KitLog pro

Powered By Kitlog Pro v2.0

JERRY D'S WEB SITE
Work Logs Found: 32
Category Work Time: 299 Hours
 Date
Hours
Work Log Summary

Details

 07-08-2012
8.00
Rib Installation Vertical Stabilizer.
Details
       

 05-28-2012
3.00
Beginning Rudder Installation.
Details
       

 05-02-2012
10.00
Installation of rudder adjusting levers.
Details
       

 04-27-2012
4.00
Rudder Cable Pulley Installation.
Details
       

 04-26-2012
14.00
Install adjustable rudder controls & brake master
Details
       

 04-13-2012
10.00
Installation of rudder torque tube assembly.
Details
       

 04-08-2012
10.00
Constructing the Rudder Pedal Torque Tubes.
Details
       

 03-21-2012
4.00
Final floorboard installation.
Details
       

 03-18-2012
12.00
Wood & Aluminum floor Installation.
Details
       

 03-08-2012
4.00
Elevator Mid & Aft push pull tubes installed.
Details
       

 03-06-2012
5.00
Elevator Aileron Mixer and Push Pull Tubes Install
Details
       

 03-05-2012
4.00
Flap Handle Construction & Installation.
Details
       

 03-03-2012
4.00
Flaperon Mixer Assembly.
Details
       

 02-23-2012
3.00
Elevator Bellcrank and Push Rod Installation.
Details
       

 02-22-2012
4.00
Control Stick Assembly Installation.
Details
       

 02-22-2012
2.00
Aileron Bellcrank Installation.
Details
       

 02-17-2012
6.00
Completed Control Column Assembly.
Details
       

 02-12-2012
14.00
Control Column Assembly.
Details
       

 02-04-2012
12.00
Control Column Bracket Assembly.
Details
       

 01-13-2012
3.00
Install 2nd attachment to trim actuator and horz s
Details
       

 01-12-2012
6.00
Install Trim Actuator
Details
       

 10-10-2011
0.00
Construction on hold for next three months.
Details

 09-25-2011
8.00
Completed fitting elevator to fuselage.
Details
       

 09-20-2011
8.00
Started hanging the elevator.
Details
       

 09-19-2011
10.00
Fitting the horizontal stabilizer to the fuselage.
Details
       

 09-18-2011
35.00
Completeing the Hstab & Elev tips.
Details
       

 09-11-2011
16.00
Horizontal Stab & Elevator Tips.
Details
       

 09-04-2011
20.00
Glueing Horizontal stabilizer ribs, and attaching
Details
       

 09-02-2011
20.00
Glueing ribs into Horizontal Stabilizer.
Details
       

 08-31-2011
20.00
Reaming, Fitting Ribs
Details
       

 08-27-2011
18.00
Kit Contents Inventory
Details
       

 08-16-2011
2.00
Kit Arrival
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.