Andrew & Neils Web Site
RV12
All
Work Logs Found:
138
Category Work Time:
599 Hours
Date
Hours
Work Log Summary
Details
10-11-2014
1.00
RV 12 personal hangar
Details
04-25-2014
1.00
Nose wheel spat
Details
04-25-2014
2.00
Fuel tank
Details
04-24-2014
2.00
Main wheel spat
Details
04-23-2014
6.00
Canopy
Details
04-22-2014
10.00
Fuel system
Details
03-07-2014
7.00
ADSB unit and USB power
Details
01-13-2014
10.00
Fuel system and tank.
Details
01-12-2014
10.00
Canopy
Details
01-11-2014
12.00
Flaperons and wings fitting
Details
05-05-2013
5.00
Cowl .
Details
05-04-2013
6.00
Cowl
Details
04-14-2013
10.00
Cowl
Details
04-13-2013
5.00
Cowl
Details
02-23-2013
5.00
Fuselage side Stiffner SB
Details
02-22-2013
3.00
Jack and prepare for Side skin stiffner.
Details
10-14-2012
5.00
Undercarriage and engine fitting.
Details
08-26-2012
7.00
Main wheel spats
Details
08-23-2012
1.00
Main wheel fairing assembly fitting. X 1
Details
08-20-2012
1.00
Main wheel fairing assembly fitting.
08-17-2012
1.00
Continue Nose wheel fairing assembly fitting. Stil
08-16-2012
1.00
Continue Nose wheel fairing assembly fitting.
08-15-2012
1.00
Continue Nose wheel fairing assembly fitting.
08-13-2012
1.00
Continue Nose wheel fairing assembly fitting.
08-12-2012
1.00
Continue Nose wheel fairing assembly fitting.
08-11-2012
2.50
Cut nose leg fairing retainer hinge to length.
Details
08-06-2012
1.50
Continue trim & drill off of nosewheel spat.
08-05-2012
4.00
Start nose wheel spat assembly.
Details
08-04-2012
7.00
Fuel tank assembly. Gorilla snot!
Details
08-03-2012
3.50
Fuel tank preparation for assembly.
Details
08-02-2012
1.50
Cut out and finish Return fitting bracket.
Details
08-01-2012
2.50
Fit doubler ring to front wall of fuel tank.
Details
07-31-2012
3.00
Dimple missed upper side skin to dash panel attach
Details
07-30-2012
1.50
Manufacture canopy strut attachment point doubler
Details
07-29-2012
4.00
Fit firewall shelf and upper fire wall
Details
07-28-2012
2.00
Prime Cockpit side of side skins.
Details
07-27-2012
2.00
Remove Stb skin for tidy up & refitting.
Details
07-26-2012
3.00
Refit Port side skin.
Details
07-25-2012
2.00
Remove port skin and finish off spar cut out.
Details
07-24-2012
3.00
Side skin spar cutouts.
Details
07-23-2012
2.00
Prepare and trial fit axle stubs & Brakes.
Details
07-21-2012
2.00
Cowl attachment hinge strips
Details
07-20-2012
1.50
Fit brake Hydraulic fittings to undercarriage
Details
06-15-2012
2.50
Prepare mapbox in lower panel
Details
06-14-2012
1.00
Fit stiffner to left instrument panel
06-13-2012
3.00
Prepare dash panels
Details
06-12-2012
3.00
Assemble nose wheel fork
06-11-2012
5.00
Assemble main wheels
06-10-2012
5.00
Dimple & fit nut plates to instrument panel tray
06-09-2012
3.00
Fit Anchor nuts to main gear spat brackets
06-08-2012
5.00
Fuselage longerons and side skins
Details
06-08-2012
2.00
Fit nut plates to instrument panel supports
06-07-2012
3.50
Fuselage longerons
Details
06-05-2012
3.00
Roll Autopilot servo
Details
06-04-2012
2.00
Pitch Autopilot servo
Details
06-03-2012
1.50
Control system
Details
06-02-2012
4.00
Control push rods
Details
05-31-2012
2.00
Wing pins
Details
05-30-2012
1.50
Floor panels continue
Details
05-29-2012
3.00
Flaperon Belcrank and Floor panels
Details
05-28-2012
25.50
Vent Doors
Details
05-09-2012
1.00
Prep & Prime step brackets.
05-08-2012
1.00
Step support bracket remake
Details
05-07-2012
1.00
Fuselage parts assemble
Details
05-06-2012
10.00
Roll bar assemble
Details
05-05-2012
8.00
Prep & Prime
Details
04-25-2012
3.00
Fuel system
Details
04-22-2012
10.00
Lower firewall fuse assembly
Details
04-20-2012
10.00
floor area and lower skin
Details
04-19-2012
3.00
Floor frames
Details
04-18-2012
2.00
Floor & Seat
Details
04-17-2012
2.00
Floor ribs
Details
04-16-2012
2.00
Control column brackets
Details
04-15-2012
6.00
Front of seat bylkhead
Details
04-14-2012
5.00
Continue seat base assemble
04-13-2012
2.00
Seat base
Details
04-11-2012
3.00
Seat base parts
Details
04-10-2012
7.00
Flaperon actuator brackets
Details
04-09-2012
12.00
Fuselage Baggage area floor and ribs
Details
04-08-2012
10.00
Fuselage unpack and sort parts
Details
04-07-2012
14.00
Flaperon assembly
Details
04-06-2012
1.00
Flaperon assy prep
Details
03-31-2012
8.00
Flaperon parts preparation.
Details
03-27-2012
2.00
Flaperon parts preparation.
Details
03-25-2012
2.00
Right wing electrics
Details
03-24-2012
9.00
Right wing close out
Details
03-23-2012
5.00
Right wing upper skins
Details
03-22-2012
2.00
Right wing hinge brackets
Details
03-21-2012
6.00
Rivet Right wing skins
Details
03-20-2012
5.00
Lower wing skins
Details
03-19-2012
3.00
Right wing, Nose ribs
Details
03-18-2012
4.00
Left wing storage prep
Details
03-17-2012
5.00
Wing tip (left) closeout.
Details
03-16-2012
5.00
Wing assembly (Left)
Details
03-15-2012
3.00
Wing skin fitting
Details
03-14-2012
3.00
Flaperon hinges & Wing skin prep
Details
03-13-2012
2.00
Flaperon hinges fit
03-12-2012
2.00
Rivet Left wing lower skins
03-11-2012
10.00
Left wing lower skins
Details
03-10-2012
8.00
Left Wing assembly.
Details
03-09-2012
5.00
Rivet nose ribs in place
Details
03-08-2012
3.00
Nose ribs
Details
03-07-2012
3.00
Ribs to spar assembly Continue
Details
03-06-2012
3.00
Rib to spar assembly
Details
03-05-2012
4.00
Wing preparation and assembly
Details
03-04-2012
10.00
Wing prep & assembly
Details
03-03-2012
10.00
Wing prep
Details
03-02-2012
5.00
More rib preparation
Details
03-01-2012
3.00
More Rib preparation
Details
02-29-2012
2.00
Wing components Continue
Details
02-29-2012
1.00
Plastic wrap tailcone.
Details
02-28-2012
6.00
Prep Components
Details
02-26-2012
5.00
Preparation & Set out wing parts
Details
02-26-2012
1.00
Install temporary door and frame assy
Details
02-26-2012
3.00
Fit Fin and Rudder fiberglass fairings.
Details
02-25-2012
7.00
Tailcone front most former rework
Details
02-24-2012
4.00
Tailcone assembly continue
Details
02-23-2012
5.00
Tailcone assebly continue
Details
02-22-2012
3.00
Tail cone assembly
Details
02-21-2012
5.00
Tail cone
Details
02-19-2012
7.00
Tail cone preparation
Details
02-18-2012
8.00
Rear fuse bulkhead
Details
02-17-2012
3.00
Rear bulkhead
Details
02-16-2012
2.00
Test Assemble & Drill off trim.
Details
02-15-2012
3.00
Tail cone assembly
02-15-2012
3.00
Compressor
Details
02-12-2012
8.00
Final assembly
Details
02-11-2012
4.00
Final Assembly
Details
02-10-2012
4.00
Rudder & 1 Stab trim tab final assembly
Details
02-08-2012
2.00
Priming
Details
02-07-2012
2.00
Rear tail cone bulkhead
Details
02-06-2012
2.00
Prep & Polish brackets
Details
02-05-2012
5.00
Final Assemble Vertical Stabilizer
Details
02-04-2012
4.00
Prep and Etch prime
Details
01-22-2012
3.00
Componet preparation
Details
01-15-2012
8.00
Inventory checkoff
Details
01-14-2012
6.00
Inventory check
Details
12-05-2011
2.00
Receive engine (S/H 35 hrs total time)
Details
SITE NAVIGATION
Contact Builder
RV12 Home
Category
# Logs
# Hours
All
138
599
Airframe preservatio
1
2
Avionics
1
7
Empennage
16
68
Engine
1
2
Fuselage
77
316
Hangar
1
1
Kit receival
2
14
Outback Workshop
2
4
Vertical Stabilizer
4
15
Wings
33
170