KitLog pro

Powered By Kitlog Pro v2.0

My Bearhawk
Work Logs Found: 60
Category Work Time: 128 Hours
 Date
Hours
Work Log Summary

Details

 04-03-2013
3.00
Wing Wiring Cable Tie Standoffs
Details
     

 03-29-2013
4.00
Fuel Tank Tensioner Straps
Details
       

 03-29-2013
6.00
Fuel Tank Strap Prep and Installation
Details
       

 03-06-2013
2.00
Right main fueltank sender
Details
       

 03-06-2013
2.00
Left Wing Unpacked
     

 03-04-2013
2.00
Cut Inspection Panel for AOA
Details
     

 02-28-2013
4.00
Inspection Panel Installation
Details
     

 02-26-2013
4.00
Fuel Tank Access Cover Nutplate
Details
       

 02-22-2013
4.00
Aux Tank Coverl - Right Wing
Details
     

 02-14-2013
1.00
Engined Delivered!
Details
     

 02-13-2013
2.00
Installed Tailwheel Springs
Details
     

 02-04-2013
3.00
Fit Firewall and Engine Mount
Details
       

 02-01-2013
2.00
Installed Stringers
Details
       

 01-31-2013
4.00
Installed Stringers
Details
       

 05-08-2012
3.00
Trim System Installation
Details
       

 05-03-2012
1.00
Right Wing Flap Actuator
Details
     

 05-03-2012
3.00
Right Wing Elevator Bellcrank and Pullies
Details
       

 05-03-2012
4.00
Prepare Inspection Convers
Details
       

 04-24-2012
3.00
Unpacked Right Wing
Details
     

 04-22-2012
1.00
Measured Flying Wires
Details
     

 04-20-2012
3.00
Cut Stringers
Details
       

 04-18-2012
1.00
Elevator Alignment Issue
Details
     

 04-10-2012
3.00
Swaged Elevator Cables
Details
       

 04-05-2012
0.50
Tapped Rudder Stops
Details
     

 04-05-2012
3.00
Swaged Rudder Cables
Details
       

 04-04-2012
3.00
Fixed Elevator Bell Crank
Details
     

 03-29-2012
1.00
Stablizer Struts
Details
       

 03-28-2012
2.00
Cut trim tabs
Details
       

 03-27-2012
0.50
Mounted Trim Wheel
Details
     

 03-22-2012
2.00
Trimmed elevator counterweights.
Details
     

 03-21-2012
3.00
Poured Lead for Elevator Counterweights
Details
       

 03-16-2012
1.00
Elevator Bell Spacers
Details
     

 03-16-2012
2.00
Elevator Bell Crank Clearance Issues
Details
       

 03-15-2012
3.00
Floor Boards
Details
       

 03-13-2012
1.00
Installed elevator and flap pullies
       

 03-13-2012
1.00
Drilled trim tab actuating tubes and arms
Details
       

 03-13-2012
3.00
Assembled and Installed Tailwheel
Details
       

 03-12-2012
0.50
Mocked up rudder pedal straps and return springs
Details
     

 03-12-2012
1.50
Installed Horizontal Stabilizers
     

 03-12-2012
1.00
Elevator Mockup
     

 03-09-2012
1.50
Mounted flap control lever
Details
     

 03-09-2012
2.00
Mounted Control Stick System
Details
       

 03-08-2012
3.00
Ran landing gear brake lines
Details
       

 03-08-2012
1.50
Mounted brake calipers
Details
       

 03-08-2012
2.00
Assembled Control Sticks
Details
       

 03-07-2012
2.00
Mounted Rudder and Brake Pedals
Details
       

 03-07-2012
2.50
Install Gear Legs and Struts
Details
       

 03-06-2012
1.50
Mounted tires on wheels
Details
     

 03-06-2012
1.50
Finished mounting brake torque plates
Details
     

 03-06-2012
1.00
Began brake line plumbing
Details

 03-05-2012
2.00
Installed master cylinders on brake pedals
Details
     

 03-03-2012
2.00
Assembled wing rotator
Details
     

 03-02-2012
2.00
Finished Drilling Brake Torque Plates Mounting Hol
Details
     

 03-01-2012
2.00
Drilling Brake Torque Plates Mounting Holes
Details
     

 03-01-2012
2.00
Assembled shock struts
Details
       

 02-29-2012
2.00
Prepared for drilling brake torque plate mounting
Details
     

 02-28-2012
1.00
Strut Prep
Details
     

 02-18-2012
1.00
Unpack and record serial numbers
Details
       

 02-17-2012
1.00
Received and unloaded kit
Details
       

 02-01-2012
0.00
Shop Setup
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.