KitLog pro

Powered By Kitlog Pro v2.0

Brendons Kit Log
Work Logs Found: 488
Category Work Time: 1673 Hours
 Date
Hours
Work Log Summary

Details

 02-23-2019
8.00
Left wing final install
Details
       

 02-22-2019
6.00
Wing attachment
Details
     

 02-22-2019
2.00
Prop install
       

 02-17-2019
8.00
Initial fitting of wings to fuselage
Details
       

 02-16-2019
8.00
Finish tail install, check controls
       

 02-10-2019
8.00
Install tail section
       

 02-09-2019
2.00
Wings, etc. move to airport
       

 02-09-2019
3.00
Fuselage unload at airport
       

 02-09-2019
3.00
Fuselage move to airport
       

 02-03-2019
3.00
Wing autopilot and pitot tube install
       

 02-03-2019
2.00
Install seatbelts
       

 02-03-2019
1.00
First garage flight!
Details
       

 02-03-2019
2.00
Cleanup panel wiring
Details
     

 02-03-2019
1.00
Baggage area bulkhead install
     

 02-02-2019
4.00
Seal baffles, install fuel transducer
       

 02-02-2019
2.00
Cowl heat protection
Details
       

 01-23-2019
3.00
Headset jacks install
       

 01-22-2019
4.00
Scat Tube Install
       

 01-21-2019
2.00
Final tail skin install
     

 01-13-2019
2.00
Final tailcone skin install
Details
     

 01-13-2019
4.00
EGT Sensor install
Details
       

 01-12-2019
4.00
Exhaust system install
       

 01-12-2019
4.00
Carpet install
Details
       

 01-06-2019
5.00
Secure tail wiring
       

 01-06-2019
1.00
First panel test
Details
       

 01-04-2019
4.00
Fuselage wiring
       

 01-02-2019
6.00
Pull tail wiring
Details
       

 12-31-2018
4.00
Install additional wiring
Details
       

 12-31-2018
4.00
Fuselage wiring
       

 12-30-2018
8.00
Tail wiring
Details
     

 12-29-2018
8.00
Wire routing
Details
     

 12-28-2018
4.00
Engine wiring
       

 12-28-2018
4.00
Engine control cable brackets
Details
       

 12-27-2018
4.00
Wire routing
Details
       

 12-27-2018
2.00
Install heater vent cables
     

 12-27-2018
2.00
Engine control cable install
     

 12-16-2018
3.00
Wire routing
Details
       

 12-16-2018
5.00
Fuse panel drop down
Details
       

 12-15-2018
8.00
Panel install prep
Details
       

 12-11-2018
2.00
Initial panel fit and trim
Details
       

 12-09-2018
6.00
Engine wire routing
Details
       

 12-08-2018
4.00
Wire routing
Details
       

 12-08-2018
4.00
Engine routing
Details
       

 12-04-2018
2.00
Baffle seal
Details
       

 12-02-2018
3.00
Lower cowl inlet
Details
     

 12-02-2018
4.00
Baffle seal
Details
     

 12-01-2018
4.00
Lower cowl air inlet
Details
       

 12-01-2018
3.00
Filtered air box
Details
       

 11-25-2018
6.00
Baffles
Details
       

 11-24-2018
8.00
Baffles
       

 11-21-2018
3.00
Baffles
Details
       

 11-18-2018
1.00
Install fuselage scat tubing
Details
       

 11-18-2018
1.00
Fix static tube routing
Details
     

 11-18-2018
5.00
Baffle work
Details
     

 11-17-2018
6.00
Wheel and leg fairing alignment
Details
       

 11-16-2018
1.00
Panel delivery
Details
       

 10-29-2018
2.00
Wheel fairings
Details
       

 10-29-2018
1.00
Cowl fiberglass work
Details
     

 10-28-2018
2.00
Wheel fairing nutplate install
     

 10-28-2018
2.00
Upper cowl work
Details
     

 10-28-2018
2.00
Lower cowl work
Details
       

 10-27-2018
4.00
Cowl side trimming
Details
       

 10-27-2018
4.00
Cowl side hinge install
Details
       

 10-26-2018
3.00
Cowl hinge install
Details
       

 10-23-2018
3.00
Cowl hinge drilling
Details
       

 10-22-2018
4.00
Upper cowl trim and fit
Details
       

 10-22-2018
4.00
Lower cowl trim and fit
       

 10-21-2018
2.00
Upper cowl trimming
Details
       

 10-21-2018
6.00
Mounting engine
       

 10-20-2018
3.00
Main wheel fairing
Details
     

 10-20-2018
5.00
Engine prep for install
Details
       

 10-18-2018
2.00
Nose wheel fairing
Details
     

 10-17-2018
2.00
Nose gear leg fairing
Details
       

 10-16-2018
3.00
Nose wheel fairing
Details
       

 10-15-2018
1.00
Engine Delivery
Details
       

 10-14-2018
4.00
Nose wheel fairing
Details
       

 10-13-2018
8.00
Gear leg fairings.
Details
       

 10-11-2018
3.00
Gear leg fairing
Details
       

 10-10-2018
4.00
Main gear fairings
Details
       

 10-06-2018
4.00
Build Floor Jacks
Details
     

 09-30-2018
4.00
Install wing tip lighting
       

 09-30-2018
4.00
Cowl trimming
Details
       

 09-29-2018
4.00
Belly Plate
Details
       

 09-19-2018
2.00
Oil Door
Details
       

 09-18-2018
2.00
Oil Door
Details
       

 09-13-2018
1.00
Mount FlyLeds control board
Details
     

 09-13-2018
1.00
Install stick grip switch heads
Details
     

 09-13-2018
1.00
Finish baggage closeout
Details
     

 09-12-2018
2.00
Install brakes
Details
     

 09-09-2018
2.00
Install stick grips
Details
     

 09-08-2018
4.00
Prepare for landing gear install
Details
     

 09-08-2018
3.00
Landing gear install
Details
       

 09-08-2018
1.00
Cowl fit alignment
Details
     

 09-03-2018
4.00
Spinner cutouts / fillers
Details
       

 09-03-2018
3.00
Initial cowl trimming
Details
       

 08-31-2018
2.00
Prop spinner cutouts
Details
     

 08-30-2018
2.00
Prop spinner plate fit
Details
       

 08-25-2018
2.00
Set nose wheel breakout force
Details
     

 08-25-2018
3.00
Air vent lever install
Details
     

 08-16-2018
2.00
Seal foil edges
Details
       

 08-16-2018
1.00
Prime fuselage belly for insulating panel
Details
     

 08-16-2018
2.00
Interior panel fit
Details
       

 08-07-2018
0.50
Mock up instrument panel
Details
       

 08-07-2018
3.00
Install belly insulation
Details
       

 08-04-2018
4.00
Repaint Cabin Interior
Details
       

 07-22-2018
3.00
Firewall insulation install
Details
       

 07-20-2018
3.00
Fit firewall insulation
Details
     

 07-03-2018
2.00
Prepare spinner back plate
Details
     

 07-03-2018
15.00
Cabin Interior Work
Details
       

 07-02-2018
8.00
Wheel, Brake Install
Details
       

 06-01-2018
0.00
Prop Arrives
     

 05-22-2018
3.00
Install Engine Mount
Details
       

 05-20-2018
6.00
Install interior panels
Details
       

 05-19-2018
8.00
Cabin exterior finish work
Details
       

 05-12-2018
4.00
Create lower windshield fairing
Details
       

 05-12-2018
4.00
Cabin top finish work
Details
       

 04-29-2018
6.00
Glass over window/cabin interface
Details
     

 04-28-2018
4.00
Prep windshield for fairing
Details
     

 04-21-2018
6.00
Glass over window/cabin interface
Details
       

 04-21-2018
2.00
Bond windshield to structure
       

 04-15-2018
4.00
Prepare windshield for install
Details
       

 04-15-2018
4.00
Fit door seals
Details
       

 04-08-2018
3.00
Prep winshield for install
Details
     

 04-08-2018
4.00
Prep and paint forward fuselage
       

 04-07-2018
4.00
Prep for windshield install
Details
     

 04-07-2018
4.00
Cabin/door fitting
Details
       

 03-25-2018
4.00
Build up door - cabin top gap
Details
       

 03-24-2018
4.00
Door Seal Install
Details
       

 03-24-2018
4.00
Cabin Top Permanent Install
Details
       

 03-18-2018
6.00
Paint cabin top and door interior
       

 03-17-2018
4.00
Prep and Prime Doors
Details
     

 03-17-2018
4.00
Prep and prime cabin top
     

 03-17-2018
2.00
Create patterns for carpet
     

 03-11-2018
6.00
Prep and paint interior
       

 03-10-2018
4.00
Paint interior panels
Details
       

 03-10-2018
4.00
Close in door hinge pockets
Details
       

 03-08-2018
4.00
Bond Windows to Structure
Details
       

 03-04-2018
8.00
Rear & Door Windows - Trim and Prep for Install
Details
       

 03-03-2018
8.00
Installed Door Struts
       

 03-02-2018
6.00
Left Door Finish Latch, Strut, Window
Details
       

 02-28-2018
8.00
Left Door Latch, Pins, Blocks
       

 02-25-2018
4.00
Right Door Center Latch, Strut Bracket
       

 02-24-2018
8.00
Finish Right Door Latch
       

 02-18-2018
6.00
Left Door Trim, Hinge Install, Start on Latch
Details
       

 02-17-2018
6.00
Right Door Trim, Install on Hinges
Details
       

 02-13-2018
2.00
Bonded left door
Details
       

 02-11-2018
5.00
Right door bonding
Details
       

 02-10-2018
6.00
Left door work
Details
     

 02-09-2018
4.00
Started Right Door
Details
       

 02-09-2018
3.00
Finish Inventory
Details
       

 02-08-2018
2.00
Finishing Kit Arrived
Details
       

 02-04-2018
8.00

Details

 02-03-2018
8.00
Prime Various Parts
Details
       

 02-03-2018
2.00
Install Flap Position Indicator
Details
     

 01-23-2018
1.00
Finish FWD Upper Fuse Install
Details

 01-21-2018
2.00
Upper Wing Root Fairing
Details
     

 01-21-2018
2.00
Cabin Top Work
Details
     

 01-20-2018
2.00
Trim Flap Pushrods, Start Upper Wing Root Fairing
     

 01-20-2018
3.00
Cabin Top Work
Details
       

 01-14-2018
3.00
Wing Root Fairing Supports
Details
       

 01-14-2018
2.00
Cabin Top Work
Details
     

 01-13-2018
3.00
FWD Fuse Top Riveting
Details
     

 01-13-2018
1.00
Cabin Top Work
Details
       

 01-07-2018
2.00
Misc
Details
       

 01-07-2018
3.00
Cabin Top Work
Details
       

 12-09-2017
6.00
Cabin Cover Prep Work
Details
       

 12-01-2017
5.00
Cut Holes for Fans, Install Front Heat Vent, Insta
Details
       

 11-29-2017
4.00
Firewall Insulation
Details
     

 11-26-2017
4.00
Emp Fairing Work
       

 11-19-2017
4.00
Cabin Cover Work
Details
     

 11-18-2017
6.00
Emp Fairings
       

 11-12-2017
1.00
Start Rebuild of Trim Tabs
     

 11-12-2017
5.00
Empennage Fairings
Details
       

 11-11-2017
4.00
Trim Rear Windows
     

 11-05-2017
4.00
Rough Trim of Windscreen
       

 11-04-2017
4.00
Match Drill Cabin Cover
Details
       

 10-28-2017
6.00
Continue Trimming Cabin Cover
Details
       

 10-27-2017
4.00
Cabin Cover Trim
Details
       

 10-22-2017
2.00
Finish Seat Back Install
     

 10-21-2017
2.00
Seat Back Install
       

 10-21-2017
2.00
Rudder Cable Exit Fairings
     

 10-21-2017
3.00
Bottom COM Antenna Install
       

 10-20-2017
4.00
Cowl Attach Hinges
     

 10-15-2017
6.00
Flap System
       

 10-08-2017
8.00
Rudder Cables, Control System
       

 10-07-2017
4.00
Brake Pedals, Brake Lines
       

 10-07-2017
4.00
Brake Pedals
       

 10-06-2017
5.00
Fuel Lines, Brake Pedals
       

 10-01-2017
5.00
Brake Lines
       

 04-21-2017
3.00
Brake Lines
       

 04-21-2017
3.00
Baggage Door, Left Baggage Cover
       

 04-08-2017
5.00
Baggage Door
       

 04-02-2017
5.00
Install Access Panels
       

 04-01-2017
4.00
Rivet Rear Seat Pans and Floors
       

 04-01-2017
2.00
Rear Seat Cover Panels
Details
       

 03-26-2017
4.00
Rivet Rear Seat Floor Pans
       

 03-25-2017
5.00
Baggage Floor, Baggage Cover, Bulkhead Corrugation
       

 03-18-2017
5.00
Wire Routing
Details
       

 03-05-2017
5.00
Floor Pan Install
       

 03-04-2017
2.00
Upper FWD Fuselage, Baggage Area
Details
       

 03-04-2017
4.00
Install Insulation
       

 01-22-2017
6.00
Prime Parts, Upper FWD Fuselage
       

 01-16-2017
3.00
Baggage Area
       

 12-09-2016
3.00
Conduit Runs
       

 12-03-2016
6.00
Tailcone Attach
       

 12-02-2016
2.00
Tailcone Attach
       

 11-27-2016
4.00
Upper Fwd Fuselage
       

 11-25-2016
6.00
Upper Fwd Fuselage
       

 11-20-2016
4.00
Rivet Fwd Fuselage, Step Install
       

 11-19-2016
6.00
Finish Front Floor, Install Gear Mount
       

 11-13-2016
4.00
Finish Side Skins, Start Floors
       

 11-12-2016
6.00
Rivet Side Skins
       

 11-06-2016
5.00
Riveting Side Skins
       

 11-05-2016
6.00
FWD Side Skin Install
       

 10-29-2016
6.00
Rivet Structure for Side Skins
       

 10-22-2016
5.00
Side Skins
       

 09-10-2016
5.00
Prep Side Skins
       

 09-06-2016
2.00
Countersink For Side Skin Install
     

 04-16-2016
5.00
Finish Fwd Side Skins
       

 04-08-2016
2.00
Fwd Side Skins
Details
       

 03-31-2016
2.00
Bending Fwd Side Skin
     

 03-22-2016
2.00
Bending Upper Fuse Side Channels
       

 03-06-2016
4.00
Drilling Mid Side Skins
       

 03-05-2016
6.00
Drilling Longerons, Baggage Door Shims
       

 03-02-2016
2.00
Finish Bending Mid Side Skins
       

 02-28-2016
4.00
Bend Mid Side Skins
     

 02-27-2016
4.00
Finishing Bending Longerons
       

 02-21-2016
3.00
Create Seat Floor and Mid Seat Rail Assemblies
       

 02-21-2016
2.00
Bend Mid Fuse Longerons
Details
     

 02-20-2016
4.00
Install Bulkhead Components, Rivet Side Plates
       

 02-20-2016
4.00
Fit and Drill Landing Gear Mount
Details
     

 02-06-2016
2.00
Prepare Seat Floor Parts
Details
     

 02-06-2016
4.00
Mate FWD & Mid Fuselage Assemblies
Details
       

 01-31-2016
4.00
Attach FWD Center Section to FWD Fuselage Ribs
Details
       

 01-30-2016
4.00
Rivet FWD Fuselage Bottom Assembly
       

 01-30-2016
4.00
Mate FWD Fuse Bottom to Firewall Assembly
Details
       

 01-02-2016
4.00
Prime FWD & Mid Fuselage Parts
       

 12-27-2015
5.00
Prepare FWD & Mid Fuselage Parts for Priming
Details
       

 12-12-2015
5.00
Final Drill, Countersink, Deburr Fuselage Parts
Details
       

 12-05-2015
2.00
Mate Mid Fuselage and FWD Fuselage Assemblies
       

 12-05-2015
1.00
Mate FWD Center Section Components
       

 12-05-2015
3.00
Final Drill FWD Cabin Floor Panels
     

 12-05-2015
2.00
Create FWD Bottom Skin Assembly
       

 11-29-2015
3.00
Match Drill FWD Fuse Bottom Parts
     

 11-29-2015
3.00
Build FWD Fuselage Sub-Assemblies
       

 11-22-2015
3.00
Assembly Seat Rail Support, Trim Control Column Mo
       

 11-21-2015
3.00
Prepare FWD Fuselage Parts
     

 11-21-2015
3.00
Join Firewall and Forward Rib Subassemblies
       

 11-08-2015
4.00
Rivet Forward Rib Subassembly
       

 11-07-2015
4.00
Rivet Forward Rib Subassembly
       

 11-07-2015
3.00
Add Access Panel to Right FWD Fuselage Rib
       

 11-03-2015
2.00
Prepare FWD Fuselage Rib
       

 11-01-2015
2.00
Firewall Assembly
       

 10-31-2015
4.00
Firewall Assembly
       

 10-31-2015
2.00
Finish Riveting Fuselage Bottom Skins
       

 10-25-2015
3.00
Rivet Fuselage Bottom Skins
     

 09-18-2015
2.00
Rivet Fuselage Bottom Skin
       

 08-29-2015
5.00
Prepare Fuselage Floor Parts
Details
       

 08-09-2015
2.00
Match Drill Fuselage Bottom Skins
       

 08-08-2015
3.00
Prime Rear Seat Ribs, Baggage Ribs, Firewall Parts
     

 08-08-2015
1.00
Build Rear Seat RIb Subassemblies
     

 08-08-2015
2.00
Attach Rear Seat Ribs to Spar Bulkhead
     

 08-08-2015
2.00
Attach Rear Seat Ribs and Baggage Ribs to Fuselage
       

 07-25-2015
6.00
Prepare Firewall Parts and Bottom Skins
       

 07-18-2015
5.00
Rib to Fuselage Bulkhead Attach
       

 07-11-2015
5.00
Attach Seat Ribs to Aft Bulkhead, Prepare Rear Sea
       

 06-19-2015
2.00
Match Drill Seat and Footwell Ribs to Rear Spar
       

 06-19-2015
2.00
Finish Rear Spar Bulkhead Assembly
       

 06-19-2015
2.00
Create Outboard Seat Rib Subassemblies
     

 06-19-2015
2.00
Create Aft Center Section Bulkhead Subassembly
       

 06-14-2015
4.00
Prime Rear Spar Bulkhead and Seat Rib Parts
       

 06-12-2015
2.00
Prepare Seat Rib Parts
       

 05-31-2015
2.00
Prepare Rear Spar Bulkhead Parts
       

 05-30-2015
5.00
AFT Center Section Bulkhead
Details
       

 05-16-2015
5.00
FWD Center Section Bulkhead Assembly
Details
       

 05-15-2015
3.00
Prepare Center Section Bulkhead Parts
Details
     

 05-13-2015
0.00
Right wing spar bottom flange nick
Details
       

 05-09-2015
3.00
Wing misc tasks
Details
     

 05-09-2015
1.00
Prepare Center Section Bulkhead Parts
Details
     

 04-26-2015
4.00
Misc wing tasks
Details
       

 04-19-2015
5.00
Misc wing tasks
Details
       

 04-03-2015
4.00
Finish riveting outboard bottom skin
       

 03-21-2015
3.00
Rivet wing tip ribs.
Details
       

 03-07-2015
5.00
Cut and fit wing tips
       

 02-27-2015
5.00
Rivet right wing outboard bottom skin
       

 02-07-2015
2.00
Cut wing tip lenses.
     

 01-17-2015
6.00
Wing wiring
Details
       

 01-03-2015
5.00
Fabricate aileron torque tubes
Details
       

 01-02-2015
3.00
Fabricate aileron control rods
     

 12-28-2014
4.00
Rivet right wing bottom inboard skin
Details
     

 12-27-2014
6.00
Rivet inboard bottom skin
Details
       

 12-26-2014
4.00
Finish right flap
Details
     

 12-23-2014
3.00
Right Flap Top Skin
Details
     

 12-12-2014
4.00
Right Flap Assembly
Details
       

 11-15-2014
3.00
Left Flap - Trailing Edge
Details
       

 11-08-2014
2.00
Install Fuel Tank
Details
       

 11-08-2014
3.00
Assembly left flap
     

 11-05-2014
2.00
Install Right Leading Edge
       

 11-04-2014
3.00
Finish Inboard Bottom Skin
Details
       

 11-01-2014
4.00
Rivet Inboard Bottom Skin
     

 10-25-2014
6.00
Install Fuel Tank, Start Wing Wiring
Details
       

 10-13-2014
2.00
Replace Aileron Brackets
Details
       

 10-05-2014
4.00
Prime Flap Parts
       

 10-04-2014
4.00
Prepare Flap Parts for Priming
Details
     

 09-23-2014
2.00
Cleco and Final Drill Right Flap Assembly
     

 09-13-2014
3.00
Rivet Gap Fairing, Install Conduit
Details
       

 09-09-2014
1.00
Countersink flap trailing edge
Details
     

 09-06-2014
4.00
Flap final drilling
Details
       

 09-06-2014
2.00
Finish Aileron
Details
       

 08-23-2014
4.00
Flap Part Preparation
Details
     

 08-23-2014
1.00
Bond Aileron Trailing Edge
Details
     

 07-20-2014
6.00
Aileron Assembly
Details
       

 06-14-2014
6.00
Remove aileron brackets and fairing, Aileron Assem
Details
       

 05-10-2014
6.00
Assemble Left Aileron
Details
       

 04-26-2014
2.00
Wiring Runs
Details
       

 04-05-2014
5.00
Start aileron build
Details
       

 03-29-2014
6.00
Install back baffle and Z brackets, right tank
Details
       

 03-23-2014
2.00
Rivet top skins
Details
     

 03-22-2014
8.00
Install pitot, wiring conduit, bottom skins
Details
       

 03-15-2014
3.00
Rivet top skins
Details
     

 03-15-2014
4.00
Prepare bottom skin
Details
       

 03-15-2014
2.00
Leak check left tank
Details
     

 03-08-2014
6.00
Install right tank attach bracket, inboard rib
Details
       

 02-15-2014
6.00
Install right tank stiffener
Details
       

 02-08-2014
8.00
Install right fuel tank ribs
Details
       

 02-01-2014
8.00
Install right tank stiffeners, left tank back baff
Details
       

 01-25-2014
8.00
Leak check left tank, dimple right tank skin
Details
       

 01-19-2014
4.00
Start right fuel tank
Details
       

 01-18-2014
8.00
Install inboard tank attach bracket
Details
       

 01-04-2014
6.00
Install fuel tank ribs
Details
       

 12-29-2013
6.00
Install tank ribs
Details
     

 12-14-2013
8.00
Install tank stiffeners and fuel cap flange
Details
       

 11-02-2013
2.00
Rivet inboard tank attach bracket
Details
     

 10-02-2013
2.00
Prepare tank parts
Details
       

 09-21-2013
7.00
Drill and C/S back plate, install Z brackets
Details
       

 09-14-2013
4.00
Rivet top wing skins.
     

 09-14-2013
4.00
Assemble and match drill fuel tank
       

 09-13-2013
1.00
Prepare tank parts
Details
     

 09-13-2013
2.00
Dimple top wing skins
Details
     

 08-28-2013
2.00
Dimple wing ribs
Details
       

 08-26-2013
2.00
Top wing skins
Details
     

 08-11-2013
4.00
Install ribs, start rear spar
Details
       

 08-10-2013
5.00
Rib assembly
Details
       

 07-30-2013
3.00
Spar web nut plates and tie down bracket
Details
       

 07-30-2013
3.00
Prepare wing ribs
Details
     

 07-29-2013
6.00
Main spar preparation.
Details
       

 07-24-2013
0.00
Slight scratches on right spar
Details
       

 07-21-2013
2.00
Finish riveting of top skins.
Details
       

 07-20-2013
4.00
Build wing cart
Details
       

 07-16-2013
2.00
Rivet top skins
Details
     

 07-11-2013
2.00
Rivet wing walk doublers
     

 06-25-2013
2.00
Finish leading edge
     

 06-23-2013
3.00
Rivet RIGHT leading edge
     

 06-19-2013
2.00
Finish leading edge riveting
Details
       

 06-17-2013
2.00
Rivet leading edge assembly
     

 06-15-2013
4.00
Prepare and prime leading edge parts
Details
       

 06-04-2013
2.00
Prepare leading edge parts.
Details
       

 06-01-2013
5.00
Prepare leading edge parts
Details
       

 05-19-2013
3.00
Start riveting of top skins
Details
     

 05-18-2013
4.00
Prime wing skin / doublers
     

 05-17-2013
2.00
Top skin preparation
Details
       

 05-11-2013
4.00
Prime rear spar parts / rivet to ribs
Details
       

 05-04-2013
4.00
Rear spar assembly preparation
Details
       

 04-29-2013
2.00
Finish rib installation
Details
     

 04-24-2013
2.00
Install rib assemblies
Details
       

 04-20-2013
3.00
Prime wing parts.
     

 04-19-2013
2.00
Prepare wing parts for priming
Details
     

 04-14-2013
4.00
Prepare wing ribs
Details
       

 04-13-2013
2.00
Start wing rib section
Details
       

 04-12-2013
2.00
Install fuel tank and wing attach nutplates
Details
     

 04-08-2013
1.00
Spot prime holes from countersinking
Details
       

 03-24-2013
4.00
Countersink spar flanges, install nutplates
Details
       

 03-21-2013
2.00
Rivet main spar extension, match drill J-stiffener
Details
       

 03-20-2013
2.00
Install main spar extension
Details
       

 03-16-2013
4.00
Install and adjust elevator trim cables
Details
     

 03-15-2013
2.00
Prime elevator trim parts
Details
     

 03-13-2013
2.00
Match drill trim brackets
Details
     

 03-12-2013
2.00
VS Attach
Details
       

 03-11-2013
2.00
Install elevator pushrod
Details
       

 03-10-2013
2.00
Assembled elevator pushrod
     

 03-09-2013
4.00
HS attach
Details
       

 03-08-2013
2.00
Fabricate spacers to HS to tail attach
Details
     

 02-23-2013
4.00
Finish HS riveting, elevator attach
Details
       

 02-22-2013
2.00
Finish riveting HS inspar ribs to spar
     

 02-17-2013
3.00
HS Skin riveting
     

 02-16-2013
4.00
Rivet HS skins
Details
     

 02-12-2013
2.00
Rivet HS skins
     

 02-10-2013
4.00
Rivet HS front spar and nose ribs
       

 02-08-2013
2.00
Rivet HS stringer and stringer web
       

 02-04-2013
2.00
Prime HS parts
       

 02-03-2013
3.00
Dimple HS skins, prep for priming
Details
       

 02-02-2013
2.00
Deburr parts
Details
     

 01-30-2013
2.00
Disassemble HS, machine countersink spars
Details
       

 01-29-2013
2.00
HS assembly
Details
       

 01-26-2013
4.00
Nose and inspar rib assembly
Details
       

 01-24-2013
2.00
Redo HS front spar
Details
       

 01-20-2013
2.00
Prepare HS parts
Details
     

 01-20-2013
2.00
Finished riveting of tailcone top skins
Details
     

 01-19-2013
4.00
Prepare front spar parts, create cradles
Details
       

 01-12-2013
3.00
Rivet tailcone top skins
Details
       

 01-09-2013
1.00
Wing kit delivery part 2
Details
       

 01-07-2013
0.50
Wing kit delivery
Details
       

 12-09-2012
4.00
Install aft deck hardware, cleco top skins
       

 12-07-2012
2.00
Assemble bellcrank ribs and tailcone aft deck
       

 11-29-2012
2.00
Tailcone riveting
Details
     

 11-28-2012
2.00
Tailcone riveting
Details
       

 11-24-2012
4.00
Rivet tailcone skin stiffeners
Details
       

 11-23-2012
3.00
Assemble frames, cleco tailcone assembly
       

 11-22-2012
2.00
Assemble bellcrank and batter tray
       

 11-18-2012
3.00
Dimple tailcone skins
     

 11-17-2012
4.00
Deburr and dimple tailcone skins
     

 11-16-2012
3.00
Prime tailcone parts
Details
       

 11-15-2012
2.00
Dimple frames, bulkheads, and stiffeners
       

 11-11-2012
3.00
Machine countersink longerons for skins
     

 11-06-2012
2.00
Trim tailcone tab, disassemble tailcone
Details
       

 10-26-2012
2.00
Match drill tailcone aft deck supports
Details
       

 10-19-2012
2.00
Cleco and drill tailcone top skins
Details
     

 10-17-2012
2.00
Install upper stiffeners, prepare and install uppe
       

 10-16-2012
2.00
Final drill skin holes
     

 10-15-2012
2.00
Install and clamp aft deck.
       

 10-14-2012
4.00
Finish rear bulkhead assembly
       

 10-12-2012
2.00
Install rear bulkheads, install bellcrank ribs
       

 10-11-2012
2.00
Install left skin, drill left stiffeners
     

 10-10-2012
2.00
Install right skin, drill right stiffeners.
       

 10-09-2012
2.00
Install stiffeners.
     

 10-08-2012
2.00
Cleco bulkhead, frames, ribs
     

 09-30-2012
3.00
Prepare stiffeners
Details
       

 09-24-2012
2.00
Prepare bulkheads
Details
       

 09-12-2012
2.00
Left elevator - roll leading edge
     

 09-11-2012
2.00
Left elevator - install trim tab
Details
     

 09-10-2012
2.00
Right elevator - roll leading edge
Details
       

 09-08-2012
5.00
Elevators - Bond trailing edge
Details
       

 09-07-2012
2.00
Right elevator - rivet rib halves, rivet counterba
       

 09-06-2012
2.00
Right elevator, rivet skins
     

 09-03-2012
2.00
Prepare tailcone parts
Details
     

 08-28-2012
2.00
Right elevator final assembly
Details
       

 08-27-2012
2.00
Right elevator final assembly
Details
       

 08-26-2012
4.00
Right elevator final assembly
Details
     

 08-24-2012
2.00
Trim tabs, bending
Details
       

 08-22-2012
2.00
Elevator trim tab parts
Details
     

 08-20-2012
2.00
Elevator trim tab preparation
     

 08-18-2012
5.00
Deburr and dimple Right elevator skins
       

 08-05-2012
3.00
Left elevator final assembly 3
Details
       

 08-04-2012
3.00
Prime left elevator parts, start final assembly
Details
       

 08-04-2012
3.00
Left elevator final assembly 2
Details
       

 08-01-2012
2.00
Match drill right elevator
       

 07-31-2012
2.00
Assemble right elevator skeleton
     

 07-18-2012
2.00
Left elevator spar preparation
Details
       

 07-17-2012
2.00
Deburr and dimple left elevator skins
Details
     

 07-14-2012
5.00
Check counterbalance assembly, deburr skins
Details
     

 07-13-2012
2.00
Match drill left elevator skins.
Details
       

 07-08-2012
4.00
Assemble left elevator skeleton.
Details
     

 07-01-2012
2.00
Preparation of left elevator parts.
Details
     

 05-27-2012
5.00
Built rear spar assembly, screwed up forward spar
Details
       

 05-26-2012
5.00
HS spar preparation
Details
       

 05-26-2012
1.00
Completed rudder
     

 05-22-2012
2.00
Installed rudder counterweight
     

 05-21-2012
2.00
Rolled rudder leading edge.
Details
       

 05-20-2012
4.00
Rivet rudder skins and trailing edge
Details
       

 05-19-2012
4.00
Bonding VS skins at trailing edge
Details
       

 05-16-2012
2.00
Riveting of rudder horn assembly & skins
Details
       

 05-15-2012
2.00
Completed riveting of VS skin
     

 05-14-2012
1.50
Rivet VS skin to spar below inspar rib
Details
       

 05-09-2012
2.00
Rivet VS skin to nose rib
Details
       

 05-08-2012
2.00
Riveted VS skeleton
Details
       

 05-07-2012
2.00
Prime rudder parts, start rudder riveting
Details
       

 05-06-2012
3.00
Prepare rudder parts for priming
Details

 05-02-2012
2.00
Rudder deburring, countersink trailing edge, dimpl
Details
     

 05-01-2012
2.00
Dimple rudder skins
     

 04-30-2012
2.00
Final drill skin to spar and trailing edge.
     

 04-29-2012
2.00
Fit rudder skins to skeleton, trim trailing edge
Details
       

 04-28-2012
4.00
Rudder part prep and skeleton assembly
Details
       

 04-28-2012
4.00
Prepare rudder ribs, shear clips and stiffeners
Details
       

 04-18-2012
2.00
Prepare Remaining VS Parts
Details
     

 04-14-2012
4.00
Primer Test, Prime some VS parts
Details
       

 03-31-2012
2.00
Rear spar assembly
Details
       

 03-31-2012
3.00
Prepare vertical stabilizer skin
Details
       

 03-29-2012
2.00
Match drill spar caps
Details
       

 03-27-2012
3.00
Trim VS-1014 L & R rear spar caps
Details
       

 03-18-2012
2.00
Drill and machine countersink wedge
Details
       

 03-13-2012
1.50
Back rivet and match drill
Details
       

 03-11-2012
2.00
Trimmed and deburred practice parts
Details
     

 03-11-2012
1.50
Practice
Details

 03-08-2012
1.50
Worked on VANs practice kit
Details

 03-07-2012
0.00
Received tools delivery
Details
       

 02-20-2012
0.00
Jessica and I with plans
     

 02-19-2012
3.00
Inventory
Details
       

 02-07-2012
3.00
Empennage Kit Arrives
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.