KitLog pro

Powered By Kitlog Pro v2.0

Garys Web Site
Work Logs Found: 92
Category Work Time: 193 Hours
 Date
Hours
Work Log Summary

Details

 09-11-2014
0.01
Started Flying Lessons Today

 05-10-2014
2.00
Instrerment Pannel
Details

 05-09-2014
3.00
Oil System
Details

 05-08-2014
4.00
Cooling System
Details

 05-07-2014
3.00
Paint Inside of Body
Details
       

 09-26-2013
1.00
strung harness hookin up
Details

 09-25-2013
1.00
Safety Wire Pre Rotator
Details
     

 09-25-2013
0.30
Mistake or Errors in Build
Details
       

 09-24-2013
2.00
Throttle Quadrant & Choke
Details
       

 09-24-2013
0.30
Seat Cover
Details
     

 09-23-2013
1.00
Wiring Harness to Frame
Details

 09-23-2013
0.50
Seat Bolt to Short
Details
     

 09-22-2013
1.00
Throttle Quadrant to Seat & Cables
Details
     

 09-21-2013
0.50
Roto Control Safety Wire
Details
     

 09-16-2013
1.00
Wiring Harness Check
Details
     

 09-14-2013
2.00
Radiator Expansion Tank
Details
       

 09-11-2013
8.00
Wiring Instrument Panel
Details
       

 09-10-2013
3.00
Panel Wiring
Details
       

 09-09-2013
0.25
Pre-Rotator Cable Routing
Details
     

 09-09-2013
0.30
Pitot Tube & Static Tube at Mast
Details
       

 09-09-2013
2.00
Clean-up and Prep for Panel Wiring
Details
     

 09-07-2013
3.00
Bleeding Brakes & Brake Line Zip Tie Mod
Details
       

 08-31-2013
1.00
Hydraulic Brake Line Attachment
Details
       

 08-31-2013
0.30
Correction to Insturment Pod to Front Upper Keel b
Details
       

 08-27-2013
4.00
Navigation Lights
Details
       

 08-27-2013
2.00
Clean Up & Tools
Details

 08-25-2013
7.00
Vertical Stabilizers & Rudder
Details
       

 08-25-2013
0.30
Fixed Cable Guide Rudders from 8/9/2012
Details
       

 05-05-2013
2.00
# 4 cable set (Rudder)
Details

 02-16-2013
2.00
Paint Rudder caps
Details
     

 09-05-2012
3.00
Strobe & Positioning Lights
Details
       

 09-04-2012
4.00
Test Location of Cables
Details

 09-01-2012
2.00
Outside Vertical Stablizers Caps
Details
       

 08-31-2012
1.25
Tail Cap
Details
       

 08-31-2012
0.50
Pre Rotator Flex Cable
Details
     

 08-31-2012
2.00
Pre Rotator Drive Alignment & Belt Tension
Details
       

 08-29-2012
3.00
Throttle & Choke Cables to Carbs
Details
       

 08-28-2012
3.00
Extended Range Tanks
Details
       

 08-09-2012
1.00
Rudder Control Cables
Details
       

 08-07-2012
1.00
Rudder Installed
Details
       

 08-06-2012
1.00
Vertical Stabilizer
Details
       

 08-03-2012
1.00
Finished Mounting of Horizontal Stabilizers
Details
       

 07-27-2012
2.00
Horizontal Stabilizer to Rear Keel
Details
       

 07-25-2012
2.00
Front Stabilizer V & H Mounts and Rudder
Details
       

 07-21-2012
2.00
Horizontal Stabilizer Rubber Trim
Details
       

 07-03-2012
2.00
Pre-Rotator & Prop
Details
       

 06-24-2012
2.00
Rudder & Horizontal and Vertical Stabilizers
Details
       

 06-24-2012
1.00
Insturment Pod to Front Upper Keel booms
Details
       

 06-23-2012
2.00
Quadrant/Throttle & Pre-Rotor
Details
       

 06-23-2012
0.30
Mounting Insturment Pod
Details
       

 06-23-2012
0.20
Engine to Mast
Details
       

 06-22-2012
0.10
Tail Wheel Asembly Installed
Details
     

 06-22-2012
1.30
Gages Installed into Panel
Details
     

 06-21-2012
2.00
Quadrant/Throttle & Pre-Rotor Control
Details
       

 06-21-2012
1.00
Engine Ring Mount & Water Pump Right Side
Details
       

 06-20-2012
2.00
Tail Boom Wiring for Position Lights
Details
       

 04-04-2012
2.00
Engine Ring Mount & Prerotator
Details
       

 03-29-2012
1.30
Battery Box
Details
       

 03-28-2012
0.15
Keel boom Wiring Sleeve
Details
       

 03-28-2012
1.00
Fuel Cell to Fuel Pump
Details
       

 03-26-2012
3.00
Rudder Pedals & Position & Brake Master Cylinders
Details
       

 03-25-2012
2.00
Pre-Rotator Safety Wire & Attached to Engine
Details
       

 03-24-2012
2.00
Pre-Rotator & Rotor Brake
Details
       

 03-13-2012
1.00
Out of the Box - Into the Air
Details
       

 03-11-2012
6.00
Rotor - Pre-rotator - Folding Upper Mast
Details
       

 03-05-2012
4.00
Upper Mast & Rotor Brake & Pre-Rotator
Details
       

 02-26-2012
0.10
Sight tube update
Details
       

 02-09-2012
2.00
Rotor Head & Control Bar Assembly
Details
       

 02-01-2012
2.00
Seat & Fuel Cell to Frame
Details
       

 01-25-2012
1.00
Quadrant/Throttle & Pre-Rotor Control
Details
     

 01-23-2012
0.15
Top Body Mount
Details
     

 01-23-2012
1.00
Pre Assembled Tail Wheel
Details
       

 01-23-2012
0.30
Motor Mount to Mast
Details
       

 01-23-2012
1.00
Finished up Fuel Cell
Details
       

 01-17-2012
1.00
Main Fuel Cell
Details
       

 01-17-2012
1.00
Control Rods
Details
       

 01-16-2012
4.00
Controls in Frame & Control Stick W/Talk Switch
Details
       

 01-01-2012
1.00
Roto Control in Frame
Details
     

 12-31-2011
6.00
Rotor controls
Details
     

 12-30-2011
10.00
Now it's starting to take shape
Details
       

 12-28-2011
3.00
Front Seat Mount & Tool
Details
       

 12-27-2011
8.00
Rear Keel Boom to mast
Details
       

 12-26-2011
1.00
Tools & Shop Setup
Details
       

 12-21-2011
1.00
Upper Front Keel to Mast
Details
     

 12-21-2011
8.00
Foot Rest & Upper Keels
Details
       

 12-14-2011
1.00
Nose Bearing and Assembly Manual
Details
     

 12-13-2011
2.00
Nose Bearing
Details
     

 12-12-2011
8.00
Keel, Mast, Front Lower Keel
Details
     

 11-30-2011
1.00
Started costruction - Nose Wheel
Details
       

 11-14-2011
2.00
Kitlog pro and inventory.
Details
       

 11-12-2011
1.00
Unpack Rotax 912 ULS
Details
       

 11-12-2011
4.00
Unpack & Inventory
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.