KitLog pro

Powered By Kitlog Pro v2.0

Phils Web Site
Work Logs Found: 84
Category Work Time: 923 Hours
 Date
Hours
Work Log Summary

Details

 12-09-2012
10.00
Install Canopy/Move to the Airport
Details
       

 12-08-2012
16.00
Remove Magnetos/Finish Baffle Installation
Details
       

 12-07-2012
0.00
Phil went to McGregor to pickup the scales
Details

 12-02-2012
2.00
Updated Firmware/Calibrated MGL Avionics
Details
       

 12-01-2012
16.00
Riveted Bottom Skin
Details
       

 11-25-2012
8.00
Installed Bottom Tail Skin
Details
       

 11-24-2012
18.00
Engine Sensor reroutes and Engine Start
Details
       

 11-10-2012
0.00
Misc Entry for detail of V6 Radio Standoff
Details
       

 11-07-2012
3.00
Canopy Work
Details
       

 11-04-2012
22.00
Gas Tank/Windshield/Panel
Details
       

 11-03-2012
0.00
Great Southern Sonex Gathering
Details
       

 10-21-2012
14.00
Reinstalled engine
Details
       

 10-20-2012
12.00
Canopy Adjusting/Fitting
Details
       

 10-14-2012
16.00
Canopy, Panel details, wire clean up
Details
       

 10-13-2012
22.00
Canopy, Wheel Pants
Details
       

 10-12-2012
6.00
Canopy Construction
Details
       

 10-07-2012
7.00
Install Trim Knob
Details
       

 10-06-2012
12.00
Interior/Glare Shield
Details
       

 09-30-2012
4.00
PTT
Details
       

 09-29-2012
10.00
Installed Transponder and Comm Radios
Details
       

 09-23-2012
4.00
Engine Oil Leaks / Engine Run up / Avionics
Details
       

 09-22-2012
10.00
Chasing Oil Leaks
Details

 09-21-2012
6.00
Reinstall Panel / Engine Oil Leaks
Details

 09-06-2012
2.00
Put new gaskets in push rod tubes
Details

 08-25-2012
16.00
Plug Wires, RDAC, Engine Start
Details
       

 08-24-2012
2.00
More work on baffels
Details
       

 08-23-2012
8.00
Electrical Wiring
Details
       

 08-19-2012
8.00
Attached Wing Tips
Details
       

 08-18-2012
18.00
Firewall Forward
Details
       

 08-17-2012
8.00
Panel Wiring
Details
       

 08-05-2012
18.00
Oil Filter Lines/Baffeling/Wiring
Details
       

 08-04-2012
20.00
Engine Cowling Fit
Details
       

 07-15-2012
12.00
Installed Comm and Transponder Ant. Installed Tra
Details
       

 07-14-2012
14.00
Engine Baffling, Fiberglass Tips, Main Bus
Details
       

 07-10-2012
4.00
Aerovee Engine Assembly
Details
       

 07-09-2012
6.00
Aerovee Engine Assembly
Details
       

 07-08-2012
10.00
Preparing engine baffling/Laying out Main Bus and
Details
       

 07-07-2012
10.00
Aerovee Engine Build
Details
     

 06-24-2012
12.00
Installed Ground Bar/Installed Panel Switches
Details
       

 06-23-2012
18.00
Finished Riveting Wing Skins/Firewall/Electrical
Details
       

 06-10-2012
6.00
Started to Layout Panel
Details
       

 06-09-2012
6.00
Oil Filter/Oil Chiller Dial-a-Trim
Details
       

 06-03-2012
10.00
Riveted Right Wing
Details

 06-02-2012
16.00
Riveted Wing Skins
Details
       

 05-28-2012
14.00
Mounted Firewall Items
Details
       

 05-20-2012
10.00
Mounted Battery Box and Gascolator on Firewall
Details
       

 05-19-2012
17.00
Installed Landing Light/ Battery Box
Details
       

 05-13-2012
6.00
Finished Left Brake. Packed Wheel Bearings
Details
       

 04-29-2012
12.00
Brakes
Details
       

 04-22-2012
8.00
Attached Ailerons
Details
       

 04-21-2012
18.00
Built Ailerons
Details
       

 04-15-2012
20.00
Finished riveting outboard wings, Flaps
Details
       

 04-14-2012
22.00
Drilled Holes for Wing Fold Lock, Ran Strobe Wirin
Details
       

 04-01-2012
14.00
Deburred and Dimpled Left Wing. Attached Left Win
Details
       

 03-31-2012
22.00
Drilled Outboard Wings / Riveted bottom of Inboard
Details
       

 03-25-2012
4.00
Drilling Outboard Wing Skins
Details
       

 03-24-2012
0.00
No Work
Details

 03-18-2012
10.00
Started Skinning Right Outboard Wing (Middle Panel
Details
     

 03-17-2012
22.00
Inboard Wing deburring and dimpling
Details
       

 03-10-2012
24.00
Skinning Inboard Wings
Details
       

 03-05-2012
0.50

Details
       

 03-04-2012
12.00
Closed up Tail Skin, Drilled Holes for Rudder Cabl
Details
       

 03-03-2012
11.00
Installed Tail Wheel
Details
       

 02-26-2012
12.00
Inboard Wing tip Bolts / Final Attach Empenage
Details
       

 02-19-2012
10.50
Installing Horizontal Stabilizer
Details
     

 02-18-2012
22.00
Inboard Wings and rear wing spar
Details
       

 02-17-2012
13.00
Wheels and Brakes. Laying out inboard ribs and gu
Details
       

 02-16-2012
5.00
Wheel pant attach plates, wheel spacers
Details
       

 02-12-2012
10.00
Installed Main Wing Spar and Yoke
       

 02-11-2012
14.00
Attached Main Gear and Rudder Pedals
Details
       

 11-28-2011
0.10
test date
     

 11-27-2011
16.00
Put Together Forward and Aft Fuselage
       

 11-26-2011
20.00
Constructed and Riveted Outboard Wing Skeletons
       

 11-25-2011
14.00
Ailerons
       

 11-24-2011
6.00
Polish/Debur Pre Machined Parts

 11-23-2011
10.00
Polishing, Construction on Flaps

 11-22-2011
12.00
Polishing, Empenage Fiberglass Tips
 

 11-21-2011
21.00
Empenage, Called Sonex to determine wrong parts

 11-20-2011
8.00
Deburred, Polished Skin, Bolted in Back Spar, Rive
       

 11-19-2011
17.00
Layed out HS, Bent Stiffners, Updrilled holes, De
       

 11-18-2011
8.00
Unpacked and Inventoried Kit
       

 11-18-2011
16.00
Layed out Vertical Stabilizer
       

 11-16-2011
0.00
Picking Up Kit at Conway Terminal
Details
       

 07-19-2011
0.10
Picture of Onex at the factory
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.