Powered By Kitlog Pro v2.0
Chucks Web Site
RV-7
All
Work Logs Found:
157
Category Work Time:
562 Hours
Date
Hours
Work Log Summary
Details
07-14-2021
0.10
Details
01-05-2013
7.00
Fabricated Tank Attach Brackets and Trap Door
Details
01-04-2013
9.00
Installed Right Wing Access Panels
Details
01-03-2013
3.00
Cut Landing Light Lens
Details
01-02-2013
2.00
Located Landing Light Assembly to Right Wing
Details
01-01-2013
5.00
Match Drilled Joint Plate to Fuel Tank
Details
12-31-2012
3.00
Fabricated Wing Walk for Right Wing
Details
12-30-2012
6.50
Fluted Right Tank Ribs
Details
12-29-2012
2.00
Drilled "Z" Brackets for Right Tank
Details
12-28-2012
4.00
Rotated Fixture to Work on Right Wing
Details
12-27-2012
6.00
Fabricated Hinge Rod Tie Down
Details
12-26-2012
12.00
Drilled Flap Hinge to Wing
Details
12-20-2012
4.00
Dimpled and Test Fit Left Flap
Details
12-12-2012
4.00
Cut Aileron Push Rods
Details
12-11-2012
1.00
Installed Pitot Bulk Head Fittings
Details
12-09-2012
3.00
Drilled Left Flap Assembly
Details
12-08-2012
2.00
Fabricated Flap Skin Spacers
Details
12-05-2012
3.00
Riveted Right Aileron Together
Details
12-04-2012
6.00
Straightened Aileron Spar and Bent Skins
Details
12-03-2012
2.00
Riveted Aileron Stiffeners
Details
12-02-2012
2.00
Primed Aileron Components
Details
12-01-2012
4.00
Rough Assembled Flaps
Details
11-30-2012
4.00
Drilled Right Aileron
Details
11-25-2012
2.00
Drilled Left Aileron Nose Rib
Details
11-24-2012
7.00
Fabricated Aileron Stiffeners
Details
11-17-2012
4.50
Closed Left Wing
Details
11-16-2012
5.00
Scarfed Bottom Skin Lap Joint
Details
11-15-2012
2.00
Riveted Access Hole Nut Plates
Details
11-14-2012
2.00
Drilled and Dimpled Access Covers
Details
11-12-2012
3.00
Completed Inboard Bottom Skin
Details
11-10-2012
9.00
Deburred and Dimpled Inboard Bottom Skin
Details
11-09-2012
6.00
Tube Routing in Bell Crank Area
Details
11-07-2012
3.00
Test Fit Light Assembly
Details
11-06-2012
1.00
Cut Hole for Left Wing Landing Light
Details
11-05-2012
2.00
Installed Conduit and Snap Busings
Details
11-03-2012
6.00
Installed and Riveted Left Outboard Top Skin
Details
11-02-2012
12.00
Primed Components & Installed Gap Farings
Details
11-01-2012
6.00
Match Drilled Gap Farings and Located AOA Ports
Details
10-23-2012
2.00
Installed Access Hatch in Outboard LE
Details
10-22-2012
2.00
Deburred and Dimpled Left Outboard Top Skin
Details
10-21-2012
1.00
Installed Patch and Deburred Wing Walk
Details
10-20-2012
11.00
Jigged Ribs Into Fixture
Details
10-19-2012
9.00
Drilled and Deburred Conduit Holes
Details
10-18-2012
2.00
Located Conduit Holes in Left Wing
Details
10-16-2012
3.00
Dimpled Doublers & Spot Primed
Details
10-12-2012
2.00
Assembled and Riveted Leading Edge Left Wing
Details
10-11-2012
2.00
Seal Primed Leading Edge Ribs
Details
10-10-2012
3.00
Etch Primed Leading Edge Ribs
Details
10-09-2012
2.00
Deburred and Dimpled Leading Edge
Details
10-08-2012
2.50
Dimpled Joint Plate, Skin, & Rib
Details
10-07-2012
2.00
Dimpled Left Wing Joint Plate
Details
10-06-2012
5.00
Pressure Tested Left Tank
Details
10-04-2012
5.00
Installed Rear Fuel Tank Baffle
Details
10-03-2012
2.00
Filled Left Tank With Water
Details
10-01-2012
2.00
Sealed Tank End Ribs on Inside
Details
09-30-2012
2.00
Sealed Fuel Probe Wire to Vent Tube
Details
09-29-2012
12.00
Installed Tank Rear Access Plate and End Ribs
Details
09-27-2012
2.00
Cut Rear Access Hole in Fuel Tank
Details
09-19-2012
3.00
Installed Outboard Capacitive Fuel Sensor
Details
09-17-2012
3.00
Installed Vent, Fuel Return Line, Trap Door
Details
09-15-2012
9.00
Riveted and Sealed Internal Tank Ribs
Details
09-14-2012
4.00
Fabricated Tank Stand & Fay Sealed Ribs
Details
09-13-2012
4.00
Installed Fuel Cap and Tank Sump
Details
09-12-2012
5.00
Riveted and Sealed Remaining Stiffeners
Details
09-11-2012
2.00
Sealed and Riveted Left Tank Stiffeners
Details
09-10-2012
3.00
Sealed Flage on Access Plate
Details
09-08-2012
8.00
Primed Components and Dimpled Tank Skin
Details
09-07-2012
8.00
Fabricated Trap Door for Left Tank
Details
09-06-2012
6.00
Fabricated Flop Tube Anti Torque Bracket
Details
09-05-2012
5.00
Installed Inboard Capacitive Probe in Left Tank
Details
09-04-2012
2.00
Installed Outboard Fuel Probe
Details
08-30-2012
3.00
C'Sink Tank Skins to Baffle
Details
08-29-2012
3.50
Match Drilled Fuel Tank Skins
Details
08-28-2012
3.00
Drilled Ribs to Rear Baffle
Details
08-27-2012
3.00
Aligned Fuel Tank to Skin and Drilled
Details
08-26-2012
2.00
Drilled Z Brackets
Details
08-25-2012
8.00
Installed Joint Plate
Details
08-24-2012
4.00
Mounted Gertz Pitot Mount
Details
08-20-2012
1.00
Deburred One of the Top Skins
Details
08-19-2012
4.00
Fabricated Wing Walk and Match Drilled
Details
08-18-2012
1.00
Installed Right Wing Tiedowns
Details
08-17-2012
4.00
Installed Right Wing Skins
Details
08-15-2012
3.00
Aligned Right Wing to Jig
Details
08-14-2012
4.00
Clecoed on Bottom Skin
Details
08-12-2012
4.00
Clecoed On Left Wing Top Skin
Details
08-02-2012
3.00
Aligned Spars to Jig
Details
08-01-2012
3.50
Prepared Leading Edge Ribs
Details
07-31-2012
3.00
Assembled Wing Jig
Details
07-30-2012
3.50
Prepared Left Wing Ribs
Details
07-29-2012
3.00
Prepared Left Wing Ribs
Details
07-28-2012
7.00
Riveted Rear Spar Components
Details
07-27-2012
5.00
Deburred and Primed Rear Spar Components
Details
07-26-2012
5.00
Drilled Rear Spar Doublers
Details
07-25-2012
2.00
Installed Right Bell Crank
Details
07-24-2012
2.00
Installed Left Bell Crank
Details
07-23-2012
3.00
Fabricated Tie Down Assembly
Details
07-20-2012
4.00
Installed Nut Plates to Right Spar
Details
07-19-2012
3.00
Machined Main Spar for Nut Plates
Details
07-18-2012
3.00
Installed Nut Plates to Left Spar and Primed
Details
07-17-2012
3.00
Installed Nut Plates to Left Wing Spar
Details
07-14-2012
7.00
Inventory Parts for Wing
Details
07-13-2012
2.00
Received Wing Kit
Details
06-18-2012
2.00
Drilled Elevator Horn for Center Bearing Attah
Details
05-31-2012
2.00
Test Fit Elevator to Horizontal Stabilizer
Details
05-24-2012
2.00
Rolled Elevator Leading Edges
Details
05-24-2012
2.00
Riveted Trim Tab Together
Details
05-23-2012
2.00
Painted Trim Tab Components
Details
05-22-2012
4.00
Bent Outboard Edge of Trim Tab and Fitup
Details
05-21-2012
2.00
Bent Inboard Edge of Trim Tab
Details
05-16-2012
4.00
Riveted on Elevator Skins
Details
05-15-2012
4.00
Placed Sealant in Trailing Edges
Details
05-14-2012
5.00
Bent Elevator Trailing Edge
Details
05-14-2012
2.00
Back Rivet Elevator Stiffeners
Details
05-12-2012
4.00
Riveted Elevator Sub Structure
Details
05-10-2012
2.50
Primed Elevator Sub Structure
Details
05-09-2012
5.50
Dimpled Elevator Substructure and Skins
Details
05-08-2012
4.00
Trimmed Elevator Stiffeners & Prepared Left Elevat
Details
05-07-2012
4.00
Match Drilled Structure and Skin for Right Elevato
Details
05-01-2012
1.50
Rolled and Formed Leading Edge of Rudder
Details
05-01-2012
3.00
Back Riveted Rudder Training Edge
Details
04-30-2012
3.00
Fabricated Elevator Trim Servo Mounts
Details
04-29-2012
2.00
Trimmed Out Skin Stiffeners and Test Fit Parts
Details
04-29-2012
2.00
Glued Rudder Trailing Edge
Details
04-28-2012
3.00
Riveted Sub-Structure and Bracing Together
Details
04-28-2012
3.00
Back Riveted Rudder Skins
Details
04-27-2012
3.00
Dimpled and Primed Sub-Structure
Details
04-26-2012
4.00
Built the Rudder Skeleton
Details
04-24-2012
4.00
Deburred and Dimpled Rudder Skins
Details
04-22-2012
3.00
Match Drilled Skin to Sub Structure
Details
04-21-2012
5.00
Trimmed Stiffeners and Mocked up Rudder
Details
04-20-2012
3.00
Riveted on Skin and Rear Spar Asy.
Details
04-19-2012
1.00
Riveted Together Ribs and Spars of VS
Details
04-18-2012
4.00
Deburred and Dimpled VS
Details
04-16-2012
2.00
Clecoed VS Spars and Ribs Together
Details
04-15-2012
8.00
Riveted HS Right Side and Rear Spar Asy.
Details
04-15-2012
1.00
Inspected HS
Details
04-14-2012
1.00
Riveted Top Skin to Left HS
Details
04-14-2012
4.00
Riveted HS Ribs and Spar to Left Skin
Details
04-14-2012
4.00
Dimpled HS Skins
Details
04-12-2012
2.00
Riveted HS Front Spar Asy. Together
Details
04-11-2012
2.00
Began Riveting HS Components
Details
04-10-2012
2.00
Applied Sealer Primer to HS Substructure
Details
04-09-2012
2.00
Etch Primed HS Parts
Details
04-05-2012
4.00
Prepared HS for Assembly
Details
04-04-2012
2.00
Prepared Right Side HS
Details
04-02-2012
1.00
Removed Left Skin
Details
04-01-2012
4.00
Drilled Horizontal Stabilizer (Left)
Details
03-31-2012
2.00
Trimmed and Bent Front Spar Channel
Details
03-31-2012
1.00
Notched and Fluted Horizontal Stab. Ribs
Details
03-31-2012
2.00
Drilled Horizontal Stabilizer (Left)
Details
03-29-2012
2.00
Tapered and Bent Front Reinforcements
Details
03-28-2012
2.00
Prepared Rear Spar Reinforcement Bars
Details
03-28-2012
1.00
Prepared Front Spar Reinforcement Angles
Details
03-27-2012
2.00
Drilled Holes in Rear Spar Assembly
Details
03-20-2012
2.00
Inventoried and Organized Parts
Details
03-19-2012
1.00
Received Empennage Kit
Details
03-09-2012
2.00
Ordered RV-7 Empennage Kit From Vans Aircraft
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
157
562
Ailerons
8
30
Elevator
18
56
Empennage
3
5
Flaps
6
31
Fuel Tanks
29
131
Horizontal Stab
20
49
Leading Edge
2
5
Miscellaneous
1
3
None
1
0
Rudder
10
32
Vertical Stab
4
10
Wings
55
210
Copyright © 2001-2024 Matronics. All Rights Reserved.