KitLog pro

Powered By Kitlog Pro v2.0

CMBAero
Work Logs Found: 113
Category Work Time: 261 Hours
 Date
Hours
Work Log Summary

Details

 03-16-2014
3.00
Fwd fuselage assy.
Details

 02-26-2014
4.00
Fwd. fuselage assy.
Details

 11-26-2013
1.50
Fwd fuselage assy.
Details

 11-25-2013
1.50
Fwd fuselage assy.
Details

 11-06-2013
1.00
Brake pedals assy.
Details

 10-29-2013
2.50
Brake pedals assy.
Details

 10-28-2013
2.50
Brake pedals work
Details

 10-11-2013
1.00
Fwd. Fuselage Fabrication
Details

 10-10-2013
3.00
Fwd Fuselage Assy.
Details

 10-09-2013
2.50
Fwd Fuselage Assy.
Details

 10-08-2013
2.50
Fwd Fuselage Fabrication and Assy.
Details

 10-01-2013
2.50
Fwd Fuselage Assy.
Details

 09-24-2013
6.00
Firewall attachment
Details
       

 09-10-2013
2.50
Longeron position and drilling
Details

 09-07-2013
2.00
Longeron position and drilling
Details
       

 08-12-2013
3.00
Sideskin preparation
Details

 08-07-2013
4.00
Sideskin preparation
Details
       

 08-06-2013
2.00
Fuselage aft and center attachment
Details
       

 08-04-2013
8.00
Fuselage
Details
       

 07-29-2013
3.00
Center Section Riveting
Details
       

 06-05-2013
4.00
Center Section Riveting
Details
       

 06-04-2013
2.00
Center Section Prep.
Details

 05-23-2013
4.00
Center Section Riveting
Details
       

 05-09-2013
2.00
Center Section Riveting
Details

 05-07-2013
2.00
Center Section Riveting
Details

 04-30-2013
2.50
Center Section Riveting
Details
       

 04-09-2013
3.00
Center Section Prep
Details
       

 03-06-2013
4.00
Center Section Final Drilling and Prep
Details
       

 03-05-2013
2.50
Center Section Work
Details
       

 03-03-2013
4.00
Center section prep.
Details

 03-01-2013
4.00
Seat Bracket and Center Section Spacer
Details
     

 03-01-2013
4.00
Control assy.
Details
       

 02-28-2013
2.00
Fuselage Riveting and Drilling
Details
       

 02-27-2013
2.00
Fuselage Drilling and Riveting
Details
       

 02-26-2013
2.00
Fuselage Riveting
Details

 02-24-2013
2.00
Fuselage Riveting
Details
       

 02-22-2013
2.00
Assemble Fuselage
Details
       

 02-21-2013
2.00
Fuselage Prep
Details

 02-10-2013
4.00
Fuselage Bulkhead Assembly
Details
       

 02-09-2013
4.00
Fuselage First assembly
Details
       

 02-08-2013
2.00
Fuselage Prep
Details
       

 02-06-2013
2.00
Fuselage Prep
Details

 02-02-2013
4.00
Fuselage Prep
Details
       

 01-31-2013
2.50
Tailcone Assembly
Details
       

 01-30-2013
2.50
Primer and Bulkheads work...
Details
       

 01-29-2013
1.50
Bulkhead doublers...
Details
     

 01-27-2013
8.00
Finish center bulkhead + work on the f-705 bulkhea
Details
       

 01-25-2013
2.50
Center bulkhead riveting...
Details
       

 01-23-2013
2.50
Center bulkhead controls and more...
Details
       

 01-20-2013
5.00
Center Bulkhead
Details
       

 01-11-2013
2.00
Firewall riveting
Details
       

 01-09-2013
2.00
Prime and rivet firewall
Details
       

 01-06-2013
6.00
Firewall assembly
Details
       

 01-03-2013
4.00
Unpacking and Inventory
Details
       

 11-23-2012
2.50
Left Elevator Work
Details
     

 11-22-2012
2.50
Left Elevator Work
Details
       

 10-04-2012
2.00
Left Elevator Work
Details
     

 09-30-2012
1.00
Left Elevator Prep Again...
Details

 09-29-2012
1.00
Left Elevator Prep...
Details

 09-23-2012
2.50
Right Elevator Finishing...
Details
       

 09-16-2012
2.50
Right Elevator Skin Riveting...
Details

 09-15-2012
2.50
Right Elevator skin, stringer, counterbalance...
Details
     

 09-09-2012
0.50
Elevator Horn
Details
       

 09-08-2012
1.00
Elevator skin and spar...
Details

 09-02-2012
1.00
Elevator Stringers
Details

 07-16-2012
1.50
Horizontal Stab. Riveting
Details
       

 04-29-2012
0.50
Rudder skin riveting...
Details
       

 04-22-2012
0.50
Rivet rudder skin
Details
       

 04-15-2012
1.00
Primer Rudder Parts
Details
       

 04-12-2012
1.20
Right Elevator Spar Prep/Riveting
Details
     

 04-09-2012
1.00
Rudder Skin/Stringer Riveting
Details
       

 04-09-2012
1.00
Rudder Parts Prep.
Details
     

 04-08-2012
2.00
Rudder Stringers Prep
Details

 04-01-2012
1.00
Rudder Spar Prep. and Riveting
Details
       

 04-01-2012
2.00
Rudder Skin Prep.
Details

 03-31-2012
2.00
Rivet Rear H. Stab Spar
Details

 03-26-2012
0.60
Left H. Stab Skin Riveting
Details
       

 03-26-2012
1.50
Left H. Stab Skin Prep.
Details
       

 03-25-2012
2.00
Right Horizontal Stabilizer Skin Riveting
Details
       

 03-24-2012
3.00
H. Stab Final Assembly and Riveting
Details
       

 03-23-2012
1.50
H. Stab Ribs Riveting...
Details
       

 03-22-2012
3.50
Horizontal Stabilizer Priming and Spar Riveting
Details
       

 03-19-2012
1.00
Horizontal Stabilizer Skin Dimpling
Details
     

 03-15-2012
1.00
Horizontal Stabilizer Skin Dimpling
Details

 03-08-2012
2.00
V. Stab. Skin Riveting
Details
       

 03-08-2012
1.30
V. Stab Frame Riveting
Details
       

 03-06-2012
0.80
Vertical Stab, Rear Spar Riveting...
Details
       

 03-05-2012
1.00
Vertical Stab. Parts Primer
Details
       

 03-04-2012
1.10
Deburr and Dimple V. Stab and H. Stab parts...
Details

 03-03-2012
3.20
V. Stab Deburring and Dimpling + DRDT2 Table
Details
       

 03-03-2012
0.70
DRDT2 and V. Stab Deburring
Details
       

 02-28-2012
1.00
Left Elevator Assembly
Details
       

 02-28-2012
1.00
Elevator Disassembly, DRDT2 and Trim tab...
Details
       

 02-27-2012
1.60
Left Elevator Stiffeners
Details
       

 02-26-2012
1.50
Rudder Skeleton and skin assy.
Details
       

 02-26-2012
1.50
Rudder Assy. Finishing
Details
       

 02-25-2012
2.00
Rudder Stiffeners Prep.
Details
       

 02-25-2012
0.50
Rudder Stiffener to Skin, Shim Building...
Details
       

 02-25-2012
1.00
Rudder Skeleton Assembly
Details
       

 02-22-2012
0.80
Disassembled right elevator and started work on ru
Details
     

 02-12-2012
1.80
Right Elevator Stiffeners and Skin
Details
       

 02-11-2012
2.80
Elevator Prep. and Counter-Balance Assy.
Details
       

 02-09-2012
2.00
Electric Elevator Trim
Details
       

 01-29-2012
2.50
Vertical Stabilizer Assembly
Details
       

 01-28-2012
4.00
Vertical Stabilizer Spar and Ribs Preparation
Details
       

 01-28-2012
0.50
H. Stab Bearing Assembly and V. Stab Prep.
Details
       

 01-26-2012
4.00
Horizontal Stabilizer Skin Assembly
Details
       

 01-22-2012
1.00
Assembled the skeleton of the horizontal stabilize
Details
       

 01-21-2012
5.00
Flute and Deburr Ribs... Deburr spars...
Details

 01-15-2012
1.50
Horizontal Stabilizer Jig + Skin prep.
Details
       

 01-14-2012
2.00
Preparing hstab spars for structure assembly...
Details
       

 01-14-2012
2.00
Horizontal Stab. Attach Angles
Details
       

 01-08-2012
2.00
Parts Inventory
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.