Date
|
Hours
|
Work Log Summary
|
Details
|
02-11-2017
|
6.00
|
sub panel, storage bin and Smoke system work
|
Details
|
|
|
02-10-2017
|
6.00
|
Sub panel, and smoke tank work
|
Details
|
|
|
02-10-2017
|
6.00
|
Right wing lower skin
|
Details
|
|
|
02-07-2017
|
5.50
|
comm/intercomm wiring harness
|
Details
|
|
|
02-06-2017
|
1.50
|
wire management in tail cone
|
Details
|
|
|
02-03-2017
|
4.50
|
Wing SB
|
Details
|
|
|
02-03-2017
|
2.00
|
install of fuel lines
|
|
|
|
02-02-2017
|
1.00
|
installed bus manager and fule pumps
|
|
|
|
02-01-2017
|
0.50
|
bus manager ground wire to firewall ground point
|
|
|
|
01-31-2017
|
4.00
|
Comm/intercomm wiring
|
Details
|
|
|
01-29-2017
|
4.00
|
paint cleanup, repaint of some parts
|
Details
|
|
|
01-28-2017
|
7.00
|
paint prep and paint
|
Details
|
|
|
01-27-2017
|
5.00
|
|
Details
|
|
|
01-22-2017
|
1.50
|
GMU22 shelf
|
Details
|
|
|
01-17-2017
|
3.00
|
GMU22 wiring harness
|
Details
|
|
|
01-13-2017
|
4.00
|
Wrap up of rear throttle and start of electric ale
|
Details
|
|
|
01-12-2017
|
2.50
|
Roll trim wirring connector
|
Details
|
|
|
01-11-2017
|
1.50
|
HVAC work
|
Details
|
|
|
01-09-2017
|
0.50
|
Installed Naca Vent
|
Details
|
|
|
01-06-2017
|
6.00
|
Rear Seat Throttle
|
Details
|
|
|
01-02-2017
|
2.00
|
Installed U805-1/flap postion sensor
|
Details
|
|
|
01-01-2017
|
4.00
|
Bus manager install
|
Details
|
|
|
12-28-2016
|
2.00
|
Firewall heat box
|
Details
|
|
|
12-27-2016
|
2.00
|
Firewall heat box
|
Details
|
|
|
12-26-2016
|
2.50
|
Installed push pull for heat, air, and alt air
|
Details
|
|
|
12-23-2016
|
7.00
|
Misc fuselage work
|
Details
|
|
|
12-22-2016
|
0.50
|
Installing nut plates on F880B
|
Details
|
|
|
12-20-2016
|
3.00
|
Garmin connector work
|
Details
|
|
|
12-16-2016
|
3.00
|
Wing Tip lights
|
Details
|
|
|
12-15-2016
|
2.50
|
finidng leather
|
Details
|
|
|
12-11-2016
|
1.50
|
Shunt holder
|
Details
|
|
|
12-10-2016
|
3.00
|
Swtich layout
|
Details
|
|
|
11-26-2016
|
3.00
|
|
Details
|
|
|
11-24-2016
|
2.50
|
Fit and install of flap position sensor
|
Details
|
|
|
11-20-2016
|
2.50
|
Firewall penetrations starter selenoid install
|
Details
|
|
|
11-19-2016
|
3.00
|
Throttle and Prop pitch firewall penetration insta
|
Details
|
|
|
11-16-2016
|
2.50
|
Battery bay door
|
Details
|
|
|
11-14-2016
|
2.50
|
Bus manager bracket, top 8 rivets on F-817
|
Details
|
|
|
11-14-2016
|
2.00
|
battery bay door
|
Details
|
|
|
11-13-2016
|
0.50
|
Riveting sides of the F 850
|
Details
|
|
|
11-11-2016
|
4.50
|
Forward bottom skins and misc
|
Details
|
|
|
11-10-2016
|
1.00
|
crimped antenna ends on RG400, and ran tail wires
|
Details
|
|
|
11-07-2016
|
0.50
|
misc fuse work in prep for turtle deck riveting
|
Details
|
|
|
11-06-2016
|
1.00
|
interior parts painting
|
Details
|
|
|
11-04-2016
|
1.50
|
more painting of interior parts
|
Details
|
|
|
11-03-2016
|
2.00
|
Passenger footwell rivetting & other misc
|
Details
|
|
|
11-02-2016
|
1.00
|
misc fuse work
|
Details
|
|
|
11-01-2016
|
2.00
|
Non attatched Interior cockpit painting
|
Details
|
|
|
10-31-2016
|
1.50
|
Floor riveting
|
Details
|
|
|
10-28-2016
|
2.50
|
Interior paint
|
Details
|
|
|
10-27-2016
|
1.00
|
misc fuse work
|
Details
|
|
|
10-26-2016
|
1.50
|
Misc interior parts painting
|
Details
|
|
|
10-26-2016
|
1.00
|
Create F864E Throttle cable bracket
|
Details
|
|
|
10-25-2016
|
1.50
|
Comm and ADSB/Trans antenna routing
|
Details
|
|
|
10-24-2016
|
2.50
|
painted fwd foot well of the interior
|
Details
|
|
|
10-21-2016
|
1.00
|
Exhaust Ramp
|
Details
|
|
|
10-20-2016
|
0.75
|
Exhuast ramp fitting
|
Details
|
|
|
10-19-2016
|
1.00
|
Made and riveted exhaust ramp stiffener
|
Details
|
|
|
10-18-2016
|
1.50
|
SS Exhaust ramp cut and rough form
|
Details
|
|
|
10-17-2016
|
1.00
|
Left side firewall penetration
|
Details
|
|
|
09-30-2016
|
1.50
|
Battery Box
|
Details
|
|
|
09-29-2016
|
1.00
|
Trim firewall penetraion for left side
|
Details
|
|
|
09-06-2016
|
1.00
|
Lower motor mount drilling and fuel return line
|
Details
|
|
|
09-02-2016
|
0.50
|
upper motor mount hole drilling
|
Details
|
|
|
09-01-2016
|
1.00
|
Motor Mount fitting
|
Details
|
|
|
08-31-2016
|
4.00
|
Primer cleanup
|
Details
|
|
|
08-11-2016
|
1.50
|
Parts prep and fuel system work
|
Details
|
|
|
08-10-2016
|
1.25
|
fwd top skin tear down and prep
|
Details
|
|
|
08-09-2016
|
1.50
|
Bagage door primer prep, fwd top skin removal
|
Details
|
|
|
08-08-2016
|
1.50
|
Baggage door fab
|
Details
|
|
|
08-03-2016
|
1.00
|
Fuel system parts order
|
Details
|
|
|
07-11-2016
|
1.00
|
F821afb fitting and drilling
|
|
|
|
07-10-2016
|
0.50
|
F-821AFB fitting
|
|
|
|
07-08-2016
|
1.25
|
Forward top skin cut for Fastback
|
|
|
|
07-06-2016
|
2.00
|
Fuel valve work, cockpit rail riveting, top skin f
|
Details
|
|
|
07-05-2016
|
1.50
|
Andair fuel valve bracket
|
Details
|
|
|
06-20-2016
|
1.00
|
Antenna Doubler prep
|
Details
|
|
|
06-20-2016
|
1.50
|
Antenna Doubler install/misc
|
Details
|
|
|
06-08-2016
|
1.50
|
Auto pilot pitch servo bracket - GSA 28
|
Details
|
|
|
06-07-2016
|
1.00
|
Antenna doublers
|
Details
|
|
|
06-06-2016
|
1.00
|
Antenna Location and Doublers
|
Details
|
|
|
05-26-2016
|
1.00
|
Forward floor and rear foot wells/floor dimpling
|
Details
|
|
|
04-22-2016
|
3.00
|
initial landing gear aligment
|
Details
|
|
|
04-03-2016
|
5.00
|
Parts priming
|
Details
|
|
|
04-02-2016
|
1.50
|
primer prep
|
Details
|
|
|
02-25-2016
|
7.00
|
Fuse parts prep
|
Details
|
|
|
02-16-2016
|
2.00
|
fitted and drilled rear bulkheads
|
Details
|
|
|
02-16-2016
|
3.50
|
Finished driling the skins
|
|
|
|
02-13-2016
|
1.50
|
Fuselage driling
|
Details
|
|
|
02-12-2016
|
1.50
|
Drilling forward skins
|
Details
|
|
|
02-12-2016
|
4.00
|
Drilled fuse skins
|
Details
|
|
|
02-11-2016
|
2.00
|
Fuselage drilling
|
Details
|
|
|
02-02-2016
|
3.00
|
Fitted fastback turtle deck and bulkheads
|
Details
|
|
|
01-16-2016
|
1.50
|
tail cone work
|
Details
|
|
|
12-10-2015
|
1.00
|
Mid fusleage drilling
|
Details
|
|
|
12-09-2015
|
1.00
|
FWD fuselage drilling part 2
|
Details
|
|
|
12-08-2015
|
3.00
|
Forward fuselage drilling
|
Details
|
|
|
12-07-2015
|
1.50
|
Weldment/bulkhead work
|
Details
|
|
|
12-07-2015
|
1.00
|
Longeron tweaking
|
Details
|
|
|
12-04-2015
|
0.50
|
Longeron fitting
|
Details
|
|
|
12-03-2015
|
1.50
|
prep for aft fuse/tailcone assembly
|
Details
|
|
|
12-03-2015
|
3.00
|
Adding Tailcone to FWD fuse
|
Details
|
|
|
12-01-2015
|
1.50
|
Primer of prepped parts
|
Details
|
|
|
12-01-2015
|
2.00
|
aft fuselage pats prep
|
Details
|
|
|
11-30-2015
|
2.50
|
Tail cone bulkhead prep and drill
|
Details
|
|
|
11-30-2015
|
1.50
|
Front seat drill
|
Details
|
|
|
11-26-2015
|
0.50
|
Tail Cone bulkheads Part2
|
Details
|
|
|
11-25-2015
|
1.50
|
Tail cone bulk heads part 1
|
Details
|
|
|
11-24-2015
|
1.50
|
Drilling mid fuse parts
|
Details
|
|
|
11-23-2015
|
2.00
|
Mid Fuselage skins and sructure
|
Details
|
|
|
11-21-2015
|
1.00
|
Fwd Fuse work
|
Details
|
|
|
11-16-2015
|
1.50
|
Drilling lower longerons
|
Details
|
|
|
11-12-2015
|
2.00
|
Bending of upper longerons
|
Details
|
|
|
10-28-2015
|
2.00
|
front seat
|
Details
|
|
|
08-15-2015
|
0.00
|
Work stoppage for summer
|
Details
|
|
|
08-14-2015
|
0.75
|
riveting of bottom skin to seat ribs
|
Details
|
|
|
08-13-2015
|
0.50
|
started riveting of bottom skin to sesat ribs
|
Details
|
|
|
08-12-2015
|
0.50
|
aileron trim bracket install
|
Details
|
|
|
08-10-2015
|
1.00
|
electric aileron trim bracket prep and install
|
Details
|
|
|
07-16-2015
|
2.00
|
center section assembly
|
Details
|
|
|
07-14-2015
|
2.00
|
created wood spacer
|
Details
|
|
|
07-12-2015
|
1.00
|
center section assembly part 1
|
Details
|
|
|
07-11-2015
|
2.50
|
Forward section assembly
|
|
|
|
07-10-2015
|
2.00
|
Primering
|
Details
|
|
|
07-09-2015
|
1.50
|
primer prep
|
Details
|
|
|
07-08-2015
|
2.50
|
Longeron Bending part 1
|
Details
|
|
|
07-06-2015
|
1.00
|
Seat rib substructure dimple
|
Details
|
|
|
07-04-2015
|
3.00
|
Seat rib assembly final drill and dimple
|
Details
|
|
|
07-02-2015
|
1.00
|
seat rib assembly
|
Details
|
|
|
07-01-2015
|
1.50
|
Seat ribn assembly
|
Details
|
|
|
06-30-2015
|
1.00
|
Pulled the parts for the seat rib assembly
|
Details
|
|
|
06-29-2015
|
2.50
|
Center section parts
|
Details
|
|
|
06-24-2015
|
1.50
|
Forward fuselage baggage bulk heads
|
Details
|
|
|
06-23-2015
|
1.50
|
Riveting of gear towers to forward fuselage skin
|
Details
|
|
|
06-22-2015
|
2.00
|
Gear tower weldment riveting
|
Details
|
|
|
06-19-2015
|
1.50
|
Torqueing of bolts on gear tower weldments
|
Details
|
|
|
06-18-2015
|
2.00
|
weldment material removal
|
Details
|
|
|
06-15-2015
|
1.50
|
Gear towere weldment install
|
Details
|
|
|
06-13-2015
|
3.00
|
Forward lower skin riveting.
|
Details
|
|
|
06-12-2015
|
2.50
|
gear tower riveting
|
Details
|
|
|
06-11-2015
|
1.50
|
Final rivetring of the firewall
|
Details
|
|
|
06-10-2015
|
1.00
|
Riveting of firewall
|
Details
|
|
|
06-09-2015
|
1.50
|
Primered parts for firewall, foreward lower sectio
|
Details
|
|
|
06-09-2015
|
1.00
|
Parts prep for priming
|
Details
|
|
|
06-08-2015
|
1.00
|
Gear tower mod access covers
|
Details
|
|
|
06-06-2015
|
1.50
|
Gear Tower Mod
|
Details
|
|
|
06-06-2015
|
1.00
|
Drilled gear tower for nutplates
|
Details
|
|
|
06-04-2015
|
3.00
|
Drilled gear towers and other prep work
|
Details
|
|
|
06-03-2015
|
0.50
|
clecod right gear tower together
|
Details
|
|
|
06-02-2015
|
1.50
|
Foreward Fuselage floor.
|
Details
|
|
|
05-23-2015
|
2.00
|
Firewall prep
|
Details
|
|
|
05-22-2015
|
0.50
|
Debured the firewall
|
Details
|
|
|
05-21-2015
|
1.50
|
Drilled firewall and brackets
|
Details
|
|
|
04-22-2015
|
1.50
|
Right flap drill
|
Details
|
|
|
04-19-2015
|
2.00
|
Parts organization
|
Details
|
|
|
04-18-2015
|
2.00
|
Inventory
|
Details
|
|
|
04-18-2015
|
2.00
|
From the crate to the shop
|
Details
|
|
|
04-16-2015
|
3.00
|
Hanging teh right flap
|
Details
|
|
|
04-16-2015
|
1.50
|
Fuselage Arrives!
|
Details
|
|
|
04-15-2015
|
2.00
|
flap hanging prep
|
Details
|
|
|
02-10-2015
|
2.00
|
Flap riveting completion
|
Details
|
|
|
02-08-2015
|
2.00
|
Flap assembly
|
Details
|
|
|
02-05-2015
|
2.00
|
Rivetting of Flap ribs to skins
|
Details
|
|
|
02-02-2015
|
3.50
|
Flap control horn rebuild
|
Details
|
|
|
01-29-2015
|
2.00
|
Flap primer 2
|
Details
|
|
|
01-28-2015
|
2.00
|
Flap primer
|
Details
|
|
|
01-27-2015
|
1.00
|
Pitot Probe wiring
|
Details
|
|
|
01-10-2015
|
2.00
|
Pitot mast drill and support bracket
|
Details
|
|
|
01-09-2015
|
0.50
|
Pitot probe fittings
|
Details
|
|
|
01-02-2015
|
5.00
|
Pitot probe...lots of thinking and not much doing
|
Details
|
|
|
01-01-2015
|
2.50
|
FL406 Flap Brace
|
Details
|
|
|
12-30-2014
|
1.00
|
FL406 fabrication part 1
|
Details
|
|
|
12-29-2014
|
1.00
|
Test fitted ailerons and created spacers for attac
|
Details
|
|
|
12-28-2014
|
1.25
|
Dimpled last lower skin & Torqued the aileron bolt
|
Details
|
|
|
12-25-2014
|
1.00
|
2nd Naca cutout
|
Details
|
|
|
12-24-2014
|
5.00
|
underside wing skin prep and dimple
|
Details
|
|
|
12-23-2014
|
1.00
|
More blue plastic removal
|
Details
|
|
|
12-22-2014
|
1.00
|
Blue plastic removal
|
Details
|
|
|
12-21-2014
|
1.50
|
Bell cranks and Pitot
|
Details
|
|
|
12-12-2014
|
1.00
|
assembled left wing bell crank
|
Details
|
|
|
12-05-2014
|
1.00
|
Misc work
|
Details
|
|
|
11-27-2014
|
0.50
|
Wing rotation on the stands
|
Details
|
|
|
11-26-2014
|
1.00
|
Riveting of the aileron gap fairing to the wing sk
|
|
|
|
11-25-2014
|
6.00
|
Riveting of right wing top skins
|
Details
|
|
|
11-15-2014
|
7.00
|
Riveted top skin of left wing
|
Details
|
|
|
11-06-2014
|
4.00
|
Prep for top skin riveting. Flap Brace, Aileron Ga
|
Details
|
|
|
11-04-2014
|
2.00
|
Match drilled Falp brace and Aileron Gap seal
|
Details
|
|
|
11-03-2014
|
2.00
|
Flap work
|
Details
|
|
|
10-30-2014
|
1.00
|
Aileron gap bracket and misc wing work
|
Details
|
|
|
10-29-2014
|
0.50
|
Flap Fix
|
Details
|
|
|
10-28-2014
|
1.00
|
Drilled Left flap hinge and scarfed wing skins
|
Details
|
|
|
09-06-2014
|
2.00
|
Right wing repair
|
Details
|
|
|
09-06-2014
|
1.00
|
Right Flap rib marking
|
Details
|
|
|
09-05-2014
|
1.50
|
Flap drilling of ribs to lower skin and rear "spar
|
Details
|
|
|
09-03-2014
|
1.00
|
Flap rib marking, part locating
|
Details
|
|
|
08-22-2014
|
0.50
|
Rivetting of rib to spar under fuel tanks
|
|
|
|
08-21-2014
|
1.00
|
Flaps part 2 Oh No no holes
|
Details
|
|
|
08-19-2014
|
1.00
|
drilled skin to spar screws, dimpled
|
|
|
|
08-18-2014
|
1.50
|
right wing leading edge riveting
|
|
|
|
08-16-2014
|
1.00
|
EAA tech inspector visit
|
|
|
|
08-14-2014
|
2.00
|
Riveting of left leading edge
|
Details
|
|
|
08-14-2014
|
1.00
|
Flaps part 1
|
Details
|
|
|
08-08-2014
|
1.00
|
Rear spar to Rib riveting
|
Details
|
|
|
08-08-2014
|
1.00
|
proud rivet trimming
|
|
|
|
08-07-2014
|
1.00
|
more ribs to spar riveting
|
|
|
|
08-06-2014
|
1.50
|
Riveting ribs to spar
|
|
|
|
08-05-2014
|
2.00
|
Tank fitting/countersink prime/spar rivets
|
Details
|
|
|
08-04-2014
|
1.50
|
Duckworks light install work
|
Details
|
|
|
08-03-2014
|
0.75
|
Right tank leak testing
|
Details
|
|
|
08-03-2014
|
0.75
|
Landing light lens fitting
|
Details
|
|
|
08-02-2014
|
0.75
|
Fuel tank testing
|
Details
|
|
|
08-01-2014
|
0.50
|
Prep for pressure test
|
Details
|
|
|
07-24-2014
|
1.50
|
Leading edge light lens
|
Details
|
|
|
07-23-2014
|
0.50
|
Reamed the bell crank bushings
|
Details
|
|
|
07-22-2014
|
1.50
|
Reroute of airlines
|
Details
|
|
|
07-18-2014
|
2.50
|
Final riveting of baffle flange
|
Details
|
|
|
07-17-2014
|
1.50
|
Prep for fuel tank baffle install
|
Details
|
|
|
07-17-2014
|
4.00
|
Back baflfe install
|
Details
|
|
|
07-15-2014
|
1.00
|
Rib misdrill mitigation
|
Details
|
|
|
07-15-2014
|
3.50
|
Misc prep work
|
Details
|
|
|
07-02-2014
|
0.50
|
clecod the reart spar to the ribs
|
Details
|
|
|
07-01-2014
|
1.50
|
Primered two of the large wing skins
|
Details
|
|
|
06-29-2014
|
1.00
|
Clecod the ribs to the spars
|
Details
|
|
|
06-26-2014
|
2.00
|
More spar counter sinking
|
Details
|
|
|
06-25-2014
|
1.50
|
primered right wing ribs
|
Details
|
|
|
06-25-2014
|
2.50
|
Counter Sinking of top 1/2 of the right spar.
|
Details
|
|
|
06-24-2014
|
1.00
|
Primered wing walks and 1/3 of the ribs
|
Details
|
|
|
06-23-2014
|
2.00
|
Filled tanks with water to look for leaks
|
Details
|
|
|
06-23-2014
|
2.50
|
Drilled the holes for conduit, Pitot, and AOA
|
Details
|
|
|
05-28-2014
|
3.50
|
Aileron final riveting
|
Details
|
|
|
05-13-2014
|
1.00
|
debur and dimple part 2
|
Details
|
|
|
05-12-2014
|
1.00
|
deburing and dimpling of aileron parts
|
Details
|
|
|
05-11-2014
|
2.00
|
Drilled trailing skins on the ailerons
|
Details
|
|
|
05-08-2014
|
1.00
|
reprime counter weight and dimpled skin
|
Details
|
|
|
05-08-2014
|
1.00
|
Counter sink/debur water pipe counter wieghts
|
Details
|
|
|
05-07-2014
|
1.00
|
Prepped and primed ailerons
|
Details
|
|
|
05-06-2014
|
2.00
|
Aileron Leading Edge
|
Details
|
|
|
01-31-2014
|
1.00
|
dimpled right wing substructure
|
Details
|
|
|
01-29-2014
|
1.50
|
Wing skin dimpling
|
Details
|
|
|
01-26-2014
|
6.00
|
wing leading edge and aleron riveting
|
Details
|
|
|
01-26-2014
|
1.00
|
Aileron spar doulbers
|
Details
|
|
|
01-25-2014
|
0.50
|
Primered aileron stiffeners and wing skin
|
Details
|
|
|
01-24-2014
|
2.50
|
Misc work
|
Details
|
|
|
01-23-2014
|
1.75
|
Dimpling of ailerons, left wing skin, and left win
|
Details
|
|
|
01-20-2014
|
0.50
|
right leadig edge light work
|
Details
|
|
|
01-17-2014
|
1.00
|
finished drilling aileron stiffeners to skin
|
Details
|
|
|
01-16-2014
|
0.50
|
continued drilling stiffeners to aleron skin
|
Details
|
|
|
01-15-2014
|
3.50
|
Aileron work
|
Details
|
|
|
01-12-2014
|
1.50
|
Removed blue plastic on top side rivet lines
|
Details
|
|
|
01-11-2014
|
3.00
|
Right side leading edge prep
|
Details
|
|
|
01-10-2014
|
1.00
|
Dimpling of Right leading edge ribs and skin
|
Details
|
|
|
01-09-2014
|
1.00
|
Cut hole for Duckworks light kit on the right side
|
Details
|
|
|
01-08-2014
|
1.00
|
EAA tech inspection before final seal
|
Details
|
|
|
01-08-2014
|
2.00
|
Assembled right side leading edge with replacement
|
Details
|
|
|
12-28-2013
|
1.00
|
Riveted nut plates to W-423(left and right)
|
Details
|
|
|
12-27-2013
|
6.00
|
Light cut out and leading edge prep for assembly.
|
Details
|
|
|
11-23-2013
|
1.50
|
Fuel drain and access plate sealing
|
Details
|
|
|
11-22-2013
|
0.50
|
Misc tank work
|
Details
|
|
|
11-18-2013
|
1.50
|
Fuel tank end ribs Part 2
|
Details
|
|
|
11-18-2013
|
1.00
|
Dimpling of the left leading edge skin
|
Details
|
|
|
11-17-2013
|
2.00
|
End ribs of the right tank part 1
|
Details
|
|
|
11-15-2013
|
1.00
|
Installed capacitive senders on right tank
|
Details
|
|
|
11-14-2013
|
0.50
|
Right tank flop tube install
|
Details
|
|
|
11-11-2013
|
3.50
|
Riveting right tank inner ribs
|
Details
|
|
|
11-10-2013
|
3.00
|
Rivet/seal left fuel tank end ribs
|
Details
|
|
|
11-09-2013
|
4.00
|
ReDimple of the right tank skin, prep and seal par
|
Details
|
|
|
11-08-2013
|
4.00
|
Left fuel tank end rib install part 1
|
Details
|
|
|
11-07-2013
|
0.50
|
Safety wire of flop tube
|
Details
|
|
|
10-23-2013
|
1.00
|
Assembly of fuel tank end ribs(fitting and electri
|
Details
|
|
|
10-22-2013
|
1.00
|
Tank end rib fitting install - prep
|
Details
|
|
|
10-15-2013
|
1.00
|
Finish riveting of the inner ribs for the left tan
|
Details
|
|
|
10-14-2013
|
3.00
|
Fuel tank inner rib seal/rivet
|
Details
|
|
|
10-13-2013
|
3.00
|
Redimple the left tank skin and start rib sealing
|
Details
|
|
|
09-20-2013
|
2.00
|
Riveting of the stiffeners
|
Details
|
|
|
09-19-2013
|
3.00
|
stiffeners part 1
|
Details
|
|
|
09-18-2013
|
2.00
|
proseal for end ribs
|
Details
|
|
|
09-14-2013
|
6.00
|
Misc fuel tank prep work
|
Details
|
|
|
09-12-2013
|
1.00
|
Flop tube anti rotation and anti hangup brackets
|
Details
|
|
|
09-07-2013
|
1.50
|
Left fuel tank rib dimpling and test assembly
|
Details
|
|
|
09-05-2013
|
1.50
|
T-410 for outboard rib and baffle line counter sin
|
Details
|
|
|
08-29-2013
|
2.00
|
The rest of the dimpling
|
Details
|
|
|
08-29-2013
|
0.75
|
Created Fuel Vent Lines
|
Details
|
|
|
08-28-2013
|
1.25
|
Dimpling of tank skins and stiffeners
|
Details
|
|
|
08-26-2013
|
0.50
|
Added AN fittings to inboard ribs for vent and ret
|
Details
|
|
|
08-23-2013
|
2.00
|
T-410,T-405, flop tube port
|
Details
|
|
|
08-19-2013
|
1.50
|
Fuel tank access ports
|
Details
|
|
|
08-16-2013
|
1.50
|
Fuel tank work, leading edge bracket
|
Details
|
|
|
08-14-2013
|
1.50
|
Fuel trap door
|
Details
|
|
|
08-14-2013
|
1.00
|
Capacitive Fuel senders
|
Details
|
|
|
07-31-2013
|
2.00
|
Fuel drain and ER tank fuel bung fitted and drille
|
Details
|
|
|
07-16-2013
|
1.50
|
Fitting the T-00007 Fuel Caps
|
Details
|
|
|
07-15-2013
|
0.50
|
First look at T-00007 Fuel Cap for RV8
|
Details
|
|
|
05-08-2013
|
2.00
|
Drilled remaining wing tank and stiffeners
|
Details
|
|
|
05-02-2013
|
3.00
|
Drilled left wing tank
|
Details
|
|
|
04-23-2013
|
1.00
|
Tank re-assembly and baffle drilling
|
Details
|
|
|
04-22-2013
|
2.00
|
Drilling the tank baffle to the Z brackets
|
Details
|
|
|
04-18-2013
|
1.00
|
Remake Z bracket
|
Details
|
|
|
04-09-2013
|
1.00
|
Cut and cleaned the fuel tank stiffeners
|
Details
|
|
|
03-29-2013
|
3.00
|
initial fit of the fuel tanks
|
Details
|
|
|
03-25-2013
|
1.00
|
Bolted Z brackets to the spar
|
Details
|
|
|
03-24-2013
|
1.00
|
Removing blue plastic covering from wing skins
|
Details
|
|
|
03-11-2013
|
1.00
|
Riveted nutplates to the spar and fit inner most Z
|
Details
|
|
|
03-06-2013
|
1.00
|
Rivetted fuel tank Z bracket nut plates
|
Details
|
|
|
02-26-2013
|
1.50
|
Drilled the leading edge of the left wing
|
Details
|
|
|
02-25-2013
|
2.00
|
Fuel tank Z bracketts
|
Details
|
|
|
02-23-2013
|
0.50
|
Fuel tank Z bracket drilling
|
Details
|
|
|
02-23-2013
|
1.50
|
Fisnish fit work for electric trim
|
Details
|
|
|
02-12-2013
|
1.00
|
Tapped the wing tie downs
|
Details
|
|
|
02-01-2013
|
1.00
|
Fitted leading edge skin on left wing
|
Details
|
|
|
01-25-2013
|
2.00
|
Drilled wing skins
|
Details
|
|
|
01-24-2013
|
3.00
|
Skin-rib alignment and drilling wing walk doubler
|
Details
|
|
|
01-20-2013
|
1.00
|
Second wing on the stand
|
Details
|
|
|
12-29-2012
|
5.00
|
Wing Stands part 2
|
Details
|
|
|
11-25-2012
|
2.00
|
Moving parts from storage to the new house/shop
|
Details
|
|
|
08-01-2012
|
3.00
|
Finshed drilling the right wing skins
|
Details
|
|
|
07-27-2012
|
3.50
|
Autopilot servo and wing skins
|
Details
|
|
|
07-18-2012
|
0.50
|
Built W-818 push rods
|
Details
|
|
|
07-17-2012
|
0.50
|
Bolted on tie down bracket and bell crank bracket
|
Details
|
|
|
07-13-2012
|
1.50
|
Asembled the right wing on the stand
|
Details
|
|
|
07-07-2012
|
4.00
|
Installing the wing stands
|
Details
|
|
|
07-04-2012
|
3.00
|
Building the wing stands
|
Details
|
|
|
06-20-2012
|
3.00
|
Rolling the leading edges of the elevators
|
Details
|
|
|
06-17-2012
|
2.00
|
Trim Tab Assembly
|
Details
|
|
|
06-17-2012
|
5.00
|
Rivet the skin on to both elevators.
|
Details
|
|
|
06-15-2012
|
1.50
|
Sub structure worok for both elevators
|
Details
|
|
|
06-12-2012
|
1.00
|
Pop riveted the leading edge of the rudder closed
|
Details
|
|
|
06-11-2012
|
1.00
|
Rolling the leading edge
|
Details
|
|
|
06-10-2012
|
1.50
|
Riveting the rudder skin
|
Details
|
|
|
06-09-2012
|
0.50
|
Assembled Rudder skeleton
|
Details
|
|
|
06-06-2012
|
2.00
|
Primed empennage parts
|
Details
|
|
|
06-04-2012
|
1.50
|
Drilled trim tab riblets
|
Details
|
|
|
05-30-2012
|
4.00
|
Trim tab
|
Details
|
|
|
05-28-2012
|
2.00
|
Making riblets
|
Details
|
|
|
05-13-2012
|
2.00
|
Left rudder prep work
|
Details
|
|
|
05-12-2012
|
0.00
|
I got my Wing Kit today!
|
Details
|
|
|
05-08-2012
|
2.00
|
Drilling the left Rudder
|
Details
|
|
|
04-24-2012
|
1.50
|
Drilling the E-714
|
Details
|
|
|
04-19-2012
|
1.00
|
Preparing the Left elevator
|
Details
|
|
|
03-20-2012
|
4.00
|
Drilled, dimpled, debured right elevator
|
Details
|
|
|
02-22-2012
|
3.00
|
Riveted Stiffeners onto both elevators
|
Details
|
|
|
02-14-2012
|
3.50
|
Prepped Elevators for riveting
|
Details
|
|
|
02-13-2012
|
1.50
|
Finshed rudder prep
|
Details
|
|
|
02-10-2012
|
1.50
|
Dimpled rudder skin
|
Details
|
|
|
02-07-2012
|
1.50
|
Bent rudder
|
Details
|
|
|
01-31-2012
|
3.00
|
Riveting the rudder stiffeners
|
Details
|
|
|
01-28-2012
|
2.50
|
Riveting the VS
|
Details
|
|
|
01-28-2012
|
1.50
|
Riveted in the rear spar and finished the VS
|
Details
|
|
|
01-27-2012
|
0.50
|
Clecoed the skin onto the VS
|
Details
|
|
|
01-26-2012
|
1.00
|
Riveted skeletal structure of VS
|
Details
|
|
|
01-17-2012
|
2.00
|
Building the VS
|
Details
|
|
|
01-07-2012
|
5.00
|
Priming
|
Details
|
|
|
01-05-2012
|
3.00
|
Trimmed the elevator stiffeners
|
Details
|
|
|
12-28-2011
|
7.00
|
Drilled Rudder, dimpled VS and rudder
|
Details
|
|
|
12-27-2011
|
3.00
|
VS/dimple/countersink and started on the rudder
|
Details
|
|
|
12-25-2011
|
3.50
|
Completed HS and drilled VS
|
Details
|
|
|
12-23-2011
|
2.50
|
VS assembled and ready to drill/ Tech inspection
|
Details
|
|
|
12-22-2011
|
1.00
|
Prep for drilling the VS
|
Details
|
|
|
12-13-2011
|
4.00
|
Finished the rigth side of the HS
|
Details
|
|
|
12-12-2011
|
2.00
|
reworked front spar rivets and started right side
|
Details
|
|
|
12-10-2011
|
4.50
|
Assembled left side of the HS
|
Details
|
|
|
12-06-2011
|
1.00
|
Rivetted front HS spar
|
Details
|
|
|
11-30-2011
|
2.00
|
Rivetting the Horizontal Stablilizer
|
Details
|
|
|
11-27-2011
|
4.00
|
primed the remaining pieces and the skins
|
Details
|
|
|
11-25-2011
|
4.00
|
Prepped paint area and primered HS spar
|
Details
|
|
|
11-25-2011
|
4.00
|
Dimpled and deburred all components and dimmpled s
|
Details
|
|
|
11-20-2011
|
5.00
|
Drilling the HS (right side)
|
Details
|
|
|
11-20-2011
|
4.00
|
drilling the HS
|
Details
|
|
|
11-16-2011
|
5.00
|
started work on frontHS spar
|
Details
|
|
|
11-15-2011
|
5.00
|
Kit arrived, inventory and initial HS spar work
|
Details
|
|
|
09-19-2011
|
2.00
|
completed step 1 for the spar
|
Details
|
|