Powered By Kitlog Pro v2.0
Bernies Web Site
KR2S
All
Work Logs Found:
80
Category Work Time:
376 Hours
Date
Hours
Work Log Summary
Details
10-23-2015
1.00
Updating Builder Log
Details
11-05-2013
1.00
Horiz Stab/Elevator Hinge Installation
Details
10-12-2013
1.00
HS Airfoil Templates Repair
Details
01-31-2012
2.00
Ruder Pedal Fabrication
Details
11-29-2011
1.00
Details
11-16-2011
8.00
Construction Tables
Details
11-16-2011
1.00
Details
11-15-2011
8.00
Standardized Work Tables
Details
11-15-2011
8.00
Construction Tables
Details
11-01-2011
4.00
Rotary Support Stand
Details
11-20-2004
4.00
Tail Wheel Installation
Details
08-16-2004
2.00
Main Landing Gear Bracket Installation on Wing Spa
Details
08-15-2004
4.00
Mounting Landing Gear Brackets to Wing Spar
Details
08-15-2004
2.00
Main Landing Gear Bracket Installation
Details
07-17-2003
2.00
Main Landing Gear Bracket Prep
Details
12-31-2002
6.00
Wing Spar Construction
Details
12-09-2002
1.00
Inspection of Wing Spars
Details
12-08-2002
2.00
Outer Wing Spar Construction
Details
12-07-2002
4.00
Outer Wing Spar Construction
Details
12-06-2002
2.00
Wing Center Spar Construction
Details
11-21-2002
5.00
Wing Spar Construction
Details
11-13-2002
6.00
Wing Aft Spar Construction
Details
11-02-2002
8.00
Rework of Fwd Wing Spars
Details
10-26-2002
2.00
Wing Aft Spar Construction
Details
10-24-2002
5.50
Outer Wing Fwd Spar Construction
Details
10-20-2002
3.00
Re-Cut and taper Wing Spar Caps
Details
10-16-2002
3.00
Wing Center Spar Construction
Details
10-10-2002
3.00
Wing Spar Cap Construction
Details
10-09-2002
45.00
Wing Spar Cap Construction
Details
10-05-2002
4.00
Construction of Wing Forward Spar Caps
Details
09-23-2002
2.00
Fabrication of outer wing spar caps
Details
09-15-2002
2.00
Out Wing Spar Cap Construction
Details
09-10-2002
1.00
Center Wing Spar Cap Construction
Details
09-09-2002
2.00
Wing Center Spar Cap Construction
Details
07-08-2002
2.00
Fuselage Boat Complete/WT & BAL
Details
06-30-2002
5.00
Sta I Brace and Gusset Installation
Details
06-28-2002
2.00
Firewall Filler Block Installation
Details
06-27-2002
4.50
Firewall Shelf Structure Installation
Details
06-24-2002
1.00
Firewall Gussets
Details
06-23-2002
4.00
Top Diagonal Structure Installation
Details
06-22-2002
1.00
Bottom Shelf Installation
Details
06-21-2002
2.00
Top fuselage diagonal sturcture
Details
06-21-2002
3.50
Firewall top x-member
Details
06-19-2002
4.00
Installation of aft fuselage top X members
Details
06-16-2002
5.50
Install top and bottom firewall shelf
Details
06-14-2002
1.50
Fuselage doubler longerons
Details
06-14-2002
4.50
Firewall Block Fabrication
Details
06-13-2002
4.00
Firewall Gussets/Aux Longerons
Details
06-12-2002
2.00
Fuselage Tail Wheel Block
Details
06-12-2002
4.00
Completed firewall cross member installation
Details
06-05-2002
2.00
Trimming plywood skin
Details
06-04-2002
2.00
Epoxy fuselage bottom skin (aft piece)
Details
06-03-2002
4.50
Epoxy fuselage bottom skin
Details
06-02-2002
1.50
Cut/Scarf Plywood belly skin
Details
06-01-2002
11.00
Fuselage belly skin preparation
Details
05-30-2002
13.00
Tail Post Fitting
Details
05-22-2002
4.00
Lower firewall cross member installation
Details
05-16-2002
6.50
Epoxing fuselage bottom member gussets
Details
05-14-2002
10.00
Cutting fuselage bottom gussets and fabricating cl
Details
05-07-2002
6.00
Epoxing Fuselage bottom cross members
Details
04-24-2002
5.50
Rudder Post Fabrication
Details
04-22-2002
6.00
Sorting out parts
Details
04-01-2002
6.00
Fuselage cross members
Details
03-28-2002
3.00
Fuselage jig for forming sides
Details
03-21-2002
6.00
Fuselage layout
Details
03-16-2002
8.00
Fuselage layout
Details
03-11-2002
1.00
Trimming Plywood on Fuselage Sides
Details
03-09-2002
7.50
Attching Fuselage Side Plywood
Details
02-19-2002
3.00
Plywood Epoxied to Second Side Ladder
Details
02-16-2002
4.00
Epoxy Plywood to Fuselage Ladder Sides
Details
02-10-2002
11.00
Prep Work for Plywood on Fuselage Sides
Details
01-31-2002
4.00
Second Fuselage Side Ladder
Details
01-29-2002
14.00
Second Fuselage Ladder
Details
01-29-2002
2.00
Expoxy First Fuselage Ladder
Details
01-23-2002
3.00
First Fuselage Side Ladder
Details
01-22-2002
4.00
Fuselage Sides
Details
01-17-2002
12.00
Fuselage construction
Details
10-21-2001
4.00
Mobile Work Bench
Details
10-02-2001
1.00
Wood Kit Delivery
Details
09-29-2001
4.00
Construction Tables
Details
SITE NAVIGATION
Contact Builder
KR2S Home
Category
# Logs
# Hours
All
80
375
Controls
1
2
Empennage
2
2
Fuselage
44
207
Landing Gear
5
14
Miscellaneous
2
7
Support Equipment
7
37
Wings
19
106
Copyright © 2001-2024 Matronics. All Rights Reserved.