RV-7A Tip-up QB build project
Work Logs Found: 482
Category Work Time: 4352 Hours
 Date
Hours
Work Log Summary

Details

 03-07-2013
9.00
Canopy frame, fitted, trimmed, and assembled
Details
       

 03-07-2013
2.50
Canopy frame fit, canopy bubble fit, R wing moved
Details
       

 03-05-2013
9.00
Canopy frame assembly, corrosion treated
Details
       

 03-04-2013
7.00
Canopy frame, panel, shroud and canopy work
Details
       

 03-01-2013
7.50
right wing riveting, skins - surface prep
Details
       

 02-28-2013
7.00
R wing riveting, priming, tip heat shielding.
Details
       

 02-27-2013
10.50
R wing riveting
Details
       

 02-26-2013
9.00
Rivet work R wing, loading of left wing and parts
Details
       

 02-25-2013
8.00
Complete L wing masked, rivet work R wing
Details
       

 02-22-2013
9.00
Masking and prep of left wing for paint, right win
Details
       

 02-21-2013
10.00
L wing prep, vent breathers made up, root fairings
Details
       

 02-20-2013
11.50
Lwing prepped for paint, sender safetied, tank fin
Details
       

 02-19-2013
10.00
R wing, tip marked and drilled, tank finalized
Details
       

 02-18-2013
8.50
R wing surfaces installed, pitot finished and fitt
Details
       

 02-15-2013
9.50
R wing tip work, workshop clean up
Details
       

 02-14-2013
12.00
Continued work on the Right wing tip, remedy on th
Details
       

 02-13-2013
11.50
Work begun on finalizing Right wing....
Details
       

 01-31-2013
8.50
Right wing tip light installtion, priming and stri
Details
       

 01-30-2013
8.50
Right wing tip, fitting and tip light installation
Details
       

 01-29-2013
8.50
Began work on the Right wing tip....
Details
       

 01-25-2013
10.00
platenuts instlled in L tip and tip finalized cont
Details
       

 01-24-2013
9.50
Finalized wing tip left wing - redo and adjustment
Details
       

 01-23-2013
12.50
Finalized wing tip installtion left wing
Details
       

 01-22-2013
10.00
Installation of platenuts into tips more fitting
Details
       

 01-18-2013
10.50
make-up, fitting and glueing of strips to tips
Details
       

 01-17-2013
12.00
Final drilling, deburring and dimpling of the wing
Details
       

 01-16-2013
12.00
Match-drilling tip and installed tip rib
Details
       

 01-15-2013
11.00
Match drilling and fit adjustments
Details
       

 01-11-2013
5.50
First fit of wing tip - left wing
Details
       

 01-10-2013
8.50
continued Tip fitment and finalized aileron alignm
Details
       

 01-08-2013
9.50
Continued left wing aileron alignm,ent and tip fit
Details
       

 01-07-2013
8.00
Left wing wing tip fitment and aileron alignment
Details
       

 01-04-2013
8.00
Cabin misc and wire routing, drive to collect pane
Details
     

 01-03-2013
9.00
Wing finishing - back into cabin panel mounts and
Details
       

 01-02-2013
7.00
back at work, wing finishing
Details
     

 12-20-2012
8.50
Avionics fitted and began sorting for installation
Details
       

 12-19-2012
8.00
Wing skin finishing, tip template made and fitted
Details
       

 12-18-2012
8.50
Wing tip repair, fitting and trim...finished skin
Details
       

 12-15-2012
4.00
Some weekend work on fitting the tip....
Details
       

 12-14-2012
9.00
Aileron and flap line up and install & tip install
Details
       

 12-13-2012
9.50
lining up of aileron and flap on Right wing......
Details
       

 12-12-2012
9.50
Fitted flap and aileron and set up to line up for
Details
       

 12-11-2012
9.00
Carried on riveting - Right wing skin almost done.
Details
       

 12-10-2012
7.00
Continued wing skin riveting
Details
       

 12-07-2012
9.00
Clean and wrap painted parts, wing skin riveting..
Details
       

 12-06-2012
9.00
Continued RW re-skinning...collected contrl surfac
Details
       

 12-05-2012
8.50
RW - Conduit final installed wing skin re riveted.
Details
       

 12-04-2012
9.00
Right wing repair cont.....delivery of metal to cu
Details
       

 12-03-2012
7.00
Right wing continued - repair of snapped conduit..
Details
       

 11-30-2012
9.00
Right wing skin continued....panel artwork emailed
Details
       

 11-29-2012
9.50
Continued riveting of R wing, panel lasercutting p
Details
       

 11-28-2012
8.50
Continued rivet work on Right wing.....
Details
       

 11-27-2012
9.00
Finished off the tips for good, wing skin riveting
Details
       

 11-26-2012
7.50
finalized these tips - reinforcing glassed in, gla
Details
       

 11-23-2012
8.50
Wing tips reinforcing and glassing...
Details
       

 11-22-2012
8.50
Continued tips reinforcing and glassing
Details
       

 11-21-2012
8.50
Strips bonded in, glassing begun
Details
       

 11-20-2012
9.00
Wing tip reinforcing
Details
       

 11-19-2012
8.00
continued wing skin finishing,
Details
       

 11-16-2012
7.50
Wing filled and finished, wing tip reinforcing
Details
       

 11-15-2012
9.00
LW - wingtips, finishing, RW - riveting....
Details
       

 11-14-2012
8.00
Wingtips - LW finishing, RW riveting
Details
       

 11-13-2012
8.50
LW wingtip, more prep and finish, cradle adjstd...
Details
       

 11-09-2012
8.50
LW finishing and prep
Details
       

 11-08-2012
10.50
finalized LW to be ready for tomorrow...wkshp work
Details
       

 11-06-2012
9.50
LW - more riveting
Details
       

 11-05-2012
8.00
LW - Riveting continued
Details
       

 11-01-2012
10.00
More riveting, lamp assembly, RW tank cover plate
Details
       

 10-31-2012
9.00
riveting, worked on tip lamps....
Details
       

 10-30-2012
9.00
RW Continued riveting...
Details
       

 10-29-2012
7.00
continued riveting, colelction of part (failed)
Details
       

 10-26-2012
8.50
riveting and final install of conduit and wire rou
Details
       

 10-25-2012
9.00
Prep and prime of LW skin, cut conduit, sourced to
Details
       

 10-23-2012
9.50
LW skin prep, tool search, pulled out conduit...
Details
       

 10-22-2012
7.00
LW skin prep and match drill, drilled out LW rivet
Details
       

 10-19-2012
9.50
RW skin riveting,
Details
       

 10-18-2012
8.50
LW skin prep, more RW skin riveting, final work on
Details
       

 10-17-2012
8.50
Installation of pitot plumbing, prep of new skin,
Details
       

 10-16-2012
9.00
LW new conduit, skin riveting, practice riveting
Details
       

 10-15-2012
8.00
repair of conduit intsectn, skin riveting, cabin f
Details
       

 10-12-2012
9.00
LW fuel cap, tank pressure test, conduit intrsectn
Details
       

 10-11-2012
10.00
RW wing tank finalized, fuel cap installed
Details
       

 10-10-2012
9.00
RW..resecured the conduit,
Details
       

 10-09-2012
8.50
RW.. servo adjst, platenuts and skin installation.
Details
       

 10-08-2012
6.50
RW.. refitted the tank and installtion of servo as
Details
       

 10-04-2012
10.00
Strpped the wing LE to fix the sheared bolt....
Details
       

 10-03-2012
9.50
Roll servo installation....
Details
       

 10-02-2012
9.00
Finalized and prep RHS wing for buttoning up
Details
       

 10-01-2012
9.00
Complete removal of LHS wing skin,
Details
       

 09-28-2012
9.00
Priming of skins and internals,
Details
       

 09-27-2012
9.50
...cont wing skin riveting
Details
     

 09-26-2012
9.00
...cont wing skin riveting
Details
       

 09-25-2012
9.50
...cont wing skin riveting
Details
     

 09-21-2012
9.00
Began riveting wing skins and wing finalization
Details
       

 09-20-2012
9.00
Pitot system made up and installed, Left wing retr
Details
       

 09-19-2012
9.00
R Wing tip, all landing light mounts made up, tip
Details
       

 09-18-2012
9.00
Wing finalizing, wing tip and lights - Right
Details
       

 09-17-2012
8.50
retro work to finalize wings - right wing.
Details
       

 09-14-2012
8.00
finalized and packed emp for paint, finishing of p
Details
       

 09-13-2012
9.00
Finalized all fg work on empennage....
Details
       

 09-12-2012
9.50
...finishing up of fiberglass work, Elevator horns
Details
       

 09-11-2012
7.00
...continued finishing of fiberglass - V-stab plat
Details
       

 09-10-2012
8.00
...continued fiberglass finishing on emp....
Details
       

 09-07-2012
9.00
Empennage covers, fairing and fg finishing cont
Details
       

 09-06-2012
7.00
finishing all fitings on emp, more sanding, stab n
Details
       

 09-05-2012
9.00
Stab finalized, emp fairing finalized, stab covers
Details
       

 09-04-2012
8.50
continued finishing and removal of emp assembly
Details
       

 09-03-2012
8.50
trying to finish this fiberglass work...
Details
       

 09-01-2012
2.50
finish up (plastics) for Monday
Details
     

 08-31-2012
9.50
empennage plastics finishing cont..
Details
       

 08-30-2012
9.00
Left tips installed, trailing edges filled up more
Details
       

 08-29-2012
9.50
cont fiberglass work, tips riveted
Details
       

 08-28-2012
9.00
Fiberglass work and match drilled stops in place
Details
       

 08-27-2012
8.50
Fiberglass work (emp) and rudder stops
Details
       

 08-24-2012
9.00
Piot final ass, finishing and fit. SP6 Tray bracke
Details
       

 08-23-2012
9.00
Pitot assembly, wings moved in, tips glassed
Details
       

 08-22-2012
5.00
Piot and mast assembly compltd and access plate fa
Details
       

 08-21-2012
9.50
Servo rod redo and fit, stab tips and elvator tips
Details
       

 08-20-2012
6.50
Supplies, Finalized the compass tray,
Details
       

 08-17-2012
9.50
SP7 brckt fabricated, fitted..Pitch srvo instlled
Details
       

 08-16-2012
9.50
workshop repacked
Details
       

 08-15-2012
9.00
workshop, AHRS bracket, AP servo arm and bellcrank
Details
       

 08-14-2012
10.00
Compas bracket, SP-7 new bracket and fit
Details
       

 08-13-2012
9.50
servo brckt brace, compass re fitted, bracket adju
Details
       

 08-03-2012
9.00
finalised servo installation, compass bracket fitt
Details
       

 08-02-2012
10.50
Avionics installation, painting
Details
       

 08-01-2012
9.00
Rear window fit, Pitch servo mounting design and f
Details
       

 07-31-2012
9.50
Frame spacers fabricated, frame fitted, painting
Details
       

 07-30-2012
7.50
Protective edging, shroud and frame adjustment and
Details
       

 07-27-2012
9.00
Devices reinstalled, new cable bracket created and
Details
       

 07-26-2012
9.50
Taping and assembly of frame parts and latch.
Details
       

 07-25-2012
9.00
Painting - jettison pins refined - panel flanges t
Details
       

 07-24-2012
9.00
Canopy masked, fitted, Painted all canopy frame pa
Details
       

 07-23-2012
9.00
Hinges drilled, rear glass marked
Details
       

 07-20-2012
8.50
Big cut! canopy cut and edged,
Details
       

 07-19-2012
9.50
Supplies, bubble trimmed and polishing
Details
       

 07-18-2012
9.00
Wing tip lights, rudder cable fairings, gear spats
Details
       

 07-17-2012
8.00
Bubble prepped for cut, ears trimmed, misc outstan
Details
       

 07-16-2012
9.00
Design ribs, canopy spacers,
Details
       

 07-13-2012
8.00
Supplise, frame final fit, marked hinges to drill
Details
       

 07-12-2012
11.50
Gear leg spats, shroud re-fitted, ribs removed....
Details
       

 07-11-2012
9.50
Rib stiffeners made up,
Details
       

 07-10-2012
9.00
Shroud skin prepped,first panel rib repair
Details
       

 07-06-2012
6.50
Shroud frame parts made up, frame assembled
Details
       

 07-05-2012
9.50
Canopy frame fabrication and assmbly, shroud final
Details
       

 07-04-2012
9.00
Cabin interior fittings, panel brackets modified,
Details
       

 07-03-2012
9.00
Gas struts, canopy frame, interior fittings
Details
       

 07-02-2012
8.50
Jettison mech. re-installed, Canopy latch final in
Details
       

 06-29-2012
9.00
jettison assembly mod, final coat on painted parts
Details
       

 06-28-2012
9.50
Canopy jettison, canopy frame, clocked jettison ar
Details
       

 06-27-2012
9.50
Canopy frame, Parts prep&prime, Static bracket add
Details
       

 06-26-2012
8.50
proper installation of latch, prep and prime of pa
Details
       

 06-25-2012
8.00
cut slot, latch mech. assembly installed
Details
       

 06-22-2012
9.00
Canopy latch begun, slotted the fuz wall
Details
       

 06-21-2012
10.50
Deck to shroud fitting, hinge drilling,
Details
       

 06-20-2012
10.00
Finalized all the deck fittings and installations,
Details
       

 06-19-2012
9.00
Static sytem complete redo
Details
       

 06-18-2012
8.00
Finalization of static system inside the fuselage,
Details
       

 06-15-2012
9.00
Static system make up then installation
Details
       

 06-14-2012
10.00
Additional panel brackets, replaced bad rivets on
Details
       

 06-13-2012
9.50
Deck rivets set, panel final installed with attach
Details
       

 06-12-2012
9.00
Right side vent ass installed, deck rivets set
Details
       

 06-08-2012
9.00
L Vent installed, vent brackets made up,
Details
       

 06-07-2012
9.50
panel primed and fitted, vent brackets made up, de
Details
       

 06-06-2012
9.50
F-703B bracket finalized and installed, vent brack
Details
       

 06-05-2012
8.50
panel brackets completed, F703B and panel finalize
Details
       

 06-04-2012
8.50
panel brackets, cleaned up cabin, covers in cabin
Details
       

 06-01-2012
9.00
Panel rib final riveted, jettison machanism fixed.
Details
       

 05-31-2012
10.00
trimmed and drilled the front deck skin, canopy re
Details
       

 05-30-2012
9.50
RH panel rib trimmed and stiffener fabricated, map
Details
       

 05-29-2012
8.50
Continued closing up the map box, panel rib marked
Details
       

 05-28-2012
7.50
Map box final trim and construction,
Details
       

 05-25-2012
9.00
riveting of deck, canopy ribs
Details
       

 05-23-2012
8.50
canopy frame made up, final riveting and completio
Details
       

 05-22-2012
9.00
canopy release handle installed, hinge bloack spac
Details
       

 05-21-2012
8.00
Continued hinge blocks, release mech. installation
Details
       

 05-18-2012
9.00
canopy release mechanism, hinge blocks
Details
       

 05-17-2012
9.00
Assembly of full canopy frame, shroud drilling, hi
Details
       

 05-16-2012
9.00
Map box continued, jettison mechanism assembled
Details
       

 05-15-2012
8.00
Canopy shroud disassembly and prime
Details
       

 05-14-2012
8.50
canopy shroud braces, parts fabrication, prep for
Details
       

 05-11-2012
9.50
canopy shroud, fitment to deck and panel ribs
Details
       

 05-10-2012
9.50
Continued the canopy braces, canopy shroud assembl
Details
       

 05-09-2012
10.00
Designed and made a tool for edge forming, finaliz
Details
       

 05-08-2012
9.00
Control bracket finalized and installed, canopy br
Details
       

 05-04-2012
9.50
Final control cable face,
Details
       

 05-03-2012
9.50
Supply shopping, new bracket made up and installed
Details
       

 05-02-2012
9.50
cable bracket redo,
Details
       

 05-01-2012
6.50
Cable brackets and installation of cables and brac
Details
       

 04-27-2012
8.00
Front deck assemb. panel installed, brackets desig
Details
       

 04-26-2012
9.50
front deck install, cable brackets and cables
Details
       

 04-25-2012
9.00
Continued bleeding and eventual completion of brak
Details
       

 04-24-2012
9.50
bought supplies to bleed brakes
Details
       

 04-23-2012
9.50
brake system bleed, leak repair
Details
       

 04-20-2012
9.00
Continued front deck install, brakes bled,
Details
       

 04-19-2012
10.00
Finalized the front deck and fittings.....
Details
       

 04-18-2012
10.00
Front upper deck riveting and fitting fabrication
Details
       

 04-17-2012
9.00
Final assembly of front deck structure...
Details
       

 03-29-2012
11.00
Interior design, cotter pin, interior painting
Details
       

 03-28-2012
10.00
finalized second brakes installation, inside of ca
Details
       

 03-27-2012
7.50
Brakes installation redo
Details
       

 03-26-2012
9.00
Finalized Brake system but had to redo
Details
       

 03-23-2012
8.00
Brake callipers and external lines assembly
Details
       

 03-15-2012
11.00
Overhead brake system, rudder fairings
Details
       

 03-14-2012
10.00
final check of new brake system, empennage fairing
Details
       

 03-13-2012
10.00
Continued checking of the brake system and repair
Details
       

 03-12-2012
9.00
Sanding down of cured tips, started repair of brak
Details
       

 03-09-2012
10.00
Boost pump cover final installation and unit final
Details
       

 03-08-2012
11.00
Final installation of the fuel system lines and pu
Details
       

 03-07-2012
11.50
Installation of the boost pump in the cabin, pump
Details
       

 03-06-2012
10.00
Started the boost pump assembly and installation
Details
       

 03-05-2012
8.00
Redo of some of the cast firberglass
Details
       

 03-02-2012
9.50
Filling and casting the tips,
Details
       

 02-29-2012
11.50
Resin filling, matching stab to elevator tips, and
Details
       

 02-28-2012
10.00
trimming, fitting and installing the elevator tips
Details
       

 02-24-2012
10.00
H-stab tip completed, R stab tip redone,
Details
       

 02-22-2012
10.50
Stab and elevator tips continued, Rudder base tip
Details
       

 02-21-2012
9.50
Fiberglass practice, fin tip, started stab tips
Details
       

 02-20-2012
9.00
Started with the fiberglass fittings, dissassembly
Details
       

 02-17-2012
8.50
Finalized heatX installation, Fuel line penetratio
Details
       

 02-16-2012
10.00
Meetings, design and firewall forward installation
Details
       

 02-15-2012
10.00
deburred and filed firewall holes, opened and repo
Details
       

 02-14-2012
9.00
Firewall drilled today!! battery box holes cut too
Details
       

 02-13-2012
9.00
Reworked the seat back supports, installled the he
Details
       

 02-10-2012
9.50
Completed the battery box, more cabin riveting,eng
Details
       

 02-09-2012
9.50
Sealing of belly, Battery box adjustment, heat shu
Details
       

 02-08-2012
9.50
Completed, mounted the battery box, cabin riveting
Details
       

 02-07-2012
8.50
More battery box, Boost pump housing
Details
       

 02-06-2012
9.00
Built a platform and began assembly of boost pump.
Details
       

 02-03-2012
8.00
Firewall installations,
Details
       

 02-02-2012
11.00
Gear installed!! More firewall installations
Details
       

 02-01-2012
9.00
Fixed attach brackets, panel reinstall, interior c
Details
       

 01-27-2012
8.50
research, bellcrank + pushrod, cabin interior
Details
       

 01-26-2012
9.50
Firewall revisited, stripping and ducts
Details
       

 01-25-2012
9.00
Cabin air vents and ducts assembled and installed.
Details
       

 01-24-2012
9.00
Flap system clean up and re-install...
Details
       

 01-23-2012
4.50
Half-day, seats installed and harnesses installed.
Details
       

 01-20-2012
9.50
Final seraled up the firewall and recess and...
Details
       

 01-19-2012
10.00
right side of firewall was bonded and sealed and l
Details
       

 01-18-2012
9.00
Removed and cleaned and replaced major assemblies
Details
       

 01-17-2012
9.00
continued Retrospective work begun with stripping
Details
       

 01-16-2012
8.00
Return to work after a month long holiday. re-read
Details
       

 12-15-2011
12.00
fitted the canopy bubble and re marked and located
Details
       

 12-14-2011
11.00
some more forward deck riveting, a little more san
Details
     

 12-13-2011
10.00
completed the empennage fairing finally
Details
     

 12-12-2011
11.00
Forward deck final dissasembly and re installation
Details
       

 12-09-2011
10.50
Worked on all glass tips and fairings
Details
       

 12-08-2011
5.00
Empennage fairing final fit and drill!
Details
       

 12-07-2011
10.00
ready to mount the first hinge blocks and vebnt sy
Details
       

 12-06-2011
11.00
Tip up to forward deck hinge points and attachment
Details
     

 12-05-2011
8.00
Forward deck skinnning and full assembly
Details
     

 12-02-2011
10.00
Cabin forwared deck and panel modifications
Details
       

 12-01-2011
5.00
Panel deck mods and revised structure
Details
       

 11-30-2011
4.00
map box completed
Details
       

 11-29-2011
8.00
Firewall drilling and locations.
Details
       

 11-28-2011
6.00
More work to fix the map box, Half the day spent o
Details
     

 11-25-2011
10.00
Map box mod, match drilling the deck structure and
Details
     

 11-24-2011
11.00
Changes made to the drawings and designs, boost pu
Details
     

 11-23-2011
12.50
Researchd and designed a final layout
Details
       

 11-22-2011
10.50
Panel layout researched and tried, Visited fellow
Details
       

 11-21-2011
10.00
Re-installed empenage, Panel research and template
Details
       

 11-18-2011
10.00
Empennage finalized
Details
     

 11-17-2011
10.50
Empennage fairing
Details

 11-16-2011
9.00
Drove out to Rand and JHB to source the fuel line
Details

 11-15-2011
10.00
Continued retro work
Details

 11-11-2011
10.00
Continued with empenage and work outlined in Thurs
Details

 11-10-2011
10.50
Continued work on retro steps, empennage, fairings
Details

 11-09-2011
7.50
return to first outstanding work to work my way ba
Details

 11-08-2011
10.00
redo of the fuel lines system...drive for parts an
Details

 11-07-2011
10.00
Installation of new fuel lines and plumbing
Details

 11-04-2011
9.00
Fuel lines replacement, and make up
Details

 11-03-2011
9.50
Fwd deck continued, panel layout research, fuel li
Details

 11-02-2011
10.00
More panel research and discussion, final fit and
Details

 11-01-2011
10.00
Prime of forward deck parts
Details

 10-28-2011
10.50
Canopy frame screws, parts prep
Details

 10-27-2011
9.50
More struggle with screws and asembly of front dec
Details
       

 10-26-2011
9.00
Aft cabin skin fitted and drilled to the cabin fra
Details
       

 10-25-2011
9.50
Panel design made up and more parts fab
Details
       

 10-24-2011
7.00
Canopy frame area finished painted
Details
     

 10-21-2011
10.00
Cabin frame area painted, Canopy frame assembled
Details
     

 10-20-2011
10.00
Panel research and templates and mockups created.
Details

 10-19-2011
7.50
Assembly and prep of parts for the forward deck an
Details

 10-18-2011
9.00
fitted the final canopy frame and all associted sh
Details

 10-17-2011
10.00
Began dry fit and assembly of the canopy framework
Details

 10-14-2011
9.50
Fabricated the new shims for the canopy frame asse
Details

 10-13-2011
10.50
After consultation with Gus at Vans (Wed) I measur

 10-12-2011
6.50
Re fabricated new brackets L and R - not drilled

 10-11-2011
10.00
Discussed a solution with Willem for the mistakes

 10-10-2011
9.00
Manufactured shims for outside brackets on canopy

 10-07-2011
10.00
Drilling of fitted canopy frame and canopy test fi
     

 10-06-2011
10.00
Re assembly and final fit of painted cabin frame a
     

 10-05-2011
8.00
Painting of first and some final coats fo rear cab

 10-04-2011
11.00
paints, abrasives and other supplies bought - spen

 10-03-2011
9.00
Prep of rear cabin assembly parts for paint
     

 09-30-2011
10.00
final fit for drilling of final assembly to cabin
     

 09-29-2011
10.50
Frame fix and panel beating
       

 09-28-2011
7.15
Canopy frame stripped and re assembled
     

 09-27-2011
10.00
Research and help sought on canopy frame issues, m

 09-26-2011
10.00
Canopy frame 3rd test fit - problems with fit and
     

 09-23-2011
10.10
Canopy frame fabrication and fit of new parts
     

 09-22-2011
10.90
canopy frame parts fabricated and mistakes re-fabr
       

 09-21-2011
8.00
canopy frame assembly and 1st dry fit to cabin
     

 09-20-2011
10.00
cabin frame fabricationand test fit of parts
     

 09-19-2011
9.00
Begun work on the cabin frame. Cable ties used to
     

 09-09-2011
9.50
Description pending

 09-08-2011
10.00
Description pending

 09-07-2011
12.00
Description pending

 09-06-2011
10.50
Description pending

 09-05-2011
10.00
Description pending

 09-02-2011
10.50
Description pending

 09-01-2011
12.50
Description pending

 08-31-2011
13.00
Description pending

 08-29-2011
5.00
Description pending- halfday, sick

 08-25-2011
11.00
Description pending

 08-24-2011
10.00
Description pending

 08-24-2011
11.00
Description pending

 08-23-2011
0.00
Description pending

 08-22-2011
10.00
Cabin re-fit and Armrest mods
Details
       

 08-18-2011
10.50
Description pending

 08-17-2011
10.50
Description pending

 08-16-2011
10.50
Description pending

 08-15-2011
10.50
Description pending

 08-12-2011
10.00
Prep, prime and 1st base coat cabin and parts.
Details
       

 08-11-2011
11.00
Description pending

 08-10-2011
11.00
Description pending

 08-09-2011
0.00
Description pending

 08-05-2011
9.50
Description pending

 08-04-2011
10.00
Description pending

 08-03-2011
10.00
Description pending

 08-02-2011
10.00
Description pending

 08-01-2011
10.00
Description pending

 07-29-2011
9.00
Description pending

 07-28-2011
10.00
Description pending

 07-27-2011
10.00
Description pending

 07-26-2011
10.00
Description pending

 07-25-2011
10.00
Description pending

 07-22-2011
10.00
Pushrods final install, V-stab match drilled to mo
     

 07-21-2011
10.50
Dry fit of V-Stab and first fit of glass empennage
     

 07-20-2011
10.50
Mass Prep of various small parts for priming

 07-19-2011
10.00
V-Stab mounting plates and spacers fabricated and
       

 07-18-2011
10.00
Elevator pushrods parts made up and prepped and pr
     

 07-15-2011
10.00
Stab remounted and incidence set final
     

 07-14-2011
9.50
H-Stab mount rivets removed and replaced

 07-13-2011
10.00
H-Stab mount problem worked on again - solution fo
     

 07-11-2011
10.00
Stab re-fit and trimmed
       

 07-08-2011
11.00
Stab mounting problem corrective work begun
     

 07-07-2011
10.50
H-stab drilled to mount – PROBLEM!!
Details
       

 07-06-2011
12.00
H-stab fitting - fabrication of new angle on the m
     

 07-05-2011
9.50
H.Stab drilled to fuz
     

 07-04-2011
10.00
H.Stab- First fit and measure, holes marked
     

 07-01-2011
10.50
Stab bracket Fabrication and test fit on fuz
     

 06-30-2011
12.00
Empennage Brackets and shims fabricated

 06-29-2011
10.00
Wing root bottom skin final drilled

 06-23-2011
9.50
no description offered

 06-22-2011
8.00
no descript recorded

 06-21-2011
10.00
No description recorded

 06-20-2011
10.00
Wing root bottom skin final drilled

 06-17-2011
5.00
Wing root fairings nutplates installed, fairings s
     

 06-15-2011
10.00
Wing root fairings sanded, primed, dimpled and com
     

 06-14-2011
10.00
Continued work on wing roots and fuz attach points
     

 06-13-2011
9.00
Wing holes dimples, fuz wing off work
     

 06-10-2011
10.00
aileron travel adjusted and linkages assembled, bo

 06-09-2011
9.50
Baggage floor replaced
Details
     

 06-08-2011
8.00
Inventory of FFW kit and extras …all accounted for
       

 06-07-2011
10.00
Control column install to aileron linkage - Left w
     

 06-06-2011
10.00
Wing tank attach brackets install,
     

 06-03-2011
10.00
Wing root fairing rubbers fitted and trimmed, fair
     

 05-20-2011
10.00
Holes cut then enlarged for flap pushrods
     

 05-19-2011
10.00
Continued work on Flaps and flap system
     

 05-18-2011
3.00
Flaps installed and flap system connected
     

 05-17-2011
11.00
Wing root fairings re-fitted and match-drilled
     

 05-16-2011
8.00
various fitting with wings installed
Details
     

 05-13-2011
10.50
Both wings fitted and drilled for incidence
     

 05-12-2011
11.00
continued measuring and alignment of wings and inc
       

 05-11-2011
10.00
Wings mounted and work begun on alignment
       

 05-10-2011
11.50
Wing to fuz mating with Willem

 05-09-2011
10.00
Work begun on fitting the wings
       

 05-05-2011
10.00
Gear mounts installed final L&R
       

 05-04-2011
9.00
Gear mounts continued

 05-03-2011
10.00
Gear mounts drilled. prepped and fitted
     

 05-02-2011
10.00
Flaps system - fuz to wing

 04-29-2011
10.00
Flap actuator and motor housing box retro finalize
Details

 04-28-2011
10.00
Flaps and cabin covers

 04-21-2011
10.00
Rear fuz work and cabin covers primed

 04-20-2011
10.00
Baggage area skins primed, prepped and fitted

 04-19-2011
10.00
Pedals finalized and dry fitted in forward positio

 04-18-2011
10.00
Pedals and baggage area fittings

 04-15-2011
10.00
Pedals L&R and fuz retro

 04-14-2011
10.00
Wings put away and work continued on fuz

 04-13-2011
10.00
Right wing flap brace fixed and Left wing aileron

 04-12-2011
9.50
Flap braces fitted and riveted

 04-11-2011
9.50
Final paint of wing parts
Details

 04-08-2011
5.00
Fixed cradle and retro work on steps

 04-07-2011
10.00
Tail cradle completed
     

 04-06-2011
7.00
Cradle for Fuz tail end
Details
     

 04-05-2011
5.00
Wing tanks and seals

 04-01-2011
10.00
Prep of L&R wing parts for paint
Details

 03-31-2011
5.50
Work begun on Right wing

 03-30-2011
6.50
Wing cradle completed

 03-29-2011
5.50
Designed and manufactured the wing cradle
Details

 03-28-2011
5.50
Finalizing the left wing

 03-25-2011
5.50
work on wing

 03-23-2011
10.00
Seat back finalized and fitted

 03-22-2011
6.00
Seat back and wing

 03-18-2011
9.00
Aileron Bellcranks and aierons installed

 03-17-2011
9.00
Replaced seatback, fabricated and retro-fitted

 03-16-2011
9.00
Pitot system final install and seatback replaced

 03-15-2011
5.50
Pitot fabricate and installation

 03-14-2011
5.50
Left aileron bellcrank installed in wing

 03-11-2011
9.00
work on wings

 03-10-2011
5.00
Wings continued

 03-09-2011
9.00
Work on wings

 03-08-2011
7.50
Flaps pushrods assembled and tested
     

 03-07-2011
4.50
Flaps system installation in cabin

 03-04-2011
9.00
Internal flaps system install
       

 03-02-2011
5.00
Various cabin covers fabricated, drilled, and debu
       

 02-28-2011
4.50
Final installation of Steps L&R
Details
     

 02-25-2011
5.00
Step shims final fit and drilled

 02-24-2011
6.50
Step shims dry fitted and trimmed

 02-23-2011
6.50
Continued work on Seatbacks and fabricated step sh
     

 02-22-2011
6.50
Seatback assembly and fit
       

 02-21-2011
5.50
Seat back fabrication and assembly
       

 02-18-2011
9.00
Steps installation (Right)
Details
       

 02-18-2011
10.00
Steps installation
Details
       

 02-17-2011
10.15
Forward upper skin,"... new Gussets and angles"
     

 02-16-2011
8.75
Fit, dimpled and drilled baggage area decking skin
       

 02-16-2011
8.75
Cut holes for steps retrofit
Details
     

 02-15-2011
8.75
Rudder pedals continued & started on Bell crank

 02-14-2011
9.75
Assembled Rudder pedals
Details
       

 02-11-2011
9.50
Work on Fuz

 02-11-2011
9.00
Work on Fuz

 02-10-2011
9.00
Work on Fuz

 02-10-2011
9.00
Work on Fuz

 02-09-2011
9.50
Wor begun on Fuselage

 02-09-2011
9.50
Built the Fuz trolley
Details
     

 02-07-2011
4.00
Elevator LE and Tank skins
Details

 02-04-2011
8.15
Trimmed wing skins

 02-03-2011
7.75
Wing bottom skins
Details

 02-01-2011
3.00
Worked on wings bottom skins
Details

 01-19-2011
7.50
Elevator brace and Aileron gap fairings primed
Details

 01-18-2011
9.00
"Wings R" Tank bolts torqued first time.

 01-17-2011
9.50
Aileron brackets drilled and dimpled
Details

 01-13-2011
7.00
Aileron brackets made up.

 01-12-2011
7.00
Unknown build hours captured

 01-11-2011
14.00
Elevator finishing

 01-10-2011
21.00
Elevator finishing

 01-07-2011
6.00
Elevators and rudder general work

 01-05-2011
14.00
Elevator trim tab
Details

 12-14-2010
0.00
Unpacking and inventory of Finish kit, fuse and wi
Details

 12-13-2010
19.00
Rudder trailing edge

 12-11-2010
11.50
Rudder work

 12-10-2010
7.00
More work on rudder

 12-09-2010
18.50
Work on Rudder and Elevators - second certificatio
Details

 12-08-2010
11.50
Rudder and Elevator
Details

 11-30-2010
11.50
Riveting on Rudder and Elevator
Details

 11-29-2010
7.00
Rudder build
Details

 11-26-2010
7.00
VS and HS and rudder plate
Details

 11-25-2010
9.00
VS Build
Details

 11-24-2010
19.00
VS build and first Inspection
Details

 11-23-2010
11.50
HS..."riveting"

 11-22-2010
12.00
HS "riveting.."

 11-19-2010
5.00
H.S ..."riveting"

 11-18-2010
8.50
Elevator..."riveting"

 11-17-2010
8.50
HS elevator

 11-11-2010
4.00
no descript recorded

 08-24-2010
4.00
no descript recorded

 08-21-2010
8.00
no description recorded

 08-20-2010
12.00
no descript recorded

 08-19-2010
12.00
no descript recorded

 08-18-2010
5.00
no descript recorded

 08-07-2010
18.00
No description

 08-06-2010
12.00
work continued on VS

 08-05-2010
14.00
Work begun on VS
Details

 08-04-2010
10.50
HS finished
Details

 08-03-2010
6.00
Work on the HS
Details

 07-31-2010
18.00
work continued on HS
Details

 07-29-2010
11.00
work on HS
Details

 07-27-2010
7.00
Work begun on HS
Details

 07-26-2010
0.00
Training and practice - workshop

 07-23-2010
0.00
Lessons and training with Jan Hanekom

 07-20-2010
0.00
..."werkswinkel"

 07-19-2010
0.00
"werkswinkel.."