Details
       

 12-08-2012
2.00
Rivet Steps In Place
Details
       

 12-02-2012
1.00
Install Naca Vents
Details
       

 12-02-2012
2.00
Fab tunnel brackets
       

 12-02-2012
3.00
Fab & Install Baggage Area Tie-Downs
Details
       

 12-01-2012
3.00
Installed Parking brake and bracket
       

 12-01-2012
5.00
Install Crotch Strap Kit
Details
       

 12-01-2012
1.00
Fab Comm Antenna Doubler Plates
Details
       

 11-28-2012
0.50
Static Ports
Details
       

 11-25-2012
2.00
Aft Fuselage
Details
       

 11-23-2012
1.00
F-757's
Details
     

 11-23-2012
3.00
Brake / Rudder Assembly Assembly
Details
       

 11-22-2012
2.00
Panel Disassembly
Details
       

 11-22-2012
1.00
Fab Elevator Bell Crank
Details
       

 11-21-2012
2.00
Rudder/brake assembly
Details
       

 11-21-2012
2.00
Misc. Tasks
Details
       

 11-20-2012
2.00
Fab Elevator Pushrod Tubes
Details
       

 11-20-2012
1.00
Anodize Brake Pedals
Details
       

 11-19-2012
4.00
Rudder Pedal Fab
Details
       

 11-18-2012
4.00
Interior cockpit painting
Details
       

 11-18-2012
8.00
Install Landing Gear Mounts
Details
       

 11-18-2012
0.00
Gear Mount Photos
       

 11-15-2012
6.00
Install Dual Step(s) Kit and Misc As-Built.
Details
       

 11-07-2012
3.00
Step Kit Holes
Details
       

 11-04-2012
2.00
Install Tail Tie Down
Details
       

 11-03-2012
4.00
Fab/Install Seat Back upright Supports
Details
       

 10-28-2012
2.00
Fabricate Tail Tie Down
Details
       

 10-28-2012
4.00
Control Stick Linkage
Details
       

 10-27-2012
8.00
Start QB As-Built
Details
     

 10-26-2012
2.00
Fuse parts Inventory
Details
       

 10-25-2012
4.00
Wash Film from QB Fuse
Details

 10-24-2012
2.00
Un-Crate the QB Fuse
Details
     

 10-22-2012
1.00
Unload QB Fuse from ABF Truck
Details
     

 10-21-2012
4.00
Wings Complete
Details
       

 10-18-2012
0.00
QB Fuse Shipped
Details
     

 10-18-2012
1.50
Left Wing Bottom Skins
Details

 10-17-2012
1.00
Left Wing Bottom Skin Rivets
Details

 10-16-2012
1.00
Start Rivets on Left Wing Bottom Skin
Details

 10-06-2012
6.00
Rigth Wing Bottom Skins
Details
       

 10-03-2012
1.00
Install Access Cover Nut Plates
Details
       

 09-30-2012
6.00
Install Right Wingtip
Details

 09-29-2012
1.00
Putz'n on the Panel
Details
       

 09-29-2012
8.00
Install fuel tanks
Details
       

 09-23-2012
6.00
Left Wingtip Install
Details
       

 09-20-2012
1.00
Pitot Tube Supports
Details
       

 09-17-2012
3.00
Aeroled Wiring & Connectors
Details

 09-16-2012
2.00
Install Aeroled Connectors
Details

 09-09-2012
4.00
Start Panel Build Up
Details
       

 09-09-2012
4.00
Panel Jig Fabrication & Paint Ideas
Details
       

 09-08-2012
4.00
Wingtip Lighting
Details
       

 09-08-2012
1.00
Testing AeroLed's
Details

 09-04-2012
1.00
Wing Tip Lenses w/ Click Bond Fasteners
Details
       

 09-03-2012
3.00
Wingtip Lenses
Details
       

 09-02-2012
2.00
Bellcrank Pitot Bracket
Details
       

 09-01-2012
5.00
Heated Pitot Tube
Details
       

 09-01-2012
3.00
Autopilot Servo
Details
       

 08-31-2012
2.00
Stall Warner Cable Routing
Details
     

 08-31-2012
1.00
Aeroled Molex Connectors
Details
       

 08-30-2012
4.00
Misc. Wing Work
Details
       

 08-29-2012
2.00
Aileron Controls
Details

 08-27-2012
3.00
Pushrod Assemblies
Details
       

 08-26-2012
10.00
Flaps Done!
Details
       

 08-26-2012
0.00
Flap Photos
       

 08-25-2012
4.00
Flap Skin Assembly
Details
       

 08-25-2012
5.00
Flap Assembly
Details
       

 08-24-2012
1.00
Ordered QB Fuse
Details
     

 08-23-2012
1.00
Alodine Flap Parts
Details

 08-22-2012
2.00
Countersinking
Details

 08-21-2012
2.00
Deburing
Details

 08-20-2012
2.00
Flap Skins
Details
       

 08-19-2012
8.00
Flap Build-up and Match Drilling
Details
       

 08-18-2012
8.00
Prepare Flap Parts
Details
       

 08-13-2012
2.00
Install Ailerons
Details
       

 08-12-2012
0.00
Aileron Photos
       

 08-12-2012
12.00
Aileron Completion
Details
       

 08-06-2012
1.00
Rivet Aileron Stiffeners
Details
       

 08-05-2012
8.00
Start Ailerons
Details
       

 08-04-2012
0.00
Radiorax install photos
       

 08-04-2012
2.00
Install radiorax tray rails
Details
       

 08-01-2012
6.00
Flap/Aileron Gap Fairings
Details
       

 07-29-2012
0.00
Flap & aileron bracket photos
       

 07-29-2012
16.00
Aileron and Flap Brackets
Details
       

 07-15-2012
6.00
Rivet Right Wing Top Skins
Details
       

 07-08-2012
8.00
Rivet Left Wing Top Skins
Details
       

 07-07-2012
8.00
Final prep Wing skins
Details
       

 07-06-2012
5.00
Riveted Leading Edges to Spar
Details
       

 07-05-2012
0.00
Lens for leading edge lights.
Details
       

 07-04-2012
0.00
Leading Edge Lights (cont...)
Details
       

 07-04-2012
0.00
Leading Edge Lighting (Cont....)
Details
       

 07-04-2012
12.00
Duckworks Leading Edge Landing/Taxi Lights
Details
       

 07-03-2012
10.00
Stall Warner and Skeleton Prep
Details
       

 07-02-2012
8.00
Rivet Leading Edges
Details
       

 07-01-2012
8.00
Prepare Wing Skins
Details

 06-30-2012
4.00
Primed Leading Edge Parts
Details

 06-28-2012
3.00
Assemble Leading Edges
Details
     

 06-26-2012
1.50
Cleco on Bottom Skins
Details

 06-25-2012
1.00
Trim and Fit J-Stringers
Details
       

 06-24-2012
6.00
Cleco and Drill Top Skins
Details
       

 06-23-2012
6.00
Riveted Wing Ribs to Spar
Details
       

 06-23-2012
2.00
Mounted Wings on Jig
Details
       

 06-22-2012
2.00
Prime Wing Ribs
Details
       

 06-17-2012
2.00
Rivet Rear Wing Spars
Details
       

 06-17-2012
6.00
Preparing Wing Ribs
Details
       

 06-17-2012
1.00
Assemble Wing Skeletons
Details
       

 06-16-2012
5.00
Rear Wing Spar Prep
Details
       

 06-16-2012
4.00
Front Wing Spar Prep
Details
       

 06-13-2012
1.50
Rivet Tank Attach Plate Nuts
Details
       

 06-13-2012
0.00
Current Panel Ideas
Details
       

 06-12-2012
2.00
Start Wing - C'Sink Fuel Tank Plate Nuts
Details
       

 06-08-2012
0.50
Install Suntail Strobe
Details
       

 06-05-2012
4.00
Inventory Wings
Details

 06-02-2012
2.00
Rudder Bottom Fiberglass
Details
       

 06-01-2012
0.00
Wings Shipped from Vans Today!

 05-20-2012
8.00
Fiberglass Stabilizer Tips
Details
       

 05-20-2012
1.00
Done! - Rivet Trim Tab to Elevator
Details
       

 05-18-2012
2.00
Trim Tab (Finally!)
Details
       

 05-18-2012
2.00
Fiberglass Elevator Tips
Details
       

 05-12-2012
38.00
Re-Build Horizontal Stabilizer
Details
       

 05-12-2012
0.00
Re-build H-Stab Photos
Details
       

 05-12-2012
1.00
Fit Elevators to Horiz. Stab
Details
       

 05-06-2012
1.00
Fitted Elevator Counterweights
Details
       

 05-04-2012
1.00
Re-Start Trim Tab Construction
Details

 04-28-2012
2.00
Finish Elevator Trailing Edges
Details
       

 04-26-2012
1.00
Start & Stop Trim Tab
Details
       

 04-25-2012
0.00
Started Panel - ordered PAR100EX
Details
     

 04-25-2012
3.00
Pro Seal Elevaotr Trim Tabs
Details

 04-25-2012
0.00
Lighting Arrived
Details

 04-24-2012
1.50
Left Elevator Trailing Edge Prep
Details
     

 04-23-2012
2.00
Left Elevator Close-up
Details
       

 04-22-2012
9.00
Start Left Elevator
Details
       

 04-21-2012
9.00
Right Elevator Construction
Details
       

 04-20-2012
3.50
Elevator Prep
Details
       

 04-18-2012
1.50
Rudder Completion
Details
       

 04-17-2012
1.50
Rudder Trailing Edge Rivets
Details
       

 04-16-2012
1.00
Right Elevator Debur Skins
Details

 04-16-2012
0.00
No Hole Yoke
Details
     

 04-15-2012
3.00
Start Elevators
Details
       

 04-15-2012
0.00
Local Flight
Details
       

 04-14-2012
0.00
Tip for Flush Riveting
Details
       

 04-14-2012
2.00
Rudder Trailing Edge
Details
       

 04-14-2012
7.50
Rudder Assembly
Details
       

 04-14-2012
0.00
Forgive my Spelling
Details

 04-13-2012
4.00
Rudder Assembly
Details
       

 04-10-2012
0.00
Lighting Options
Details
       

 04-10-2012
2.00
Complete Vertical Stabilizer
Details
       

 04-09-2012
1.00
Rivet Rear Spar of Vert. Stab.
Details
       

 04-09-2012
0.00
Pneumatic Riveter Dimpler
Details
     

 04-08-2012
0.00
Misc. Tools
Details
     

 04-08-2012
4.00
Assemble, Drill & Debur Rudder
Details
       

 04-07-2012
3.00
Rudder Skin Stiffener Installation
Details
       

 04-07-2012
4.00
Rudder Skin Stiffener Fabrication
Details
       

 04-06-2012
3.00
Start Riveting Vertical Stab.
Details

 04-05-2012
1.00
Dimple & Cleco Vert Stab Skin
Details
     

 04-04-2012
0.50
Debur Vertical Stabilizer Skin
Details

 04-03-2012
1.00
Dimple Vertical Stabilizer
Details
       

 04-02-2012
1.50
Vertical Ribs
Details

 04-02-2012
0.00
Standard Wing Kit
Details

 04-02-2012
0.00
Pneumatic Riveter
Details

 04-01-2012
2.00
Start Vertical Stabilizer
Details
       

 04-01-2012
0.50
Rear Hing Bearing Bracket
Details
       

 04-01-2012
4.00
Complete Horizontal Stabilizer
Details
       

 03-31-2012
2.00
Riveting Spar Halves
Details
       

 03-31-2012
8.00
Horizontal Stabilizer Assembly
Details
       

 03-31-2012
0.00
Horiz. Stab Assembly Photos
       

 03-31-2012
0.50
Hinge Bearing
Details
       

 03-28-2012
4.00
Primer
Details
       

 03-26-2012
0.50
Dimpler Table Risers
Details
       

 03-26-2012
2.00
Dimple Skins
Details
       

 03-26-2012
0.00
Air Drill Chuck
Details

 03-25-2012
1.00
Remove Plastic Along match drilled holes
Details
     

 03-25-2012
6.00
Debur & Dimple Horizontal Stabilizer Parts
Details
       

 03-25-2012
4.00
Cleco and Match Drill Horizontal Stabilizer
Details
       

 03-24-2012
1.00
Cradle Jig
Details
     

 03-24-2012
8.00
Build up Horiz. Stab.
Details
       

 03-23-2012
2.50
Fabricate Front Spar Angles
Details
       

 03-22-2012
2.00
Step One
Details
       

 03-22-2012
1.50
Receive and Inventory
Details
       

 03-17-2012
1.00
Tool Set Up
Details
       

 03-10-2012
8.00
Practice
Details
       

 03-07-2012
4.00
Build EAA Tables
Details
     

 03-01-2012
0.00
My Aviation Timeline
Details
       