Date
|
Hours
|
Work Log Summary
|
Details
|
01-05-2018
|
6.00
|
Prepared and installed 180 deg thermostat
|
Details
|
|
|
12-19-2017
|
2.00
|
I{nstalled Wheel Pants
|
Details
|
|
|
05-01-2016
|
2.00
|
Sign off- issue Temp Aiarwothiness
|
Details
|
|
|
04-22-2016
|
0.50
|
Installed A/C Data Plate
|
Details
|
|
|
04-20-2016
|
1.50
|
Finished installing wings Ready for inspection
|
Details
|
|
|
04-18-2016
|
5.00
|
Fixed Pitot/AOA leaks
|
Details
|
|
|
04-15-2016
|
5.00
|
Trouble shooting pitiot /AOA line leaks
|
Details
|
|
|
04-15-2016
|
2.50
|
Repaired aft cargo bulkhead riveting error
|
Details
|
|
|
04-13-2016
|
4.00
|
Testing Pitot System
|
Details
|
|
|
04-12-2016
|
4.00
|
Update Dynon, Fix Pitot leak
|
Details
|
|
|
04-11-2016
|
3.00
|
Completed install of tail cone
|
Details
|
|
|
04-08-2016
|
2.00
|
Added Fiberglas to upper and lower tailcone
|
Details
|
|
|
04-06-2016
|
3.00
|
Fitting tail cone and adding lead weight
|
Details
|
|
|
03-29-2016
|
3.00
|
Working on ballasting Tail Cone
|
Details
|
|
|
02-12-2016
|
2.00
|
Preping for Tail Cone Ballast
|
Details
|
|
|
02-09-2016
|
2.00
|
Installed Grab Bar on Instrument panel
|
Details
|
|
|
02-01-2016
|
3.50
|
Measured a/c for wt./Bal., Fixed strobe/nav light
|
Details
|
|
|
01-29-2016
|
2.50
|
Worked on landing light lens and strobe problem
|
Details
|
|
|
01-29-2016
|
1.50
|
Weighed aicraft
|
Details
|
|
|
01-25-2016
|
1.50
|
Drained fuel for weighing, Trouble shooting strobe
|
Details
|
|
|
01-24-2016
|
1.50
|
Installed wing walks, steps and strobes
|
Details
|
|
|
01-22-2016
|
5.00
|
Asssembled wings to Fuselage
|
Details
|
|
|
01-18-2016
|
3.00
|
Completed canpoy seal
|
Details
|
|
|
01-15-2016
|
1.50
|
Trimmed rear canopy seal retainer and installed it
|
Details
|
|
|
01-12-2016
|
2.00
|
Prepped and painted rear canopy retainer
|
Details
|
|
|
01-11-2016
|
2.00
|
Working on Canopy Seal Parts
|
Details
|
|
|
12-30-2015
|
2.00
|
Installed new battery, Installed instrument panel
|
Details
|
|
|
12-28-2015
|
3.00
|
Repositioned horizontal sabilizer
|
Details
|
|
|
12-08-2015
|
3.00
|
Reassembling after paint
|
Details
|
|
|
11-18-2015
|
6.00
|
Installed Tail parts
|
Details
|
|
|
11-17-2015
|
3.00
|
Reinstalling Instrument Panel
|
Details
|
|
|
11-01-2015
|
0.00
|
Visited Paint shop to view progress
|
Details
|
|
|
10-23-2015
|
0.00
|
Panel Engraving Complete
|
Details
|
|
|
09-25-2015
|
3.50
|
Removed Instrument panel for labeling and powder c
|
Details
|
|
|
09-23-2015
|
4.00
|
Disassembly for paint
|
Details
|
|
|
09-21-2015
|
4.50
|
Install new radiator tubing, Install Vans Dynon uo
|
Details
|
|
|
09-16-2015
|
2.00
|
Paint Prep, Set Nose gear friction
|
Details
|
|
|
09-15-2015
|
2.00
|
Attempted Dynon RV-12 update fo 5th time
|
Details
|
|
|
09-07-2015
|
2.50
|
Dynon update
|
Details
|
|
|
09-01-2015
|
3.10
|
Completed installation of Nose wheel fairing
|
Details
|
|
|
08-31-2015
|
3.60
|
Working on Nose Strut fairing
|
Details
|
|
|
08-28-2015
|
2.50
|
Installed nose gear fairing on to nose gear
|
Details
|
|
|
08-27-2015
|
2.50
|
Started on Nose Gear Faring. Wiroked on finish of
|
Details
|
|
|
08-25-2015
|
3.00
|
Completed installation of oil door in upper cowl
|
Details
|
|
|
08-24-2015
|
3.00
|
Finished fitting oil door. Installed doubler
|
Details
|
|
|
08-20-2015
|
1.50
|
Started installation of Oil door in uper cowl
|
Details
|
|
|
08-18-2015
|
5.00
|
Installed canopy and cowl
|
Details
|
|
|
08-17-2015
|
2.00
|
Trouble shot Dynon backup battery
|
Details
|
|
|
08-14-2015
|
1.50
|
Resealed,Hydraulic brake fitting
|
Details
|
|
|
07-17-2015
|
4.00
|
Completed installing rear window
|
Details
|
|
|
07-11-2015
|
2.00
|
removed rear windoww to fix brocken screw
|
Details
|
|
|
07-06-2015
|
5.00
|
Working on rear window install
|
Details
|
|
|
07-03-2015
|
2.00
|
Riveted Turtle deck skins
|
Details
|
|
|
06-30-2015
|
1.20
|
Started installing the aft turtle deck skins and w
|
Details
|
|
|
06-29-2015
|
3.00
|
painting aft turtle deck inbd skin, fibrelass sant
|
Details
|
|
|
06-24-2015
|
2.00
|
Cowl work, started putting on aft cabin skins
|
Details
|
|
|
06-11-2015
|
3.00
|
Reinstalled Dynon backup battery, worked on cowl
|
Details
|
|
|
06-10-2015
|
2.50
|
Complted install of valve cover vent
|
Details
|
|
|
06-02-2015
|
1.50
|
Added Vent to Valve cover
|
Details
|
|
|
05-26-2015
|
2.00
|
Finished fastening inst panel cover
|
Details
|
|
|
05-19-2015
|
2.50
|
Misc. fixes
|
Details
|
|
|
05-13-2015
|
2.50
|
Resetting Dynon EMS
|
Details
|
|
|
05-08-2015
|
3.00
|
Completed Upholsery installation
|
Details
|
|
|
05-06-2015
|
3.00
|
Working on installation of upholstery
|
Details
|
|
|
05-04-2015
|
3.00
|
Completed floor install, Started Upholstery Instal
|
Details
|
|
|
04-30-2015
|
3.00
|
Repared flare on Fuel Line
|
Details
|
|
|
04-28-2015
|
2.50
|
More nutplate tapping, Part fitting
|
Details
|
|
|
04-23-2015
|
3.50
|
Misc. Problems
|
Details
|
|
|
04-16-2015
|
4.00
|
Fabricated 6 Bushings, Inatalled Seat Belts ect
|
Details
|
|
|
04-09-2015
|
3.00
|
Still putting stuff back togther
|
Details
|
|
|
04-06-2015
|
2.10
|
Reassemblng after installing SB 14-12-06
|
Details
|
|
|
03-28-2015
|
4.00
|
Completed fab. and install of Bearing Brkt. Brace
|
Details
|
|
|
02-13-2015
|
4.00
|
Completed SB 14-11-03 Wing doublers
|
Details
|
|
|
02-10-2015
|
2.50
|
Completed Canopy switch install.
|
Details
|
|
|
02-09-2015
|
5.00
|
Installed canopy lock switch hardware
|
Details
|
|
|
02-06-2015
|
0.50
|
Updated Dynon software and checked wiring
|
Details
|
|
|
02-02-2015
|
1.50
|
Completed installing wiring at instrument panel
|
Details
|
|
|
01-30-2015
|
1.00
|
Working on installing wiring for Canopy latch
|
Details
|
|
|
12-19-2014
|
3.50
|
Canopy latch install
|
Details
|
|
|
12-15-2014
|
1.00
|
Completed installation of Gates idler pulley
|
Details
|
|
|
12-11-2014
|
1.30
|
machined an aluminum spacer for the new idler pull
|
Details
|
|
|
12-10-2014
|
1.00
|
Machined bushing for idler pulley
|
Details
|
|
|
12-09-2014
|
1.00
|
Removed Idler Pulley
|
Details
|
|
|
11-24-2014
|
3.00
|
Finishing fiberglass up on Cowl and Canopy
|
Details
|
|
|
11-21-2014
|
8.00
|
More work on cowls , split top from bottom
|
Details
|
|
|
11-11-2014
|
3.00
|
More sanding and filling on lower cowl
|
Details
|
|
|
11-07-2014
|
5.00
|
More fiberglass work
|
Details
|
|
|
11-04-2014
|
3.00
|
Added filler to cowl. Worked on wiring
|
Details
|
|
|
11-03-2014
|
2.50
|
Trouble shoot oil pressure problem
|
Details
|
|
|
10-31-2014
|
6.00
|
Working on Fibreglassing lower cowl
|
Details
|
|
|
09-30-2014
|
2.00
|
Installed R.H. Stabilator Tip
|
Details
|
|
|
09-29-2014
|
2.30
|
Installed L.H. stabilator tip
|
Details
|
|
|
09-22-2014
|
1.00
|
Completed ADAHRS stiffner install
|
Details
|
|
|
09-18-2014
|
1.00
|
Installed adahrs stiffner brace in place
|
Details
|
|
|
09-08-2014
|
1.80
|
Started on ADAHR stiffner install
|
Details
|
|
|
08-25-2014
|
1.50
|
Added Fibreglass to the exterior of the bottom cow
|
Details
|
|
|
08-14-2014
|
1.50
|
Continued working on the lower cowl fibreglass
|
Details
|
|
|
08-12-2014
|
1.50
|
Started the fibreglass work on the lower cowl
|
|
|
|
08-08-2014
|
1.00
|
Added cushion clamps to support heater inlet hose
|
Details
|
|
|
08-04-2014
|
1.50
|
Reinstalled flaperon control rods
|
Details
|
|
|
07-11-2014
|
1.00
|
Working on installation of flaperon control rods
|
Details
|
|
|
07-08-2014
|
1.00
|
Still working on the rear tunnel cover nutplates
|
Details
|
|
|
07-07-2014
|
2.00
|
Repairing rear tunnel nutplates
|
Details
|
|
|
07-05-2014
|
2.50
|
Grounded Oil Pressure Transducer, Removed floor pa
|
Details
|
|
|
06-30-2014
|
2.00
|
C/W Notification 14-05-02
|
Details
|
|
|
06-24-2014
|
3.00
|
Reinstalled floor panels. First full power runup
|
Details
|
|
|
06-23-2014
|
2.00
|
Rerouted the lower elevator cable
|
Details
|
|
|
05-08-2014
|
3.00
|
Trouble shoot Control Cables
|
Details
|
|
|
05-06-2014
|
2.50
|
Checking things out
|
Details
|
|
|
05-05-2014
|
2.50
|
Misc. Projects
|
Details
|
|
|
05-03-2014
|
3.00
|
Fixed hyd. leak, Reinstalled canopy, Improved cano
|
Details
|
|
|
05-02-2014
|
3.50
|
Filled fibreglass fairing using mocro beads
|
Details
|
|
|
04-30-2014
|
1.00
|
Worked on fiberglass on canopy
|
Details
|
|
|
04-28-2014
|
2.50
|
Working on Canopy Fairing, First run with prop
|
Details
|
|
|
04-17-2014
|
3.00
|
Started rework on fibreglass on canopy
|
Details
|
|
|
04-15-2014
|
4.00
|
REmoved canopy, riveted aft cabin l.h. side, Fitte
|
Details
|
|
|
04-07-2014
|
3.00
|
INstalled shoulder harness, Reworked canopy shield
|
Details
|
|
|
04-04-2014
|
3.00
|
Tapped nutplates, removed canopy fairings
|
Details
|
|
|
04-02-2014
|
3.00
|
Reinstalled cowl and canopy
|
Details
|
|
|
03-28-2014
|
3.50
|
Sanded and filled new fibreglass on upper cowl
|
Details
|
|
|
03-27-2014
|
2.00
|
Fibreglassed upper cowl
|
Details
|
|
|
03-26-2014
|
2.00
|
Painted Canopy fairing
|
Details
|
|
|
03-21-2014
|
5.00
|
Installed fuel tank, Removed canopy
|
Details
|
|
|
02-26-2014
|
3.50
|
Installed Canopy Latch
|
Details
|
|
|
02-24-2014
|
2.50
|
Finishe riveting and sealing fuel tank
|
Details
|
|
|
02-13-2014
|
2.00
|
Removed inlet fuel filters,completed r.h. instrume
|
Details
|
|
|
02-12-2014
|
2.00
|
Worked on fuel tank,cowling and r.h. inst panel
|
Details
|
|
|
02-11-2014
|
3.00
|
Removed ECU , Installed Guide for Cowl
|
Details
|
|
|
02-06-2014
|
2.00
|
Pressure tested fuel tank, Started modifying the u
|
Details
|
|
|
01-31-2014
|
2.50
|
Sealed doublers and fuel sender plate in place
|
Details
|
|
|
01-30-2014
|
3.50
|
Prepped fuel tank for S/B 13-12-19, Asssembled tow
|
Details
|
|
|
01-29-2014
|
3.50
|
S/B 13-12-19 Fuel Tank update
|
Details
|
|
|
01-27-2014
|
3.00
|
Drained and removed fuel tank, Retorqued block he
|
Details
|
|
|
01-24-2014
|
3.50
|
Set Prop Pitch, Installed Engine block heater
|
Details
|
|
|
01-23-2014
|
2.00
|
Solved interference problem, Installed prop
|
Details
|
|
|
01-22-2014
|
2.00
|
Completed lower cowl and painted interior of both
|
Details
|
|
|
01-09-2014
|
3.50
|
Completed upper cowl air inlet
|
Details
|
|
|
01-07-2014
|
2.50
|
Vented fuel cap, More fibreglass work
|
Details
|
|
|
01-06-2014
|
3.50
|
Worked on fitting cowl/oil cooler
|
Details
|
|
|
01-04-2014
|
4.00
|
Fibreglassing
|
Details
|
|
|
01-02-2014
|
4.00
|
Attached oil cooler duct to lower cowl
|
Details
|
|
|
12-31-2013
|
4.00
|
Started fibreglassing
|
Details
|
|
|
12-20-2013
|
2.00
|
Reinstalled bulkhead fairing
|
Details
|
|
|
12-18-2013
|
3.00
|
Trouble shoot fuel line leak
|
Details
|
|
|
12-17-2013
|
4.50
|
Completed heater electrical, Ran Engine
|
Details
|
|
|
12-16-2013
|
3.00
|
Reinstalled heater, filled with coolant
|
Details
|
|
|
12-04-2013
|
2.50
|
Installed new muffler, rerouted coolant overflow
|
Details
|
|
|
12-02-2013
|
4.00
|
Removed heater for return to Viking
|
Details
|
|
|
11-15-2013
|
2.50
|
Removed muffler for rerturn to viking
|
Details
|
|
|
11-06-2013
|
2.00
|
Instlled Coolant overflow tank, Reworked fuselage
|
Details
|
|
|
10-21-2013
|
4.00
|
Installed Cabin Heat control
|
Details
|
|
|
10-18-2013
|
5.00
|
Fabricated and installed crankcase breather tube
|
Details
|
|
|
10-15-2013
|
3.00
|
Installed cover plate and Oil breather kit
|
Details
|
|
|
09-30-2013
|
2.50
|
Installed rear bulkhead and fuel tank
|
Details
|
|
|
09-24-2013
|
2.50
|
Fabricated and installed engine control switch gua
|
Details
|
|
|
09-19-2013
|
3.00
|
Completed wiring checkout for strobe and nav light
|
Details
|
|
|
09-18-2013
|
3.00
|
Still Trouble shooting the nav/strobe switch
|
Details
|
|
|
09-17-2013
|
2.00
|
Trouble shooting the Nav/Strobe switch
|
Details
|
|
|
09-13-2013
|
3.00
|
Fihished heater electrical connection
|
Details
|
|
|
09-11-2013
|
3.00
|
Working on heaater fan electrical inatallation
|
Details
|
|
|
09-06-2013
|
2.50
|
Trouble shoot wing lighting wiring r.h side
|
Details
|
|
|
09-05-2013
|
10.00
|
Install wings connect flaperon lonkage
|
Details
|
|
|
09-03-2013
|
3.00
|
nstalled hose clamps on heater, Moved fuselage and
|
Details
|
|
|
08-28-2013
|
3.00
|
Completed ADSB install
|
Details
|
|
|
08-26-2013
|
3.00
|
Installed heater mechanical
|
Details
|
|
|
08-22-2013
|
6.00
|
Worked on heater install
|
Details
|
|
|
08-21-2013
|
3.50
|
Worked on installing the heater
|
Details
|
|
|
08-19-2013
|
3.00
|
Completed fitting of cowl
|
Details
|
|
|
08-07-2013
|
4.50
|
Torqqued manifild,Extended engine intake temp. har
|
Details
|
|
|
08-05-2013
|
7.50
|
Completed throttle cable installation
|
Details
|
|
|
08-03-2013
|
2.00
|
Installed throttle cable.
|
Details
|
|
|
08-02-2013
|
3.00
|
Modified front of canopy skirt
|
Details
|
|
|
07-31-2013
|
2.50
|
Removed tape fron canopy fairing
|
Details
|
|
|
07-30-2013
|
4.50
|
Trimmed fairing and cemented it on to canopy
|
Details
|
|
|
07-29-2013
|
5.00
|
Installed canopy, prepping fwd fairing
|
Details
|
|
|
07-26-2013
|
3.00
|
Reinstalled cowl
|
Details
|
|
|
07-25-2013
|
4.50
|
Installed ADSB cables
|
Details
|
|
|
07-23-2013
|
3.00
|
More engine work
|
Details
|
|
|
07-18-2013
|
2.00
|
Installed updated ECU,Installed ADSB box
|
Details
|
|
|
07-15-2013
|
3.50
|
Wiring, intake manifold fitting
|
Details
|
|
|
07-12-2013
|
1.50
|
Installed Alternator out light
|
Details
|
|
|
07-11-2013
|
3.00
|
Rework oil cooler hoses
|
Details
|
|
|
07-10-2013
|
3.50
|
Reinstalled oil cooler, trial fitted new intake ma
|
Details
|
|
|
07-03-2013
|
2.50
|
Rewire engine ground
|
Details
|
|
|
07-02-2013
|
2.50
|
Disassembled engine components for update
|
Details
|
|
|
06-18-2013
|
3.30
|
Update intake manifold and coolant system
|
Details
|
|
|
06-14-2013
|
3.00
|
Installed Idler Pulley, Belt and Alternator
|
Details
|
|
|
05-29-2013
|
2.00
|
Installed Craknshaft pulley and reinstalled ngine
|
Details
|
|
|
05-28-2013
|
2.00
|
Removed engine for Pulley update
|
Details
|
|
|
05-18-2013
|
1.50
|
Turned and installed Idler bushing
|
Details
|
|
|
05-15-2013
|
1.50
|
Preparing for pulley update
|
Details
|
|
|
05-13-2013
|
1.00
|
Reinstalled radiator
|
Details
|
|
|
04-09-2013
|
4.00
|
Removed Radiator and ECU
|
Details
|
|
|
02-02-2013
|
0.00
|
Shutting down for Shoulder Replacement
|
Details
|
|
|
01-28-2013
|
2.50
|
More cowl fitting
|
Details
|
|
|
01-22-2013
|
4.00
|
Finished SB 112-11-09 - Worked on fitting cowl
|
Details
|
|
|
01-14-2013
|
3.50
|
Installed L.H. Landing Gear
|
Details
|
|
|
01-10-2013
|
3.00
|
Prepared and installed outer gear wear plates and
|
Details
|
|
|
01-09-2013
|
3.00
|
Fitting new landing gear mounts
|
Details
|
|
|
01-07-2013
|
2.00
|
Working on SB 12-11-09
|
Details
|
|
|
01-03-2013
|
5.00
|
Working on SB 12-11-09
|
Details
|
|
|
12-19-2012
|
1.50
|
SB-12-11-09
|
Details
|
|
|
12-19-2012
|
1.00
|
Added Dipstick to oil filler cap.
|
Details
|
|
|
12-14-2012
|
8.00
|
Started installation of Landing gear SB-12-11-09
|
Details
|
|
|
12-07-2012
|
6.00
|
Attached hinge to upper cowl
|
Details
|
|
|
12-06-2012
|
4.50
|
Ready for final fit of top cowl
|
Details
|
|
|
12-04-2012
|
8.00
|
Working on cowling
|
Details
|
|
|
11-30-2012
|
8.00
|
Fitted top cowl
|
Details
|
|
|
11-27-2012
|
10.00
|
Completed install of lower cowl
|
Details
|
|
|
11-26-2012
|
8.00
|
First fit of lower cowl
|
Details
|
|
|
11-21-2012
|
3.00
|
Completed trim servo setup
|
Details
|
|
|
11-20-2012
|
3.50
|
Setting up Trim Servo
|
Details
|
|
|
11-14-2012
|
2.50
|
Auto Pilot completed, It works!!!
|
Details
|
|
|
11-13-2012
|
5.00
|
Still Working on Auto pilot disconnect switch
|
Details
|
|
|
11-12-2012
|
2.00
|
Trouble shooting Auto Pilot Disconnect
|
Details
|
|
|
11-08-2012
|
2.00
|
More Dynon Setup
|
Details
|
|
|
11-01-2012
|
3.50
|
Trouble Shoot Auto Pilot servo power
|
Details
|
|
|
10-31-2012
|
1.00
|
Beginning to set up Skyview
|
Details
|
|
|
10-30-2012
|
2.00
|
Power on Dynon and other stuff
|
Details
|
|
|
10-25-2012
|
3.50
|
wired firewall fwd connector and EMS connector
|
Details
|
|
|
10-23-2012
|
2.50
|
Fabricated GPS mount
|
Details
|
|
|
10-22-2012
|
5.00
|
C/W SB 12-09-26 and wiring
|
Details
|
|
|
10-19-2012
|
4.00
|
Installed Fuse block and Dynon 60 amp shunt
|
Details
|
|
|
10-18-2012
|
3.00
|
More wiring
|
Details
|
|
|
10-17-2012
|
2.50
|
Completed SB 12-08-09 on nose wheel fairing
|
Details
|
|
|
10-09-2012
|
3.00
|
Completed installation of master relay.
|
Details
|
|
|
10-08-2012
|
1.50
|
Installed Master relay
|
Details
|
|
|
10-02-2012
|
4.00
|
installed roll servo finished pitch servo
|
Details
|
|
|
10-01-2012
|
1.00
|
Completed install of pitch servo
|
Details
|
|
|
09-28-2012
|
2.80
|
Installed Auto Pilot Pitch Servo
|
Details
|
|
|
09-27-2012
|
4.80
|
Finishing controls assembly
|
Details
|
|
|
09-25-2012
|
3.00
|
Installed control stick links to mixer
|
Details
|
|
|
09-20-2012
|
3.00
|
Started installing flight controls
|
|
|
|
09-18-2012
|
2.00
|
More Wireing
|
Details
|
|
|
09-17-2012
|
3.50
|
More engine wireing and power distribution wireing
|
Details
|
|
|
09-13-2012
|
2.50
|
Figured out wimg/fuselage wireing
|
Details
|
|
|
09-10-2012
|
4.00
|
More Wiring
|
Details
|
|
|
09-04-2012
|
5.00
|
Wiring
|
Details
|
|
|
08-31-2012
|
8.50
|
Installed fuel pump,Flow sender, bundled wiring
|
Details
|
|
|
08-30-2012
|
3.50
|
Worked on Engine wiring
|
Details
|
|
|
08-28-2012
|
2.00
|
Worked on Center instrument panel
|
Details
|
|
|
08-27-2012
|
4.50
|
Wiring engine and panel
|
Details
|
|
|
08-14-2012
|
3.50
|
Modified inst panel to mount ELT and Intercom
|
Details
|
|
|
08-10-2012
|
4.00
|
Converted all Nylock locknuts to Steel locknuts
|
Details
|
|
|
08-07-2012
|
3.00
|
Completd L.H. Fuselage Pitot/AOA connections
|
Details
|
|
|
08-01-2012
|
3.50
|
Completed working on L.H. Wing
|
Details
|
|
|
07-24-2012
|
2.00
|
Trial fit for L.H. Wing and connector
|
Details
|
|
|
07-23-2012
|
3.50
|
Completed wiring for L.H. Wing
|
Details
|
|
|
07-20-2012
|
3.00
|
Prepped wing for new cable pull
|
Details
|
|
|
07-19-2012
|
4.00
|
Installed Wing to check connector fit.
|
Details
|
|
|
07-17-2012
|
5.50
|
Completed Oil Cooler Mounting
|
Details
|
|
|
07-16-2012
|
4.00
|
Fabricated new Oill Cooler brackets
|
Details
|
|
|
07-09-2012
|
2.00
|
Installed connector at wing root.
|
Details
|
|
|
07-06-2012
|
4.00
|
Working on Right wing wiring
|
Details
|
|
|
07-02-2012
|
2.00
|
Prepped R.H. Wing for update
|
Details
|
|
|
06-20-2012
|
2.50
|
Completed install of L.H. wing connector
|
Details
|
|
|
06-18-2012
|
2.50
|
Drilled holes for mounts in fuselage floor
|
Details
|
|
|
06-15-2012
|
4.50
|
Setting up the new wireing for the strobes
|
Details
|
|
|
06-11-2012
|
8.00
|
Repaired interfence on engine mount
|
Details
|
|
|
06-07-2012
|
1.00
|
Wired sensors on engine
|
Details
|
|
|
06-05-2012
|
4.00
|
Installed Fittings and wired Fuel pump Assembly
|
Details
|
|
|
06-04-2012
|
3.20
|
Modified Oil Cooler
|
Details
|
|
|
05-29-2012
|
3.00
|
Installed ELT
|
Details
|
|
|
05-28-2012
|
3.50
|
Avionic installation
|
Details
|
|
|
05-22-2012
|
2.50
|
Started Instrumet panel assembly
|
Details
|
|
|
05-22-2012
|
1.50
|
Pulled ECU harness through Firewall
|
Details
|
|
|
05-21-2012
|
3.00
|
Insatalled Oil Cooler
|
Details
|
|
|
05-15-2012
|
2.70
|
Routed cables and installed Skyview components
|
Details
|
|
|
05-14-2012
|
2.50
|
Worked on cable routing and oilcooler install
|
Details
|
|
|
05-12-2012
|
7.00
|
Installed gearbox and radiator
|
Details
|
|
|
05-12-2012
|
3.00
|
Installed ADAHRS
|
Details
|
|
|
05-09-2012
|
5.00
|
Prepped tunnel harness
|
Details
|
|
|
05-08-2012
|
2.50
|
Pulled Tunnel wires
|
Details
|
|
|
05-04-2012
|
5.00
|
Connected wires for intercom, Auto pilot disconnec
|
Details
|
|
|
05-03-2012
|
2.00
|
Routed AOA and Pitot Tubing
|
Details
|
|
|
04-25-2012
|
4.00
|
Miscellaneouse work
|
Details
|
|
|
04-19-2012
|
5.00
|
Prepped Airframe for avionics mounts
|
Details
|
|
|
04-18-2012
|
2.00
|
Started revising the avionics shelf
|
Details
|
|
|
04-17-2012
|
2.00
|
Inventoried avionics kit
|
Details
|
|
|
04-13-2012
|
2.00
|
Unpacked and studied installation manual
|
Details
|
|
|
04-12-2012
|
7.00
|
Drove to VAns to pickup Avionics Kit
|
Details
|
|
|
04-09-2012
|
4.00
|
Installed spacers, Worked on fuel system
|
Details
|
|
|
04-06-2012
|
2.00
|
Still Working on Fuel system
|
Details
|
|
|
04-03-2012
|
4.50
|
Partially Installed fuel pumps/lines
|
Details
|
|
|
04-02-2012
|
2.00
|
Installing Fuel Pump System
|
Details
|
|
|
03-15-2012
|
8.00
|
Installed Engine
|
Details
|
|
|
03-14-2012
|
5.00
|
Installed Stabilator Cables
|
Details
|
|
|
03-12-2012
|
10.50
|
Installed Rudder Cables
|
Details
|
|
|
03-07-2012
|
2.50
|
Recieved Viking engine today
|
Details
|
|
|
02-09-2012
|
8.00
|
Move to new hangar in Bend
|
Details
|
|
|
01-28-2012
|
2.50
|
C/W SB 11-12-14
|
Details
|
|
|
01-25-2012
|
3.50
|
Added clip to support return line fitting, Started
|
Details
|
|
|
12-23-2011
|
2.00
|
Working on nose wheel fairing
|
Details
|
|
|
12-20-2011
|
2.50
|
Finished fitting parts together
|
Details
|
|
|
12-19-2011
|
4.50
|
Working on Nose wheel fairing
|
Details
|
|
|
12-09-2011
|
3.50
|
Completed MLG wheel fairings
|
Details
|
|
|
12-06-2011
|
2.00
|
Installed nutplates on R.H. wheel fairing
|
Details
|
|
|
12-05-2011
|
4.50
|
Working on MLG Wheel Pants
|
Details
|
|
|
11-30-2011
|
2.00
|
Intalled Wheel fairing mount plates into fairing
|
Details
|
|
|
11-30-2011
|
2.00
|
Installed Cabling on Fwd Tail Cone bulkhead
|
Details
|
|
|
11-28-2011
|
3.00
|
Started Wheel Fairings
|
Details
|
|
|
11-18-2011
|
3.30
|
Completed Pitot Tube install
|
Details
|
|
|
11-17-2011
|
4.00
|
Built Tail Stand, Moved wing to table. Started Pit
|
Details
|
|
|
11-16-2011
|
4.20
|
Riveted TAil Cone shear clips to Fuse, Installed c
|
Details
|
|
|
11-15-2011
|
2.30
|
Riveted bottom of Tail cone and Fuselage Joint
|
Details
|
|
|
11-14-2011
|
1.50
|
Joined Tail Cone to Fuselage
|
Details
|
|
|
11-14-2011
|
3.50
|
Joined Tail cone asm to Fuselage
|
Details
|
|
|
11-14-2011
|
1.00
|
Helped position Tail Cone to Fuselage
|
Details
|
|
|
11-14-2011
|
1.00
|
Helped position Tail Cone to Fuselage
|
Details
|
|
|
11-11-2011
|
1.50
|
Preparing to install the Empennage to teh Fuselage
|
Details
|
|
|
11-09-2011
|
2.00
|
Reassembling the rudder
|
Details
|
|
|
11-07-2011
|
5.50
|
Finished install of Tail cone. Started Pitot Tube
|
Details
|
|
|
11-03-2011
|
3.50
|
Fitted tail cone to fuselage
|
Details
|
|
|
10-31-2011
|
2.50
|
Fitting and attaching tail cone
|
Details
|
|
|
10-29-2011
|
3.50
|
Removed stabilator, Started fitting til cone
|
Details
|
|
|
10-28-2011
|
3.50
|
Installed hardware in Flaperons, Ect.
|
Details
|
|
|
10-25-2011
|
4.50
|
Wires, clamps, noise filter
|
Details
|
|
|
10-20-2011
|
1.00
|
Installed OAT probe and harness
|
Details
|
|
|
10-20-2011
|
3.00
|
Fitted and installed wings
|
Details
|
|
|
10-18-2011
|
1.50
|
Installed Brake Lines
|
Details
|
|
|
10-17-2011
|
5.00
|
Completed puting on the landing gear
|
Details
|
|
|
10-15-2011
|
3.00
|
Installed L.H. MLG leg and Nose gear leg
|
Details
|
|
|
10-12-2011
|
6.00
|
Installed fuel drain and R.H. MLG
|
Details
|
|
|
10-11-2011
|
2.00
|
Checking Cable Routing
|
Details
|
|
|
10-10-2011
|
8.00
|
Installing cabling and brake lines
|
Details
|
|
|
09-27-2011
|
5.00
|
More cable installation
|
Details
|
|
|
09-26-2011
|
4.50
|
Pulling wires
|
Details
|
|
|
09-20-2011
|
5.00
|
Installing cabling, Setting reed switches
|
Details
|
|
|
09-19-2011
|
6.50
|
Installing cableing
|
Details
|
|
|
09-16-2011
|
6.00
|
Installed Wireing duct and Grommet
|
Details
|
|
|
09-15-2011
|
7.00
|
Install lift handles, Attached canopy to frame
|
Details
|
|
|
09-14-2011
|
3.50
|
Fabricated and installed Guide blocks
|
Details
|
|
|
09-12-2011
|
4.00
|
Final Fitting and Drilling of Canopy
|
Details
|
|
|
09-09-2011
|
4.00
|
Fitted and drilled canopy and skirts
|
Details
|
|
|
09-08-2011
|
3.00
|
Retrieved fuselage from paint shop
|
Details
|
|
|
09-08-2011
|
1.00
|
Fabricated Flaperon Push rods
|
Details
|
|
|
09-07-2011
|
2.50
|
Trimmed Canopy & Fabricated control parts
|
Details
|
|
|
09-05-2011
|
5.00
|
Moved Fuselage to paint shop
|
Details
|
|
|
09-03-2011
|
4.50
|
Prepped fuse interioar for painting
|
Details
|
|
|
09-02-2011
|
3.00
|
Fitted canopy. Fuel tank leak test good
|
Details
|
|
|
09-01-2011
|
6.50
|
Readied for interior painting
|
Details
|
|
|
08-31-2011
|
4.00
|
Working on canopy frame
|
Details
|
|
|
08-30-2011
|
3.00
|
Started on Canopy frame
|
Details
|
|
|
08-30-2011
|
2.00
|
Organized stuff in hangar
|
Details
|
|
|
08-29-2011
|
4.00
|
Moved fuselage and tools to hangar
|
Details
|
|
|
08-29-2011
|
2.00
|
Move to Hangar
|
Details
|
|
|
08-29-2011
|
3.50
|
Helped move to hangar
|
Details
|
|
|
08-26-2011
|
1.00
|
Upholstery arrived
|
Details
|
|
|
08-12-2011
|
3.00
|
Built Support Box for Fuselage.
|
Details
|
|
|
08-10-2011
|
5.00
|
Inventory Parts
|
Details
|
|
|
08-06-2011
|
3.00
|
Unpacked crate
|
Details
|
|
|
08-04-2011
|
4.50
|
Installed components for Fwd upper fuse and turtle
|
Details
|
|
|
08-03-2011
|
4.00
|
Installed Oilt tank support, Canopy braces and Upp
|
Details
|
|
|
08-02-2011
|
5.00
|
Worked on Panel Base. Installed it.
|
Details
|
|
|
07-31-2011
|
3.10
|
Completed upper Firewall Install.
|
Details
|
|
|
07-29-2011
|
4.50
|
Assembled upper Firewall and Installed it
|
Details
|
|
|
07-28-2011
|
5.00
|
Fabricated and installed fuel lines
|
Details
|
|
|
07-26-2011
|
5.50
|
Installed Rudder pedals, Fuel Pump and shutoff val
|
Details
|
|
|
07-25-2011
|
3.00
|
Assembled Rudder and brake asm.
|
Details
|
|
|
07-23-2011
|
7.40
|
Installed Roll Bar. Installed Baggage Bulkhead. Fa
|
Details
|
|
|
07-19-2011
|
4.00
|
Fabricated Roll Bar, Prepped Baggage Bulkhead
|
Details
|
|
|
07-18-2011
|
2.00
|
Working on Roll Bar Asm
|
Details
|
|
|
07-15-2011
|
3.20
|
Installed Vent Doors and Cowl Hinges
|
Details
|
|
|
07-14-2011
|
7.40
|
Installed Side Skins
|
Details
|
|
|
07-13-2011
|
3.00
|
Fitted longerons, Fitted L.H. Side skin
|
Details
|
|
|
07-12-2011
|
4.60
|
Installed Mid Fuse Brace. Built Mid Fuse Skeleton
|
Details
|
|
|
07-11-2011
|
4.00
|
Formed Longerons
|
Details
|
|
|
07-09-2011
|
3.00
|
Installed Gascolator bracket, Flo scan Mount. Ass
|
Details
|
|
|
07-08-2011
|
3.00
|
Installed Shelf on Lower Firewall
|
Details
|
|
|
07-06-2011
|
3.20
|
Installed Auto Pilot brackets, Started Lower fwd.
|
Details
|
|
|
06-27-2011
|
5.20
|
Installed steps and seat floor
|
Details
|
|
|
06-25-2011
|
6.00
|
attached bottom skin and doublers
|
Details
|
|
|
06-10-2011
|
2.50
|
RIveted Floor supports and Bulkhead
|
Details
|
|
|
06-01-2011
|
6.00
|
Assembling 1203 Bulkhead to Center Section
|
Details
|
|
|
05-30-2011
|
2.00
|
Preparing Control column bulkhead
|
Details
|
|
|
05-29-2011
|
1.70
|
Riveting Fuse Parts together
|
Details
|
|
|
05-28-2011
|
5.50
|
Assembled Seat Floor Asms.
|
Details
|
|
|
05-27-2011
|
3.80
|
Assembled Seat Ribs, Flaperon mixer and Pulley Bra
|
Details
|
|
|
05-25-2011
|
5.00
|
Assembling Seat ribs and control parts
|
Details
|
|
|
05-24-2011
|
4.00
|
Assembling Baggage floor
|
Details
|
|
|
05-19-2011
|
6.00
|
Assembling Cargo floor
|
Details
|
|
|
05-16-2011
|
6.00
|
Fabricated Center Section Bulkhead
|
Details
|
|
|
05-15-2011
|
2.00
|
Completed parts inventory
|
Details
|
|
|
05-14-2011
|
4.00
|
Unpack Crate and Inventory
|
Details
|
|
|
03-21-2011
|
2.00
|
Completed riveting on flaperon
|
Details
|
|
|
03-21-2011
|
1.50
|
Completed riveting flaperon
|
Details
|
|
|
03-20-2011
|
1.50
|
Installing R.H. flaperon leading edge skins
|
Details
|
|
|
03-17-2011
|
3.50
|
Riveted training edge skins to R.H. flaperon
|
|
|
|
03-16-2011
|
4.50
|
Completed Nav/strobe install. Started on flaperon
|
Details
|
|
|
03-15-2011
|
4.50
|
Fitted Nav/Strobe light extension
|
Details
|
|
|
03-14-2011
|
4.50
|
Installed Tip closeout and fitted Tip extensijon
|
Details
|
|
|
03-11-2011
|
3.50
|
Riveted remaing leading edge skins. Riveted aft to
|
Details
|
|
|
03-11-2011
|
6.00
|
Riveted remaing leading edge skins. Riveted aft to
|
Details
|
|
|
03-10-2011
|
2.50
|
Riveted leading edge R.H. wing. Fitted aft top win
|
Details
|
|
|
03-10-2011
|
2.00
|
Fabricated R.H wing cradle
|
Details
|
|
|
03-08-2011
|
3.50
|
Installing Landing Light and Wiring
|
Details
|
|
|
03-07-2011
|
1.50
|
Turned wing over. Clecoed fwd skins. Stared landin
|
Details
|
|
|
03-07-2011
|
5.50
|
Completed riveting bottom skins. Started installat
|
Details
|
|
|
03-05-2011
|
4.50
|
Clecoing and riveting bottom R.H. wing skins
|
Details
|
|
|
03-03-2011
|
4.00
|
Assembling R.H. Wing
|
Details
|
|
|
02-28-2011
|
2.50
|
Placed L.H. wing in cradle. Started R.H wing asm
|
Details
|
|
|
02-28-2011
|
5.50
|
Adjusted Stall Warning. Checked Nav/strobe wiring,
|
Details
|
|
|
02-26-2011
|
3.50
|
Installed wing tip light fairing
|
Details
|
|
|
02-25-2011
|
2.00
|
Installed Nav.strobe connector. Loctite added to B
|
Details
|
|
|
02-23-2011
|
5.00
|
Flox applied to L.H. tip fairing. Deburred R.H. w
|
Details
|
|
|
02-22-2011
|
4.00
|
Completed L.H. flaperon. started L.H. nav/strobe i
|
Details
|
|
|
02-22-2011
|
3.50
|
Completed L.H. flaperon Started L.H. hnv/strobe in
|
Details
|
|
|
02-21-2011
|
1.00
|
Riveted skins to ribs and spar
|
Details
|
|
|
02-21-2011
|
2.00
|
Deburred Flaperon ribs
|
Details
|
|
|
02-21-2011
|
6.50
|
Assembled L.H. Flaperon
|
Details
|
|
|
02-19-2011
|
3.50
|
Finished L.H. wing tip, Fabricated Flaperon Bracke
|
Details
|
|
|
02-17-2011
|
3.00
|
Closed out L.H. Wing tip
|
Details
|
|
|
02-16-2011
|
3.50
|
Riveted wing tip components
|
Details
|
|
|
02-15-2011
|
1.00
|
Completed Wing Cradle
|
Details
|
|
|
02-15-2011
|
2.00
|
Completed riveting top skins on wing
|
Details
|
|
|
02-15-2011
|
5.00
|
Completed riveting on top skins on L.H. wing
|
Details
|
|
|
02-14-2011
|
2.00
|
fitted and riveted wing walk doubler to l.h. wing
|
Details
|
|
|
02-14-2011
|
2.50
|
Fabricated wing support
|
Details
|
|
|
02-12-2011
|
5.00
|
Fitted top l.h. wing skins
|
Details
|
|
|
02-10-2011
|
1.50
|
Installed Flaperon hinge brackets
|
Details
|
|
|
02-09-2011
|
5.00
|
Completed riveting L.H. Bottom skins.
|
Details
|
|
|
02-08-2011
|
4.50
|
Riveting bottom skins
|
Details
|
|
|
02-05-2011
|
1.50
|
Final adjust stall warning, instslled terminal bra
|
Details
|
|
|
02-04-2011
|
5.50
|
Riveted L.H. Wing ribs, Fabricated stall warner
|
Details
|
|
|
02-03-2011
|
4.00
|
Assembled main ribs to main and rear spar
|
Details
|
|
|
02-02-2011
|
2.00
|
Prepped fwd wing ribs
|
Details
|
|
|
02-01-2011
|
1.00
|
Assemembled wing rear spars
|
Details
|
|
|
01-31-2011
|
1.50
|
Riveted Rib Clips to Left wing spar
|
Details
|
|
|
01-31-2011
|
4.50
|
Fabricated Flaperon Hinges
|
Details
|
|
|
01-30-2011
|
3.00
|
Labled storage boxes, Stored parts
|
Details
|
|
|
01-29-2011
|
3.00
|
Completed Inventory of parts
|
Details
|
|
|
01-29-2011
|
2.00
|
Broke down shipping crates
|
Details
|
|
|
01-26-2011
|
2.00
|
Took Delivery of Wing and Lighting Kits
|
Details
|
|
|
12-31-2010
|
1.50
|
Installed Vstab and Rudder top fairings
|
Details
|
|
|
12-29-2010
|
2.00
|
Fabricated anti servo Linkage
|
Details
|
|
|
12-27-2010
|
5.00
|
Installed anti Servo Tabs, started trim system
|
Details
|
|
|
12-24-2010
|
2.00
|
Installed stabilator
|
Details
|
|
|
12-24-2010
|
2.00
|
Installed the stabilator
|
Details
|
|
|
12-24-2010
|
2.00
|
Install Stabilator
|
Details
|
|
|
12-22-2010
|
3.00
|
Installed vertical stab and rudder
|
Details
|
|
|
12-22-2010
|
3.00
|
Installed Vertical Stab and rudder
|
Details
|
|
|
12-22-2010
|
1.00
|
Fabricate support for empennage
|
Details
|
|
|
12-22-2010
|
1.00
|
Fabricate empennage support
|
|
|
|
12-18-2010
|
1.50
|
Finished riveting top skin
|
Details
|
|
|
12-18-2010
|
1.50
|
Brokedown and salvaged Empennage shipping crate
|
|
|
|
12-17-2010
|
4.00
|
Assembled and clecoed top skin
|
|
|
|
12-15-2010
|
4.00
|
Asm. Side Skins
|
Details
|
|
|
12-14-2010
|
2.00
|
Installed Static ports/Clecoed Upper L.H. Skin
|
Details
|
|
|
12-11-2010
|
1.50
|
Assembling Empennage
|
Details
|
|
|
12-10-2010
|
5.50
|
Rear Empennage Assembly
|
Details
|
|
|
12-10-2010
|
4.00
|
Assemble Rear empennage
|
Details
|
|
|
12-08-2010
|
3.00
|
Complete Aft Bulkhead
|
Details
|
|
|
12-07-2010
|
2.50
|
Fabricate the Aft Bulkhead
|
Details
|
|
|
12-06-2010
|
3.50
|
Fabricating frames
|
Details
|
|
|
12-05-2010
|
2.00
|
Completed riveting on Hstab
|
Details
|
|
|
12-04-2010
|
4.00
|
Riveting hstab skins
|
Details
|
|
|
12-03-2010
|
2.00
|
Prep hstab for riveting
|
Details
|
|
|
12-02-2010
|
2.00
|
Assemble hstab ribs
|
Details
|
|
|
11-28-2010
|
3.00
|
Assemble hstab ribs
|
Details
|
|
|
11-27-2010
|
5.00
|
Assemble hstab spar box
|
Details
|
|
|
11-26-2010
|
3.50
|
Start Hstab spar box
|
Details
|
|
|
11-25-2010
|
7.00
|
Fabricate anti-servo tabs
|
Details
|
|
|
11-22-2010
|
4.00
|
Final asm. rudder
|
Details
|
|
|
11-20-2010
|
3.50
|
Prep, assemble rudder
|
Details
|
|
|
11-19-2010
|
3.50
|
final asm. vstab
|
Details
|
|
|
11-19-2010
|
6.50
|
final asm vstab
|
Details
|
|
|
11-17-2010
|
2.00
|
Fab vertical stab - csking, lable making, inventor
|
Details
|
|
|
11-14-2010
|
1.00
|
fab V-stab main spar - deburring
|
|
|
|
11-13-2010
|
4.00
|
Fab v-stab spar
|
Details
|
|
|
11-10-2010
|
2.00
|
Inventory
|
Details
|
|
|
10-26-2010
|
8.00
|
Build Tables
|
|
|