KitLog pro

Powered By Kitlog Pro v2.0

Lorens Web Site
Work Logs Found: 160
Category Work Time: 1076 Hours
 Date
Hours
Work Log Summary

Details

 10-29-2016
1.00
First flight and at 10 hours
Details
       

 10-27-2016
100.00
Engine change out
Details
       

 10-26-2016
20.00
Cowl Modifications
Details
       

 09-08-2014
1.00
Flight Test Phase
Details
       

 03-25-2014
16.00
Removed and Replaced push rod tubes
Details
       

 03-04-2014
0.50
Magnified Pictures of Circlips
Details
       

 02-28-2014
4.00
Removed Fuel Tank for New Shut Off Valve Actuator
Details
       

 02-23-2014
12.00
Removed the Red Menace and Installed Rotec TBI
Details
       

 12-17-2013
3.00
Installed Orifice in Oil Pressure Line to Sending
Details
       

 12-16-2013
2.00
Calibrated Oil Pressure and Oil Temp
Details
       

 12-11-2013
2.00
Double Checking Cotter Keys and Wing Lock
Details
       

 12-10-2013
2.00
Misc. Avionics Components
Details
       

 12-09-2013
3.00
Final Tightening of Main Spar Pivot Bolts-Install
Details
       

 12-06-2013
1.00
Wife tries out my new seat
Details
       

 12-05-2013
12.00
Completed Balancing Ailerons and Installing Ailero
Details
       

 12-04-2013
24.00
Completed Wiring and Configuring Dynon Skyview and
Details
       

 10-23-2013
8.00
Pulling Wire and Terminating
Details
       

 10-20-2013
8.00
Wiring Dynon Skyview and MGL V-6 Radio
Details
       

 10-11-2013
2.00
Hauled home after painting
Details
       

 10-10-2013
16.00
Paint-base coat and clear coar
Details
       

 09-16-2013
8.00
Removed Cylinders toReplace Circlips
Details
       

 09-07-2013
8.00
Paint Preparation and Paint
Details
       

 08-29-2013
4.00
Final Assy of Main Gear wheels
Details
       

 08-27-2013
8.00
Misc Wiring and Back up Battery
Details
       

 08-26-2013
8.00
Installing Avionics
Details
       

 08-22-2013
2.00
Final Assembly of Control Rod to Elevator
Details
       

 08-21-2013
6.00
Fabricated Fairings
Details
       

 05-12-2013
24.00
Modified Boat Trailer to Haul My Onex
Details
       

 04-06-2013
10.00
Started Wiring Panel
Details
       

 04-04-2013
1.00
Installed Engine Oil Cooler
Details
     

 03-22-2013
4.00
Cutouts for breakers, EFIS, radios, and switches
Details
       

 03-20-2013
16.00
Completed Inboard Wing Skinning
Details
       

 03-18-2013
10.00
Install Wing Tips
Details
       

 03-18-2013
1.00
Inside of outboard wing before installing wing ti
       

 03-17-2013
8.00
Skin Inboard Left Wing
Details
       

 03-14-2013
8.00
Install Landing Light
Details
       

 03-12-2013
4.00
Install Electrical components
Details
     

 03-04-2013
2.00
Installed Com Radio Antenna
Details
     

 03-02-2013
4.00
Trim System Attachment
Details
       

 02-28-2013
12.00
Installed Cabin Heater/Vent Duct and Battery Box
Details
       

 02-18-2013
1.00
Test Fit Prop
Details
       

 02-17-2013
5.00
Installed Trim system
Details
       

 02-16-2013
4.00
Testing Nav,Position, and Strobe Lights
Details
       

 02-16-2013
1.00
Installing exhaust
Details
       

 02-11-2013
10.00
Fabricated wiring for position and wingtip strobe
Details
       

 02-06-2013
1.00
Visit from EAA Technical Advisor
Details
     

 01-30-2013
2.00
Assembled Throttle Quadrant
Details
       

 01-29-2013
4.00
Fabricate and install Fuel Tank Shut Off
Details
       

 01-28-2013
6.00
Started Adding Engine Accessories
Details
       

 01-25-2013
8.00
Final Assembly of Engine and Attached to Mount
Details
       

 01-08-2013
6.00
Final Engine assembly
Details
       

 01-07-2013
6.00
Final Assembly of Engine
Details
       

 01-06-2013
4.00
Took Measurements fo 7:0:1 Compression Ratio
Details
       

 01-05-2013
4.00
Final Assembly of Engine
Details
       

 01-04-2013
1.00
Crankcase Ready for final assembly
Details
       

 01-03-2013
12.00
Checking and Insuring Connecting Rod Clearance
Details
       

 01-01-2013
1.00
Install AeroVee Engine Mount
Details
       

 01-01-2013
0.50
Drill, tap and bend Pitot Tube assembly
Details
       

 12-31-2012
4.00
Fabricated and installed rudder spring attachment
Details
       

 12-20-2012
40.00
Final touches on canopy.
Details
       

 12-18-2012
8.00
Updrill and Cleco Fiberglass Wing tips
Details
       

 12-16-2012
16.00
Cut and Fit Canopy and Canopy Frame
Details
       

 12-07-2012
4.00
Started Fitting Canopy
Details
       

 11-27-2012
12.00
Installed AirWard Nut Plate Kit
Details
       

 11-17-2012
2.00
Installed Hub and Crankshaft Timing Gear
Details
     

 11-15-2012
4.00
Test Fit Prop to hub
Details
       

 11-15-2012
4.00
Installed Connecting Rods on Crankshaft

 11-15-2012
4.00
Installed Connecting Rods on Crankshaft
Details
       

 11-14-2012
6.00
Completed Prop Hub Installation
Details
       

 11-13-2012
6.00
Complete Block Painting and Start Engine Assembly
Details
       

 11-12-2012
8.00
Prep and Paint Engine Block
Details
       

 11-09-2012
1.00
Checked Clearance on Oil Pump
Details
       

 11-05-2012
4.00
Fabricated Engine Stand that Attaches to Shop A-Fr
Details
       

 10-28-2012
1.00
Wing support for transit installed
Details
       

 10-27-2012
6.00
Wing support assembly for transport
Details
       

 07-17-2012
4.00
Installing Windscreen
Details
       

 07-09-2012
4.00

Details
       

 07-06-2012
12.00
Installing Heel Brakes
Details
       

 06-26-2012
4.00
Rolled out of the shop
Details
       

 06-14-2012
16.00
Aileron Assembly
Details
       

 06-12-2012
6.00
Updrill and Assemble Aileron Counterbalance and Ai
Details
       

 06-10-2012
8.00
Fabricate and Install Flaps
Details
       

 06-06-2012
4.00
Installing Tail Wheel
Details
       

 05-26-2012
8.00
Empanage and Horizontal Stabilizer Install
Details
       

 05-22-2012
8.00
Install Controls and Control surfaces
Details
       

 05-06-2012
8.00
Installed Rudder Pedals and Rudder Cable Pulleys
Details
       

 04-30-2012
4.00
Fabircate and Install Rudder Cable Pulley Brackets
Details
       

 04-27-2012
8.00
Torque and Torqe Seal Fuselage Hardware-Install Se
Details
       

 04-25-2012
8.00
Install Brake/Axle on Landing Gear and Attach Gear
Details
       

 04-24-2012
1.00
Right Angle Mini Drill
Details
     

 04-22-2012
8.00
Updrill and Debur Rright Inboard Wing
Details
       

 04-19-2012
5.00
Debur and Dimple Left Inboard Wing Assy.
Details
       

 04-18-2012
6.00
Riveted Left Outboard Wing skin
Details
       

 04-17-2012
6.00
Wing Pivot Doubler angles
Details
       

 04-17-2012
1.00
Grind Clearance for Short Aileron Rod in Outboard
Details
       

 04-14-2012
4.00
Received Engine Components
Details
     

 03-19-2012
8.00
Skinning Inboard Wing Panels
Details
       

 03-10-2012
8.00
Wing Lock/Fold assembly
Details
       

 03-09-2012
8.00
Completing Paddle Assemblies and Skinning Wings
Details
       

 03-08-2012
8.00
Assembling Right Outboard Wing Panel Substructure
Details
       

 03-06-2012
8.00
Assembled Control Stick
Details
       

 03-02-2012
16.00
Installed Ribs on right main spar
Details
       

 02-27-2012
8.00
Installed left folding wing
Details
       

 02-22-2012
6.00
Installed Inboard Paddle Assembly Attachments
Details
       

 02-22-2012
8.00
Assembling left inboard wing
Details
       

 02-21-2012
8.00
Double checking all plan revisions.
Details

 02-20-2012
2.00
Jig for enlarging phenolic wheel pulley bore to 5
Details
       

 02-16-2012
4.00
Made holes for rudder cables.
Details
     

 02-15-2012
4.00
Keeping things straight
     

 02-14-2012
8.00
Started installing ribs on left sid
Details
       

 02-13-2012
8.00
Installed main and reart spars
Details
       

 02-11-2012
3.00
Elevator Control Rod
Details
       

 02-10-2012
2.00
Rev 1-31-12-Detail 02 R/L and 03 R/L-Cutout detail
Details
       

 02-07-2012
4.00
Aligned and Drilled Landing Gear to Fuselage
Details
       

 01-24-2012
1.00
Gear ready for final attachment
Details
     

 01-23-2012
1.00
Drilling pilot holes
Details
       

 01-22-2012
6.00
Establish Main Gear Centerline
Details
       

 01-21-2012
4.00
Aileron Paddle Assembies
Details
     

 01-20-2012
4.00
Assembled some small parts
Details
       

 01-13-2012
1.00
Checked All Rivets for Proper Installation
Details
       

 01-12-2012
12.00
Continued Assembly of Forward Fuselage
Details
       

 01-09-2012
5.00
Started Firewall Assembly
Details
       

 01-06-2012
6.00
Working on Fuselage
Details
       

 01-04-2012
8.00
Assembled Forward Fuselage
Details
       

 01-01-2012
6.00
Continued Fuselage Assembly
Details
       

 12-28-2011
8.00
Continued Fuselage Assembly
Details
       

 12-24-2011
16.00
Started Assembling Aft fuselage
Details
       

 12-21-2011
1.50
Wooden Fence for cutting fiberglass
Details
       

 12-19-2011
6.00
Attached Fiberglass Wing Tips
Details
       

 12-12-2011
6.00
Dimpling and deburring
Details
       

 12-07-2011
4.00

Details

 12-06-2011
6.00
Completed riveting and bolting Left Main Spar -Fo
Details
       

 12-02-2011
16.00
Left Outboard Folding Wing Assembly
Details
       

 12-01-2011
0.10
EAA Chapter 1111 members visited my project
Details
       

 11-22-2011
4.00
Left Hand Outboard Forward Fold Rib Assembly
Details
       

 11-21-2011
5.00
Completed Rudder
Details
       

 11-14-2011
6.00
Completed vertical tail assembly
Details
       

 11-14-2011
1.00
Completed riveting of vertical tail
     

 11-11-2011
1.00
Took the day off
Details
       

 11-10-2011
4.00
Assembled Outboard paddle assemblies
Details
     

 11-08-2011
6.00
Preassembled main spar
Details
       

 11-07-2011
8.00
Outboard Wing Panel Substructure
Details
       

 11-06-2011
4.00
Aft wing ribs attachments
Details
       

 11-05-2011
8.00
Center Rear Main Spar Assembly and Outboard Rear S
Details
       

 11-03-2011
3.00
Completed component storage
Details
     

 11-02-2011
3.00
Assembled 2 Outboard Rear Spars
Details
       

 11-01-2011
1.00
Riveting elevator
Details
       

 11-01-2011
10.00
Assembling Elevator
Details
       

 10-26-2011
4.00
Pre-assembled Empennage
Details
     

 10-25-2011
4.00
Completed riveting horizontal tail skin
Details
       

 10-23-2011
6.00
Final assembly for riveting
Details
       

 10-21-2011
6.00
Installing Piano hinge for elevator
Details
       

 10-20-2011
6.00
Final assembly of Horizontal Tail
Details
       

 10-19-2011
8.00
Formed Forward Spar and PreAssembled
Details
       

 10-18-2011
0.50
Working Small Parts
Details
     

 10-17-2011
4.00
Receiving Hardware
Details
       

 10-11-2011
4.00
Pre-assembled Vertical Tail Assy
Details
       

 10-05-2011
3.00
Getting Started with a simple assembly.
Details
       

 09-23-2011
1.00
Unloading Kits
Details
       

 09-23-2011
2.00
Unloading Kits
       










Copyright © 2001-2024 Matronics. All Rights Reserved.