Date
|
Hours
|
Work Log Summary
|
Details
|
03-07-2013
|
9.00
|
Canopy frame, fitted, trimmed, and assembled
|
Details
|
|
|
03-07-2013
|
2.50
|
Canopy frame fit, canopy bubble fit, R wing moved
|
Details
|
|
|
03-05-2013
|
9.00
|
Canopy frame assembly, corrosion treated
|
Details
|
|
|
03-04-2013
|
7.00
|
Canopy frame, panel, shroud and canopy work
|
Details
|
|
|
03-01-2013
|
7.50
|
right wing riveting, skins - surface prep
|
Details
|
|
|
02-28-2013
|
7.00
|
R wing riveting, priming, tip heat shielding.
|
Details
|
|
|
02-27-2013
|
10.50
|
R wing riveting
|
Details
|
|
|
02-26-2013
|
9.00
|
Rivet work R wing, loading of left wing and parts
|
Details
|
|
|
02-25-2013
|
8.00
|
Complete L wing masked, rivet work R wing
|
Details
|
|
|
02-22-2013
|
9.00
|
Masking and prep of left wing for paint, right win
|
Details
|
|
|
02-21-2013
|
10.00
|
L wing prep, vent breathers made up, root fairings
|
Details
|
|
|
02-20-2013
|
11.50
|
Lwing prepped for paint, sender safetied, tank fin
|
Details
|
|
|
02-19-2013
|
10.00
|
R wing, tip marked and drilled, tank finalized
|
Details
|
|
|
02-18-2013
|
8.50
|
R wing surfaces installed, pitot finished and fitt
|
Details
|
|
|
02-15-2013
|
9.50
|
R wing tip work, workshop clean up
|
Details
|
|
|
02-14-2013
|
12.00
|
Continued work on the Right wing tip, remedy on th
|
Details
|
|
|
02-13-2013
|
11.50
|
Work begun on finalizing Right wing....
|
Details
|
|
|
01-31-2013
|
8.50
|
Right wing tip light installtion, priming and stri
|
Details
|
|
|
01-30-2013
|
8.50
|
Right wing tip, fitting and tip light installation
|
Details
|
|
|
01-29-2013
|
8.50
|
Began work on the Right wing tip....
|
Details
|
|
|
01-25-2013
|
10.00
|
platenuts instlled in L tip and tip finalized cont
|
Details
|
|
|
01-24-2013
|
9.50
|
Finalized wing tip left wing - redo and adjustment
|
Details
|
|
|
01-23-2013
|
12.50
|
Finalized wing tip installtion left wing
|
Details
|
|
|
01-22-2013
|
10.00
|
Installation of platenuts into tips more fitting
|
Details
|
|
|
01-18-2013
|
10.50
|
make-up, fitting and glueing of strips to tips
|
Details
|
|
|
01-17-2013
|
12.00
|
Final drilling, deburring and dimpling of the wing
|
Details
|
|
|
01-16-2013
|
12.00
|
Match-drilling tip and installed tip rib
|
Details
|
|
|
01-15-2013
|
11.00
|
Match drilling and fit adjustments
|
Details
|
|
|
01-11-2013
|
5.50
|
First fit of wing tip - left wing
|
Details
|
|
|
01-10-2013
|
8.50
|
continued Tip fitment and finalized aileron alignm
|
Details
|
|
|
01-08-2013
|
9.50
|
Continued left wing aileron alignm,ent and tip fit
|
Details
|
|
|
01-07-2013
|
8.00
|
Left wing wing tip fitment and aileron alignment
|
Details
|
|
|
01-04-2013
|
8.00
|
Cabin misc and wire routing, drive to collect pane
|
Details
|
|
|
01-03-2013
|
9.00
|
Wing finishing - back into cabin panel mounts and
|
Details
|
|
|
01-02-2013
|
7.00
|
back at work, wing finishing
|
Details
|
|
|
12-20-2012
|
8.50
|
Avionics fitted and began sorting for installation
|
Details
|
|
|
12-19-2012
|
8.00
|
Wing skin finishing, tip template made and fitted
|
Details
|
|
|
12-18-2012
|
8.50
|
Wing tip repair, fitting and trim...finished skin
|
Details
|
|
|
12-15-2012
|
4.00
|
Some weekend work on fitting the tip....
|
Details
|
|
|
12-14-2012
|
9.00
|
Aileron and flap line up and install & tip install
|
Details
|
|
|
12-13-2012
|
9.50
|
lining up of aileron and flap on Right wing......
|
Details
|
|
|
12-12-2012
|
9.50
|
Fitted flap and aileron and set up to line up for
|
Details
|
|
|
12-11-2012
|
9.00
|
Carried on riveting - Right wing skin almost done.
|
Details
|
|
|
12-10-2012
|
7.00
|
Continued wing skin riveting
|
Details
|
|
|
12-07-2012
|
9.00
|
Clean and wrap painted parts, wing skin riveting..
|
Details
|
|
|
12-06-2012
|
9.00
|
Continued RW re-skinning...collected contrl surfac
|
Details
|
|
|
12-05-2012
|
8.50
|
RW - Conduit final installed wing skin re riveted.
|
Details
|
|
|
12-04-2012
|
9.00
|
Right wing repair cont.....delivery of metal to cu
|
Details
|
|
|
12-03-2012
|
7.00
|
Right wing continued - repair of snapped conduit..
|
Details
|
|
|
11-30-2012
|
9.00
|
Right wing skin continued....panel artwork emailed
|
Details
|
|
|
11-29-2012
|
9.50
|
Continued riveting of R wing, panel lasercutting p
|
Details
|
|
|
11-28-2012
|
8.50
|
Continued rivet work on Right wing.....
|
Details
|
|
|
11-27-2012
|
9.00
|
Finished off the tips for good, wing skin riveting
|
Details
|
|
|
11-26-2012
|
7.50
|
finalized these tips - reinforcing glassed in, gla
|
Details
|
|
|
11-23-2012
|
8.50
|
Wing tips reinforcing and glassing...
|
Details
|
|
|
11-22-2012
|
8.50
|
Continued tips reinforcing and glassing
|
Details
|
|
|
11-21-2012
|
8.50
|
Strips bonded in, glassing begun
|
Details
|
|
|
11-20-2012
|
9.00
|
Wing tip reinforcing
|
Details
|
|
|
11-19-2012
|
8.00
|
continued wing skin finishing,
|
Details
|
|
|
11-16-2012
|
7.50
|
Wing filled and finished, wing tip reinforcing
|
Details
|
|
|
11-15-2012
|
9.00
|
LW - wingtips, finishing, RW - riveting....
|
Details
|
|
|
11-14-2012
|
8.00
|
Wingtips - LW finishing, RW riveting
|
Details
|
|
|
11-13-2012
|
8.50
|
LW wingtip, more prep and finish, cradle adjstd...
|
Details
|
|
|
11-09-2012
|
8.50
|
LW finishing and prep
|
Details
|
|
|
11-08-2012
|
10.50
|
finalized LW to be ready for tomorrow...wkshp work
|
Details
|
|
|
11-06-2012
|
9.50
|
LW - more riveting
|
Details
|
|
|
11-05-2012
|
8.00
|
LW - Riveting continued
|
Details
|
|
|
11-01-2012
|
10.00
|
More riveting, lamp assembly, RW tank cover plate
|
Details
|
|
|
10-31-2012
|
9.00
|
riveting, worked on tip lamps....
|
Details
|
|
|
10-30-2012
|
9.00
|
RW Continued riveting...
|
Details
|
|
|
10-29-2012
|
7.00
|
continued riveting, colelction of part (failed)
|
Details
|
|
|
10-26-2012
|
8.50
|
riveting and final install of conduit and wire rou
|
Details
|
|
|
10-25-2012
|
9.00
|
Prep and prime of LW skin, cut conduit, sourced to
|
Details
|
|
|
10-23-2012
|
9.50
|
LW skin prep, tool search, pulled out conduit...
|
Details
|
|
|
10-22-2012
|
7.00
|
LW skin prep and match drill, drilled out LW rivet
|
Details
|
|
|
10-19-2012
|
9.50
|
RW skin riveting,
|
Details
|
|
|
10-18-2012
|
8.50
|
LW skin prep, more RW skin riveting, final work on
|
Details
|
|
|
10-17-2012
|
8.50
|
Installation of pitot plumbing, prep of new skin,
|
Details
|
|
|
10-16-2012
|
9.00
|
LW new conduit, skin riveting, practice riveting
|
Details
|
|
|
10-15-2012
|
8.00
|
repair of conduit intsectn, skin riveting, cabin f
|
Details
|
|
|
10-12-2012
|
9.00
|
LW fuel cap, tank pressure test, conduit intrsectn
|
Details
|
|
|
10-11-2012
|
10.00
|
RW wing tank finalized, fuel cap installed
|
Details
|
|
|
10-10-2012
|
9.00
|
RW..resecured the conduit,
|
Details
|
|
|
10-09-2012
|
8.50
|
RW.. servo adjst, platenuts and skin installation.
|
Details
|
|
|
10-08-2012
|
6.50
|
RW.. refitted the tank and installtion of servo as
|
Details
|
|
|
10-04-2012
|
10.00
|
Strpped the wing LE to fix the sheared bolt....
|
Details
|
|
|
10-03-2012
|
9.50
|
Roll servo installation....
|
Details
|
|
|
10-02-2012
|
9.00
|
Finalized and prep RHS wing for buttoning up
|
Details
|
|
|
10-01-2012
|
9.00
|
Complete removal of LHS wing skin,
|
Details
|
|
|
09-28-2012
|
9.00
|
Priming of skins and internals,
|
Details
|
|
|
09-27-2012
|
9.50
|
...cont wing skin riveting
|
Details
|
|
|
09-26-2012
|
9.00
|
...cont wing skin riveting
|
Details
|
|
|
09-25-2012
|
9.50
|
...cont wing skin riveting
|
Details
|
|
|
09-21-2012
|
9.00
|
Began riveting wing skins and wing finalization
|
Details
|
|
|
09-20-2012
|
9.00
|
Pitot system made up and installed, Left wing retr
|
Details
|
|
|
09-19-2012
|
9.00
|
R Wing tip, all landing light mounts made up, tip
|
Details
|
|
|
09-18-2012
|
9.00
|
Wing finalizing, wing tip and lights - Right
|
Details
|
|
|
09-17-2012
|
8.50
|
retro work to finalize wings - right wing.
|
Details
|
|
|
09-14-2012
|
8.00
|
finalized and packed emp for paint, finishing of p
|
Details
|
|
|
09-13-2012
|
9.00
|
Finalized all fg work on empennage....
|
Details
|
|
|
09-12-2012
|
9.50
|
...finishing up of fiberglass work, Elevator horns
|
Details
|
|
|
09-11-2012
|
7.00
|
...continued finishing of fiberglass - V-stab plat
|
Details
|
|
|
09-10-2012
|
8.00
|
...continued fiberglass finishing on emp....
|
Details
|
|
|
09-07-2012
|
9.00
|
Empennage covers, fairing and fg finishing cont
|
Details
|
|
|
09-06-2012
|
7.00
|
finishing all fitings on emp, more sanding, stab n
|
Details
|
|
|
09-05-2012
|
9.00
|
Stab finalized, emp fairing finalized, stab covers
|
Details
|
|
|
09-04-2012
|
8.50
|
continued finishing and removal of emp assembly
|
Details
|
|
|
09-03-2012
|
8.50
|
trying to finish this fiberglass work...
|
Details
|
|
|
09-01-2012
|
2.50
|
finish up (plastics) for Monday
|
Details
|
|
|
08-31-2012
|
9.50
|
empennage plastics finishing cont..
|
Details
|
|
|
08-30-2012
|
9.00
|
Left tips installed, trailing edges filled up more
|
Details
|
|
|
08-29-2012
|
9.50
|
cont fiberglass work, tips riveted
|
Details
|
|
|
08-28-2012
|
9.00
|
Fiberglass work and match drilled stops in place
|
Details
|
|
|
08-27-2012
|
8.50
|
Fiberglass work (emp) and rudder stops
|
Details
|
|
|
08-24-2012
|
9.00
|
Piot final ass, finishing and fit. SP6 Tray bracke
|
Details
|
|
|
08-23-2012
|
9.00
|
Pitot assembly, wings moved in, tips glassed
|
Details
|
|
|
08-22-2012
|
5.00
|
Piot and mast assembly compltd and access plate fa
|
Details
|
|
|
08-21-2012
|
9.50
|
Servo rod redo and fit, stab tips and elvator tips
|
Details
|
|
|
08-20-2012
|
6.50
|
Supplies, Finalized the compass tray,
|
Details
|
|
|
08-17-2012
|
9.50
|
SP7 brckt fabricated, fitted..Pitch srvo instlled
|
Details
|
|
|
08-16-2012
|
9.50
|
workshop repacked
|
Details
|
|
|
08-15-2012
|
9.00
|
workshop, AHRS bracket, AP servo arm and bellcrank
|
Details
|
|
|
08-14-2012
|
10.00
|
Compas bracket, SP-7 new bracket and fit
|
Details
|
|
|
08-13-2012
|
9.50
|
servo brckt brace, compass re fitted, bracket adju
|
Details
|
|
|
08-03-2012
|
9.00
|
finalised servo installation, compass bracket fitt
|
Details
|
|
|
08-02-2012
|
10.50
|
Avionics installation, painting
|
Details
|
|
|
08-01-2012
|
9.00
|
Rear window fit, Pitch servo mounting design and f
|
Details
|
|
|
07-31-2012
|
9.50
|
Frame spacers fabricated, frame fitted, painting
|
Details
|
|
|
07-30-2012
|
7.50
|
Protective edging, shroud and frame adjustment and
|
Details
|
|
|
07-27-2012
|
9.00
|
Devices reinstalled, new cable bracket created and
|
Details
|
|
|
07-26-2012
|
9.50
|
Taping and assembly of frame parts and latch.
|
Details
|
|
|
07-25-2012
|
9.00
|
Painting - jettison pins refined - panel flanges t
|
Details
|
|
|
07-24-2012
|
9.00
|
Canopy masked, fitted, Painted all canopy frame pa
|
Details
|
|
|
07-23-2012
|
9.00
|
Hinges drilled, rear glass marked
|
Details
|
|
|
07-20-2012
|
8.50
|
Big cut! canopy cut and edged,
|
Details
|
|
|
07-19-2012
|
9.50
|
Supplies, bubble trimmed and polishing
|
Details
|
|
|
07-18-2012
|
9.00
|
Wing tip lights, rudder cable fairings, gear spats
|
Details
|
|
|
07-17-2012
|
8.00
|
Bubble prepped for cut, ears trimmed, misc outstan
|
Details
|
|
|
07-16-2012
|
9.00
|
Design ribs, canopy spacers,
|
Details
|
|
|
07-13-2012
|
8.00
|
Supplise, frame final fit, marked hinges to drill
|
Details
|
|
|
07-12-2012
|
11.50
|
Gear leg spats, shroud re-fitted, ribs removed....
|
Details
|
|
|
07-11-2012
|
9.50
|
Rib stiffeners made up,
|
Details
|
|
|
07-10-2012
|
9.00
|
Shroud skin prepped,first panel rib repair
|
Details
|
|
|
07-06-2012
|
6.50
|
Shroud frame parts made up, frame assembled
|
Details
|
|
|
07-05-2012
|
9.50
|
Canopy frame fabrication and assmbly, shroud final
|
Details
|
|
|
07-04-2012
|
9.00
|
Cabin interior fittings, panel brackets modified,
|
Details
|
|
|
07-03-2012
|
9.00
|
Gas struts, canopy frame, interior fittings
|
Details
|
|
|
07-02-2012
|
8.50
|
Jettison mech. re-installed, Canopy latch final in
|
Details
|
|
|
06-29-2012
|
9.00
|
jettison assembly mod, final coat on painted parts
|
Details
|
|
|
06-28-2012
|
9.50
|
Canopy jettison, canopy frame, clocked jettison ar
|
Details
|
|
|
06-27-2012
|
9.50
|
Canopy frame, Parts prep&prime, Static bracket add
|
Details
|
|
|
06-26-2012
|
8.50
|
proper installation of latch, prep and prime of pa
|
Details
|
|
|
06-25-2012
|
8.00
|
cut slot, latch mech. assembly installed
|
Details
|
|
|
06-22-2012
|
9.00
|
Canopy latch begun, slotted the fuz wall
|
Details
|
|
|
06-21-2012
|
10.50
|
Deck to shroud fitting, hinge drilling,
|
Details
|
|
|
06-20-2012
|
10.00
|
Finalized all the deck fittings and installations,
|
Details
|
|
|
06-19-2012
|
9.00
|
Static sytem complete redo
|
Details
|
|
|
06-18-2012
|
8.00
|
Finalization of static system inside the fuselage,
|
Details
|
|
|
06-15-2012
|
9.00
|
Static system make up then installation
|
Details
|
|
|
06-14-2012
|
10.00
|
Additional panel brackets, replaced bad rivets on
|
Details
|
|
|
06-13-2012
|
9.50
|
Deck rivets set, panel final installed with attach
|
Details
|
|
|
06-12-2012
|
9.00
|
Right side vent ass installed, deck rivets set
|
Details
|
|
|
06-08-2012
|
9.00
|
L Vent installed, vent brackets made up,
|
Details
|
|
|
06-07-2012
|
9.50
|
panel primed and fitted, vent brackets made up, de
|
Details
|
|
|
06-06-2012
|
9.50
|
F-703B bracket finalized and installed, vent brack
|
Details
|
|
|
06-05-2012
|
8.50
|
panel brackets completed, F703B and panel finalize
|
Details
|
|
|
06-04-2012
|
8.50
|
panel brackets, cleaned up cabin, covers in cabin
|
Details
|
|
|
06-01-2012
|
9.00
|
Panel rib final riveted, jettison machanism fixed.
|
Details
|
|
|
05-31-2012
|
10.00
|
trimmed and drilled the front deck skin, canopy re
|
Details
|
|
|
05-30-2012
|
9.50
|
RH panel rib trimmed and stiffener fabricated, map
|
Details
|
|
|
05-29-2012
|
8.50
|
Continued closing up the map box, panel rib marked
|
Details
|
|
|
05-28-2012
|
7.50
|
Map box final trim and construction,
|
Details
|
|
|
05-25-2012
|
9.00
|
riveting of deck, canopy ribs
|
Details
|
|
|
05-23-2012
|
8.50
|
canopy frame made up, final riveting and completio
|
Details
|
|
|
05-22-2012
|
9.00
|
canopy release handle installed, hinge bloack spac
|
Details
|
|
|
05-21-2012
|
8.00
|
Continued hinge blocks, release mech. installation
|
Details
|
|
|
05-18-2012
|
9.00
|
canopy release mechanism, hinge blocks
|
Details
|
|
|
05-17-2012
|
9.00
|
Assembly of full canopy frame, shroud drilling, hi
|
Details
|
|
|
05-16-2012
|
9.00
|
Map box continued, jettison mechanism assembled
|
Details
|
|
|
05-15-2012
|
8.00
|
Canopy shroud disassembly and prime
|
Details
|
|
|
05-14-2012
|
8.50
|
canopy shroud braces, parts fabrication, prep for
|
Details
|
|
|
05-11-2012
|
9.50
|
canopy shroud, fitment to deck and panel ribs
|
Details
|
|
|
05-10-2012
|
9.50
|
Continued the canopy braces, canopy shroud assembl
|
Details
|
|
|
05-09-2012
|
10.00
|
Designed and made a tool for edge forming, finaliz
|
Details
|
|
|
05-08-2012
|
9.00
|
Control bracket finalized and installed, canopy br
|
Details
|
|
|
05-04-2012
|
9.50
|
Final control cable face,
|
Details
|
|
|
05-03-2012
|
9.50
|
Supply shopping, new bracket made up and installed
|
Details
|
|
|
05-02-2012
|
9.50
|
cable bracket redo,
|
Details
|
|
|
05-01-2012
|
6.50
|
Cable brackets and installation of cables and brac
|
Details
|
|
|
04-27-2012
|
8.00
|
Front deck assemb. panel installed, brackets desig
|
Details
|
|
|
04-26-2012
|
9.50
|
front deck install, cable brackets and cables
|
Details
|
|
|
04-25-2012
|
9.00
|
Continued bleeding and eventual completion of brak
|
Details
|
|
|
04-24-2012
|
9.50
|
bought supplies to bleed brakes
|
Details
|
|
|
04-23-2012
|
9.50
|
brake system bleed, leak repair
|
Details
|
|
|
04-20-2012
|
9.00
|
Continued front deck install, brakes bled,
|
Details
|
|
|
04-19-2012
|
10.00
|
Finalized the front deck and fittings.....
|
Details
|
|
|
04-18-2012
|
10.00
|
Front upper deck riveting and fitting fabrication
|
Details
|
|
|
04-17-2012
|
9.00
|
Final assembly of front deck structure...
|
Details
|
|
|
03-29-2012
|
11.00
|
Interior design, cotter pin, interior painting
|
Details
|
|
|
03-28-2012
|
10.00
|
finalized second brakes installation, inside of ca
|
Details
|
|
|
03-27-2012
|
7.50
|
Brakes installation redo
|
Details
|
|
|
03-26-2012
|
9.00
|
Finalized Brake system but had to redo
|
Details
|
|
|
03-23-2012
|
8.00
|
Brake callipers and external lines assembly
|
Details
|
|
|
03-15-2012
|
11.00
|
Overhead brake system, rudder fairings
|
Details
|
|
|
03-14-2012
|
10.00
|
final check of new brake system, empennage fairing
|
Details
|
|
|
03-13-2012
|
10.00
|
Continued checking of the brake system and repair
|
Details
|
|
|
03-12-2012
|
9.00
|
Sanding down of cured tips, started repair of brak
|
Details
|
|
|
03-09-2012
|
10.00
|
Boost pump cover final installation and unit final
|
Details
|
|
|
03-08-2012
|
11.00
|
Final installation of the fuel system lines and pu
|
Details
|
|
|
03-07-2012
|
11.50
|
Installation of the boost pump in the cabin, pump
|
Details
|
|
|
03-06-2012
|
10.00
|
Started the boost pump assembly and installation
|
Details
|
|
|
03-05-2012
|
8.00
|
Redo of some of the cast firberglass
|
Details
|
|
|
03-02-2012
|
9.50
|
Filling and casting the tips,
|
Details
|
|
|
02-29-2012
|
11.50
|
Resin filling, matching stab to elevator tips, and
|
Details
|
|
|
02-28-2012
|
10.00
|
trimming, fitting and installing the elevator tips
|
Details
|
|
|
02-24-2012
|
10.00
|
H-stab tip completed, R stab tip redone,
|
Details
|
|
|
02-22-2012
|
10.50
|
Stab and elevator tips continued, Rudder base tip
|
Details
|
|
|
02-21-2012
|
9.50
|
Fiberglass practice, fin tip, started stab tips
|
Details
|
|
|
02-20-2012
|
9.00
|
Started with the fiberglass fittings, dissassembly
|
Details
|
|
|
02-17-2012
|
8.50
|
Finalized heatX installation, Fuel line penetratio
|
Details
|
|
|
02-16-2012
|
10.00
|
Meetings, design and firewall forward installation
|
Details
|
|
|
02-15-2012
|
10.00
|
deburred and filed firewall holes, opened and repo
|
Details
|
|
|
02-14-2012
|
9.00
|
Firewall drilled today!! battery box holes cut too
|
Details
|
|
|
02-13-2012
|
9.00
|
Reworked the seat back supports, installled the he
|
Details
|
|
|
02-10-2012
|
9.50
|
Completed the battery box, more cabin riveting,eng
|
Details
|
|
|
02-09-2012
|
9.50
|
Sealing of belly, Battery box adjustment, heat shu
|
Details
|
|
|
02-08-2012
|
9.50
|
Completed, mounted the battery box, cabin riveting
|
Details
|
|
|
02-07-2012
|
8.50
|
More battery box, Boost pump housing
|
Details
|
|
|
02-06-2012
|
9.00
|
Built a platform and began assembly of boost pump.
|
Details
|
|
|
02-03-2012
|
8.00
|
Firewall installations,
|
Details
|
|
|
02-02-2012
|
11.00
|
Gear installed!! More firewall installations
|
Details
|
|
|
02-01-2012
|
9.00
|
Fixed attach brackets, panel reinstall, interior c
|
Details
|
|
|
01-27-2012
|
8.50
|
research, bellcrank + pushrod, cabin interior
|
Details
|
|
|
01-26-2012
|
9.50
|
Firewall revisited, stripping and ducts
|
Details
|
|
|
01-25-2012
|
9.00
|
Cabin air vents and ducts assembled and installed.
|
Details
|
|
|
01-24-2012
|
9.00
|
Flap system clean up and re-install...
|
Details
|
|
|
01-23-2012
|
4.50
|
Half-day, seats installed and harnesses installed.
|
Details
|
|
|
01-20-2012
|
9.50
|
Final seraled up the firewall and recess and...
|
Details
|
|
|
01-19-2012
|
10.00
|
right side of firewall was bonded and sealed and l
|
Details
|
|
|
01-18-2012
|
9.00
|
Removed and cleaned and replaced major assemblies
|
Details
|
|
|
01-17-2012
|
9.00
|
continued Retrospective work begun with stripping
|
Details
|
|
|
01-16-2012
|
8.00
|
Return to work after a month long holiday. re-read
|
Details
|
|
|
12-15-2011
|
12.00
|
fitted the canopy bubble and re marked and located
|
Details
|
|
|
12-14-2011
|
11.00
|
some more forward deck riveting, a little more san
|
Details
|
|
|
12-13-2011
|
10.00
|
completed the empennage fairing finally
|
Details
|
|
|
12-12-2011
|
11.00
|
Forward deck final dissasembly and re installation
|
Details
|
|
|
12-09-2011
|
10.50
|
Worked on all glass tips and fairings
|
Details
|
|
|
12-08-2011
|
5.00
|
Empennage fairing final fit and drill!
|
Details
|
|
|
12-07-2011
|
10.00
|
ready to mount the first hinge blocks and vebnt sy
|
Details
|
|
|
12-06-2011
|
11.00
|
Tip up to forward deck hinge points and attachment
|
Details
|
|
|
12-05-2011
|
8.00
|
Forward deck skinnning and full assembly
|
Details
|
|
|
12-02-2011
|
10.00
|
Cabin forwared deck and panel modifications
|
Details
|
|
|
12-01-2011
|
5.00
|
Panel deck mods and revised structure
|
Details
|
|
|
11-30-2011
|
4.00
|
map box completed
|
Details
|
|
|
11-29-2011
|
8.00
|
Firewall drilling and locations.
|
Details
|
|
|
11-28-2011
|
6.00
|
More work to fix the map box, Half the day spent o
|
Details
|
|
|
11-25-2011
|
10.00
|
Map box mod, match drilling the deck structure and
|
Details
|
|
|
11-24-2011
|
11.00
|
Changes made to the drawings and designs, boost pu
|
Details
|
|
|
11-23-2011
|
12.50
|
Researchd and designed a final layout
|
Details
|
|
|
11-22-2011
|
10.50
|
Panel layout researched and tried, Visited fellow
|
Details
|
|
|
11-21-2011
|
10.00
|
Re-installed empenage, Panel research and template
|
Details
|
|
|
11-18-2011
|
10.00
|
Empennage finalized
|
Details
|
|
|
11-17-2011
|
10.50
|
Empennage fairing
|
Details
|
|
|
11-16-2011
|
9.00
|
Drove out to Rand and JHB to source the fuel line
|
Details
|
|
|
11-15-2011
|
10.00
|
Continued retro work
|
Details
|
|
|
11-11-2011
|
10.00
|
Continued with empenage and work outlined in Thurs
|
Details
|
|
|
11-10-2011
|
10.50
|
Continued work on retro steps, empennage, fairings
|
Details
|
|
|
11-09-2011
|
7.50
|
return to first outstanding work to work my way ba
|
Details
|
|
|
11-08-2011
|
10.00
|
redo of the fuel lines system...drive for parts an
|
Details
|
|
|
11-07-2011
|
10.00
|
Installation of new fuel lines and plumbing
|
Details
|
|
|
11-04-2011
|
9.00
|
Fuel lines replacement, and make up
|
Details
|
|
|
11-03-2011
|
9.50
|
Fwd deck continued, panel layout research, fuel li
|
Details
|
|
|
11-02-2011
|
10.00
|
More panel research and discussion, final fit and
|
Details
|
|
|
11-01-2011
|
10.00
|
Prime of forward deck parts
|
Details
|
|
|
10-28-2011
|
10.50
|
Canopy frame screws, parts prep
|
Details
|
|
|
10-27-2011
|
9.50
|
More struggle with screws and asembly of front dec
|
Details
|
|
|
10-26-2011
|
9.00
|
Aft cabin skin fitted and drilled to the cabin fra
|
Details
|
|
|
10-25-2011
|
9.50
|
Panel design made up and more parts fab
|
Details
|
|
|
10-24-2011
|
7.00
|
Canopy frame area finished painted
|
Details
|
|
|
10-21-2011
|
10.00
|
Cabin frame area painted, Canopy frame assembled
|
Details
|
|
|
10-20-2011
|
10.00
|
Panel research and templates and mockups created.
|
Details
|
|
|
10-19-2011
|
7.50
|
Assembly and prep of parts for the forward deck an
|
Details
|
|
|
10-18-2011
|
9.00
|
fitted the final canopy frame and all associted sh
|
Details
|
|
|
10-17-2011
|
10.00
|
Began dry fit and assembly of the canopy framework
|
Details
|
|
|
10-14-2011
|
9.50
|
Fabricated the new shims for the canopy frame asse
|
Details
|
|
|
10-13-2011
|
10.50
|
After consultation with Gus at Vans (Wed) I measur
|
|
|
|
10-12-2011
|
6.50
|
Re fabricated new brackets L and R - not drilled
|
|
|
|
10-11-2011
|
10.00
|
Discussed a solution with Willem for the mistakes
|
|
|
|
10-10-2011
|
9.00
|
Manufactured shims for outside brackets on canopy
|
|
|
|
10-07-2011
|
10.00
|
Drilling of fitted canopy frame and canopy test fi
|
|
|
|
10-06-2011
|
10.00
|
Re assembly and final fit of painted cabin frame a
|
|
|
|
10-05-2011
|
8.00
|
Painting of first and some final coats fo rear cab
|
|
|
|
10-04-2011
|
11.00
|
paints, abrasives and other supplies bought - spen
|
|
|
|
10-03-2011
|
9.00
|
Prep of rear cabin assembly parts for paint
|
|
|
|
09-30-2011
|
10.00
|
final fit for drilling of final assembly to cabin
|
|
|
|
09-29-2011
|
10.50
|
Frame fix and panel beating
|
|
|
|
09-28-2011
|
7.15
|
Canopy frame stripped and re assembled
|
|
|
|
09-27-2011
|
10.00
|
Research and help sought on canopy frame issues, m
|
|
|
|
09-26-2011
|
10.00
|
Canopy frame 3rd test fit - problems with fit and
|
|
|
|
09-23-2011
|
10.10
|
Canopy frame fabrication and fit of new parts
|
|
|
|
09-22-2011
|
10.90
|
canopy frame parts fabricated and mistakes re-fabr
|
|
|
|
09-21-2011
|
8.00
|
canopy frame assembly and 1st dry fit to cabin
|
|
|
|
09-20-2011
|
10.00
|
cabin frame fabricationand test fit of parts
|
|
|
|
09-19-2011
|
9.00
|
Begun work on the cabin frame. Cable ties used to
|
|
|
|
09-09-2011
|
9.50
|
Description pending
|
|
|
|
09-08-2011
|
10.00
|
Description pending
|
|
|
|
09-07-2011
|
12.00
|
Description pending
|
|
|
|
09-06-2011
|
10.50
|
Description pending
|
|
|
|
09-05-2011
|
10.00
|
Description pending
|
|
|
|
09-02-2011
|
10.50
|
Description pending
|
|
|
|
09-01-2011
|
12.50
|
Description pending
|
|
|
|
08-31-2011
|
13.00
|
Description pending
|
|
|
|
08-29-2011
|
5.00
|
Description pending- halfday, sick
|
|
|
|
08-25-2011
|
11.00
|
Description pending
|
|
|
|
08-24-2011
|
10.00
|
Description pending
|
|
|
|
08-24-2011
|
11.00
|
Description pending
|
|
|
|
08-23-2011
|
0.00
|
Description pending
|
|
|
|
08-22-2011
|
10.00
|
Cabin re-fit and Armrest mods
|
Details
|
|
|
08-18-2011
|
10.50
|
Description pending
|
|
|
|
08-17-2011
|
10.50
|
Description pending
|
|
|
|
08-16-2011
|
10.50
|
Description pending
|
|
|
|
08-15-2011
|
10.50
|
Description pending
|
|
|
|
08-12-2011
|
10.00
|
Prep, prime and 1st base coat cabin and parts.
|
Details
|
|
|
08-11-2011
|
11.00
|
Description pending
|
|
|
|
08-10-2011
|
11.00
|
Description pending
|
|
|
|
08-09-2011
|
0.00
|
Description pending
|
|
|
|
08-05-2011
|
9.50
|
Description pending
|
|
|
|
08-04-2011
|
10.00
|
Description pending
|
|
|
|
08-03-2011
|
10.00
|
Description pending
|
|
|
|
08-02-2011
|
10.00
|
Description pending
|
|
|
|
08-01-2011
|
10.00
|
Description pending
|
|
|
|
07-29-2011
|
9.00
|
Description pending
|
|
|
|
07-28-2011
|
10.00
|
Description pending
|
|
|
|
07-27-2011
|
10.00
|
Description pending
|
|
|
|
07-26-2011
|
10.00
|
Description pending
|
|
|
|
07-25-2011
|
10.00
|
Description pending
|
|
|
|
07-22-2011
|
10.00
|
Pushrods final install, V-stab match drilled to mo
|
|
|
|
07-21-2011
|
10.50
|
Dry fit of V-Stab and first fit of glass empennage
|
|
|
|
07-20-2011
|
10.50
|
Mass Prep of various small parts for priming
|
|
|
|
07-19-2011
|
10.00
|
V-Stab mounting plates and spacers fabricated and
|
|
|
|
07-18-2011
|
10.00
|
Elevator pushrods parts made up and prepped and pr
|
|
|
|
07-15-2011
|
10.00
|
Stab remounted and incidence set final
|
|
|
|
07-14-2011
|
9.50
|
H-Stab mount rivets removed and replaced
|
|
|
|
07-13-2011
|
10.00
|
H-Stab mount problem worked on again - solution fo
|
|
|
|
07-11-2011
|
10.00
|
Stab re-fit and trimmed
|
|
|
|
07-08-2011
|
11.00
|
Stab mounting problem corrective work begun
|
|
|
|
07-07-2011
|
10.50
|
H-stab drilled to mount – PROBLEM!!
|
Details
|
|
|
07-06-2011
|
12.00
|
H-stab fitting - fabrication of new angle on the m
|
|
|
|
07-05-2011
|
9.50
|
H.Stab drilled to fuz
|
|
|
|
07-04-2011
|
10.00
|
H.Stab- First fit and measure, holes marked
|
|
|
|
07-01-2011
|
10.50
|
Stab bracket Fabrication and test fit on fuz
|
|
|
|
06-30-2011
|
12.00
|
Empennage Brackets and shims fabricated
|
|
|
|
06-29-2011
|
10.00
|
Wing root bottom skin final drilled
|
|
|
|
06-23-2011
|
9.50
|
no description offered
|
|
|
|
06-22-2011
|
8.00
|
no descript recorded
|
|
|
|
06-21-2011
|
10.00
|
No description recorded
|
|
|
|
06-20-2011
|
10.00
|
Wing root bottom skin final drilled
|
|
|
|
06-17-2011
|
5.00
|
Wing root fairings nutplates installed, fairings s
|
|
|
|
06-15-2011
|
10.00
|
Wing root fairings sanded, primed, dimpled and com
|
|
|
|
06-14-2011
|
10.00
|
Continued work on wing roots and fuz attach points
|
|
|
|
06-13-2011
|
9.00
|
Wing holes dimples, fuz wing off work
|
|
|
|
06-10-2011
|
10.00
|
aileron travel adjusted and linkages assembled, bo
|
|
|
|
06-09-2011
|
9.50
|
Baggage floor replaced
|
Details
|
|
|
06-08-2011
|
8.00
|
Inventory of FFW kit and extras …all accounted for
|
|
|
|
06-07-2011
|
10.00
|
Control column install to aileron linkage - Left w
|
|
|
|
06-06-2011
|
10.00
|
Wing tank attach brackets install,
|
|
|
|
06-03-2011
|
10.00
|
Wing root fairing rubbers fitted and trimmed, fair
|
|
|
|
05-20-2011
|
10.00
|
Holes cut then enlarged for flap pushrods
|
|
|
|
05-19-2011
|
10.00
|
Continued work on Flaps and flap system
|
|
|
|
05-18-2011
|
3.00
|
Flaps installed and flap system connected
|
|
|
|
05-17-2011
|
11.00
|
Wing root fairings re-fitted and match-drilled
|
|
|
|
05-16-2011
|
8.00
|
various fitting with wings installed
|
Details
|
|
|
05-13-2011
|
10.50
|
Both wings fitted and drilled for incidence
|
|
|
|
05-12-2011
|
11.00
|
continued measuring and alignment of wings and inc
|
|
|
|
05-11-2011
|
10.00
|
Wings mounted and work begun on alignment
|
|
|
|
05-10-2011
|
11.50
|
Wing to fuz mating with Willem
|
|
|
|
05-09-2011
|
10.00
|
Work begun on fitting the wings
|
|
|
|
05-05-2011
|
10.00
|
Gear mounts installed final L&R
|
|
|
|
05-04-2011
|
9.00
|
Gear mounts continued
|
|
|
|
05-03-2011
|
10.00
|
Gear mounts drilled. prepped and fitted
|
|
|
|
05-02-2011
|
10.00
|
Flaps system - fuz to wing
|
|
|
|
04-29-2011
|
10.00
|
Flap actuator and motor housing box retro finalize
|
Details
|
|
|
04-28-2011
|
10.00
|
Flaps and cabin covers
|
|
|
|
04-21-2011
|
10.00
|
Rear fuz work and cabin covers primed
|
|
|
|
04-20-2011
|
10.00
|
Baggage area skins primed, prepped and fitted
|
|
|
|
04-19-2011
|
10.00
|
Pedals finalized and dry fitted in forward positio
|
|
|
|
04-18-2011
|
10.00
|
Pedals and baggage area fittings
|
|
|
|
04-15-2011
|
10.00
|
Pedals L&R and fuz retro
|
|
|
|
04-14-2011
|
10.00
|
Wings put away and work continued on fuz
|
|
|
|
04-13-2011
|
10.00
|
Right wing flap brace fixed and Left wing aileron
|
|
|
|
04-12-2011
|
9.50
|
Flap braces fitted and riveted
|
|
|
|
04-11-2011
|
9.50
|
Final paint of wing parts
|
Details
|
|
|
04-08-2011
|
5.00
|
Fixed cradle and retro work on steps
|
|
|
|
04-07-2011
|
10.00
|
Tail cradle completed
|
|
|
|
04-06-2011
|
7.00
|
Cradle for Fuz tail end
|
Details
|
|
|
04-05-2011
|
5.00
|
Wing tanks and seals
|
|
|
|
04-01-2011
|
10.00
|
Prep of L&R wing parts for paint
|
Details
|
|
|
03-31-2011
|
5.50
|
Work begun on Right wing
|
|
|
|
03-30-2011
|
6.50
|
Wing cradle completed
|
|
|
|
03-29-2011
|
5.50
|
Designed and manufactured the wing cradle
|
Details
|
|
|
03-28-2011
|
5.50
|
Finalizing the left wing
|
|
|
|
03-25-2011
|
5.50
|
work on wing
|
|
|
|
03-23-2011
|
10.00
|
Seat back finalized and fitted
|
|
|
|
03-22-2011
|
6.00
|
Seat back and wing
|
|
|
|
03-18-2011
|
9.00
|
Aileron Bellcranks and aierons installed
|
|
|
|
03-17-2011
|
9.00
|
Replaced seatback, fabricated and retro-fitted
|
|
|
|
03-16-2011
|
9.00
|
Pitot system final install and seatback replaced
|
|
|
|
03-15-2011
|
5.50
|
Pitot fabricate and installation
|
|
|
|
03-14-2011
|
5.50
|
Left aileron bellcrank installed in wing
|
|
|
|
03-11-2011
|
9.00
|
work on wings
|
|
|
|
03-10-2011
|
5.00
|
Wings continued
|
|
|
|
03-09-2011
|
9.00
|
Work on wings
|
|
|
|
03-08-2011
|
7.50
|
Flaps pushrods assembled and tested
|
|
|
|
03-07-2011
|
4.50
|
Flaps system installation in cabin
|
|
|
|
03-04-2011
|
9.00
|
Internal flaps system install
|
|
|
|
03-02-2011
|
5.00
|
Various cabin covers fabricated, drilled, and debu
|
|
|
|
02-28-2011
|
4.50
|
Final installation of Steps L&R
|
Details
|
|
|
02-25-2011
|
5.00
|
Step shims final fit and drilled
|
|
|
|
02-24-2011
|
6.50
|
Step shims dry fitted and trimmed
|
|
|
|
02-23-2011
|
6.50
|
Continued work on Seatbacks and fabricated step sh
|
|
|
|
02-22-2011
|
6.50
|
Seatback assembly and fit
|
|
|
|
02-21-2011
|
5.50
|
Seat back fabrication and assembly
|
|
|
|
02-18-2011
|
9.00
|
Steps installation (Right)
|
Details
|
|
|
02-18-2011
|
10.00
|
Steps installation
|
Details
|
|
|
02-17-2011
|
10.15
|
Forward upper skin,"... new Gussets and angles"
|
|
|
|
02-16-2011
|
8.75
|
Fit, dimpled and drilled baggage area decking skin
|
|
|
|
02-16-2011
|
8.75
|
Cut holes for steps retrofit
|
Details
|
|
|
02-15-2011
|
8.75
|
Rudder pedals continued & started on Bell crank
|
|
|
|
02-14-2011
|
9.75
|
Assembled Rudder pedals
|
Details
|
|
|
02-11-2011
|
9.50
|
Work on Fuz
|
|
|
|
02-11-2011
|
9.00
|
Work on Fuz
|
|
|
|
02-10-2011
|
9.00
|
Work on Fuz
|
|
|
|
02-10-2011
|
9.00
|
Work on Fuz
|
|
|
|
02-09-2011
|
9.50
|
Wor begun on Fuselage
|
|
|
|
02-09-2011
|
9.50
|
Built the Fuz trolley
|
Details
|
|
|
02-07-2011
|
4.00
|
Elevator LE and Tank skins
|
Details
|
|
|
02-04-2011
|
8.15
|
Trimmed wing skins
|
|
|
|
02-03-2011
|
7.75
|
Wing bottom skins
|
Details
|
|
|
02-01-2011
|
3.00
|
Worked on wings bottom skins
|
Details
|
|
|
01-19-2011
|
7.50
|
Elevator brace and Aileron gap fairings primed
|
Details
|
|
|
01-18-2011
|
9.00
|
"Wings R" Tank bolts torqued first time.
|
|
|
|
01-17-2011
|
9.50
|
Aileron brackets drilled and dimpled
|
Details
|
|
|
01-13-2011
|
7.00
|
Aileron brackets made up.
|
|
|
|
01-12-2011
|
7.00
|
Unknown build hours captured
|
|
|
|
01-11-2011
|
14.00
|
Elevator finishing
|
|
|
|
01-10-2011
|
21.00
|
Elevator finishing
|
|
|
|
01-07-2011
|
6.00
|
Elevators and rudder general work
|
|
|
|
01-05-2011
|
14.00
|
Elevator trim tab
|
Details
|
|
|
12-14-2010
|
0.00
|
Unpacking and inventory of Finish kit, fuse and wi
|
Details
|
|
|
12-13-2010
|
19.00
|
Rudder trailing edge
|
|
|
|
12-11-2010
|
11.50
|
Rudder work
|
|
|
|
12-10-2010
|
7.00
|
More work on rudder
|
|
|
|
12-09-2010
|
18.50
|
Work on Rudder and Elevators - second certificatio
|
Details
|
|
|
12-08-2010
|
11.50
|
Rudder and Elevator
|
Details
|
|
|
11-30-2010
|
11.50
|
Riveting on Rudder and Elevator
|
Details
|
|
|
11-29-2010
|
7.00
|
Rudder build
|
Details
|
|
|
11-26-2010
|
7.00
|
VS and HS and rudder plate
|
Details
|
|
|
11-25-2010
|
9.00
|
VS Build
|
Details
|
|
|
11-24-2010
|
19.00
|
VS build and first Inspection
|
Details
|
|
|
11-23-2010
|
11.50
|
HS..."riveting"
|
|
|
|
11-22-2010
|
12.00
|
HS "riveting.."
|
|
|
|
11-19-2010
|
5.00
|
H.S ..."riveting"
|
|
|
|
11-18-2010
|
8.50
|
Elevator..."riveting"
|
|
|
|
11-17-2010
|
8.50
|
HS elevator
|
|
|
|
11-11-2010
|
4.00
|
no descript recorded
|
|
|
|
08-24-2010
|
4.00
|
no descript recorded
|
|
|
|
08-21-2010
|
8.00
|
no description recorded
|
|
|
|
08-20-2010
|
12.00
|
no descript recorded
|
|
|
|
08-19-2010
|
12.00
|
no descript recorded
|
|
|
|
08-18-2010
|
5.00
|
no descript recorded
|
|
|
|
08-07-2010
|
18.00
|
No description
|
|
|
|
08-06-2010
|
12.00
|
work continued on VS
|
|
|
|
08-05-2010
|
14.00
|
Work begun on VS
|
Details
|
|
|
08-04-2010
|
10.50
|
HS finished
|
Details
|
|
|
08-03-2010
|
6.00
|
Work on the HS
|
Details
|
|
|
07-31-2010
|
18.00
|
work continued on HS
|
Details
|
|
|
07-29-2010
|
11.00
|
work on HS
|
Details
|
|
|
07-27-2010
|
7.00
|
Work begun on HS
|
Details
|
|
|
07-26-2010
|
0.00
|
Training and practice - workshop
|
|
|
|
07-23-2010
|
0.00
|
Lessons and training with Jan Hanekom
|
|
|
|
07-20-2010
|
0.00
|
..."werkswinkel"
|
|
|
|
07-19-2010
|
0.00
|
"werkswinkel.."
|
|
|