KitLog pro

Powered By Kitlog Pro v2.0

PETER'S WEB SITE
Work Logs Found: 548
Category Work Time: 2694 Hours
 Date
Hours
Work Log Summary

Details

 03-01-2008
6.00
Scotchbrite, acid etch & alodine wings & fuse

 03-01-2008
6.00
Scotchbrite, acid etch & alodine wings & fuse

 02-29-2008
8.00
Scotchbrite, acid etch & alodine wings & fuse

 02-29-2008
8.00
Scotchbrite, acid etch & alodine wings & fuse

 02-28-2008
2.00
Scotchbrite, acid etch & alodine wings & fuse

 02-28-2008
2.00
Scotchbrite, acid etch & alodine wings & fuse

 02-22-2008
8.00
Fit & bog rh wingtp, sand tips & wheel pants

 02-21-2008
9.00
Sand & bog w'screen, fit canopy latch, sand & prim

 02-20-2008
8.00
sand front of w'screen, fit rear w'screen skirt, s

 02-19-2008
9.00
Bog windscreen & sand, glass rear of w'screen/cano
       

 02-18-2008
8.00
Fit windscreen, baggage cover

 02-16-2008
4.00
Rivet turtledeck on

 02-15-2008
1.00
Instrument checks
Details
     

 02-15-2008
8.00
Bleed brakes, turtledeck, wings

 02-13-2008
8.00
Cowls, baffles, wiring

 02-12-2008
4.00
Cowls, prop, spinner

 02-07-2008
5.00
Ancor nuts to wing tips

 02-06-2008
9.00
Wing tips, wiring

 02-05-2008
9.00
Dimple turtle deck, wiring

 02-04-2008
9.00
Electric wiring at fuel pump, cockpit floor

 02-02-2008
2.00
Cockpit floor

 02-01-2008
8.00
Baffles, electronic ignition, cockpit floor

 01-31-2008
8.00
Baffles, oil door, cowls

 01-30-2008
3.00
Baffles

 01-29-2008
8.00
Sand top & bottom cowl, fit oil cooler

 01-25-2008
4.00
Prime baffle parts & lower cowl, sand top cowl

 01-24-2008
7.00
paint baffles, sand & prime top cowl, fit tacho co

 01-23-2008
8.00
Prime baffles, sand wheel pant, fit nose pant

 01-22-2008
8.00
Cowl pins, baffles, wheel pants

 01-19-2008
4.00
Intersection fairing to rh wheel pant

 01-18-2008
7.00
wheel pants fitted to wheels

 01-12-2008
2.00
Fit main wheel pants

 01-12-2008
2.00
Bog rear canopy skirt

 01-11-2008
8.00
Rear canopy skirt

 01-10-2008
4.00
Check high tension cabes

 01-10-2008
5.00
Baffles

 01-09-2008
3.00
Canopy
       

 01-09-2008
2.00
Baffles

 01-08-2008
4.00
Baffles

 01-07-2008
8.00
Baffles, snorkel

 01-06-2008
4.00
Snorkel

 01-04-2008
5.00
Fit side skirts to canopy

 01-04-2008
5.00
Fit inlet ducts to top cowl

 01-03-2008
9.00
Baffles
       

 01-02-2008
0.50
Move to Hervey Bay - wings
       

 01-02-2008
2.00
Baffles

 01-01-2008
9.00
Baffles

 12-31-2007
5.00
Secure hinges to cowl
       

 12-31-2007
5.00
New die skirts for canopy

 12-30-2007
5.00
Fit cowls
       

 12-29-2007
6.00
Fit hinges for top cowl

 12-28-2007
7.00
Trial fit side skirts
     

 12-28-2007
3.00
Pipe from throttle body to injector bowl

 12-21-2007
0.50
Move to Hervey Bay
       

 12-21-2007
0.50
Move to Hervey Bay
       

 12-20-2007
0.10
Photograph panel front
       

 12-20-2007
0.10
Photograph panel back
       

 12-20-2007
0.10
Photograph engine
       

 12-20-2007
0.10
Photograph engine
       

 12-04-2007
2.00
Autopilot plumbing
     

 12-03-2007
4.00
Coax connection to tpdr, radio aerials
     

 11-19-2007
7.00
Paint & install map-box door

 11-14-2007
4.00
Install Altimeter

 11-13-2007
5.00
Infill lettering on panel

 11-09-2007
5.00
Remove, paint & reinstall panel

 11-08-2007
7.00
Remove, paint & reinstall panel

 11-07-2007
6.00
Install cabin heat cble

 11-06-2007
5.00
Make and install magnetometer bracket

 11-06-2007
5.00
Make and install magnetometer bracket

 11-05-2007
6.00
Install air filter bypass valve and cable

 09-07-2007
4.00
Canopy - install spacers to roll bar

 09-06-2007
5.00
Windscreen - trim to size

 09-04-2007
5.00
Windscreen - trim to size

 09-03-2007
5.00
Windscreen - trim to size

 08-31-2007
6.00
Install canopy rear rail

 08-29-2007
6.00
Alodine and paint canopy parts

 08-28-2007
5.00
Side skirts

 08-27-2007
6.00
Side skirts

 08-24-2007
5.00
Side skirts

 08-23-2007
6.00
Side skirts - cut lightening holes

 08-21-2007
7.00
Drill canopy to frame
       

 08-20-2007
8.00
Drill canopy to frame

 08-17-2007
4.00
Drill & fit canopy handle

 08-16-2007
5.00
Fit top strip

 08-15-2007
6.00
Drill and install plastic blocks-end rails

 08-14-2007
5.00
bevel and sand canopy edges

 08-13-2007
6.00
bevel and sand canopy edges

 08-10-2007
7.00
Cut canopy to fit frame
       

 08-09-2007
6.00
Cut canopy to fit frame

 08-08-2007
8.00
Cut canopy to fit frame

 08-07-2007
8.00
Cut canopy to fit frame

 08-06-2007
7.00
Cut canopy to fit frame

 08-03-2007
7.00
Fit frame to fuse

 08-02-2007
7.00
Fit frame to fuse

 08-01-2007
6.00
Fit frame to fuse

 07-31-2007
6.00
Fit frame to fuse

 07-30-2007
6.00
Fit frame to fuse

 07-27-2007
8.00
Fit frame to fuse

 07-26-2007
4.00
Nutplate strip

 07-25-2007
8.00
Canopy side rails-cut, bevel, drill

 07-24-2007
8.00
Canopy side rails-cut, bevel, drill

 07-19-2007
5.00
Prime forward top skin

 07-18-2007
5.00
Rivet forward top skin

 07-18-2007
3.00
Make fuel meter cover

 07-16-2007
3.00
Install fuel selector and cover

 07-15-2007
1.00
SAAA meeting here

 07-13-2007
3.00
Attach throttle cable

 07-12-2007
2.00
Spacer on fuel lines in tunnel

 07-12-2007
5.00
Cleco subpanel

 07-11-2007
4.00
Install insulation inside cockpit

 07-10-2007
5.00
Install Koolmat, rudder pedals, brake lines

 07-03-2007
5.00
Prime and paint parts

 07-02-2007
5.00
Install Koolmat

 07-01-2007
5.00
Install Koolmat

 06-28-2007
4.00
Paint front cockpit walls near rudder pedals

 06-19-2007
3.00
Make magnetometer support

 06-19-2007
6.00
Debur & dimple forward top skin

 06-18-2007
4.00
Finish F-6111. Drill C-661

 06-15-2007
4.00
Install forward top skin & right F-6111
     

 06-14-2007
3.00
Make map light brackets
       

 06-14-2007
5.00
Install forward top skin
     

 06-13-2007
4.00
Attach canopy tracks

 06-12-2007
4.00
Attach roll bar brace
     

 06-11-2007
4.00
Attach roll bar

 06-11-2007
4.00
Attach roll bar

 06-09-2007
1.00
TC visit w Howard Mason
     

 06-08-2007
3.00
Bracket for Whelan power supply

 06-08-2007
3.00
Bracket for Whelan power supply

 06-06-2007
4.00
Install fuel flow meter
       

 06-05-2007
5.00
Drill holes in eyeballs
       

 06-04-2007
4.00
Drill noles in eyeball
       

 06-03-2007
2.00
Plate nuts behind panel

 06-03-2007
5.00
Cut sub-panel for radio stack

 06-01-2007
5.00
Cut sub-panel for radio stack

 05-30-2007
5.00
Cut sub-panel for radio stack

 05-29-2007
5.00
Fit map box

 05-27-2007
2.00
Trial fit panel & intruments

 05-26-2007
3.00
Fit map box

 05-25-2007
5.00
Install GRT, EIS, Trutrack screens in panel
     

 05-24-2007
5.00
Install radio & transponder trays

 05-23-2007
3.00
File holes in panel

 05-22-2007
2.00
Remove panel, install rudder pedals & brake valve

 05-22-2007
2.00
Remove panel, install rudder pedals & brake valve

 05-21-2007
8.00
Holes for wiring

 05-21-2007
8.00
Bundle wires & install cables

 05-19-2007
9.00
Wire panel & engine
       

 05-19-2007
9.00
Cut holes in panel

 05-19-2007
9.00
Cut holes in panel
       

 05-18-2007
8.00
Wire panel
     

 05-18-2007
8.00
Eyeballs for wiring

 05-18-2007
8.00
Assembly

 05-17-2007
8.00
Wire engine
       

 05-17-2007
8.00
Install aerials

 05-17-2007
8.00
Assembling

 05-16-2007
7.00
Wiring harness, connect instruments on bench
       

 05-16-2007
8.00
Exhaust supports, alternator
       

 05-16-2007
6.00
Exhaust
     

 05-15-2007
5.00
Install exhaust & throttle cable shield
     

 05-15-2007
5.00
Install exhaust
     

 05-15-2007
5.00
GRT sensors - CHT, oil & fuel pressure
       

 05-14-2007
4.00
Throttle eyeball & spacer. Fit park brake valve

 05-10-2007
4.00
Mixture cable bracket & eyeball

 05-09-2007
5.00
Throttle & mixture cable brackets

 04-27-2007
4.00
Install NACA air vents

 04-26-2007
4.00
Install prop govenor cable
       

 04-25-2007
4.00
Install eyeball for prop gov cable in firewall

 04-24-2007
4.00
Install prop govenor
     

 04-23-2007
4.00
Rotate top of prop govenor & safety wire
       

 04-04-2007
4.00
Install vent eyeballs

 04-03-2007
0.00
New helper
       

 04-03-2007
4.00
Make panel brackets

 04-02-2007
4.00
Drill forward canopy skin

 03-29-2007
4.00
Fit forward canopy skin
       

 03-28-2007
4.00
Paint cockpit

 03-27-2007
4.00
Paint cockpit

 03-26-2007
4.00
Paint cockpit

 03-23-2007
4.00
Paint cockpit
       

 03-22-2007
4.00
Paint cockpit

 03-21-2007
4.00
Paint cockpit

 03-20-2007
4.00
Paint cockpit

 03-19-2007
4.00
Paint cockpit

 03-14-2007
0.00
Email Aerosport Power re dessicant-see detail
Details

 03-13-2007
4.00
Tubing to HP fuel pump
       

 03-10-2007
3.00
Tubing to HP fuel pump

 03-09-2007
3.00
Tubing to HP fuel pump

 03-08-2007
3.00
Tubing to HP fuel pump

 03-07-2007
3.00
clean fuselage

 02-21-2007
2.00
Move canopy to Peregian
       

 02-20-2007
2.00
Move fuse to Peregian Beach
       

 11-17-2006
4.00
Alodine wing skins

 11-14-2006
5.00
R & L wing inspection plates

 11-14-2006
5.00
Drill wire holes in wing ribs

 11-13-2006
5.00
Drill wire holes in wing ribs

 11-13-2006
3.00
Drill roll bar to longeron

 11-12-2006
3.00
Drill roll bar to longeron

 11-12-2006
3.00
Bend sub panel

 11-11-2006
0.00
Email Vans re fitting roll bar
Details

 11-09-2006
5.00
Make 668 spacers

 11-09-2006
7.00
Fit HP fuel pump cover
     

 11-08-2006
5.00
Fit HP fuel pump cover

 11-08-2006
5.00
Fit aft inspection plates
     

 11-07-2006
7.00
Make canopy rollers, rivet map box

 11-07-2006
7.00
Fit HP fuel pump cover
     

 11-06-2006
5.00
Fiberglass horiz stab tips closed

 11-05-2006
4.00
Install harness cables

 11-05-2006
5.00
Fiberglass horiz stab tips closed

 11-04-2006
4.00
Fiberglass horiz stab tips closed

 11-04-2006
4.00
Attach rudder fairing

 11-02-2006
3.00
L wing - strobe & nav lights

 11-02-2006
3.00
Empenage fairings

 11-01-2006
3.00
L wing - strobe & nav lights

 11-01-2006
3.00
Empenage fairings

 10-28-2006
4.00
L wing - strobe & nav lights
     

 10-28-2006
4.00
Empenage fairings

 10-27-2006
5.00
Rudder fairings

 10-27-2006
6.00
L wing - strobe & nav lights

 10-26-2006
4.00
Rudder fairings
       

 10-26-2006
7.00
R wing - strobe & nav lights
     

 10-25-2006
5.00
R wing - strobe & nav lights
     

 10-24-2006
5.00
Heated pitot, R wing wiring
     

 10-24-2006
1.00
Heated pitot

 10-23-2006
4.00
Heated pitot
       

 10-10-2006
1.00
Heated pitot

 10-09-2006
1.00
Heated pitot

 09-28-2006
5.00
Right wing aileron stop, check aileron deflection
Details

 09-28-2006
5.00
Pitot mount

 09-25-2006
5.00
Elevator up stop

 09-25-2006
5.00
Attach rudder cable fairings

 09-19-2006
2.00
Rivet seat floor

 09-14-2006
4.00
Empenage attach-measure elev deflections
Details

 09-13-2006
9.00
Make new elev up stop

 09-13-2006
9.00
Empenage attach-measure elev. deflection

 09-12-2006
8.00
Fit hoses to engine

 09-12-2006
8.00
Fit hoses to engine

 09-11-2006
6.00
Hang engine
       

 09-11-2006
3.00
Hang engine

 09-06-2006
6.00
L, R & nose wheels
       

 09-06-2006
6.00
Crotch strap, map box
       

 09-05-2006
5.00
Left wheel / leg
     

 09-05-2006
5.00
Crotch strap

 09-04-2006
7.00
Right wheel /leg, oil pressure fitting on engine

 09-04-2006
2.00
oil pressure fitting on engine

 09-01-2006
7.00
Main wheels, fuel lube on vent & brake lines

 09-01-2006
7.00
Fuel line doubler in fireall

 08-31-2006
6.00
Firewall fuel line doubler

 08-31-2006
6.00
Alodining, drill pitch servo bracket

 08-30-2006
6.00
Redrill nosewheel hole in firewall

 08-30-2006
7.00
Install pitch servo
       

 08-29-2006
6.00
Warner Summerton (TC) visit, fit engine mount
       

 08-29-2006
6.00
Warner Summerton (TC) visit, fit engine mount

 08-28-2006
10.00
Test fit upper forward fuselage

 08-28-2006
10.00
Test fit upper forward fuselage
       

 08-23-2006
6.00
Install Digiflight roll servo in right wing
Details
       

 08-22-2006
6.00
Safetying fuel pickup tubes, Manual aileron trim
Details
       

 08-22-2006
6.00
Battery box, relays on firewall
       

 08-21-2006
7.00
Manual aileron trim
       

 08-21-2006
6.00
Battery box, relays on firewall
       

 08-20-2006
2.00
Manual aileron trim

 08-20-2006
2.00
Battery box

 08-17-2006
7.00
Rudder stops

 08-17-2006
8.00
R wing fairing platenuts
       

 08-16-2006
7.00
R wing fairing platenuts

 08-16-2006
6.00
Fit tail fairing, finish rudder stops

 08-15-2006
12.00
L wing fairing platenuts

 08-15-2006
6.00
Fit tail fairing
     

 08-14-2006
7.00
Remove wings, locktite pushrods, fuel tank attach

 08-14-2006
6.00
Fit tail fairing

 08-11-2006
8.00
Run brake lines
       

 08-11-2006
8.00
Rudder stops

 08-10-2006
8.00
R & L vent lines
       

 08-10-2006
6.00
H Stab lower trim, new rudder stops

 08-09-2006
7.00
Rudder stop

 08-09-2006
9.00
Attach rudder, make right fuel vent line

 08-08-2006
8.00
Attach rear bulkhead and vert stab

 08-08-2006
8.00
Attach rear bulkhead and vert stab
       

 08-07-2006
6.00
Align vert stab spars and drilled

 08-07-2006
6.00
Align vert stab spars and drilled
     

 08-02-2006
6.00


 08-02-2006
4.00


 08-01-2006
6.00


 08-01-2006
4.00


 07-31-2006
8.00
Drill elevator control horns

 07-31-2006
6.00
Drill elevator control horns
       

 07-28-2006
8.00
Mount elevators on HS

 07-28-2006
8.00
Make elevator stops, trim HS ends

 07-27-2006
8.00
R baggage compartment platenuts

 07-27-2006
8.00
Bend left vent line

 07-26-2006
6.00
Right vent line
     

 07-25-2006
6.00
Holes in fuse for fuel lines

 07-25-2006
6.00
Holes in fuse for fuel lines

 07-24-2006
6.00
Prepare fuel and vent lines
Details
     

 07-24-2006
6.00
Flap push rod - right wing
     

 07-23-2006
3.50
Flap push rod - left wing
     

 07-21-2006
9.00
Wing fairings

 07-21-2006
9.00
Flap push rod - right wing

 07-19-2006
3.00
Fuel tank attach bracket
       

 07-19-2006
3.00
Fit & drill R wing faring

 07-16-2006
1.00
Prepare & rivet right baggage floor

 07-13-2006
10.00
Set up wings
Details
       

 07-13-2006
10.00
Set up wings

 07-12-2006
9.00
Flap hinge to center, temp wing attach

 07-12-2006
9.00
Flap hinge to center, temp wing attach

 07-11-2006
6.00
Firewall forward & prop arrive
       

 07-11-2006
6.00
Firewall forward & prop arrive

 07-10-2006
6.00
Install landing light
     

 07-10-2006
6.00
Install landing light

 07-09-2006
3.00
Install landing light

 07-09-2006
3.00
Install landing light

 07-05-2006
5.00
Install landing light

 07-05-2006
5.00
Install landing light

 07-04-2006
5.00
Install baggage floor

 07-04-2006
5.00
Install baggage floor

 07-03-2006
4.00
Rivet F757 left

 07-03-2006
4.00
Install static rivets and lines

 07-02-2006
3.00
Make fuel selector valve - VA 107

 06-23-2006
5.00
rivet side brace

 06-23-2006
5.00
Electric flap assemly

 06-22-2006
1.00
Part install l baggage floor

 06-20-2006
1.00
Complete fuel tank attach bracket
Details

 06-19-2006
6.00
Pick up engine from Brisbane airport

 06-19-2006
6.00
Pick up engine from Brisbane airport

 06-18-2006
3.00
Baggage left rear side & floor

 06-16-2006
7.00
Control system

 06-16-2006
7.00
Control system

 06-15-2006
7.00
Rivet L step, control system

 06-15-2006
7.00
Rivet L step, control system

 06-14-2006
7.00
Forward covers, control system

 06-14-2006
7.00
Forward covers, control system
       

 06-13-2006
7.00
Forward covers, control system

 06-13-2006
7.00
Forward covers, control system

 06-12-2006
8.00
Forward covers, alodine, boot rings

 06-12-2006
8.00
Forward covers, alodine, boot rings

 06-11-2006
5.00
Forward covers, install l leg weldment

 06-11-2006
5.00
Forward covers, install l leg weldment

 06-10-2006
8.00
Bolt r leg weldment, fit left

 06-10-2006
4.00
Bolt r leg weldment, fit left
       

 06-09-2006
8.00
Fit r leg attach weldment, tank attach
       

 06-09-2006
4.00
Fit r leg attach weldment, tank attach
       

 06-08-2006
8.00
Fit l leg attach weldment, start right

 06-08-2006
3.00
Fit l leg attach weldment, start right

 06-07-2006
2.00
Drilled left u'carrage leg
Details

 06-07-2006
2.00
Drilled left u'carrage leg

 06-07-2006
6.00
Built new shelves

 06-06-2006
7.00
Left step & electric flap
     

 06-06-2006
7.00
Left step & electric flap

 06-05-2006
7.00
Alodining & electric flap

 06-05-2006
6.00
Alodining & electric flap

 06-04-2006
3.00
Left step

 06-04-2006
3.00
Left step

 06-03-2006
2.00
Elec. flap assembly, L step

 06-03-2006
3.00
Elec. flap assembly, L step

 05-31-2006
7.00
Elec. flap assembly, L step

 05-31-2006
7.00
Elec. flap assembly, L step

 05-30-2006
7.00
Elec. flap assembly, L step

 05-30-2006
7.00
Elec. flap assembly, L step

 05-29-2006
8.00
Elec. flap assembly, R step

 05-29-2006
8.00
Elec. flap assembly, R step

 05-28-2006
2.00
Elec. flap install'n, steps

 05-28-2006
2.00
Elec. flap install'n, steps

 05-26-2006
8.00
Elevator bellcrank, steps, F741A

 05-26-2006
8.00
Elevator bellcrank, steps, F741A

 05-25-2006
8.00
Seat back, brake & rudder pedals

 05-25-2006
4.00
Seat back, brake & rudder pedals

 05-24-2006
5.00
Seat back, brake & rudder pedals

 05-24-2006
5.00
Seat back, brake & rudder pedals

 05-23-2006
7.00
Prep seats & brake pedals for alodine

 05-23-2006
6.00
Prep seats & brake pedals for alodine

 05-22-2006
7.00
Seat back and rudder pedals

 05-22-2006
7.00
Seat back and rudder pedals

 05-21-2006
3.00
Seat back and rudder pedals

 05-21-2006
3.00
Seat back and rudder pedals

 05-19-2006
5.00
Rudder stop, seat back, tank attach brkt

 05-19-2006
5.00
Rudder stop, seat back, tank attach brkt

 05-18-2006
8.00
Rudder stop, seat back, tank attach brkt

 05-18-2006
8.00
Rudder stop, seat back, tank attach brkt

 05-17-2006
6.00
Rudder stop, seat back, tank attach brkt

 05-17-2006
6.00
Rudder stop, seat back, tank attach brkt

 05-16-2006
5.00
Rudder stop & seat back

 05-16-2006
5.00
Rudder stop & seat back

 05-15-2006
6.00
Prep. and install 705 J,K,L

 05-15-2006
6.00
Prep. and install 705 J,K,L

 05-10-2006
6.00
Read instructions and mark QB tasks

 05-10-2006
6.00
Read instructions and mark QB tasks

 05-09-2006
1.00
Find and clean shed again

 05-09-2006
1.00
Find and clean shed again

 12-01-2005
5.00
Ail.pushrod length, install flap hinge

 12-01-2005
5.00
Ail.pushrod length, install flap hinge

 11-30-2005
5.00
Install aileron

 11-30-2005
5.00
Install aileron

 11-29-2005
5.00
Install aileron

 11-29-2005
5.00
Install aileron

 11-28-2005
5.00
L wing-ail. brackets,fairing,flap brace

 11-28-2005
5.00
L wing-ail. brackets,fairing,flap brace

 11-27-2005
7.00
L wing.Install bellcrank & pushrods

 11-27-2005
7.00
Grease & tighten nuts on controls

 11-26-2005
4.00
L wing-attach flap hinge and flap
Details

 11-26-2005
4.00
L wing-attach flap hinge and flap

 11-25-2005
2.00


 11-25-2005
2.00


 10-31-2005
8.00
Rivet aileron brackets

 10-31-2005
8.00
Rivet aileron brackets

 10-22-2005
7.00
Assemble aileron brackets

 10-22-2005
7.00
Assemble aileron brackets

 10-21-2005
9.00
Aileron push rods

 10-21-2005
9.00
Aileron push rods

 10-20-2005
6.00
Left elevator leading edge

 10-20-2005
6.00
Left elevator leading edge

 10-19-2005
7.00
Rivet trim tab & attach to elevator

 10-19-2005
7.00
Rivet trim tab & attach to elevator

 10-18-2005
8.00
Build trim tab

 10-18-2005
8.00
Build trim tab

 10-14-2005
5.00
Build trim tab

 10-14-2005
5.00
Build trim tab

 10-13-2005
7.00
Build trim servo mount

 10-13-2005
7.00
Build trim servo mount

 10-12-2005
7.00
Drill, debur & dimple l.elevator

 10-12-2005
5.00
Drill, debur & dimple l.elevator

 10-11-2005
3.00
L elev. stiffners, bend l elev l.edge

 10-11-2005
3.00
L elev. stiffners, bend l elev l.edge

 10-10-2005
4.00
Prime left elevator, bend & rivet rudder

 10-10-2005
2.00
Prime left elevator, bend & rivet rudder

 10-08-2005
6.00
Rivet rudder trail edge & bend lead edge

 10-08-2005
6.00
Rivet rudder trail edge & bend lead edge

 10-07-2005
3.00
Finish L elev and glue rudder trail edge

 10-07-2005
4.00
Finish L elev and glue rudder trail edge
     

 10-06-2005
3.00
Bend trailing edge & assemble L elev

 10-06-2005
1.00
Bend trailing edge & assemble L elev

 10-05-2005
4.00
Undrill L elev to bend trailing edge

 10-05-2005
6.00
Undrill L elev to bend trailing edge

 10-04-2005
6.00
Undrill L elev to bend trailing edge
Details

 10-04-2005
6.00
Undrill L elev to bend trailing edge

 09-06-2005
8.00
Start L elev

 09-06-2005
4.00
Start L elev

 08-31-2005
7.00
Finish R elev & start L

 08-31-2005
7.00
Finish R elev & start L

 08-30-2005
7.00
Right elevator
     

 08-30-2005
7.00
Right elevator

 08-29-2005
8.00
Right elevator

 08-29-2005
8.00
Right elevator

 08-28-2005
1.50
Right elevator

 08-28-2005
1.50
Right elevator

 06-30-2005
6.00
Finish HS

 06-30-2005
6.00
Finish HS

 06-29-2005
4.00
Close HS left side

 06-29-2005
4.00
Close HS left side

 06-28-2005
4.00
Close HS left side

 06-28-2005
4.00
Close HS left side

 06-27-2005
1.00
Finish VS

 06-27-2005
2.00
Finish VS

 06-26-2005
2.00
Finish VS

 06-25-2005
2.00
Rivet VS

 06-25-2005
2.00
Rivet VS

 06-24-2005
6.00
Rivet VS forward spar, ribs, skin

 06-24-2005
6.00
Rivet VS forward spar, ribs, skin

 06-23-2005
4.00
Rivet VS rear spar

 06-23-2005
4.00
Rivet VS rear spar

 06-20-2005
5.00
Inventory QB kit

 06-20-2005
5.00
Inventory QB kit

 06-19-2005
5.00
Inventory QB kit

 06-19-2005
3.00
Inventory QB kit

 06-17-2005
3.00
QB kit arrives
       

 06-17-2005
3.00
QB kit arrives

 06-16-2005
6.00
Priming
     

 06-16-2005
1.00
Priming

 06-15-2005
5.00
Alodine horiz & vert stab

 06-15-2005
5.00
Alodine horiz & vert stab

 05-26-2005
4.00
Rivet rudder skin to spar & rib
       

 05-26-2005
4.00
Rivet rudder skin to spar & rib
       

 05-25-2005
3.00
Rivet rudder skin to spar & rib
Details
       

 05-25-2005
3.00
Rivet rudder skin to spar & rib

 05-24-2005
2.50
Rivet rudder skin to spar & rib

 05-23-2005
5.00
Rivet c'balance skin to tip rib

 05-23-2005
5.00
Rivet c'balance skin to tip rib

 05-21-2005
4.00
Rivet R912 to R913

 05-21-2005
4.00
Rivet R912 to R913

 05-20-2005
6.00
Prime R elevator

 05-20-2005
4.00
Prime R elevator

 05-19-2005
6.00
R elevator skeleton-alodine & prime

 05-19-2005
4.00
R elevator skeleton-alodine & prime

 05-18-2005
6.00
RH elevator - drill stiff & skin
Details

 05-18-2005
6.00
RH elevator - drill stiff & skin

 05-17-2005
1.50

Details

 05-14-2005
1.00


 05-11-2005
7.00
Debur & dimple rudder. Make attach strip

 05-11-2005
7.00
Debur & dimple rudder. Make attach strip

 05-10-2005
5.50


 05-10-2005
5.50


 05-09-2005
8.00
Rivet stiffeners to rudder
Details
       

 05-09-2005
6.00
Rivet stiffeners to rudder
       

 05-08-2005
6.00
Start elevator

 05-08-2005
6.00
Start elevator

 05-07-2005
4.50
Prime rudder

 05-06-2005
1.50
Prime rudder

 05-04-2005
3.00
Trial priming

 05-03-2005
3.00
Trial alodining

 05-02-2005
2.00
Trial alodining

 05-01-2005
3.00
Dimple HS skin

 05-01-2005
2.00
Dimple HS skin

 04-29-2005
5.50
Rudder skeleton

 04-29-2005
5.50
Rudder skeleton

 04-28-2005
4.00
Rudder skeleton

 04-28-2005
4.00
Rudder skeleton

 04-27-2005
5.00
Build rudder - stiffeners

 04-27-2005
5.00
Build rudder - stiffeners

 04-26-2005
4.00
Build rudder - stiffeners

 04-26-2005
4.00
Build rudder - stiffeners

 04-25-2005
1.50
Debur HS

 04-22-2005
4.50
Complete right HS

 04-22-2005
4.50
Complete right HS

 04-21-2005
4.00
Assembled right HS
     

 04-21-2005
4.00
Assembled right HS

 04-20-2005
4.00
Left HS - new front spar
     

 04-20-2005
4.00
Left HS - new front spar

 04-19-2005
2.00
Left HS - new front spar
Details
     

 04-19-2005
2.00
Left HS - new front spar

 12-21-2004
1.10


 12-21-2004
1.10


 12-20-2004
1.50


 12-20-2004
1.00


 12-19-2004
2.00


 12-19-2004
2.00


 12-18-2004
1.00


 12-12-2004
2.50


 12-12-2004
1.50


 12-04-2004
5.05


 12-04-2004
1.50


 11-28-2004
2.50
VS debur & dimple

 11-28-2004
1.50
VS debur & dimple

 11-27-2004
0.50


 11-25-2004
2.60
VS Drilled & deburred

 11-25-2004
2.30
VS Drilled & deburred

 11-24-2004
1.00


 11-23-2004
1.50
VS spars and ribs & skin clecoed

 11-22-2004
1.75
VS spars and ribs

 11-21-2004
1.00
Stuffed up HS-702

 11-21-2004
1.00


 11-20-2004
2.75
Bending HS-714 & HS 710

 11-20-2004
1.25


 11-19-2004
1.75


 11-19-2004
2.25


 11-17-2004
2.50
HS Rear spar assembly
       

 11-15-2004
1.00
HS Rear spar assembly

 11-15-2004
1.00
HS Rear spar assembly

 11-07-2004
2.00
Rear spar assembly

 11-07-2004
0.50
Rear spar assembly

 10-24-2004
0.01
Photographed tools
     

 10-24-2004
0.01
Photographed kit
       

 10-09-2004
1.00
Shaped HS-609PP










Copyright © 2001-2024 Matronics. All Rights Reserved.