KitLog pro

Powered By Kitlog Pro v2.0

Timothys Mazda 20B RV-10
Work Logs Found: 461
Category Work Time: 1566 Hours
 Date
Hours
Work Log Summary

Details

 03-30-2012
6.00
Wheel Fairings
Details

 03-29-2012
5.00
Wheel Fairings
Details

 03-28-2012
7.00
Wheel Fairings
Details

 03-18-2012
4.00
Wheel Pants
Details

 03-17-2012
3.00
Ground Runs
Details

 03-14-2012
3.00
Installed prop hub
Details

 03-04-2012
1.00
Polished
Details

 03-04-2012
0.00
ELT Check
Details

 03-03-2012
6.00
Complete Pre-Inspection
Details

 02-25-2012
5.00
Inspected wings
Details

 02-19-2012
2.00
Cowling Fastners & Inspection
Details

 02-17-2012
8.00
Ground Run
Details

 02-03-2012
4.00
Panel Labels
Details
       

 01-29-2012
4.00
Installed Side panels
       

 01-29-2012
4.00
Installed Fuel Cap labels
Details
     

 01-29-2012
5.00
Install Pax Seat Belts, wire ties
Details
     

 01-22-2012
3.00
Install panel labels
Details
       

 01-21-2012
5.40
Weight and Balance
Details
       

 01-15-2012
6.40
Installed Carpet, Dash, and ENGINE RUN
Details
       

 01-07-2012
5.50
Zipped Tied Wires
Details
     

 12-28-2011
4.00
Data Plate, B-Nut, Circuit Breakers
Details
     

 11-13-2011
4.00
Installed Muffler
Details
       

 11-12-2011
4.00
Muffler
Details
     

 11-11-2011
1.50
Sanded Wheel pants
Details

 10-19-2011
2.00
Sanded Top Cowling
Details

 10-17-2011
5.00
Oil Door
Details

 10-14-2011
6.00
Welded Exhaust
Details

 10-10-2011
5.00
New Exhaust
Details

 09-21-2011
6.00
Installed Floor Panels
Details

 09-20-2011
5.00
Interior Work
Details

 09-19-2011
5.00
Oil Cooler Ducting
Details

 09-16-2011
3.00
Oil Cooler Duct
Details

 09-15-2011
5.00
Installed Wing Tips
Details

 09-14-2011
5.00
Trouble Shooting Injectors
Details

 09-11-2011
3.00
Engine, spinner, Ducting, landing lights
Details

 09-10-2011
6.00

Details

 09-02-2011
8.00
Engine Runs/Exhaust
Details

 08-31-2011
77.00
Engine Runs

 08-23-2011
9.00
Wing Tip Lights
Details

 08-22-2011
6.00
Cowling/Wing Tips
Details

 08-21-2011
4.00
Rad Duct
Details

 08-20-2011
4.00
Engine Start
Details

 08-16-2011
1.00
Reviewed EM3 Data

 08-14-2011
3.00
Installed Wing Tip Lights

 08-14-2011
3.00
Installed Seat Belts,fixed oil leak

 08-14-2011
4.00
Install New Oil Cooler
Details

 08-13-2011
5.00
UHS Spinner
Details
     

 08-06-2011
6.00
Formed Shell for rad ducting
Details

 07-31-2011
4.00
Side Panels
Details

 07-16-2011
3.00
Completed Engine/oil cooler
Details

 06-25-2011
4.00
FIRST ENGINE Start
Details
       

 06-24-2011
3.00
Engine-fixing leaks
Details
     

 06-22-2011
3.00
Fluids
Details

 06-12-2011
4.00
Filled Fluids, oil/water
Details

 06-11-2011
5.00
Wing Tips Install

 06-11-2011
2.00
Installed Transponder Switch

 06-11-2011
4.00
Fuel Line test, pressure test
Details

 05-28-2011
10.00
Transponder, RDAC, Fuel System
Details

 05-20-2011
2.00
RDAC wiring

 03-25-2011
7.80
Filled Brakes
Details

 03-24-2011
8.00
Exhaust
Details

 03-22-2011
6.00
Oil System
Details

 03-21-2011
4.00
Radio Switch
Details

 02-27-2011
6.20
Nav, Strobe, Landing Light Install
Details

 02-26-2011
4.00
Landing Light Install
Details

 01-22-2011
5.00
Wiring Panel

 12-04-2010
6.00
Installed Panel
Details

 11-28-2010
3.00
Installed Panel
Details

 11-07-2010
2.00
Installed Panel
Details

 10-16-2010
5.00
Welded Radator Tubes
Details

 10-10-2010
5.00
Welded Radator Tubes
Details

 10-02-2010
7.50
Installed Prop
Details

 09-26-2010
5.00
Construct Prop
Details

 09-19-2010
6.00
Installed Tip
Details

 09-12-2010
3.00
Wiring Wings
Details

 09-11-2010
5.00
Wiring Wings
Details

 09-05-2010
4.00
Install Wing Tip
Details

 09-04-2010
5.00
Wing Tip
Details

 08-29-2010
6.00
Wiring Tru Trak/Radio
Details

 08-28-2010
8.00
Tru Trak Installed
Details

 08-14-2010
8.00
Installed Panel Avionics
Details

 08-01-2010
8.00
Wired Trim Servos
Details

 07-31-2010
8.00
Installed Trim
Details

 07-25-2010
8.00
Installed Empennage Tail Fairing
Details

 07-24-2010
9.00
Installed Wings
Details

 07-18-2010
6.00
Install Vertical stab
Details

 07-17-2010
8.00
Installed Horizontal Stab
Details

 07-07-2010
4.00
Moved To Hangar
Details

 01-17-2010
6.00
Wiring Panel and center console

 01-16-2010
5.00
Routing Wires

 01-15-2010
8.00
Wiring Panel

 01-04-2010
2.00
Wiring Panel

 12-05-2009
2.00
Wiring Fuel Pumps

 11-25-2009
6.00
Wiring Panel Components

 11-22-2009
6.00
Running Wiring

 11-15-2009
5.00
Installed Center Console

 11-14-2009
6.00
Installed Center Console

 11-13-2009
3.00
Fitted Radiator Hoses

 11-12-2009
4.00
Alternator Bracket Rework

 11-06-2009
6.00
Installed Components on panel

 11-04-2009
5.00
Installed Radiator

 11-02-2009
4.00
Installed Radiator Bracket

 08-28-2009
6.00
Installed Windscreen

 08-26-2009
4.00
Disengage Internal Reg on Alternator

 08-25-2009
3.00
Installed Forward Cowling Screws/Epoxy

 08-23-2009
3.00
Installed Windscreen

 08-21-2009
3.00
Trimed Windscreen

 08-20-2009
4.00
Installed Skybolts

 08-16-2009
6.00
Cowling Lower Mounted

 08-15-2009
4.00
Cowling Upper Mounted

 08-09-2009
6.00
Coils Mounted/Reducion Gear Box oil Line

 08-08-2009
6.00
Wired Strobes

 08-02-2009
2.00
Wiring

 07-30-2009
2.00
Welded Last of Intake

 07-28-2009
2.00
Finish Welding Intake

 07-23-2009
6.00
Constructed interior Center Console

 07-21-2009
4.00
Intall Fuel Pressure Regulator

 07-18-2009
4.00
Intake

 07-17-2009
4.00
Refitting Intake

 07-12-2009
1.00
Installed Welded Intake

 07-10-2009
4.00
Run Engine Wiring

 07-09-2009
6.00
Welded Intake

 07-08-2009
4.50
Mounted Intake

 06-27-2009
3.00
Construct Intake

 06-25-2009
4.00
Install Reduction Gear Box

 06-23-2009
2.00
Mounted Coils

 06-15-2009
2.00
Mounting

 06-12-2009
2.00
Installed

 06-10-2009
3.00
Installed Cowling Strips

 06-09-2009
3.00
Installed FIre wall Components

 06-08-2009
4.00
Installed Engine Brackets

 06-06-2009
3.00
Installed Cowling

 06-03-2009
3.00
Installed Alternator Bracket

 05-23-2009
2.00
Installed Engine

 05-12-2009
1.00
Installed Hinge Covers

 05-11-2009
1.00
Installed Door Hinge Covers

 05-08-2009
2.00
Installed Door Struts

 05-07-2009
5.50
Installed Door Windows

 05-06-2009
1.00
Installed RT Door

 05-05-2009
1.00
Installed LF Door

 03-21-2009
1.00
Finished Cabin Windows

 03-20-2009
3.00
Finishing Cabin Windows

 03-19-2009
2.00
Installed RT Canopy Window

 03-18-2009
3.00
Installing Left Canopy Window

 03-17-2009
2.00
Installed Cabin Windows

 03-15-2009
4.00
Latch Covers and Window Trim Fitting

 03-15-2009
3.00
Installing Windows in Doors

 03-11-2009
2.00
Door Interior Sanding/Filling

 03-09-2009
3.00
Sanded and filled Door Panels

 03-06-2009
3.00
Sanding Interior Door Panels

 03-05-2009
3.00
Sanding/Filling interior door Panels

 03-02-2009
2.00
Door Latch Closeouts

 02-28-2009
4.00
Headliner Closeouts

 02-27-2009
3.00
Fiberglass Door Handles

 02-26-2009
2.00
Fiberglass Door Handles

 02-21-2009
6.00
Installed Headliner around windows

 02-20-2009
8.00
Smooth Primed Doors

 02-19-2009
8.00
Smooth Primed Cabin Top

 02-18-2009
8.00
Sanded Cabin Top

 02-12-2009
3.00
Left Door Fitted

 02-07-2009
3.00
RT Door Latch Fitting/replacing

 02-07-2009
5.00
RT Door Fitted and Plex Glass Cut

 01-28-2009
2.00
Installing Door Latches

 01-27-2009
2.00
Installing Door Latches

 01-25-2009
3.00
Installing Door Latches

 01-24-2009
8.00
Installed Door Latches

 01-20-2009
3.00
Fitted Doors

 01-17-2009
3.00
Fitted Cabin Doors

 01-16-2009
8.00


 01-15-2009
1.00


 01-14-2009
2.00
Sanded Door Windows

 01-13-2009
3.00


 01-12-2009
3.00
Installed Head Liner

 01-09-2009
2.00
Wheel and Tire Assembly

 01-06-2009
1.00
Paint the Seat Backs

 01-05-2009
2.00


 01-02-2009
4.00


 01-01-2009
3.00


 12-31-2008
1.00
Installed Pitot Static Lines

 12-19-2008
3.00


 12-04-2008
4.00


 12-03-2008
2.00


 12-01-2008
2.00


 11-30-2008
2.00


 11-28-2008
6.00


 11-26-2008
4.00


 11-25-2008
4.00
Cabin Top

 11-24-2008
4.00
Sanding Cabin Rails

 11-16-2008
3.00


 11-15-2008
1.00


 11-14-2008
4.00


 11-12-2008
4.00


 11-11-2008
6.00


 11-10-2008
4.00
Constructed Rear Equipment Tray

 11-08-2008
5.00
Installed Fuel System for Rotary Engine

 11-04-2008
3.00
Installed Flap Motor

 11-03-2008
3.00
Painted Interior

 11-02-2008
4.00
Painted Interior

 10-29-2008
3.00


 10-27-2008
4.00


 10-26-2008
3.00


 10-25-2008
4.00


 10-23-2008
4.00


 10-22-2008
2.00


 10-20-2008
2.00


 10-19-2008
2.00


 10-17-2008
2.00


 10-16-2008
2.00


 10-15-2008
2.00


 10-14-2008
4.00


 10-13-2008
8.00


 10-11-2008
4.00


 10-09-2008
6.00


 10-08-2008
3.00


 10-04-2008
3.00


 10-02-2008
4.00


 09-30-2008
6.00


 09-29-2008
2.00


 09-27-2008
8.00


 09-25-2008
5.00


 09-23-2008
2.00


 09-21-2008
1.00


 09-20-2008
1.00


 09-16-2008
1.00


 07-29-2008
7.00


 07-27-2008
7.00


 07-21-2008
1.00


 07-19-2008
9.00


 07-17-2008
2.00


 07-16-2008
3.00


 07-13-2008
7.00


 07-12-2008
9.00


 07-11-2008
8.00


 07-10-2008
9.00


 06-28-2008
4.00


 06-27-2008
3.00


 06-24-2008
3.00


 06-22-2008
5.00


 06-21-2008
5.00
Riveting

 06-18-2008
3.00


 06-15-2008
5.00


 06-14-2008
6.00


 06-12-2008
2.00


 06-10-2008
3.00


 06-08-2008
4.00


 06-07-2008
6.00


 06-06-2008
3.00


 06-04-2008
2.00


 06-03-2008
3.00


 06-01-2008
4.00
Flaps Completed

 05-31-2008
0.50


 05-30-2008
1.00


 05-28-2008
1.00
Riveting Flaps

 05-27-2008
0.50
Riveting Flaps

 05-26-2008
2.00
Riveting Flaps

 05-25-2008
7.00


 05-24-2008
3.00


 05-22-2008
2.00


 05-21-2008
2.00


 05-20-2008
2.00


 05-18-2008
2.00


 05-17-2008
4.00


 05-16-2008
1.00
Installed Pitot Tube

 05-15-2008
0.50
Primed Pitot Tube

 05-12-2008
2.50
Completed Riveting BTM Skins

 05-11-2008
1.00
Riveting BTM Skins

 05-10-2008
1.50
Riveting BTM Skins

 05-09-2008
3.00
Riveting BTM Skins

 05-07-2008
1.80
Primed BTM Skins

 05-06-2008
2.00
Dimpled BTM Skins

 05-05-2008
6.00
Riveting BTM RT Skins

 05-04-2008
4.00
Riveting BTM Rt Skin

 05-03-2008
3.00


 05-02-2008
3.00


 04-25-2008
1.50
Installed Auto Pilot Servo in wing

 04-24-2008
2.00


 04-23-2008
3.00


 04-22-2008
2.00
Tested/Resealed Leaks in tank

 02-07-2008
3.00
Ailerona Complet

 02-05-2008
3.00


 02-04-2008
2.50


 02-02-2008
2.00


 01-28-2008
3.00


 01-27-2008
2.00


 01-24-2008
1.00
Tanks Complete

 01-24-2008
2.00


 01-24-2008
3.00


 01-19-2008
8.00


 01-18-2008
6.00


 01-12-2008
1.00


 01-09-2008
1.00


 01-08-2008
3.00


 12-19-2007
3.00


 12-18-2007
4.00


 12-16-2007
7.00


 12-15-2007
8.00
Tanks

 12-14-2007
3.60


 12-13-2007
3.20


 12-12-2007
1.30


 12-11-2007
2.80


 12-10-2007
2.00


 12-07-2007
1.80


 12-06-2007
1.90


 12-05-2007
1.60


 12-03-2007
1.00


 12-02-2007
1.60


 12-01-2007
3.80


 11-30-2007
2.40


 11-27-2007
1.30


 11-25-2007
1.90


 11-24-2007
4.50


 11-23-2007
3.00


 11-21-2007
2.00


 11-20-2007
1.50


 11-17-2007
3.50


 11-16-2007
3.00


 11-15-2007
2.00


 11-14-2007
1.00


 11-13-2007
2.00


 11-11-2007
6.00


 11-08-2007
3.00
Uncrated/Stored

 11-07-2007
1.50


 11-05-2007
1.00


 11-04-2007
1.00


 11-04-2007
4.00


 11-04-2007
1.00


 11-03-2007
2.00


 11-03-2007
1.50


 11-02-2007
1.00


 11-02-2007
0.50


 11-01-2007
1.30


 11-01-2007
0.80


 10-31-2007
1.40


 10-29-2007
0.50
Primed

 10-29-2007
1.50


 10-24-2007
2.00
Dimpling

 10-23-2007
2.50
Dimpling

 10-22-2007
2.00


 10-21-2007
3.00


 10-20-2007
3.50


 10-19-2007
1.00
Primed

 10-08-2007
1.00


 10-07-2007
3.50


 10-06-2007
2.00


 10-06-2007
1.80


 10-04-2007
7.00


 09-30-2007
5.00


 09-29-2007
2.00
Primed Parts

 09-28-2007
1.20


 09-26-2007
2.00


 09-25-2007
2.00


 09-24-2007
1.40


 09-23-2007
2.20


 09-23-2007
4.00


 09-22-2007
3.50


 09-18-2007
1.50


 09-17-2007
1.50


 09-15-2007
2.00
Inventoried Wings

 09-15-2007
2.00


 05-09-2007
4.00
Fitting Tips

 05-07-2007
2.00


 05-05-2007
4.00


 04-27-2007
2.20


 04-25-2007
5.00


 04-22-2007
1.00


 04-09-2007
1.00
Tail Strobe/Lt
Details

 04-09-2007
1.30
Elevator Trim
Details

 04-05-2007
0.10
Installing Tail/light
Details

 04-03-2007
2.00
Redue Trim Tab

 04-01-2007
0.75


 03-30-2007
1.50


 03-29-2007
3.00


 03-27-2007
1.50


 03-26-2007
1.45


 03-25-2007
1.00


 03-21-2007
1.30


 03-15-2007
1.77


 03-14-2007
0.78


 03-12-2007
2.50


 03-11-2007
2.50


 03-10-2007
1.00


 03-06-2007
1.00


 03-05-2007
3.40
Priming elevators

 02-26-2007
0.78


 02-25-2007
0.83
Paint Prep

 02-25-2007
2.00


 02-24-2007
1.66


 02-21-2007
1.00
Dimpling

 02-19-2007
1.10


 02-19-2007
1.75


 02-16-2007
2.25


 02-15-2007
2.00


 02-13-2007
0.40


 02-13-2007
1.50


 01-17-2007
1.50


 01-15-2007
1.50


 01-13-2007
2.80


 01-10-2007
1.30


 01-09-2007
2.00


 01-08-2007
0.50


 01-06-2007
1.80


 01-05-2007
1.00


 01-04-2007
1.50


 12-26-2006
0.70


 12-26-2006
1.80


 12-24-2006
2.70


 12-24-2006
1.30


 12-23-2006
1.00


 12-23-2006
1.00


 12-22-2006
1.00


 12-21-2006
0.70


 12-20-2006
0.80


 12-19-2006
1.30


 12-19-2006
3.80


 12-16-2006
2.30


 12-15-2006
2.50


 12-14-2006
0.60


 12-14-2006
1.00


 12-13-2006
2.30


 12-10-2006
4.00
Horizontal Stab Complete

 12-09-2006
1.80


 12-06-2006
1.00


 12-05-2006
1.50


 12-04-2006
1.50


 12-03-2006
2.50


 12-01-2006
2.00


 11-30-2006
1.00


 11-29-2006
1.70


 11-24-2006
2.00


 11-24-2006
3.00


 11-23-2006
1.00


 11-21-2006
3.50


 11-18-2006
2.30


 11-17-2006
2.70


 11-11-2006
1.00


 11-10-2006
4.10


 11-09-2006
3.00
Rudder Complete

 11-09-2006
2.80


 11-08-2006
2.00


 11-07-2006
0.50


 11-07-2006
2.00


 11-06-2006
2.30


 11-04-2006
4.75
Completed Horizontal Stab

 11-03-2006
1.95


 11-03-2006
3.00


 11-01-2006
2.00
Primered Rudder/Vert Stab
       

 10-31-2006
1.01
Lacquered
       

 10-30-2006
1.50
Primer Prep for Rudder/Vert Stab
       

 10-27-2006
1.28

       

 10-26-2006
1.27


 10-26-2006
2.17

       

 10-08-2006
2.12


 10-08-2006
2.12


 10-07-2006
4.99


 10-06-2006
2.42
Inventory Emp
Details

 10-06-2006
1.00

Details
       

 10-06-2006
2.93

       

 10-05-2006
1.58
Inventory Emp
Details

 10-04-2006
4.50
Inventory Emp
Details

 10-03-2006
1.00
Inventory Emp
Details

 10-02-2006
0.58
Inventory Emp
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.