Date
|
Hours
|
Work Log Summary
|
Details
|
12-03-2020
|
0.00
|
Installed Mini.
|
Details
|
|
|
12-01-2020
|
0.00
|
Weatherstripping, heater control.
|
Details
|
|
|
11-29-2020
|
0.00
|
Test flightand iPad experiment.
|
Details
|
|
|
11-27-2020
|
0.00
|
Headliner prep.
|
Details
|
|
|
11-20-2020
|
0.00
|
Test flight and miscellaneous
|
Details
|
|
|
11-19-2020
|
0.00
|
Small tasks
|
Details
|
|
|
11-14-2020
|
0.00
|
Weatherproofing.
|
Details
|
|
|
11-13-2020
|
0.00
|
Oil leaks, weatherproofing.
|
Details
|
|
|
11-12-2020
|
0.00
|
Test/training flight
|
Details
|
|
|
11-11-2020
|
0.00
|
ELT completions and weatherproofing.
|
Details
|
|
|
11-09-2020
|
0.00
|
ELT mounting.
|
Details
|
|
|
11-08-2020
|
0.00
|
Flight with Jeanne.
|
Details
|
|
|
11-07-2020
|
0.00
|
Test flights, oil relief valve.
|
Details
|
|
|
11-06-2020
|
0.00
|
Baggage area and wing root.
|
Details
|
|
|
11-05-2020
|
0.00
|
Baffles, controls, headliner support.
|
Details
|
|
|
11-04-2020
|
0.00
|
Re-assembly after oil leak remediation.
|
Details
|
|
|
11-01-2020
|
0.00
|
Reset trim limits.
|
Details
|
|
|
10-27-2020
|
0.00
|
Attached carburetor assembly, worked on baffles.
|
Details
|
|
|
10-24-2020
|
0.00
|
Installed oil-related parts and headliner supports
|
Details
|
|
|
10-21-2020
|
0.00
|
Baggage area upholstery and crankcase sealant.
|
Details
|
|
|
10-20-2020
|
0.00
|
Finished prepping engine bottom for saelant.
|
Details
|
|
|
10-19-2020
|
0.00
|
Oil leak work, other.
|
Details
|
|
|
10-18-2020
|
0.00
|
Break-in flight, oil leak
|
Details
|
|
|
10-17-2020
|
0.00
|
New headliner kit and oil leak.
|
Details
|
|
|
10-15-2020
|
0.00
|
Oil leak, AirTex snaps wrong.
|
Details
|
|
|
10-14-2020
|
0.00
|
Oil leak and baggage area upholstery
|
Details
|
|
|
10-13-2020
|
0.00
|
Oil leak and fuselage cross brace.
|
Details
|
|
|
10-12-2020
|
0.00
|
Oil leaks
|
Details
|
|
|
10-09-2020
|
0.00
|
Finished flushing fuel system.
|
Details
|
|
|
10-08-2020
|
0.00
|
Cleaning fuel system
|
Details
|
|
|
10-07-2020
|
0.00
|
Fuel system cleaning.
|
Details
|
|
|
10-06-2020
|
0.00
|
Fuel tanks, AirTex re-order.
|
Details
|
|
|
10-05-2020
|
0.00
|
Test flights, transponder
|
Details
|
|
|
10-03-2020
|
0.00
|
Good oil pressure!
|
Details
|
|
|
10-02-2020
|
0.00
|
Oil pressure gauge, relief valve, shelf and tunnel
|
Details
|
|
|
10-01-2020
|
0.00
|
Oil pressure relief valve.
|
Details
|
|
|
09-30-2020
|
0.00
|
Tunnel cover, skylight retainers.
|
Details
|
|
|
09-28-2020
|
0.00
|
Low oil pressure, cont.
|
Details
|
|
|
09-25-2020
|
0.00
|
Transponder tests, oil pressure concerns.
|
Details
|
|
|
09-24-2020
|
0.00
|
Installed tach, ground run.
|
Details
|
|
|
09-22-2020
|
0.00
|
Starter, antenna, brake leak, other...
|
Details
|
|
|
09-21-2020
|
0.00
|
Starter, antenna, tach cable.
|
Details
|
|
|
09-18-2020
|
0.00
|
Starter and more.
|
Details
|
|
|
09-17-2020
|
0.00
|
Transponder, starter.
|
Details
|
|
|
09-16-2020
|
0.00
|
Tach, transponder, starter.
|
Details
|
|
|
09-15-2020
|
0.00
|
Tach cable failed.
|
Details
|
|
|
09-14-2020
|
0.00
|
Reinstalled and adjusted VR.
|
Details
|
|
|
09-12-2020
|
0.00
|
Regulator work onbench.
|
Details
|
|
|
09-11-2020
|
0.00
|
Oil leaks, regulator, transponder issues.
|
Details
|
|
|
09-10-2020
|
1.00
|
Second breakin flight.
|
Details
|
|
|
09-09-2020
|
1.00
|
First Flight!
|
Details
|
|
|
09-08-2020
|
0.00
|
Oil temp gauge.
|
Details
|
|
|
09-04-2020
|
0.00
|
VR, cowl.
|
Details
|
|
|
09-03-2020
|
0.00
|
Starter, gauges, amps.
|
Details
|
|
|
09-01-2020
|
0.00
|
Oil leak.
|
Details
|
|
|
08-31-2020
|
0.00
|
Taxi tests, oil leak.
|
Details
|
|
|
08-29-2020
|
0.00
|
High speed taxi tests.
|
Details
|
|
|
08-28-2020
|
0.00
|
Minor tasks, paperwork.
|
Details
|
|
|
08-27-2020
|
0.00
|
Revised logs and 337's, ordered tach.
|
|
|
|
08-26-2020
|
0.00
|
More final tasks.
|
Details
|
|
|
08-25-2020
|
0.00
|
Final Documentation.
|
Details
|
|
|
08-24-2020
|
0.00
|
Rudder rigging, other tasks.
|
Details
|
|
|
08-23-2020
|
0.00
|
Documentation Day
|
|
|
|
08-22-2020
|
0.00
|
Taxi tests.
|
Details
|
|
|
08-21-2020
|
0.00
|
Logbooks, AD's.
|
Details
|
|
|
08-20-2020
|
0.00
|
Weigh-in
|
Details
|
|
|
08-18-2020
|
0.00
|
Prepping for weigh-in, oil leaks, battery.
|
Details
|
|
|
08-17-2020
|
0.00
|
Miscellaneous tasks.
|
Details
|
|
|
08-14-2020
|
0.00
|
Balanced prop.
|
Details
|
|
|
08-13-2020
|
0.00
|
Prop orientation vs. vibration.
|
Details
|
|
|
08-12-2020
|
0.00
|
Fitted and installed doors
|
Details
|
|
|
08-10-2020
|
0.00
|
Finished belt installation, sent inner ends back.
|
Details
|
|
|
08-07-2020
|
0.00
|
Shoulder belt hardware.
|
Details
|
|
|
08-06-2020
|
0.00
|
Seatbelts.
|
Details
|
|
|
08-05-2020
|
0.00
|
WIng root fairings
|
Details
|
|
|
08-04-2020
|
0.00
|
Documents and logbooks.
|
Details
|
|
|
08-03-2020
|
0.00
|
Wheels and fairings.
|
Details
|
|
|
08-01-2020
|
0.00
|
Gear alignment.
|
Details
|
|
|
07-31-2020
|
0.00
|
Worked on toe-in
|
Details
|
|
|
07-30-2020
|
0.00
|
Ailerons, decals, more.
|
Details
|
|
|
07-29-2020
|
0.00
|
Miscellaneous small tasks.
|
Details
|
|
|
07-28-2020
|
0.00
|
Moved RV, supervised Jane, did minor tasks.
|
Details
|
|
|
07-27-2020
|
0.00
|
Second run, prop and oil pressure.
|
Details
|
|
|
07-25-2020
|
0.00
|
First engine run.
|
Details
|
|
|
07-24-2020
|
0.00
|
Planning/Organization tasks for final push.
|
Details
|
|
|
07-23-2020
|
0.00
|
Ailerons and engine.
|
Details
|
|
|
07-22-2020
|
0.00
|
Ailerons and right mag problems
|
Details
|
|
|
07-21-2020
|
0.00
|
Aileron and elevator rigging.
|
Details
|
|
|
07-17-2020
|
0.00
|
Ailerons
|
Details
|
|
|
07-16-2020
|
0.00
|
Rough adjusted ailerons.
|
Details
|
|
|
07-15-2020
|
0.00
|
Fuel system, instrument panel.
|
Details
|
|
|
07-11-2020
|
0.00
|
Windshield, ailerons.
|
Details
|
|
|
07-10-2020
|
0.00
|
Reinstalled windshield, miscellaneous tasks.
|
Details
|
|
|
07-09-2020
|
0.00
|
Antennas, ELT, interior
|
Details
|
|
|
07-07-2020
|
0.00
|
Wing root and wiring.
|
Details
|
|
|
07-06-2020
|
0.00
|
Removed winshield, worked in that area.
|
Details
|
|
|
07-03-2020
|
0.00
|
Worked on windshield fitting.
|
Details
|
|
|
07-02-2020
|
0.00
|
Installed jury struts
|
Details
|
|
|
07-01-2020
|
0.00
|
Checked jury struts, connected aileron cables.
|
Details
|
|
|
06-30-2020
|
0.00
|
Adjusted dihedral.
|
Details
|
|
|
06-29-2020
|
0.00
|
Swapped lift struts.
|
Details
|
|
|
06-26-2020
|
0.00
|
Prepared for windshield reinstall.
|
Details
|
|
|
06-25-2020
|
0.00
|
Set wing dihedral, removed windshield.
|
Details
|
|
|
06-24-2020
|
0.00
|
Wings on!
|
Details
|
|
|
06-23-2020
|
0.00
|
Fianl prep for wing installs.
|
Details
|
|
|
06-22-2020
|
0.00
|
Prep for wing install.
|
Details
|
|
|
06-20-2020
|
0.00
|
Installed airscoop.
|
Details
|
|
|
06-18-2020
|
0.00
|
Aileron hardware, prop, insurance.
|
Details
|
|
|
06-17-2020
|
0.00
|
Left door, seats, panel labels.
|
Details
|
|
|
06-16-2020
|
0.00
|
Finished left door.
|
Details
|
|
|
06-15-2020
|
0.00
|
Worked on doors, staus meeting.
|
Details
|
|
|
06-13-2020
|
0.00
|
Worked on doors and windows.
|
Details
|
|
|
06-12-2020
|
0.00
|
Multiple tasks
|
Details
|
|
|
06-11-2020
|
0.00
|
Engine mount bolts in and out.
|
Details
|
|
|
06-10-2020
|
0.00
|
Paperwork and prop news.
|
Details
|
|
|
06-09-2020
|
0.00
|
Ailerons and engine mounts.
|
Details
|
|
|
06-08-2020
|
0.00
|
Ailerons, wing attachments, engine mounts.
|
Details
|
|
|
06-05-2020
|
0.00
|
Wing work and mags.
|
Details
|
|
|
06-04-2020
|
0.00
|
Began prep work for wing install.
|
Details
|
|
|
06-03-2020
|
0.00
|
Magneto wiring and seat back assembly.
|
Details
|
|
|
06-01-2020
|
0.00
|
Prop decision, mag wires, other stuff.
|
Details
|
|
|
05-30-2020
|
0.00
|
Workbench cleanup and various small tasks.
|
Details
|
|
|
05-28-2020
|
0.00
|
Reorganized hangar.
|
Details
|
|
|
05-27-2020
|
0.00
|
Crew meeting, decisions made, starter starter test
|
Details
|
|
|
05-26-2020
|
0.00
|
Multiple tasks.
|
Details
|
|
|
05-25-2020
|
0.00
|
Nav lights, wings, panel.
|
Details
|
|
|
05-24-2020
|
0.00
|
Fuel tests, nav lights.
|
Details
|
|
|
05-23-2020
|
0.00
|
Worked on nav lights at home.
|
Details
|
|
|
05-22-2020
|
0.00
|
Fuel tests, mags, research.
|
Details
|
|
|
05-21-2020
|
0.00
|
Generator, primer, nav lights.
|
Details
|
|
|
05-20-2020
|
0.00
|
FWF wiring +...
|
Details
|
|
|
05-19-2020
|
0.00
|
Rudder stops.
|
Details
|
|
|
05-18-2020
|
0.00
|
Many miscellaneous tasks.
|
Details
|
|
|
05-15-2020
|
0.00
|
Tail and panel wiring.
|
Details
|
|
|
05-14-2020
|
0.00
|
Wings laid out.
|
Details
|
|
|
05-13-2020
|
0.00
|
A little panel work
|
Details
|
|
|
05-12-2020
|
0.00
|
Ordered grease and buttons, packed up props.
|
Details
|
|
|
05-11-2020
|
0.00
|
Continued electrical work.
|
Details
|
|
|
05-09-2020
|
0.00
|
|
|
|
|
05-07-2020
|
0.00
|
Tail feathers and rigging.
|
Details
|
|
|
05-06-2020
|
0.00
|
Tail feather work.
|
Details
|
|
|
05-05-2020
|
0.00
|
Sam worked on tail.
|
Details
|
|
|
05-04-2020
|
0.00
|
Finished most panel wiring.
|
Details
|
|
|
05-02-2020
|
0.00
|
Began wiring revisions.
|
Details
|
|
|
05-01-2020
|
0.00
|
Prop arrangements
|
Details
|
|
|
04-30-2020
|
0.00
|
Updated wiring diagram
|
Details
|
|
|
04-28-2020
|
0.00
|
Moved to T hangar, worked on HS.
|
Details
|
|
|
04-27-2020
|
0.00
|
Cowling, fairings, other.
|
Details
|
|
|
04-23-2020
|
0.00
|
Cables, baffles, headliner.
|
Details
|
|
|
04-22-2020
|
0.00
|
Fuel system, mixture cable.
|
Details
|
|
|
04-21-2020
|
0.00
|
Many FWF tasks.
|
Details
|
|
|
04-20-2020
|
0.00
|
Brakes, windshield, Grimes.
|
Details
|
|
|
04-18-2020
|
0.00
|
Visit to airport!
|
Details
|
|
|
04-17-2020
|
0.00
|
Starter, windshield, brakes.
|
Details
|
|
|
04-16-2020
|
0.00
|
Repaired window latch. worked on starter.
|
Details
|
|
|
04-15-2020
|
0.00
|
Painted glare shield.
|
Details
|
|
|
04-14-2020
|
0.00
|
Sam - Baffles, mags, battery.
|
Details
|
|
|
04-10-2020
|
0.00
|
Sam continued at FBO.
|
Details
|
|
|
04-09-2020
|
0.00
|
Worked on windshield strip.
|
Details
|
|
|
04-08-2020
|
0.00
|
Checked present latch mechanism.
|
|
|
|
04-07-2020
|
0.00
|
Moved props to T hangar.
|
Details
|
|
|
03-31-2020
|
0.00
|
Starter bearing measurements
|
Details
|
|
|
03-30-2020
|
0.00
|
Tested light, tried bearing.
|
Details
|
|
|
03-29-2020
|
0.00
|
Airport visit for latchs and lights.
|
Details
|
|
|
03-27-2020
|
0.00
|
Worked on yokes, ordered starter bearing.
|
Details
|
|
|
03-26-2020
|
0.00
|
Worked parts at home.
|
Details
|
|
|
03-23-2020
|
0.00
|
Recieved airbox brace, ordered throttle.
|
Details
|
|
|
03-22-2020
|
0.00
|
Returned baffles to FBO hangar.
|
|
|
|
03-21-2020
|
0.00
|
Finished painting baffles.
|
|
|
|
03-20-2020
|
0.00
|
Baffles @ Pecks Lake, windshield at FBO.
|
Details
|
|
|
03-19-2020
|
0.00
|
Sam worked on baffles and windshield.
|
Details
|
|
|
03-18-2020
|
0.00
|
Aileron pulleys. exhaust system.
|
Details
|
|
|
03-17-2020
|
0.00
|
Worked on exhaust and baffles.
|
Details
|
|
|
03-16-2020
|
0.00
|
Moved fuselage to FBO hangar.
|
Details
|
|
|
03-13-2020
|
0.00
|
Ordered parts, worked on throttle control.
|
Details
|
|
|
03-11-2020
|
0.00
|
Moved back to airport.
|
Details
|
|
|
03-10-2020
|
0.00
|
Unmasked, moved parts and equipment.
|
Details
|
|
|
03-09-2020
|
0.00
|
Sam and Jeanne masked and shot trim.
|
|
|
|
03-07-2020
|
0.00
|
Met with Jeanne, Sam, and Bill, revise paint plan
|
|
|
|
03-05-2020
|
0.00
|
Mounted cowl and began masking for trim coat.
|
Details
|
|
|
03-03-2020
|
0.00
|
Installed engine.
|
Details
|
|
|
03-02-2020
|
0.00
|
First and second coats white basecoat.
|
Details
|
|
|
02-29-2020
|
0.00
|
Prrimed fuselage.
|
Details
|
|
|
02-28-2020
|
0.00
|
Aileron pulleys and Alodine.
|
Details
|
|
|
02-25-2020
|
0.00
|
Cleaned & scuffed aft fuselage. Added some filler.
|
|
|
|
02-24-2020
|
0.00
|
Moved fuselafe to Milton's
|
|
|
|
02-22-2020
|
0.00
|
Painted 2nd batch second coat.
|
|
|
|
02-21-2020
|
0.00
|
Roughed up and prepped 2nd batch parts.
|
|
|
|
11-23-2019
|
0.00
|
Received ski fitting kit
|
|
|
|
11-17-2019
|
0.00
|
Painted 2nd batch first coat.
|
|
|
|
11-16-2019
|
0.00
|
Primed 2nd batch parts
|
|
|
|
11-15-2019
|
0.00
|
Prepped/alodined 2nd batch parts
|
|
|
|
11-08-2019
|
0.00
|
Reorganized paint area, moved interior to T hangar
|
|
|
|
08-01-2019
|
0.00
|
Began lower cowl repair.
|
Details
|
|
|
06-18-2019
|
0.00
|
Wayne Sheets borrowed baffles.
|
Details
|
|
|
06-13-2019
|
0.00
|
Lower cowl cosmetics and patch.
|
|
|
|
06-06-2019
|
0.00
|
Door and window interior painting.
|
Details
|
|
|
06-03-2019
|
0.00
|
Worked on doors
|
Details
|
|
|
05-31-2019
|
0.00
|
Put away all tools, prepped for move.
|
|
|
|
05-29-2019
|
0.00
|
Gear legs.
|
Details
|
|
|
05-28-2019
|
0.00
|
Panel and gear.
|
Details
|
|
|
05-25-2019
|
0.00
|
ELT test, wiring tidy-up.
|
Details
|
|
|
05-24-2019
|
0.00
|
Avionics wiring.
|
Details
|
|
|
05-22-2019
|
0.00
|
Tested radio audio.
|
Details
|
|
|
05-21-2019
|
0.00
|
Revised sub-panel mounting, check audio wiring.
|
Details
|
|
|
05-15-2019
|
0.00
|
Photos from UFO fly-in.
|
Details
|
|
|
05-14-2019
|
0.00
|
Finished panel wiring, powered up.
|
Details
|
|
|
05-13-2019
|
0.00
|
Mag compass
|
Details
|
|
|
05-12-2019
|
0.00
|
ELT remote battery, cleaned, installed, tested.
|
|
|
|
05-11-2019
|
0.00
|
Photos of C140.
|
Details
|
|
|
05-10-2019
|
0.00
|
Puttered - electrical.
|
Details
|
|
|
05-03-2019
|
0.00
|
Worked on avionics.
|
Details
|
|
|
05-02-2019
|
0.00
|
Inserted D cells, tested ELT for output.
|
|
|
|
05-01-2019
|
0.00
|
Worked on wiring and avionics.
|
Details
|
|
|
04-29-2019
|
0.00
|
Installed left aft spar spacer, painted parts.
|
|
|
|
04-18-2019
|
0.00
|
Wiring.
|
Details
|
|
|
04-17-2019
|
0.00
|
Miscellaneous minor tasks.
|
Details
|
|
|
04-16-2019
|
0.00
|
Continued wiring.
|
Details
|
|
|
04-15-2019
|
0.00
|
Worked on second batch of parts at Milton's.
|
Details
|
|
|
04-13-2019
|
0.00
|
Moved first batch of painted parts to T hangar.
|
|
|
|
04-12-2019
|
0.00
|
Panel work.
|
Details
|
|
|
04-11-2019
|
0.00
|
Spars, strobe, miscellaneous.
|
Details
|
|
|
04-10-2019
|
0.00
|
Panel work.
|
Details
|
|
|
04-09-2019
|
0.00
|
Fuselage and panel work continue.
|
Details
|
|
|
04-08-2019
|
0.00
|
Fuselage and panel work continue.
|
Details
|
|
|
04-07-2019
|
0.00
|
First batch parts paint.
|
Details
|
|
|
04-06-2019
|
0.00
|
Priming session 1.
|
Details
|
|
|
04-05-2019
|
0.00
|
Painted interior, Alodined parts.
|
Details
|
|
|
04-04-2019
|
0.00
|
Readied for interior paint.
|
Details
|
|
|
04-03-2019
|
0.00
|
Panel layout plus.
|
Details
|
|
|
04-02-2019
|
0.00
|
Fuselage tasks.
|
Details
|
|
|
04-01-2019
|
0.00
|
Various tasks on fuselage.
|
Details
|
|
|
03-30-2019
|
0.00
|
Miscellaneous Saturday puttering.
|
Details
|
|
|
03-28-2019
|
0.00
|
Regulator, solunoid, Floating panel blank.
|
Details
|
|
|
03-27-2019
|
0.00
|
Regulator and solunoid work.
|
Details
|
|
|
03-26-2019
|
0.00
|
Miscellaneous tasks.
|
Details
|
|
|
03-25-2019
|
0.00
|
Paint choices, antennas, voltage regulator.
|
Details
|
|
|
03-24-2019
|
0.00
|
Cowl latches, struts.
|
Details
|
|
|
03-23-2019
|
0.00
|
Parts prep for paint.
|
Details
|
|
|
03-21-2019
|
0.00
|
More antenna work.
|
Details
|
|
|
03-20-2019
|
0.00
|
Worked on antennas.
|
Details
|
|
|
03-19-2019
|
0.00
|
Primer prep and Grimes.
|
Details
|
|
|
03-16-2019
|
0.00
|
Panel prep for paint.
|
Details
|
|
|
03-15-2019
|
0.00
|
Continued work on panel.
|
Details
|
|
|
03-14-2019
|
0.00
|
Finished wiring on mockup panel.
|
Details
|
|
|
03-13-2019
|
0.00
|
Worked fuselage parts @ Milton's.
|
Details
|
|
|
03-12-2019
|
0.00
|
Worked on small parts, wiring.
|
Details
|
|
|
03-11-2019
|
0.00
|
Began paint prep at Milton's
|
Details
|
|
|
03-08-2019
|
0.00
|
Continued on wiring.
|
Details
|
|
|
03-07-2019
|
0.00
|
Worked on avionics wiring.
|
Details
|
|
|
03-06-2019
|
0.00
|
Worked on avionics wiring.
|
Details
|
|
|
03-05-2019
|
0.00
|
Began building up panel wiring.
|
Details
|
|
|
03-04-2019
|
0.00
|
Started intercom wiring.
|
Details
|
|
|
03-01-2019
|
0.00
|
Finished glovebox and CB panel.
|
Details
|
|
|
02-28-2019
|
0.00
|
Worked on electrical planning.
|
Details
|
|
|
02-27-2019
|
0.00
|
Made decision, reduced glove box, made CB panel
|
Details
|
|
|
02-26-2019
|
0.00
|
Worked on electrical system design.
|
Details
|
|
|
02-25-2019
|
0.00
|
Test fit switches and breakers.
|
Details
|
|
|
02-24-2019
|
0.00
|
Documented old wiring, drafted new wiring and pane
|
Details
|
|
|
02-23-2019
|
0.00
|
Took pictures, did research.
|
Details
|
|
|
02-22-2019
|
0.00
|
Peparation for panel wiring.
|
Details
|
|
|
02-21-2019
|
0.00
|
Documented old wiring.
|
Details
|
|
|
02-20-2019
|
0.00
|
Fit windshields, removed old wiring.
|
Details
|
|
|
02-19-2019
|
0.00
|
Worked on windsheild.
|
Details
|
|
|
02-18-2019
|
0.00
|
Installed doors, checked windsheild and controls.
|
Details
|
|
|
02-14-2019
|
0.00
|
Heater, seat pan riveting.
|
Details
|
|
|
02-12-2019
|
0.00
|
Staged h'ware, loosened switches.
|
Details
|
|
|
02-11-2019
|
0.00
|
Installed rivets, repaired heater control.
|
Details
|
|
|
02-08-2019
|
0.00
|
Secured battery cable.
|
Details
|
|
|
02-06-2019
|
0.00
|
Installed aileron controls.
|
Details
|
|
|
02-01-2019
|
0.00
|
Riveted seat pan.
|
Details
|
|
|
01-31-2019
|
0.00
|
Small tasks.
|
Details
|
|
|
01-29-2019
|
0.00
|
Trim wheel, rivets.
|
Details
|
|
|
01-28-2019
|
0.00
|
Fuel plumbing install.
|
Details
|
|
|
01-26-2019
|
0.00
|
Rivetted gearbox cover.
|
Details
|
|
|
01-25-2019
|
0.00
|
Catch-up weekday sessions
|
Details
|
|
|
01-18-2019
|
0.00
|
Aileron controls, brake lines.
|
Details
|
|
|
01-17-2019
|
0.00
|
Tested left brake plumbing.
|
Details
|
|
|
01-16-2019
|
0.00
|
Gearbox cover and brake lines.
|
Details
|
|
|
01-15-2019
|
0.00
|
Elevator cables, gearbox.
|
Details
|
|
|
01-14-2019
|
0.00
|
Repaired two rivets.
|
Details
|
|
|
01-12-2019
|
0.00
|
More fuselage riveting.
|
Details
|
|
|
01-11-2019
|
0.00
|
Flight control hookups.
|
Details
|
|
|
01-08-2019
|
0.00
|
Odds and ends.
|
Details
|
|
|
01-07-2019
|
0.00
|
Small stuff after flying with Jacob Hentnik.
|
Details
|
|
|
01-05-2019
|
0.00
|
Right side riveting, battery box.
|
Details
|
|
|
01-04-2019
|
0.00
|
Got information about motor mount attachment.
|
Details
|
|
|
01-03-2019
|
0.00
|
Flight controls parts.
|
Details
|
|
|
01-02-2019
|
0.00
|
Worked on flight controls.
|
Details
|
|
|
12-31-2018
|
0.00
|
Began work on re-installation of flight controls.
|
Details
|
|
|
12-30-2018
|
0.00
|
Two team riveting and motor mount install.
|
Details
|
|
|
12-28-2018
|
0.00
|
Replaced right rudder cable.
|
Details
|
|
|
12-27-2018
|
0.00
|
Repaired elevator bellcrank.
|
Details
|
|
|
12-26-2018
|
0.00
|
Replaced battery cable and brake lines.
|
Details
|
|
|
12-21-2018
|
0.00
|
Riveted floorboards.
|
Details
|
|
|
12-19-2018
|
0.00
|
Catch-up Entry Last Few Days
|
Details
|
|
|
12-13-2018
|
0.00
|
Sorted out brake lines.
|
Details
|
|
|
12-12-2018
|
0.00
|
Fuel plumbing, battery wire.
|
Details
|
|
|
12-11-2018
|
0.00
|
Fit, drilled box cover and seat pan.
|
Details
|
|
|
12-10-2018
|
0.00
|
Fitted floors and gearbox cover.
|
Details
|
|
|
12-07-2018
|
0.00
|
Dry fit floor boards, drilled side skins.
|
Details
|
|
|
12-06-2018
|
0.00
|
Back to work on fuselage!
|
Details
|
|
|
12-03-2018
|
0.00
|
Overhauled rudder pedal assembly.
|
Details
|
|
|
05-09-2018
|
0.00
|
Moved wings.
|
Details
|
|
|
05-08-2018
|
0.00
|
Picked up skiis.
|
Details
|
|
|
04-29-2018
|
0.00
|
Second sprayed coat Poly-Tone, tops.
|
Details
|
|
|
04-28-2018
|
0.00
|
Second sprayed coat Poly-Tone, bottoms.
|
|
|
|
04-27-2018
|
0.00
|
Sanded bottoms.
|
Details
|
|
|
04-25-2018
|
0.00
|
Sanded tops.
|
Details
|
|
|
04-24-2018
|
0.00
|
First sprayed coat Poly-Tone, tops.
|
|
|
|
04-21-2018
|
0.00
|
First sprayed coat Poly-Tone, bottoms.
|
Details
|
|
|
04-17-2018
|
0.00
|
Melted drain holes, fixed bump.
|
Details
|
|
|
04-11-2018
|
0.00
|
Light test, inspection, started drain holes.
|
Details
|
|
|
04-09-2018
|
0.00
|
Fabricated replacement rigging attach brackets.
|
|
|
|
04-07-2018
|
0.00
|
Third sprayed coat Poly-Spray, bottoms.
|
Details
|
|
|
04-06-2018
|
0.00
|
Third sprayed coat Poly-Spray, tops.
|
Details
|
|
|
04-04-2018
|
0.00
|
Second sprayed coat Poly-Spray, tops.
|
Details
|
|
|
04-03-2018
|
0.00
|
Repairs, ironing, full sanding, bottoms.
|
|
|
|
03-30-2018
|
0.00
|
Second sprayed coat Poly-Spray, bottoms.
|
Details
|
|
|
03-29-2018
|
0.00
|
First sprayed coat Poly-Spray, bottoms.
|
Details
|
|
|
03-28-2018
|
0.00
|
Worked wing tops.
|
Details
|
|
|
03-27-2018
|
0.00
|
First sprayed coat Poly-Spray, tops.
|
Details
|
|
|
03-26-2018
|
0.00
|
Third sprayed coat Poly-Brush, tops.
|
Details
|
|
|
03-25-2018
|
0.00
|
Third sprayed coat Poly-Brush, bottoms.
|
Details
|
|
|
03-24-2018
|
0.00
|
Second sprayed coat PolyBrush, bottoms.
|
Details
|
|
|
03-23-2018
|
0.00
|
Second sprayed coat Poly-Brush, tops.
|
Details
|
|
|
03-17-2018
|
0.00
|
First sprayed coat Poly-Brush, tops.
|
Details
|
|
|
03-16-2018
|
0.00
|
First sprayed coat Poly-Brush, bottoms.
|
Details
|
|
|
03-15-2018
|
0.00
|
50:50 Poly-Brush coat due to long storage.
|
Details
|
|
|
03-14-2018
|
0.00
|
Prep for wing coatings.
|
Details
|
|
|
03-12-2018
|
0.00
|
Replaced filters, modified stands, laid out wings.
|
|
|
|
03-10-2018
|
0.00
|
Cleaned out painting area.
|
|
|
|
03-09-2018
|
0.00
|
Cut off rusty hardware.
|
|
|
|
03-06-2018
|
0.00
|
Worked towards paint booth.
|
Details
|
|
|
03-05-2018
|
0.00
|
Finished engine, cleaned parts.
|
Details
|
|
|
03-04-2018
|
0.00
|
Began cleaning out paint booth
|
Details
|
|
|
03-03-2018
|
0.00
|
Began ski rejuvination
|
Details
|
|
|
03-01-2018
|
0.00
|
Painted motor mount, reorganized.
|
Details
|
|
|
02-28-2018
|
0.00
|
Installed intake pipes. Painted valve covers.
|
Details
|
|
|
02-27-2018
|
0.00
|
Finished installijg cylinders and associated parts
|
Details
|
|
|
02-26-2018
|
0.00
|
Feb catchup, installed cylinders.
|
Details
|
|
|
01-29-2018
|
0.00
|
Received pistons, rejected one.
|
Details
|
|
|
01-26-2018
|
0.00
|
Dry fit carb and air intake.
|
Details
|
|
|
01-19-2018
|
0.00
|
Discovered wrong pistons, ordered.
|
Details
|
|
|
01-11-2018
|
0.00
|
Prepped cylinders, pistons, rings for cylinder ins
|
Details
|
|
|
01-08-2018
|
0.00
|
Installed pushrod tubes.
|
Details
|
|
|
01-05-2018
|
0.00
|
Found and worked on pistons.
|
Details
|
|
|
12-28-2017
|
0.00
|
Generator and honing.
|
Details
|
|
|
12-21-2017
|
0.00
|
Lapped and reinstalled valves.
|
Details
|
|
|
12-15-2017
|
0.00
|
Worked on Sherwood cylinders.
|
Details
|
|
|
12-08-2017
|
0.00
|
Checked cylinders.
|
Details
|
|
|
07-25-2017
|
0.00
|
Removed from jig, set up new area.
|
|
|
|
07-24-2017
|
0.00
|
Finished fitting gear leg covers.
|
Details
|
|
|
07-11-2017
|
0.00
|
Finished belly rivets, worked on gear leg covers.
|
|
|
|
07-07-2017
|
0.00
|
Riveted about 75% of belly stiffeners.
|
|
|
|
07-05-2017
|
0.00
|
Began fitting side skins.
|
|
|
|
07-04-2017
|
0.00
|
Riveted belly skin in place.
|
|
|
|
07-03-2017
|
0.00
|
Clecoed belly skin in place.
|
|
|
|
06-19-2017
|
0.00
|
Continued re-assembly of fuselage.
|
Details
|
|
|
06-13-2017
|
0.00
|
Blasted, inspected, cleaned engine mount.
|
|
|
|
06-03-2017
|
0.00
|
Riveted front skins to structure.
|
|
|
|
05-29-2017
|
0.00
|
Began riveting skins on. Primed firewall.
|
|
|
|
05-27-2017
|
0.00
|
Deburring and cleaning.
|
Details
|
|
|
05-26-2017
|
0.00
|
Continued work on gearbox bulkheads and new skins
|
Details
|
|
|
05-13-2017
|
0.00
|
Began riveting gearbox into fuselage.
|
|
|
|
05-12-2017
|
0.00
|
More riveting gearbox together, test fit.
|
|
|
|
05-08-2017
|
0.00
|
Continued riveting gear box.
|
|
|
|
05-06-2017
|
0.00
|
Turned the corner! Reassembly begins!
|
Details
|
|
|
05-05-2017
|
0.00
|
Parts primed by Chris.
|
|
|
|
05-03-2017
|
0.00
|
Finished upsizing gearbox assembly holes, deburred
|
|
|
|
05-02-2017
|
0.00
|
Marked hole sizes.
|
Details
|
|
|
05-01-2017
|
0.00
|
Clamped in place and drilled steel angles.
|
|
|
|
04-10-2017
|
0.00
|
Behind panel work.
|
Details
|
|
|
04-08-2017
|
0.00
|
Picked up remaining two cylinders from Ken.
|
|
|
|
04-06-2017
|
0.00
|
Began inspecting Sherwood cylinders.
|
Details
|
|
|
04-04-2017
|
0.00
|
Deburred and cleaned parts.
|
|
|
|
03-31-2017
|
0.00
|
Disassembled center section, trimmed bulkhead flan
|
|
|
|
03-29-2017
|
0.00
|
Completed fitting skins and internal structure. Re
|
|
|
|
03-19-2017
|
0.00
|
Drilled new side skins, pushed out elevator rod be
|
|
|
|
03-16-2017
|
0.00
|
Got new bearing for elevator control rod end.
|
|
|
|
03-15-2017
|
0.00
|
Cleaned and repaired elevator control bracket.
|
|
|
|
03-07-2017
|
0.00
|
Fabbed new skins near LG legs, started elevator co
|
|
|
|
03-06-2017
|
0.00
|
Trim control.
|
Details
|
|
|
03-03-2017
|
0.00
|
Continued on fuselage.
|
Details
|
|
|
02-05-2017
|
0.00
|
More reconstruction work .............
|
Details
|
|
|
01-24-2017
|
0.00
|
Catch-up entry - work continues...
|
Details
|
|
|
01-07-2017
|
0.00
|
Bill worked on gearboxes and new skins.
|
|
|
|
12-23-2016
|
0.00
|
Marked and cut angles off.
|
|
|
|
12-19-2016
|
0.00
|
Laid out and drilled both forward skins
|
|
|
|
12-14-2016
|
0.00
|
Removed brake pedal clamps
|
Details
|
|
|
12-03-2016
|
0.00
|
Worked on bulkhead and skins.
|
Details
|
|
|
11-25-2016
|
0.00
|
Installed master cylinders.
|
|
|
|
11-23-2016
|
0.00
|
Master cylinder bracket and bulkhead marking.
|
Details
|
|
|
11-22-2016
|
0.00
|
Drilled holes in new forward bulkhead.
|
|
|
|
11-21-2016
|
0.00
|
Bulkhead work and master cylinders.
|
Details
|
|
|
11-07-2016
|
0.00
|
Gear and brake cylinders
|
Details
|
|
|
11-05-2016
|
0.00
|
Moved wings from T hangar to Milton's
|
|
|
|
06-02-2016
|
0.00
|
Tires and tubes.
|
Details
|
|
|
05-21-2016
|
0.00
|
Clinder work, incl AD.
|
Details
|
|
|
05-17-2016
|
0.00
|
Catch up entry. See details.
|
Details
|
|
|
05-04-2016
|
0.00
|
Wheels, rocker bushings, gear box.
|
Details
|
|
|
05-03-2016
|
0.00
|
Brake work.
|
Details
|
|
|
04-14-2016
|
0.00
|
Completed 337 forms.
|
Details
|
|
|
04-13-2016
|
0.00
|
Carb box, 337's.
|
Details
|
|
|
04-12-2016
|
0.00
|
Brake parts and airbox work.
|
Details
|
|
|
04-11-2016
|
0.00
|
Cleaned/prepped wheels and brake parts.
|
Details
|
|
|
04-09-2016
|
0.00
|
Started work on gear/wheels/brakes.
|
Details
|
|
|
04-08-2016
|
0.00
|
Catch-up W/E 4/8.
|
Details
|
|
|
04-02-2016
|
0.00
|
Frustrating day.
|
Details
|
|
|
03-31-2016
|
0.00
|
Air box, carbs, misc.
|
Details
|
|
|
03-30-2016
|
0.00
|
Prepared to work on cylinders.
|
Details
|
|
|
03-22-2016
|
0.00
|
Installed carb SB.
|
Details
|
|
|
03-21-2016
|
0.00
|
Fabbed second set of bulkheads.
|
Details
|
|
|
02-01-2016
|
0.00
|
Carb inspection.
|
Details
|
|
|
01-30-2016
|
0.00
|
Drilled angles.
|
Details
|
|
|
01-27-2016
|
0.00
|
Prepped parts, started on carbs.
|
Details
|
|
|
01-26-2016
|
0.00
|
Continued making new parts..
|
Details
|
|
|
01-21-2016
|
0.00
|
Joggles.
|
Details
|
|
|
01-20-2016
|
0.00
|
|
Details
|
|
|
01-18-2016
|
0.00
|
Fabbed new belly skin.
|
Details
|
|
|
01-16-2016
|
0.00
|
Saturday Work Day
|
Details
|
|
|
01-14-2016
|
0.00
|
Worked on stringer and other tasks.
|
Details
|
|
|
01-13-2016
|
0.00
|
Doublers and floors.
|
Details
|
|
|
01-12-2016
|
0.00
|
Worked on doorpost top channels.
|
Details
|
|
|
01-09-2016
|
0.00
|
Finished floor panels, removed rivets.
|
Details
|
|
|
01-06-2016
|
0.00
|
Work continues on fuselage.
|
Details
|
|
|
12-28-2015
|
0.00
|
Bulkheads.
|
Details
|
|
|
12-14-2015
|
0.00
|
Bulkheads and floor boards.
|
Details
|
|
|
12-11-2015
|
0.00
|
Continued fuselage work.
|
Details
|
|
|
12-03-2015
|
0.00
|
Bulkhead work.
|
Details
|
|
|
11-18-2015
|
0.00
|
Removed gear boxes and bulheads.
|
Details
|
|
|
11-17-2015
|
0.00
|
Removed floors and pushrod, trial fit doors.
|
Details
|
|
|
11-14-2015
|
0.00
|
Disassembly of items in gear box area.
|
Details
|
|
|
11-13-2015
|
0.00
|
Removed three big skins.
|
Details
|
|
|
11-12-2015
|
0.00
|
Drilled rivets.
|
Details
|
|
|
11-11-2015
|
0.00
|
Drilled rivets.
|
Details
|
|
|
11-07-2015
|
0.00
|
Removed windsheild and venturi's.
|
Details
|
|
|
11-06-2015
|
0.00
|
Drilled rivets, removed skin.
|
|
|
|
11-05-2015
|
0.00
|
Fuselage back in jig.
|
Details
|
|
|
04-01-2015
|
0.00
|
Serviced magnetos.
|
Details
|
|
|
12-28-2014
|
0.00
|
Finished wings to point of spray coats.
|
Details
|
|
|
12-12-2014
|
0.00
|
Continued covering the left wing.
|
Details
|
|
|
12-06-2014
|
0.00
|
Continued covering the left wing.
|
Details
|
|
|
12-01-2014
|
0.00
|
Continued covering the left wing.
|
Details
|
|
|
11-20-2014
|
0.00
|
Started gluing butt rib.
|
|
|
|
11-19-2014
|
0.00
|
Inspected left wing, installed envelope.
|
Details
|
|
|
06-26-2014
|
0.00
|
Fabricated backing ring, dry fit Grimes assembly.
|
|
|
|
06-25-2014
|
0.00
|
Installed braces left wing.
|
|
|
|
06-19-2014
|
0.00
|
Finished patching, installed tinnermans, trial fit
|
|
|
|
06-12-2014
|
0.00
|
Bolted braces and started fabric patching.
|
|
|
|
06-03-2014
|
0.00
|
Fabricated braces.
|
Details
|
|
|
05-29-2014
|
0.00
|
Dealing with butt rib bowing.
|
Details
|
|
|
05-03-2014
|
0.00
|
Ironed wing.
|
Details
|
|
|
04-30-2014
|
0.00
|
Right wing ready for ironing and spraying.
|
|
|
|
04-24-2014
|
0.00
|
Taped top of right wing.
|
Details
|
|
|
04-19-2014
|
0.00
|
Riveted top side right wing.
|
Details
|
|
|
04-18-2014
|
0.00
|
Applied bottom span-wise tapes.
|
Details
|
|
|
04-17-2014
|
0.00
|
Flew the C-17 sim at SWF.
|
|
|
|
04-16-2014
|
0.00
|
Installed chord-wise tapes.
|
|
|
|
04-15-2014
|
0.00
|
Set rivets, prepped for finishing tapes.
|
|
|
|
04-14-2014
|
0.00
|
Reinforcing tapes and rivets, right bottom.
|
|
|
|
04-12-2014
|
0.00
|
Worked on right wing.
|
Details
|
|
|
04-11-2014
|
0.00
|
Continued prepping left wing.
|
Details
|
|
|
04-10-2014
|
0.00
|
Continued work on left wing.
|
Details
|
|
|
04-08-2014
|
0.00
|
First coat Poly-Brush right wing top.
|
Details
|
|
|
04-05-2014
|
0.00
|
Worked on right wing with Jeanne.
|
Details
|
|
|
04-02-2014
|
0.00
|
250 degree iron right wing.
|
Details
|
|
|
03-30-2014
|
0.00
|
Glued right wing fabric.
|
Details
|
|
|
03-29-2014
|
0.00
|
Readied right wing for cover.
|
Details
|
|
|
03-28-2014
|
0.00
|
More tasks on left wing, swapped.
|
Details
|
|
|
03-27-2014
|
0.00
|
Continued work on left wing.
|
Details
|
|
|
03-25-2014
|
0.00
|
Built new Pitot tube.
|
Details
|
|
|
03-21-2014
|
0.00
|
Research at home, pitot/static.
|
Details
|
|
|
03-20-2014
|
0.00
|
Continued left wing prep.
|
Details
|
|
|
03-19-2014
|
0.00
|
Catch-up entry.
|
Details
|
|
|
01-24-2014
|
0.00
|
Primed wings.
|
Details
|
|
|
01-18-2014
|
0.00
|
Week's summary.
|
Details
|
|
|
01-10-2014
|
0.00
|
Completed leading edge install.
|
Details
|
|
|
01-09-2014
|
0.00
|
Began riveting leading edge.
|
Details
|
|
|
01-08-2014
|
0.00
|
Clecoed on leading edge.
|
Details
|
|
|
01-06-2014
|
0.00
|
Continued on right wing.
|
Details
|
|
|
01-04-2014
|
0.00
|
Continued work on leading edge.
|
Details
|
|
|
12-31-2013
|
0.00
|
Continued work on right wing.
|
Details
|
|
|
12-27-2013
|
0.00
|
Transferred fuel to right tank. Left tested good.
|
|
|
|
12-23-2013
|
0.00
|
Worked on right wing.
|
Details
|
|
|
12-21-2013
|
0.00
|
Installed new leading edge, right wing.
|
Details
|
|
|
12-13-2013
|
0.00
|
Worked on right wing.
|
Details
|
|
|
12-05-2013
|
0.00
|
Completed removal of left wing leading edge.
|
Details
|
|
|
12-04-2013
|
0.00
|
Primed tank bottoms.
|
|
|
|
12-03-2013
|
0.00
|
Alondined gas tanks, patched additional suspect ar
|
Details
|
|
|
12-01-2013
|
0.00
|
Competed repairs to wing structure.
|
Details
|
|
|
11-29-2013
|
0.00
|
Built new leading edges.
|
Details
|
|
|
11-22-2013
|
0.00
|
Worked on gear leg.
|
Details
|
|
|
11-21-2013
|
0.00
|
Swapped gear legs.
|
Details
|
|
|
11-20-2013
|
0.00
|
Moved fuselage to my hanagar.
|
Details
|
|
|
11-19-2013
|
0.00
|
Built gear leg dollies.
|
|
|
|
11-18-2013
|
0.00
|
Finished disassembly, removed from jig.
|
Details
|
|
|
11-15-2013
|
0.00
|
Removed floor panels.
|
|
|
|
11-13-2013
|
0.00
|
Drilled out floor.
|
|
|
|
11-12-2013
|
0.00
|
Worked on gearbox/doorpost disassembly.
|
Details
|
|
|
11-08-2013
|
0.00
|
Exposed more problems in MLG area.
|
Details
|
|
|
11-07-2013
|
0.00
|
More disassembly & inspection.
|
Details
|
|
|
11-06-2013
|
0.00
|
Interior removal, assembled generator.
|
Details
|
|
|
11-05-2013
|
0.00
|
Fuselage in jig.
|
Details
|
|
|
11-04-2013
|
0.00
|
Moved fuselage to FBO hangar.
|
Details
|
|
|
11-02-2013
|
0.00
|
Leading edge experiments
|
Details
|
|
|
11-01-2013
|
0.00
|
Patched gas tanks
|
Details
|
|
|
10-31-2013
|
0.00
|
Summer doldrums.
|
Details
|
|
|
05-21-2013
|
0.00
|
Unwrapped/inspected prop.
|
|
|
|
05-17-2013
|
0.00
|
Prop arrived.
|
|
|
|
05-17-2013
|
0.00
|
PolyFiber shipment arrived.
|
|
|
|
04-27-2013
|
2.00
|
Stripped leading edge, set some rivets.
|
Details
|
|
|
04-11-2013
|
1.00
|
Mag grease, generator.
|
Details
|
|
|
03-07-2013
|
4.00
|
More structure repairs, top of left wing.
|
Details
|
|
|
03-06-2013
|
2.00
|
Generator and magneto work.
|
Details
|
|
|
03-04-2013
|
2.00
|
Generator and patch work.
|
Details
|
|
|
03-03-2013
|
4.00
|
Worked on left wing repairs and cleaning.
|
Details
|
|
|
03-02-2013
|
3.50
|
Began left wing structure repairs.
|
Details
|
|
|
03-01-2013
|
3.00
|
Air filter, muffler bracket, generator bearing.
|
Details
|
|
|
02-28-2013
|
4.00
|
Torqued down cover, disassembled generator.
|
Details
|
|
|
02-26-2013
|
2.00
|
Installed gears and crankcase cover.
|
Details
|
|
|
02-14-2013
|
4.00
|
Weighed pistons, lapped valves.
|
Details
|
|
|
02-13-2013
|
4.00
|
Cleaned parts.
|
Details
|
|
|
02-12-2013
|
4.00
|
Cam gear bolts missing.
|
Details
|
|
|
02-09-2013
|
7.00
|
Stripped left wing.
|
Details
|
|
|
02-07-2013
|
1.00
|
Mounted engine on stand.
|
Details
|
|
|
02-06-2013
|
6.00
|
Mated case halves.
|
Details
|
|
|
02-04-2013
|
4.00
|
Finished checking dimensions.
|
Details
|
|
|
02-03-2013
|
4.00
|
Worked on wings.
|
Details
|
|
|
02-02-2013
|
2.00
|
Checked dimensions cylinders 1& 2.
|
Details
|
|
|
01-31-2013
|
7.00
|
Found bad pinion.
|
Details
|
|
|
01-30-2013
|
5.00
|
Installed internal parts.
|
Details
|
|
|
01-27-2013
|
6.00
|
Fabric Class Day 2
|
|
|
|
01-26-2013
|
8.00
|
SportAir Fabric Class at OSH Day 1
|
|
|
|
01-14-2013
|
6.00
|
Stripped aluminum from right wing.
|
Details
|
|
|
01-09-2013
|
2.00
|
Ordered consumables.
|
Details
|
|
|
01-08-2013
|
0.00
|
Odds and ends
|
Details
|
|
|
01-01-2013
|
1.00
|
Removed one wing skin.
|
Details
|
|
|
12-31-2012
|
1.00
|
Finished blasting last cylinder.
|
Details
|
|
|
12-26-2012
|
6.00
|
Disassembled/cleaned cylinders.
|
Details
|
|
|
12-19-2012
|
7.00
|
Assembled crank and connecting rods.
|
Details
|
|
|
12-18-2012
|
5.00
|
Ordered hardware.
|
Details
|
|
|
12-17-2012
|
3.00
|
Assembled oil pump.
|
Details
|
|
|
12-13-2012
|
3.00
|
Cleaned mating surfaces.
|
Details
|
|
|
12-12-2012
|
2.00
|
More preliminary tasks.
|
Details
|
|
|
12-06-2012
|
1.00
|
Started spreadsheet.
|
Details
|
|
|
12-04-2012
|
1.00
|
Organized parts.
|
Details
|
|
|
12-03-2012
|
4.00
|
Finished elevators.
|
Details
|
|
|
12-02-2012
|
4.00
|
Riveted trailing edges.
|
Details
|
|
|
12-01-2012
|
3.00
|
Riveted right elevator, set up for laser.
|
|
|
|
11-30-2012
|
5.00
|
Riveted left elevator to spar.
|
|
|
|
11-29-2012
|
6.00
|
Continued work on elevators.
|
Details
|
|
|
11-28-2012
|
1.50
|
Continued drilling elevator trailing edges.
|
Details
|
|
|
10-19-2012
|
4.00
|
Made progress on right elevator.
|
Details
|
|
|
10-12-2012
|
4.00
|
Continued work on right elevator.
|
Details
|
|
|
09-27-2012
|
0.50
|
Prepped parts, visited Granville
|
Details
|
|
|
09-26-2012
|
5.00
|
Fabbed elevator parts.
|
Details
|
|
|
09-25-2012
|
0.00
|
Summer recess, some progress
|
Details
|
|
|
07-03-2012
|
2.00
|
Built up new spar.
|
Details
|
|
|
06-26-2012
|
5.00
|
Finished wing skin, cut out left elevator skins
|
Details
|
|
|
06-25-2012
|
5.00
|
Worked on skin, got #4 cylinder piston out.
|
Details
|
|
|
06-22-2012
|
5.00
|
Prepped/primed elevator parts.
|
Details
|
|
|
06-06-2012
|
8.00
|
Catch up of several short sessions.
|
Details
|
|
|
05-17-2012
|
1.50
|
Began left elevator rebuild.
|
Details
|
|
|
05-15-2012
|
4.00
|
Finished rudder.
|
|
|
|
05-14-2012
|
6.00
|
Lots of riveting on the rudder.
|
Details
|
|
|
05-11-2012
|
2.00
|
Debured edges, started final assembly,
|
Details
|
|
|
05-10-2012
|
6.00
|
Aligned trailing edges, drilled.
|
Details
|
|
|
05-09-2012
|
4.00
|
Drilled rudder skins.
|
Details
|
|
|
05-07-2012
|
1.00
|
Fabbed rudder strip, got cam verdict.
|
Details
|
|
|
05-04-2012
|
6.00
|
Completed & primed all rudder parts.
|
Details
|
|
|
05-03-2012
|
5.00
|
Finished rudder skins, worked other parts.
|
Details
|
|
|
05-02-2012
|
6.00
|
Cut out rudder skins.
|
Details
|
|
|
04-25-2012
|
5.00
|
Started working on rudder skins.
|
Details
|
|
|
04-22-2012
|
1.00
|
Finished cleaning up spar parts.
|
Details
|
|
|
04-20-2012
|
2.00
|
Disassembled rudder spar assembly.
|
Details
|
|
|
04-18-2012
|
4.00
|
Completed crankcase disassembly.
|
Details
|
|
|
04-17-2012
|
6.00
|
Continued disassembly.
|
Details
|
|
|
04-16-2012
|
4.00
|
Continued Engine Disassembly
|
Details
|
|
|
04-13-2012
|
4.00
|
Engine Disassembly
|
Details
|
|
|
03-22-2012
|
2.00
|
Set up in shop, began disassembly.
|
Details
|
|
|
03-21-2012
|
0.00
|
Mounted engine to stand.
|
Details
|
|
|
03-16-2012
|
10.00
|
Finished and stored HS.
|
Details
|
|
|
03-01-2012
|
2.00
|
Completed riveting of top HS skins.
|
Details
|
|
|
02-25-2012
|
2.00
|
Worked on corrosion on right wing.
|
Details
|
|
|
02-23-2012
|
4.00
|
Riveted top right skin.
|
Details
|
|
|
02-22-2012
|
1.00
|
Began riveting leading edge.
|
Details
|
|
|
02-21-2012
|
6.00
|
Worked on HS reassembly.
|
Details
|
|
|
02-20-2012
|
2.00
|
Started riveting.
|
Details
|
|
|
01-18-2012
|
5.00
|
Finished spar repair, primed all parts.
|
Details
|
|
|
01-17-2012
|
3.00
|
Worked on spar repair.
|
Details
|
|
|
01-16-2012
|
4.00
|
Finished skins, prepped for primer.
|
Details
|
|
|
01-14-2012
|
6.00
|
Cut out all big skins, center skin, match drilled.
|
Details
|
|
|
01-13-2012
|
5.00
|
Cleaned leading edge strips, cut out first skin.
|
Details
|
|
|
01-12-2012
|
5.00
|
Removed all skeleton parts, cleaned.
|
Details
|
|
|
01-11-2012
|
3.00
|
Removed center skins.
|
|
|
|
01-06-2012
|
2.00
|
Removed remaining outer skins.
|
|
|
|
01-05-2012
|
3.00
|
Removed HS skins.
|
Details
|
|
|
01-04-2012
|
2.00
|
Finished HS Jig, started disassembly.
|
Details
|
|
|
01-03-2012
|
2.00
|
Began work on HS.
|
Details
|
|
|
01-02-2012
|
0.00
|
Inventoried parts and pieces
|
Details
|
|
|
12-27-2011
|
2.00
|
Removed damaged rudder skins.
|
Details
|
|
|
12-23-2011
|
2.00
|
Practiced rivet removal, began rudder disassembly.
|
Details
|
|
|
12-22-2011
|
0.00
|
Cleaned parts, drilled a few rivets.
|
Details
|
|
|
12-21-2011
|
0.00
|
Picked up the wings, tail, engine.
|
Details
|
|