KitLog pro

Powered By Kitlog Pro v2.0

Chops' Web Site
Work Logs Found: 156
Category Work Time: 658 Hours
 Date
Hours
Work Log Summary

Details

 01-23-2023
6.00
Ignition lead fabrication
Details
       

 01-21-2023
4.00
Heater muff installation
Details
     

 01-21-2023
2.00
EGT and CHT probe installation
Details
       

 01-20-2023
20.00
Intercooler mounting
Details
       

 01-05-2023
1.00
Fuel pumps and pre filters removal
Details

 01-04-2023
4.00
Engine mounting
Details
     

 12-11-2022
5.00
Fuel pumps and pre filters mounting
Details
       

 12-11-2022
3.00
Dual ADAHRS setup
Details
       

 10-23-2022
0.00
Engine mount modification
Details
     

 09-22-2022
3.00
ECUs mounting
Details
       

 07-19-2022
2.00
Engine unboxing
Details
       

 06-18-2022
1.00
Engine mount fabrication
Details
       

 05-14-2022
3.00
Wing tips installation day 4 of ???
Details

 05-01-2022
3.00
Wing tips installation day 3 of ???
Details
     

 02-26-2022
3.00
Pilots joystick airframe wiring
Details
       

 02-13-2022
4.00
Go-around switch
Details
       

 01-28-2022
5.00
Wing tips installation day 2 of ???
Details
       

 01-27-2022
3.00
Pilots sticks wiring
Details
       

 01-22-2022
4.00
Wing tips installation day 1 of ???
Details
       

 01-21-2022
2.00
Fuel tank pressure check
Details
     

 01-20-2022
3.00
Fuel tank vents
Details
       

 01-19-2022
5.00
Wiring
Details
       

 01-18-2022
5.00
Fuel tank bulkhead buildup
Details
       

 01-11-2022
3.00
Cabin lighting
Details
     

 01-06-2022
4.00
Joystick doubler
Details
       

 11-02-2021
3.00
Throttle quadrant mod
Details
       

 10-31-2021
5.00
Rudder pedals assembly
Details
       

 10-24-2021
3.00
Wiring looms termination
Details
       

 10-10-2021
4.00
Final fit undercarriage legs
Details
       

 09-27-2021
4.00
EMS and ARINC-429 mounting
Details
       

 08-29-2021
2.00
Cabin heat cable
Details
     

 08-08-2021
5.00
Brake lines
Details
       

 07-04-2021
10.00
Fitting landing lights
Details
       

 05-14-2021
3.00
Earth tab forrests
Details
       

 04-05-2021
5.00
Park brake valve
Details
       

 02-21-2021
7.00
Interior work
Details
       

 01-29-2021
1.00
Pilot seatback assembly
Details
     

 01-27-2021
1.00
Rear seat frame assembly
Details
       

 01-26-2021
2.00
Happy Australia Day (and seat frame assembly)
Details
     

 01-25-2021
9.00
Seats, throttle and various parts priming and pain
Details
       

 01-20-2021
6.00
Headphone jacks
Details
       

 01-19-2021
6.00
Wiring harness plugs
Details
       

 01-17-2021
4.00
ELT Antenna installation
Details
       

 01-10-2021
6.00
Fuel pump and filter installation
Details
       

 01-09-2021
5.00
Wiring the VP-X Pro
Details
       

 01-05-2021
8.00
Undercarriage installation and alignment - AGAIN
Details
       

 12-30-2020
6.00
Fuel selector installation
Details
       

 12-27-2020
2.00
Tail cone stiffeners
Details

 12-27-2020
3.00
Rear seat throttle part 3
Details
       

 11-21-2020
3.00
Rear seat throttle part 2
Details
       

 10-28-2020
3.00
Start rear throttle installation
Details
     

 10-05-2020
5.00
Seats construction
Details
       

 10-02-2020
4.00
Lower right longeron final rivet
Details
       

 10-02-2020
3.00
Bolt installation lower longerons
Details
       

 09-27-2020
1.00
QB incorrect hardware in lower longerons
Details
     

 09-26-2020
4.00
Initial fit of VP-X Pro
Details
       

 03-06-2020
5.00
Right lower longeron change cont.
Details
       

 11-30-2019
5.00
Right lower longeron change cont.
Details
     

 11-10-2019
5.00
Right lower longeron change
Details
       

 10-07-2019
1.00
Fixed ELT install dry run
Details
     

 09-08-2019
3.00
Elevator trim tab servo
Details
       

 08-14-2019
4.00
Wing root-fuselage wiring
Details
     

 07-12-2019
4.00
Pitot-AoA lines install
Details
       

 07-08-2019
3.00
ADAHRS installation
Details
       

 04-25-2019
2.00
Rudder stops set
Details
       

 04-22-2019
3.00
Elevator stops rigging
Details
       

 03-09-2019
4.00
Avionics rack final layout and pitch servo install
Details
       

 02-17-2019
4.00
Avionics tray mod
Details
       

 02-03-2019
2.00
ADAHRS mount fitted
Details
       

 02-01-2019
1.00
Park brake cable
Details
     

 01-28-2019
3.00
Rear turtle deck former fitted
Details
       

 01-18-2019
3.00
Finish turtle deck riveting
Details
       

 01-15-2019
3.00
Park brake fit
Details
       

 01-06-2019
5.00
Turtle deck fitted
Details
       

 01-04-2019
2.00
Dry fit nose locker door
Details
     

 01-03-2019
4.00
Nose locker door
Details
       

 12-27-2018
3.00
Nose locker floor access panel cont.
Details
       

 12-23-2018
3.00
Nose locker floor cutout
Details
       

 12-11-2018
2.00
Assembled avionics rack
Details
       

 11-29-2018
3.00
Flap actuator cover
Details
       

 11-25-2018
4.00
Flap position sensor
Details
       

 11-13-2018
3.00
Nose locker parts fabrication
Details
     

 10-27-2018
5.00
First fit of forward skin
Details
       

 09-06-2018
3.00
ADAHRS rack
Details
       

 08-19-2018
3.00
Avionics rack
Details
     

 08-18-2018
3.00
Instrument panel fit
Details
       

 08-15-2018
3.00
Roll bar installation
Details
       

 07-25-2018
5.00
Turtledeck fitment
Details
       

 05-11-2018
5.00
Gear tower cut-outs Part #2
Details
       

 10-21-2017
3.00
SB 16-12-16 RV-8QB Center Section Bolts
Details
     

 09-18-2017
5.00
Fitting the main gear
Details
       

 07-15-2017
6.00
Fin installation
Details
       

 05-21-2017
7.00
Horizontal Stabiliser installation
Details
       

 05-06-2017
2.00
Final move to the new shed
       

 05-01-2017
10.00
Interior paint job
Details
       

 04-30-2017
8.00
Interior painting
Details
       

 03-06-2017
2.00
Gear tower cut-outs Part #1
Details
       

 09-26-2016
4.00
New shed :)
Details
     

 02-19-2016
0.50
Grove gear legs arrive
Details
       

 01-26-2016
4.00
Pitch servo installation kit
Details
       

 01-19-2016
8.00
Rear seat rudder pedals Part 1
Details
       

 01-12-2016
4.00
Electric aileron trim installation
Details
       

 11-28-2015
10.00
Aircraft flooring
Details
       

 11-23-2015
4.00
Painting day
Details
       

 11-01-2015
4.00
Floor stiffiners
Details
     

 10-14-2015
6.00
Rear lap seatbelt mount correction
Details
       

 10-06-2015
2.00
Joystick torquetube setup
Details
       

 10-05-2015
4.00
Flooring
Details
       

 09-23-2015
9.00
Elevator pushrods fabricated
Details
     

 09-21-2015
10.00
Control sticks and torque tube assembly
Details
       

 09-20-2015
3.00
Elevator control tubes
Details
       

 09-19-2015
12.00
Ground adjustable rudder pedals
Details
       

 09-05-2015
8.00
Attaching lower wing skins
Details
     

 08-30-2015
8.00
Wing lower skins
Details
       

 01-19-2015
20.00
SB 14-01-31 Horizontal stabiliser forward spar mod
Details
       

 08-13-2014
6.00
Stall warning kit install
Details
       

 05-23-2014
5.00
Roll servo installation
Details
     

 01-25-2014
8.00
Pitot mast installation
Details
       

 01-24-2014
8.00
Wings wiring
Details
       

 01-15-2014
8.00
Flap brace and aileron gap fairing installation
Details
       

 01-14-2014
6.00
Flap brace and aileron fairing prep
Details
       

 01-12-2014
4.00
Aileron brackets installation
Details
       

 01-11-2014
6.00
Alieron brackets fabrication
Details

 01-05-2014
6.00
Aileron pushrod fabrication
Details
     

 01-04-2014
6.00
Aileron bellcrank installation
Details

 12-14-2013
1.00
Elevator bellcrank centre pivot
Details
       

 11-09-2013
4.00
Elevator initial installlation
Details
       

 11-06-2013
8.00
Elevator trim tab
Details
       

 08-24-2013
2.00
Tech Councillor visit
Details

 08-03-2013
1.00
Trial fit of elevators
Details
     

 08-03-2013
3.00
Roll R/H elevator leading edge
Details
       

 07-27-2013
3.00
Roll L/H elevator leading edge
Details
     

 01-12-2013
8.00
Engine disassembly
Details

 12-03-2012
1.00
Engine core arrived.
Details
     

 09-28-2012
4.00
Left elevator assembly
Details
       

 09-25-2012
3.00
Left elevator priming
Details
     

 09-16-2012
3.00
Right elevator assembly
Details
       

 09-15-2012
3.00
Right elevator priming
Details

 07-19-2011
4.00
Rudder completion
Details
       

 03-19-2011
1.00
Dented fuselage
Details
       

 01-25-2011
4.00
QB kit arrival
Details
       

 08-07-2010
1.00
Unpacking
Details

 10-26-2007
1.00
Packing
Details

 04-17-2005
7.00
Horizontal stabiliser assembled
Details
     

 03-28-2005
1.50
Horizontal stab spars assembly
Details
     

 03-26-2005
3.50
Vertical fin assembly
Details
     

 03-25-2005
1.00
Left stabiliser and fin priming
Details

 03-24-2005
2.00
Horizontal stab and fin priming prep
Details

 03-23-2005
1.00
Horizontal stab and fin priming prep
Details

 01-26-2005
3.00
Right horizontal stab prep cont.
Details

 12-21-2004
4.00
Right horizontal stabiliser prep.
Details

 12-20-2004
1.50
Left horizontal stabiliser structure and skins
Details
     

 12-19-2004
4.00
Left horizontal stabiliser ribs prep
Details

 11-25-2004
1.00
Horizontal stabiliser spar cont.
Details

 11-22-2004
1.50
Horizontal stabiliser spar construction continued.
Details

 11-21-2004
4.00
Horizontal stabiliser spar construction
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.