Powered By Kitlog Pro v2.0
S
Sonex
All
Work Logs Found:
28
Category Work Time:
108 Hours
Date
Hours
Work Log Summary
Details
07-12-2017
1.00
side
02-02-2013
8.00
Forward side panels
01-05-2013
2.00
Turtledeck skin initial assembly
Details
09-26-2012
6.00
Initial assembly of left flap
08-19-2012
10.00
Vertical Stabilizer
08-19-2012
1.50
Horizontal Stabilizer near completion
08-18-2012
2.00
Initial fitting of horizontal stabilizer skins
08-18-2012
2.00
Elevator parts ready for skins
Details
08-12-2012
20.00
Horizontal Stabilizer Frame ready for skins.
Details
08-12-2012
4.00
Flap ribs ready for skins
Details
08-12-2012
8.00
Aileron parts ready for skins
Details
08-11-2012
2.00
Turtledeck Skins
Details
04-06-2012
6.00
1/8" Plate
Details
04-01-2012
1.50
Main Spar Lower Angles
Details
03-29-2012
0.25
Cut bushing stock to length
03-28-2012
0.75
Cut lead plate for aileron counterweights
03-18-2012
3.00
Idler Ass'y
Details
03-17-2012
8.00
Main & Forward Spar Fittings
Details
03-03-2012
2.00
Flap Handle for Dual Controls
Details
02-26-2012
1.00
Tie Down Fittings L & R
Details
02-26-2012
0.75
Angle
02-26-2012
1.00
Aft Main Spar Strap
Details
02-11-2012
5.00
Aileron Bellcrank Pivot Ass'y L & R
Details
02-04-2012
0.50
Root Attach Angles
Details
02-04-2012
1.00
Flap & Brake Detent Ass'y
Details
01-31-2012
10.00
Aldridge Aerospace Speed Whittler
Details
01-21-2012
1.00
Aileron Hinge Halves L & R cut & drill pilot holes
01-20-2012
0.00
Filed my Letter of Intent with MD-RA
Details
SITE NAVIGATION
Sonex Home
P51 Home
Sonex Home
Category
# Logs
# Hours
All
28
108
Controls
3
3
Empennage
8
45
Fuselage
4
15
Miscellaneous
3
7
Tools
1
10
Wings
9
28
Copyright © 2001-2024 Matronics. All Rights Reserved.