Details

 04-20-2008
6.00
Painting
Details
       

 04-19-2008
3.00
Polishing and Painting
Details
     

 04-18-2008
1.50
Repaint a Portion of the Blue Stripe
Details

 04-18-2008
2.50
Painting Bottom of Wing Fairing
Details
     

 04-17-2008
1.70
Polishing
Details

 04-14-2008
1.60
Color Sanding and Polishing
Details

 04-12-2008
2.50
Final Prep. to Add Blue Stripe
Details

 04-11-2008
1.80
Rudder Reinstall
Details

 04-08-2008
0.70
Rudder
Details

 04-01-2008
1.50
Mask and Paint Rudder
Details

 03-31-2008
0.50
Painting Rudder
Details

 03-30-2008
0.70
Rudder Painting
Details

 03-30-2008
8.00
Painting Bottom of Airplane
Details
       

 03-29-2008
1.50
Mask and Paint Rudder
Details

 03-27-2008
0.80
Painrting Rudder Continued
Details
       

 03-26-2008
0.60
Rudder Masking
Details
     

 03-25-2008
1.60
Rudder Painting
Details
       

 03-23-2008
6.50
Painting Lower Fuselage
Details

 03-17-2008
1.50
Painting
Details
     

 03-16-2008
1.50
Sanding
Details

 03-16-2008
6.00
Prepping Wing Joint Fairing
Details

 03-09-2008
2.00
Door Jambs
Details

 03-08-2008
0.50
Safety Wire Plus
Details

 03-08-2008
0.50
Finish Safety Belt Install
Details

 03-08-2008
6.50
Door Jambs
Details

 03-07-2008
0.50
Right Seat Shoulder Belt
Details

 03-06-2008
15.00
Priming and Sanding
Details

 03-05-2008
0.80
Right Seat Belt
Details

 03-03-2008
1.00
Left Seat Lap Belt
Details

 03-02-2008
5.00
Sanding, Filling and Priming
Details

 03-02-2008
0.80
Finnish Steering Cable Install
Details

 02-27-2008
1.00
Installing Steering Cable
Details

 02-24-2008
5.50
Snading and filling
Details

 02-24-2008
1.20
Lubing Outer Gear Doors
Details

 02-22-2008
2.20
Plumbing Header Tank
Details

 02-21-2008
2.00
Insulating & Fire Proofing
Details

 02-18-2008
1.60
Installing Header Tank Lines
Details

 02-17-2008
8.00
Installing Header Tank
Details

 02-15-2008
1.20
Safety Wire Rudder Pedals
Details

 02-13-2008
1.50
Bleed Brakes
Details

 02-11-2008
1.70
Reseal Cylinder Fittings
Details

 02-03-2008
8.00
Finnish Second Rudder Pedal Joint
Details

 02-03-2008
2.50
2nd Rudder Pedal Joint
Details

 01-27-2008
8.00
New Rudder Pedal Joint
Details
       

 01-25-2008
3.50
Making New Joints
Details
     

 01-21-2008
1.50
Continued Windsheild Fairing
Details

 01-20-2008
5.00
Fairing Windsheild
Details

 01-19-2008
3.00
Front Windsheild Fairing
Details

 01-18-2008
2.50
Front Windsheild Work
Details

 01-13-2008
5.00
Windsheild Continued
Details
     

 01-06-2008
4.50
Fairing in Windsheild
Details
     

 01-05-2008
6.00
Fairing in the Windsheild
Details
     

 01-04-2008
3.50
Windsheild Fairing
Details

 01-03-2008
2.00
Installing Carbon Fiber Tape
Details
     

 01-01-2008
5.00
Refinish Around New Windsheild
Details
     

 12-31-2007
4.50
Installing New Windsheild
Details
       

 12-23-2007
1.00
Fnish Trim Paint
Details

 12-23-2007
6.00
Finishing Work Around the Front Window
Details

 12-22-2007
3.00
Priming and Sanding
Details

 12-21-2007
0.70
Sanding
Details

 12-18-2007
1.60
Gluing Balsa in Place
Details

 12-17-2007
0.50
Windsheild Work
Details

 12-16-2007
1.10
Right Seat Fiberglass
Details

 12-10-2007
1.20
Fairing Windsheild
Details

 12-09-2007
1.50
Remove White Rubber
Details

 12-09-2007
3.50
Fairing Work
Details

 11-27-2007
5.00
Windsheild
Details
       

 11-26-2007
0.20
Installing Top Aileron Hinge Covers
Details
     

 11-25-2007
4.00
Pitot Work
Details
       

 11-25-2007
0.70
Painting Upper Aileron Covers
Details
     

 11-24-2007
5.50
Fit up of Left Aileron
Details
     

 11-23-2007
1.50
Finishing the Left Aileron
Details
     

 11-22-2007
2.50
Left Aileron Finishing
Details
     

 11-21-2007
1.50
Aileron Painting
Details
     

 11-20-2007
1.50
Pitot Work
Details

 11-19-2007
3.00
Aileron Work
Details
     

 11-18-2007
5.00
Aileron Work
Details

 11-17-2007
1.00
Aileron Work
Details

 11-16-2007
1.50
Aileron Work
Details

 11-15-2007
3.00
Aileron Work
Details
     

 11-12-2007
1.00
Aileron Priming
Details

 11-11-2007
3.50
Pitot Work
Details
     

 11-08-2007
2.00
Aileron Work
Details

 11-05-2007
1.00
Left Aileron Work
Details

 11-04-2007
5.00
Left Aileron
Details

 11-02-2007
0.75
Filling & Smoothing
Details

 11-01-2007
2.00
Small Finishing Items
Details
     

 10-31-2007
0.60
Trimming Fiberglass
Details

 10-30-2007
1.50
Fiberglass Work
Details

 10-29-2007
0.70
Fairing Work
Details

 10-28-2007
4.00
Aileron Modification
Details

 10-14-2007
8.00
Wing Fairing Work
Details

 10-12-2007
2.50
Fiberglassing the Left Wing Fairing
Details

 10-11-2007
1.20
Finish Work Upper Fairing
Details

 10-08-2007
1.30
Smoothing Upper Fairing Surface
Details

 10-07-2007
5.30
Glassing the Fairing
Details

 10-05-2007
1.50
Finnish Forming Metal Fairing
Details

 10-04-2007
2.50
Start Left Fairing
Details

 09-30-2007
5.00
Wing Work
Details

 09-29-2007
4.00
Left Wing Modifications
Details

 09-28-2007
0.60
Door Installation
Details
     

 09-27-2007
1.20
Color Sanding
Details

 09-24-2007
0.70
Clear Coating
Details

 09-23-2007
2.50
Fit Left Wing
Details

 09-22-2007
2.50
"Experimental" Lettering
Details

 09-21-2007
3.00
Masking and Painting Left Door
Details

 09-20-2007
0.80
Painting the Left Door
Details

 09-19-2007
1.50
Sanding Left Door
Details

 09-17-2007
2.00
Color Sanding
Details

 09-16-2007
0.80
Clear Coating
Details

 09-15-2007
2.50
Unmasking & Cleanup
Details

 09-15-2007
0.50
Painting
Details

 09-14-2007
1.50
Masking "Experimental"
Details

 09-13-2007
1.20
Painting Right Door
Details

 09-11-2007
1.30
Sanding & Filling Right Canopy Door
Details
     

 09-10-2007
1.50
Right Canopy Door Work
Details
     

 09-09-2007
2.20
Preparring Right Canopy Door
Details

 09-09-2007
3.50
Finnish Right Main Gear Door
Details
     

 09-08-2007
0.50
Start Color Sanding
Details

 09-07-2007
2.40
Working on Right Gear Door
Details

 09-06-2007
0.50
Sanding and Filling Gear Door
Details
     

 09-06-2007
0.60
Add Instrument Panel Edge
Details
     

 08-04-2007
1.20
Instrument Panel Top
Details
       

 08-03-2007
0.70
Completion of Instrument Panel Top
Details

 08-02-2007
7.00
Instrument Panel Top Finishing
Details

 08-01-2007
2.50
Making a Pattern
Details

 07-29-2007
6.00
Finnish & Install Cowl Doors
Details
     

 07-29-2007
1.00
Finish Last Flap Gap Seal
Details

 07-28-2007
3.50
Cowl Doors
Details

 07-26-2007
1.50
Priming Plus
Details

 07-26-2007
1.20
Cowl Doors
Details

 07-23-2007
1.00
Cowl Doors
Details

 07-22-2007
4.00
Cowl Doors
Details

 07-19-2007
2.20
Cowl Doors
Details

 07-18-2007
1.00
Cowl Doors
Details

 07-17-2007
2.00
Left Flap Gap Seal Work
Details

 07-16-2007
0.50
Finnish & Mount Right Flap Gap Seal
Details

 07-15-2007
3.50
Finnish Right Flap Gap Seal
Details

 07-12-2007
0.50
Right Flap Gap Seal
Details

 07-08-2007
6.50
Center Flap Gap Seal
Details
     

 07-04-2007
1.50
Mount Compass
Details
     

 07-04-2007
2.00
Add Screw Mount Blocks
Details
     

 07-01-2007
1.50
Fiberglass Work
Details

 06-28-2007
1.20
Trim and Recoat Flap Gap Seals
Details
     

 06-28-2007
0.60
Change Gascolator Access
Details
     

 06-27-2007
1.00
Start Flap Gap Seals
Details
     

 06-27-2007
2.50
Adding Mounts for Cowl Access Doors
Details
     

 06-10-2007
7.50
Cowl Plywood Installation
Details
       

 06-09-2007
6.00
Bungee System
Details
       

 06-08-2007
2.50
Cowl Plywood Pattern
Details
     

 06-07-2007
1.50
Start Cowl Plywood Pattern
Details
     

 06-05-2007
2.50
Complete Left Wing to Paint Stage
Details
     

 06-04-2007
1.10
Left Wing & Aileron
Details

 06-03-2007
7.50
Finish Left Main Gear Door & Install
Details
       

 06-02-2007
2.00
Sanding, Filling & Painting Left Gear Door
Details

 06-02-2007
2.00
Sanding & Filling
Details

 06-01-2007
1.30
More Sanding & Priming Left Gear Door
Details

 05-31-2007
4.00
Priming and Smoothing Main Gear Door
Details
     

 05-30-2007
1.00
Sanding & Filling Left Wing Bottom
Details
     

 05-29-2007
2.10
Sanding & Filling Left Wing
Details

 05-28-2007
3.00
Painting Console Access Panel
Details
     

 05-27-2007
2.00
Painting & Installing the Trim Tab
Details
       

 05-27-2007
2.50
Jeff's Visit & Bottom Access Panel
Details
       

 05-26-2007
1.00
Visitng 19GS
Details
       

 05-26-2007
2.00
Priming and Painting the Trim Tab
Details

 05-26-2007
0.10
More 19GS
Details
     

 05-26-2007
1.50
Flying 19GS
Details
       

 05-25-2007
4.00
Finishing the Right Outer Gear Door
Details
     

 05-24-2007
2.00
Upper Rudder Hinge Panels
Details
     

 05-23-2007
2.00
Right Outside Gear Door
Details
       

 05-22-2007
1.00
Install Fuel Pressure Gauge
Details
     

 05-21-2007
1.40
Painting Belly Strobe Ring
Details
     

 05-20-2007
1.50
Painting Lower Rudder Hinge Access Panels
Details
     

 05-17-2007
3.00
Center Fuselage Access Door
Details
     

 05-15-2007
1.00
Transponder Antenna Cover
Details
     

 05-15-2007
1.50
Rear Access Door
Details
     

 05-14-2007
3.00
Buff and Install Gear Door
Details
       

 05-13-2007
6.00
Painting Gear Door
Details
     

 05-12-2007
6.00
Trying Loele Paint Products
Details
     

 05-12-2007
0.50
Install Fuel Pressure Gauge
Details
     

 05-11-2007
2.00
First Loele Test
Details
     

 05-10-2007
4.00
Changeing the Right Wing Tip
Details
     

 05-08-2007
3.00
Ven Surge Tank Parts
Details
       

 05-06-2007
3.00
Priming and Sanding thr Right Wing Outer Panel
Details

 05-05-2007
3.50
Right Wing Work
Details

 04-29-2007
5.00
Filling and Sanding
Details

 04-28-2007
4.50
Sanding and Filling
Details

 04-28-2007
1.00
Priming
Details

 04-27-2007
2.50
Make Header Tank Plates
Details
       

 04-26-2007
3.00
Sanding and Filling
Details

 04-25-2007
2.00
Filling and Sanding
Details

 04-23-2007
1.50
Priming
Details

 04-22-2007
2.50
Smoothing the Bottom of the Fuselage
Details
     

 04-22-2007
1.50
Change Out Light Panel
Details
     

 04-21-2007
1.00
Change Gauges
Details
       

 04-21-2007
0.80
Change Fuel Pump
Details
     

 04-20-2007
1.40
Sand Left Top Horizontal Stabilizer
Details
     

 04-19-2007
2.30
Sanding and Filing
Details
     

 04-18-2007
1.30
Making New Light Panel
Details

 04-16-2007
2.00
Filling and Sanding Rudder
Details

 04-15-2007
0.70
Reassemble Right Wing Outer Panel
Details
     

 04-14-2007
5.00
More Wing Filling & Sanding
Details

 04-13-2007
3.00
Right Outer Wing Panel
Details

 04-12-2007
2.50
Wing Work
Details

 04-12-2007
1.00
Priming Parts
Details

 04-11-2007
1.50
Aileron Gap Seal Work
Details
       

 04-09-2007
2.50
Sanding the Right Wing Bottom
Details
     

 04-08-2007
5.00
Priming, Filling Sanding
Details
       

 04-07-2007
5.00
Filling and Sanding the Fuselage
Details
     

 04-06-2007
2.00
Sanding Cabin Doors
Details

 04-05-2007
1.50
Priming
Details

 04-03-2007
1.00
Finishing Small Items
Details

 04-02-2007
2.30
Sanding & Filling
Details

 04-01-2007
4.00
Preparring Small Parts
Details
     

 04-01-2007
2.00
Filling & Sanding
Details

 03-31-2007
5.00
Finninshing Small Parts
Details
     

 03-30-2007
1.00
Priming
Details

 03-30-2007
1.00
Priming
Details

 03-29-2007
1.50
Sanding
Details

 03-28-2007
0.60
Filling
Details

 03-27-2007
2.00
Sanding and Filling
Details

 03-27-2007
2.00
Applying Fiberglass
Details

 03-26-2007
2.00
Sanding and Filling
Details

 03-25-2007
6.00
Sanding and Filling
Details

 03-24-2007
5.00
Sanding and Filling
Details

 03-23-2007
1.00
Sanding and Filling
Details

 03-22-2007
2.00
Sanding and Filling
Details

 03-20-2007
0.70
Sanding
Details

 03-19-2007
3.00
Applying Primer Surfacer
Details

 03-18-2007
1.50
Tank Vent Change
Details

 03-18-2007
2.00
ELT Work
Details

 03-17-2007
5.00
Sanding
Details
       

 03-17-2007
0.01
More Current Pictures
Details
       

 03-16-2007
0.80
Primer Surfacer Application
Details

 03-15-2007
0.60
Wiring Fuel Senders
Details

 03-15-2007
2.50
Sanding & Filling
Details

 03-15-2007
1.40
Make Antenna Mount and Install
Details

 03-14-2007
1.20
Start ELT Istallation
Details

 03-13-2007
2.20
Sand Primer Surfacer
Details

 03-12-2007
1.00
Prime Right Wing Top
Details

 03-11-2007
4.00
Fuel Sender Wiring +
Details

 03-09-2007
1.50
Wiring Tank Senders
Details

 03-08-2007
4.00
Fairing and Flap Work
Details
     

 03-07-2007
0.30
Assemble Rear Fuselage Access Door
Details

 03-06-2007
0.50
Installing More Wood Inserts
Details

 03-05-2007
0.30
Assemble Lower Access Door w/ SS Screws
Details

 03-04-2007
3.50
Installing the Fuel Selector
Details
     

 03-04-2007
1.50
Install New Screw Inserts
Details

 03-03-2007
0.10
Commercial License
Details

 03-01-2007
0.30
Change Right Valve Inlet
Details
     

 02-25-2007
3.50
Right Tank Fuel System
Details
     

 02-22-2007
2.00
Plumbing
Details
     

 02-20-2007
0.10
Test ELT +
Details

 02-19-2007
2.50
Adding Low Pressure Items
Details
     

 02-18-2007
4.00
Various Wing Tasks
Details
       

 02-18-2007
1.00
Install Fuel Valve
Details

 02-17-2007
2.50
Wing Changes
Details

 02-17-2007
1.50
Install Custom Tail Tie Down
Details
       

 02-16-2007
2.00
Correcting Right Aileron Error
Details
     

 02-15-2007
2.70
Right Wing Fairing Work
Details
     

 02-14-2007
0.75
Fairing Work
Details

 02-13-2007
0.01
External Lock Info. on 12-3-05 Updated
Details

 02-12-2007
2.25
Continued Fairing Work
Details
     

 02-11-2007
8.00
Left Fairing Work
Details
     

 02-10-2007
0.50
Rework Left Wing Fairing
Details

 02-09-2007
2.00
Remove Left Fairing Skin
Details

 02-08-2007
6.00
Nearly Done on the Step Design
Details

 02-07-2007
2.00
CAD Step Work
Details

 02-06-2007
1.00
More Step Design
Details

 02-05-2007
1.50
CAD Step Work
Details

 02-04-2007
4.00
Retractable Step Design
Details

 02-03-2007
2.00
Start Over Again
Details

 02-02-2007
1.50
Begin Retractable Step Design
Details

 02-01-2007
0.40
Oregon Aero Seats
Details
       

 02-01-2007
0.10
Addition Seats Shot
     

 01-30-2007
1.30
Finnish Front Gear Door Guide
Details
     

 01-30-2007
2.00
Exterior Step Design
Details

 01-28-2007
2.50
Constructing New Front Gear Door Guide
Details
     

 01-28-2007
1.50
Complete Wing Hinge Covers
Details
     

 01-28-2007
1.50
Adding Screws to Bell Cranks
Details
       

 01-27-2007
2.00
Modify Upper Hinge Doors.
Details
     

 01-27-2007
0.50
Fix Aileron Shroud Section
Details
     

 01-27-2007
1.00
Fill Depression in Horizontal Stabilizer
Details
     

 01-27-2007
0.70
Change Hinge Doors
Details

 01-24-2007
0.20
Finish Top Front of Rudder
Details
     

 01-24-2007
2.50
Change Fasteners on Aileron Hinge Covers
Details
     

 01-23-2007
0.20
3rd Application of Filler to Rudder Top
Details

 01-22-2007
1.50
Install Transponder Antenna Cover
Details
     

 01-21-2007
4.50
Design and Construct Transponder Antenna Cover
Details

 01-20-2007
0.40
Change Screws Out on Flap Hinges
Details
     

 01-20-2007
1.50
Add Air Tabs
Details
       

 01-19-2007
1.00
Make Flap Hinge Covers
Details
     

 01-18-2007
2.00
Make Hinge Covers Plus
Details

 01-18-2007
0.30
2nd Rudder Front Fill
Details

 01-17-2007
0.30
Rudder Top Front Work
Details

 01-16-2007
0.70
Reassemble Center Console
Details

 01-15-2007
2.50
Begin Steering Cable Work
Details
     

 01-14-2007
5.00
Change Pedal Connections
Details

 01-13-2007
2.50
Continue on Brakes
Details

 01-13-2007
0.70
Add New Fairings
Details
     

 01-12-2007
2.50
Making Fairings
Details
       

 01-11-2007
2.00
More Brake Work
Details

 01-10-2007
1.50
Adjust Ftiings and Work on Brakes
Details

 01-09-2007
0.40
Bleeding Brakes
Details

 01-08-2007
1.50
Make and Install Last 2 Brake Hoses
Details

 01-07-2007
4.00
More Brake Hose Installation
Details
       

 01-06-2007
5.00
Making Aeroquip Hoses
Details
     

 01-04-2007
8.00
Adding Parking Brake and Fittings for Master Cylin
Details
       

 01-03-2007
3.50
Fixing Rudder Cable Clevis Units
Details

 01-03-2007
4.00
Brake Plumbing
Details
     

 01-02-2007
4.00
Weight & balance
Details

 01-02-2007
4.00
Finishing the Second Rudder Pedal Assembly
Details
     

 01-01-2007
8.00
Finish & Install the Front Rudder Pedal Assembly
Details
       

 12-31-2006
5.50
Modifying the Second Rudder Pedal Assembly
Details
     

 12-30-2006
4.00
Pedal Work
Details

 12-30-2006
3.00
Finish Wiring Gear Solenoids
Details
     

 12-29-2006
6.00
Test Fit Foward Pedal Assembly
Details

 12-28-2006
5.00
Change Forward Pedal Assembly
Details

 12-27-2006
8.00
Finish Constructing the Landing Gear Solenoid Syst
Details
       

 12-26-2006
6.00
Installing Landing Gear Solinoids
Details

 12-24-2006
6.00
Repair Remaining Hydraulic Cylinders Etc.
Details
       

 12-23-2006
5.00
First Wing Hanging
Details
     

 12-22-2006
2.50
Complete New Canopy Latch Points
Details
     

 12-21-2006
4.00
Redesign Canopy Latch System
Details
     

 12-21-2006
3.00
More Work on ELT Installation
Details

 12-20-2006
4.00
Working on an ELT Installation
Details

 12-20-2006
4.00
Remove Pedals and Devise Changes
Details
       

 12-20-2006
2.00
Determine Cause of Leak in Hydraulic Cylinders
Details

 12-19-2006
8.00
Door Stops and Steering Springs
Details
       

 12-18-2006
6.00
Devise a Method for Locking the Outer Gear Doors
Details

 12-17-2006
2.00
Assemble Rudder Pedals
Details

 12-16-2006
7.00
Continued Rudder Pedal Work
Details
       

 12-15-2006
2.50
Continued Rudder Pedal Work
Details
       

 12-14-2006
4.00
More Rudder Pedal Work
Details
       

 12-13-2006
1.20
Working on Second Rudder Pedal Set
Details
     

 12-12-2006
2.00
Second Rudder Pedal Set
Details
     

 12-11-2006
1.50
First Rudder Pedal Cleaning
Details
       

 12-10-2006
3.50
Final Rudder Pedal Modifications First Set
Details
       

 12-09-2006
6.50
Working on Modifications to Rudder Pedals
Details
       

 12-09-2006
1.50
Rudder Pedals Continued
Details
       

 12-08-2006
3.00
Working on Modified Rudder Pedal Assembly
Details
     

 12-08-2006
0.30
Finish End of Fairing
Details
       

 12-07-2006
0.20
Sand Fiberglass Fairing Ends
Details

 12-07-2006
1.00
Remove 1 of 2 Rudder Assemblies
Details

 12-03-2006
4.00
Working on Toe Brakes
Details
       

 12-03-2006
0.10
Parts & Expenses
Details

 12-02-2006
3.00
Work on Fairing Ends
Details
       

 12-02-2006
0.90
Finnish Filling and Sanding
Details

 12-02-2006
0.60
Begin Brake System Change
Details
     

 12-01-2006
0.10
Paint Small Parts
Details
     

 12-01-2006
0.10
Main Gear Uplock Spring Test
Details

 12-01-2006
0.40
Final Bolt Install
Details
     

 12-01-2006
2.20
Filling and Sanding
Details

 12-01-2006
0.50
Add Fairing Ends
Details
     

 11-29-2006
1.50
Filling and Sanding
Details

 11-26-2006
7.00
Filling and Sanding Left Tank
Details

 11-25-2006
4.00
Glassing Left Fuel Tank
Details

 11-24-2006
4.00
Glassing the Upper Seam and Tank
Details

 11-23-2006
1.70
Attach Left Fuel Tank
Details
     

 11-22-2006
6.00
Finish Paint Scheme Design
Details
       

 11-20-2006
3.00
Final Tank Assembly
Details

 11-20-2006
3.00
Designing Paint Scheme
Details
     

 11-19-2006
5.00
Left Tank Work
Details
       

 11-18-2006
4.00
Install Rear of Left Tank
Details
     

 11-17-2006
4.50
Installing Tank Fitting and Sender
Details
       

 11-16-2006
1.70
Paint Control Sticks
Details
       

 11-16-2006
3.00
Finish Left Landing Light
Details
     

 11-16-2006
0.10
Engine Design Plan
Details

 11-15-2006
0.30
Install Left Landing Light Relay
Details
       

 11-14-2006
0.10
Oregon Aero call
Details

 11-14-2006
1.20
Finish Right Landing Light Wiring
Details
     

 11-13-2006
3.50
Wire Right Landing Light
Details
     

 11-12-2006
6.00
Mounting Langing Lights
Details
     

 11-11-2006
1.50
Finish Wiring Defroster System
Details
     

 11-11-2006
3.00
Begin Mounting Landing Lights
Details
     

 11-10-2006
0.10
New Registration Number
Details

 11-09-2006
1.50
Continued Defroster Work
Details
     

 11-08-2006
1.00
Seat Measurements
Details

 11-08-2006
4.00
More Defroster Work
Details
     

 11-07-2006
1.50
Working on Defroster System
Details
     

 11-06-2006
2.70
Making Y Tube Modifications
Details
     

 11-05-2006
5.00
Finnish Fuel Tank Ends
Details
     

 11-04-2006
5.50
Right Tank Work
Details
     

 11-04-2006
2.00
Replace Front Gear Cable
Details
     

 11-03-2006
4.00
Near Finnish on Cable Install
Details

 11-02-2006
2.30
Partial install of the Front Cable
Details

 11-01-2006
1.00
Initial Front Cable
Details

 10-31-2006
3.00
Front Cable Clamp Assembly
Details
     

 10-30-2006
2.00
Adding the Front Landing Gear Uplock Hook System
Details
     

 10-29-2006
3.00
Fire Sheilds Continued
Details
       

 10-28-2006
2.00
Fire Sheilds Continued
Details
     

 10-27-2006
2.00
Making Stainless Steel Fire Sheilds
Details
     

 10-26-2006
3.50
Stainless Steel Fire Sheilds
Details
     

 10-25-2006
3.00
Making Pilot Side Defroster Housing
Details
     

 10-24-2006
4.00
Passenger Defroster Housing
Details
     

 10-23-2006
1.50
Install Inner Baffles
Details

 10-23-2006
3.00
Forming Heat Ducts
Details
     

 10-22-2006
4.00
Making Inner Tank Baffles
Details

 10-21-2006
2.00
Start Inner Tank Baffles
Details
     

 10-21-2006
4.00
Finish Correcting Nose Flaws
Details
     

 10-20-2006
3.00
Removing Tank Skin From Mold
Details
     

 10-19-2006
2.00
Correcting Nose Flaws
Details
     

 10-18-2006
4.00
Finishing Basic Tank Skin
Details
     

 10-17-2006
1.50
Tank Work Continued
Details

 10-16-2006
2.50
Making 2nd Fuel Tank Skin
Details

 10-15-2006
3.00
Clean Up Right Tank and Prep Left Tank Mold
Details

 10-12-2006
2.00
Side Tank Mounts
Details
       

 10-10-2006
3.00
Install Fuel Pickup and Sender
Details
     

 10-09-2006
3.00
Install Tank Vent
Details
     

 10-08-2006
8.00
Final Right Tank Mounting
Details

 10-07-2006
4.00
Assembling the Rear of the Right Tank
Details
     

 10-06-2006
4.00
Assembling Rear of Tank
Details
     

 10-05-2006
6.00
Modifing and the Right Tank
Details
       

 10-04-2006
2.00
Finish Tank to Spar Mounting
Details
     

 10-03-2006
3.00
Work on Assembling The Tank to the Main Spar
Details

 10-02-2006
4.00
Add the rear top mount Strip to Tank
Details

 10-01-2006
5.00
Rear of Tank Work
Details
     

 09-30-2006
5.00
Finish Inner Baffle Installation
Details
     

 09-29-2006
6.00
Assembling Right Fuel Tank
Details
     

 09-28-2006
2.50
Install the Fuel Filler in the Right Tank
Details
       

 09-28-2006
1.00
Add First Tank Baffle
Details
     

 09-26-2006
3.00
Remove Left Door and Refinish Vynal
Details
       

 09-25-2006
3.40
Drill and Tap Large Tank End
Details
     

 09-24-2006
1.30
Finish Left Door Outside Plus
Details
     

 09-24-2006
0.20
Add Rear Door Handles
Details
     

 09-24-2006
2.60
Add One Tank End
Details
       

 09-23-2006
3.00
Start Left Door Modification
Details
     

 09-23-2006
0.30
Paint Dip Stick.
Details

 09-22-2006
5.00
Finish Right Side Door
Details

 09-21-2006
1.50
Finish Painting Gear and Motor Mount
Details
       

 09-21-2006
1.00
Alter Front of Right Door
Details
     

 09-20-2006
2.00
Paint Front Landing Gear and Motor Mount
Details
     

 09-19-2006
1.20
Paint Motor Mount and Front Landing Gear
Details
     

 09-18-2006
4.00
Work on Painting Front Landing Gear
Details

 09-17-2006
6.00
Disassemble and Paint Left Landing Gear
Details
     

 09-15-2006
3.00
Paint Right Landing Gear Parts
Details
       

 09-15-2006
0.40
Install Outer Fuel Brackets
Details
     

 09-14-2006
0.20
Replace Lighted Rocker Switch
Details
     

 09-14-2006
1.30
Form and Install Second Jack Pad
Details
     

 09-14-2006
0.50
Add Wiring Lables
Details
     

 09-10-2006
0.50
Mount Inner Fuel Tank Brackets
Details
     

 09-10-2006
3.20
Adding Drink Holders and Door Handles
Details
       

 09-10-2006
0.50
Add Left Jack Pad
Details
     

 09-09-2006
3.50
Replace Flap Drive Bracket
Details
       

 09-09-2006
1.20
Left Firewall Access Panel
Details
     

 09-08-2006
0.60
Install Headset Jacks
Details
       

 09-08-2006
1.00
Add Right Side Firewall Access Plate
Details
     

 09-07-2006
1.30
Wire Cabin Light
Details
     

 09-05-2006
2.50
Finnish Current Wiring
Details
     

 09-04-2006
4.00
More Wiring Work
Details

 09-03-2006
8.00
Wiring Many Systems to New Circuit Breaker Panels
Details
     

 09-02-2006
4.00
Right Tank Skin Finish Up
Details
     

 09-02-2006
2.00
Install Remaining Circuit Breakers and Stall Horn
Details
       

 09-01-2006
5.00
Removing Right Tank Skin
Details

 08-31-2006
6.00
Fiberglassing Right Tank
Details

 08-30-2006
1.00
Finishing the Right Tank Mold
Details
       

 08-29-2006
3.00
Mold Making Continued
Details
     

 08-29-2006
0.10
Brackets +
Details

 08-27-2006
1.80
Stencilling Cicuit Breakers
Details
       

 08-27-2006
5.00
Continue Making Tank Molds
Details
     

 08-26-2006
6.00
Filling and Sanding Tank Molds
Details
     

 08-24-2006
1.20
Installing Cicuit Breakers
Details
     

 08-23-2006
2.20
Mold Making
Details
     

 08-22-2006
1.00
More Mold Making
Details
     

 08-21-2006
1.20
Continue Mold Making
Details
     

 08-19-2006
1.00
Work on Tank Molds
Details
     

 08-19-2006
5.00
Make Panels Around Quadrant
Details
     

 08-18-2006
3.00
Heat Panel & Quadrant Surround
Details
     

 08-17-2006
0.70
Install New Light Panel
Details
     

 08-16-2006
0.50
Remake Light Panel
Details
       

 08-15-2006
0.80
Make and Replace Uplock Spring
Details
     

 08-15-2006
1.60
Install Fiberfrax to Bottom Front of Fuselage
Details
     

 08-14-2006
0.10
More Views of Right Door Assembly
Details
       

 08-14-2006
2.40
Finishing More Door Modifications
Details
       

 08-13-2006
2.50
Make Door Stops
Details
       

 08-10-2006
3.00
Right Seat Door Work
Details
     

 08-07-2006
2.50
Skinning Right Outer Door
Details
     

 08-06-2006
8.00
Fit Door Hinges
Details
       

 08-05-2006
6.00
Continue Constructing Last Gear Door
Details
       

 08-04-2006
0.40
Paint Intake Tubes
Details
     

 08-04-2006
2.80
Finish Fit of Last Gear Door
Details
     

 08-04-2006
2.00
Continue Fiberfrax Installation
Details
     

 08-03-2006
0.50
Painting Engine parts
Details
     

 08-03-2006
4.00
Installing Fiberfrax
Details
     

 08-02-2006
1.60
Final Installation of Nose Gear Wiring
Details
     

 08-01-2006
1.50
Finish Nu-lite Wiring
Details
       

 07-31-2006
1.50
Wiring for Nu-lites
Details
     

 07-31-2006
2.20
Change Uplock Hook Spring
Details
     

 07-30-2006
1.50
Wiring Additions and Changes
Details

 07-30-2006
1.00
Right Seat Outer Door Core Work
Details
     

 07-30-2006
0.40
Painting Small Parts
Details

 07-30-2006
2.50
Nose Gear Limit Switch Wiring
Details
       

 07-30-2006
0.30
Finish Nose Gear Door Carriage
Details
     

 07-30-2006
1.50
Finish Lower Fuselage Access Panel
Details
     

 07-29-2006
5.00
Lower Fuselage Access Panel Continued
Details
     

 07-29-2006
0.80
Inner Right Seat Outer Door Skin
Details

 07-28-2006
1.20
Repair Mounting Holes and Fill Wing
Details
     

 07-28-2006
0.10
Over Center Continued
Details
     

 07-28-2006
1.00
Gear Door Work
Details
     

 07-28-2006
0.70
Adding Mounts for Lower Fuselage Access Panel
Details
     

 07-27-2006
0.80
Wing Surface Filling
Details
     

 07-27-2006
1.50
Begin Adding a Bottom Console Access Panel
Details
     

 07-27-2006
1.00
Additional Screws
Details
     

 07-27-2006
2.00
Added Layers of Plywood to Door Outer Ring
Details
     

 07-25-2006
5.00
Last Gear Door Work
Details
     

 07-25-2006
0.10
Front Landing Gear Problem II
Details
       

 07-25-2006
2.00
Figuring Out Front Over Center Problem
Details
       

 07-24-2006
3.00
Front Landing Gear Work
Details
       

 07-24-2006
0.10
Finish Instrument Sub-panels II
Details
     

 07-23-2006
8.00
Finish Instrument Sub-panels
Details
       

 07-15-2006
1.60
Install Fiberfrax Under the Fuselage
Details

 07-10-2006
1.80
More Disassembly
Details
     

 07-09-2006
2.00
Dissassembly of Engine
Details

 07-08-2006
1.80
Engine Disassembly
Details

 07-07-2006
1.50
Disassembly Begins
Details

 07-04-2006
2.20
Finnish Last Interior Panel
Details

 06-25-2006
3.00
Install Left Landing Gear Door Hinges
Details
     

 06-24-2006
0.50
Add Rheostat
Details

 06-01-2006
0.10
Return Suction Gauge
Details

 04-25-2006
1.60
Master Switch Install
Details
     

 04-24-2006
3.00
Lighted Switch Panels Installed.
Details
       

 04-19-2006
0.10
Landing Gear Door Hinges
Details

 04-18-2006
2.50
Make Some Changes to Hinge Design
Details

 04-17-2006
4.00
Landing Gera Door Hinge Design
Details

 02-19-2006
3.00
Stick Approns
Details
     

 02-18-2006
6.00
Adding Gap Seals
Details
     

 02-17-2006
3.00
Small Details
Details

 02-16-2006
2.50
Pilot Aileron Work
Details

 02-16-2006
0.50
Bracket Installation
Details

 02-15-2006
2.00
Passenger Main Gear Door
Details

 01-24-2006
0.80
Test Pilot Aileron
Details

 01-24-2006
2.20
Fiinal Pilot Gear Door Filling
Details

 01-23-2006
3.00
Finishing Pilot Gear Door
Details

 01-22-2006
3.00
Aileron Mass Balance
Details

 01-20-2006
1.00
Pilot Aileron Work
Details

 01-13-2006
1.00
Fill Pilot Gear Door
Details

 01-12-2006
1.00
Skin Pilot Gear Door
Details

 01-12-2006
1.00
Additonal Airleron Filling
Details

 01-11-2006
2.00
Core of Pilot Landing Gear Door
Details

 01-10-2006
3.00
Closing Mechanism
Details

 01-09-2006
1.00
Correct Pilot Gear Fit
Details

 01-09-2006
1.00
Correct Fit of Pilot Landing Gear
Details

 01-01-2006
0.50
Installed Wing Tie Down Rings
Details
     

 01-01-2006
2.00
Assemble and Fit Landing Gear Control Lever
Details

 01-01-2006
1.60
Add Stainless Scuff Plates
Details
     

 12-30-2005
0.50
Installed Transponder Antenna
Details
     

 12-29-2005
1.00
Constructing Forward Aileron Control Arm
Details
     

 12-28-2005
2.00
Pilot Aileron Work
Details

 12-27-2005
2.00
Make Outer Panel for Pilot Door Lock
Details
     

 12-26-2005
3.00
Pilot Door Skin
Details

 12-24-2005
4.00
More Interior Dye Work
Details

 12-24-2005
2.00
Install Stainless Heal Plates
Details
     

 12-23-2005
3.00
Interior Work and Start Transponder Antenna Instal
Details

 12-22-2005
2.00
Landing Gear Details
Details

 12-22-2005
0.50
Filling and Sanding the Pilot Aileron
Details

 12-21-2005
3.00
Uplock Hook Stops
Details

 12-20-2005
8.00
Various Finishing Tasks
Details

 12-08-2005
0.10
Canopy Levers
Details

 12-06-2005
1.50
More Vynal Dying
Details

 12-05-2005
3.00
Vynal Dying
Details
       

 12-03-2005
6.00
Make Exterior Cabin Lock & Latch Mechanism
Details
       

 12-02-2005
6.00
Wing Farings
Details

 12-01-2005
4.00
Pilot Wing Fairing
Details

 11-30-2005
1.00
Add Seat Back Plywood
Details

 11-29-2005
1.50
Finish Work on Doors
Details

 11-27-2005
2.50
Passenger Exterior Door Plywood
Details

 10-02-2005
5.00
Filling and Smoothing Fuselage
Details

 10-01-2005
2.00
Passenger Canopy Work
Details

 10-01-2005
6.00
Filling and Priming Fuselage
Details

 09-30-2005
1.00
Finnish Rudder Hinge Doors
Details

 09-30-2005
2.50
Cabin Doors and Latches
Details

 09-29-2005
0.10
Wing Attach Bushings #2
Details

 09-29-2005
3.00
Finish Fitting Elevator
Details

 09-28-2005
3.00
Rudder Access Doors
Details

 09-27-2005
3.00
Filling and Sanding
Details

 09-26-2005
2.00
Right Side Wing Fairing
Details

 09-25-2005
3.00
Filling and fixing.
Details

 09-24-2005
3.00
Finnish Fit of Elevator
Details

 09-24-2005
4.00
Correct Elevator Free Travel
Details

 09-22-2005
1.00
Add Missing Fuselage Brace
Details
     

 09-21-2005
4.00
Rudder Gap Corrections
Details

 09-20-2005
6.00
Rudder Corrections
Details

 09-19-2005
5.00
Sanding Fuselage
Details

 09-18-2005
3.00
Sandinge Fuselage
Details

 09-17-2005
3.00
Correct Static Ports +
Details
     

 09-16-2005
2.00
Bottom Fuselage Access Doors
Details

 09-15-2005
3.00
Sanding and Filling
Details
     

 09-14-2005
7.00
Start Sanding
Details

 09-13-2005
5.00
Fit Engine Mount and Check Over Aircraft
Details

 09-02-2005
0.10
Tank Drains
Details

 09-02-2005
8.00
Pick up Project
Details
       

 09-02-2005
0.10
Photos from Previous Builder
Details
       

 08-29-2005
0.10
Canopy Hinges
Details

 08-26-2005
0.10
Wing Attach Bushings
Details

 08-22-2005
2.00
Aileron Work
Details

 08-21-2005
1.00
Fuselage Cad Work
Details

 08-20-2005
3.00
Work on Fuselage Parts
Details

 08-18-2005
1.00
Multiple Block Metal Parts
Details

 08-18-2005
1.00
More CAD Work
Details

 08-14-2005
2.00
CAD Work
Details

 08-13-2005
1.00
Fuel Tank Work
Details

 08-05-2005
0.10
Order Canopy Handle Mount Plates
Details

 07-31-2005
2.00
CAD Work
Details

 07-30-2005
12.00
CAD Work
Details

 07-25-2005
2.00
More CAD Work
Details

 07-24-2005
2.00
CAD Work for Wood Parts
Details

 07-22-2005
2.00
Multiple Block Metal Parts
Details

 07-21-2005
2.00
Multiple Block Metal Parts
Details

 07-18-2005
2.00
Multiple Block Metal Parts
Details

 07-15-2005
1.00
Multiple Block Metal Parts
Details

 07-12-2005
1.00
Multiple Block Metal Parts
Details

 07-12-2005
1.00
Multiple Block Metal Parts
Details

 07-11-2005
1.00
Mutiple Block Metal Parts
Details

 07-11-2005
1.00
Multiple Block Metal Parts
Details

 07-10-2005
1.00
Mutiple Block Metal Parts
Details

 07-10-2005
1.00
Multiple Block Metal Parts
Details

 07-07-2005
4.00
Mutiple Block Metal Parts
Details

 07-07-2005
4.00
Multiple Block Metal Parts
Details

 07-06-2005
3.00
Multiple Block Metal Parts
Details

 07-06-2005
3.00
Multiple Block Metal Parts
Details

 07-05-2005
1.00
Multiple Block Metal Parts
Details

 07-05-2005
1.00
Multiple Block Metal Parts
Details

 07-04-2005
10.00
Multiple Block Metal Parts Work
Details

 07-04-2005
10.00
Multiple Block Metal Parts
Details

 07-02-2005
7.00
Plan Review +