Work Logs Found: 471
Category Work Time: 1538 Hours
 Date
Hours
Work Log Summary

Details

 01-05-2018
6.00
Prepared and installed 180 deg thermostat
Details
       

 12-19-2017
2.00
I{nstalled Wheel Pants
Details
     

 05-01-2016
2.00
Sign off- issue Temp Aiarwothiness
Details
       

 04-22-2016
0.50
Installed A/C Data Plate
Details

 04-20-2016
1.50
Finished installing wings Ready for inspection
Details

 04-18-2016
5.00
Fixed Pitot/AOA leaks
Details

 04-15-2016
5.00
Trouble shooting pitiot /AOA line leaks
Details

 04-15-2016
2.50
Repaired aft cargo bulkhead riveting error
Details

 04-13-2016
4.00
Testing Pitot System
Details

 04-12-2016
4.00
Update Dynon, Fix Pitot leak
Details

 04-11-2016
3.00
Completed install of tail cone
Details
       

 04-08-2016
2.00
Added Fiberglas to upper and lower tailcone
Details
       

 04-06-2016
3.00
Fitting tail cone and adding lead weight
Details
       

 03-29-2016
3.00
Working on ballasting Tail Cone
Details
       

 02-12-2016
2.00
Preping for Tail Cone Ballast
Details

 02-09-2016
2.00
Installed Grab Bar on Instrument panel
Details

 02-01-2016
3.50
Measured a/c for wt./Bal., Fixed strobe/nav light
Details

 01-29-2016
2.50
Worked on landing light lens and strobe problem
Details

 01-29-2016
1.50
Weighed aicraft
Details

 01-25-2016
1.50
Drained fuel for weighing, Trouble shooting strobe
Details

 01-24-2016
1.50
Installed wing walks, steps and strobes
Details
       

 01-22-2016
5.00
Asssembled wings to Fuselage
Details
     

 01-18-2016
3.00
Completed canpoy seal
Details

 01-15-2016
1.50
Trimmed rear canopy seal retainer and installed it
Details

 01-12-2016
2.00
Prepped and painted rear canopy retainer
Details

 01-11-2016
2.00
Working on Canopy Seal Parts
Details

 12-30-2015
2.00
Installed new battery, Installed instrument panel
Details

 12-28-2015
3.00
Repositioned horizontal sabilizer
Details

 12-08-2015
3.00
Reassembling after paint
Details

 11-18-2015
6.00
Installed Tail parts
Details
     

 11-17-2015
3.00
Reinstalling Instrument Panel
Details
       

 11-01-2015
0.00
Visited Paint shop to view progress
Details
       

 10-23-2015
0.00
Panel Engraving Complete
Details

 09-25-2015
3.50
Removed Instrument panel for labeling and powder c
Details

 09-23-2015
4.00
Disassembly for paint
Details

 09-21-2015
4.50
Install new radiator tubing, Install Vans Dynon uo
Details
       

 09-16-2015
2.00
Paint Prep, Set Nose gear friction
Details

 09-15-2015
2.00
Attempted Dynon RV-12 update fo 5th time
Details

 09-07-2015
2.50
Dynon update
Details

 09-01-2015
3.10
Completed installation of Nose wheel fairing
Details
       

 08-31-2015
3.60
Working on Nose Strut fairing
Details

 08-28-2015
2.50
Installed nose gear fairing on to nose gear
Details
       

 08-27-2015
2.50
Started on Nose Gear Faring. Wiroked on finish of
Details

 08-25-2015
3.00
Completed installation of oil door in upper cowl
Details
       

 08-24-2015
3.00
Finished fitting oil door. Installed doubler
Details

 08-20-2015
1.50
Started installation of Oil door in uper cowl
Details
     

 08-18-2015
5.00
Installed canopy and cowl
Details
       

 08-17-2015
2.00
Trouble shot Dynon backup battery
Details

 08-14-2015
1.50
Resealed,Hydraulic brake fitting
Details

 07-17-2015
4.00
Completed installing rear window
Details

 07-11-2015
2.00
removed rear windoww to fix brocken screw
Details

 07-06-2015
5.00
Working on rear window install
Details

 07-03-2015
2.00
Riveted Turtle deck skins
Details
       

 06-30-2015
1.20
Started installing the aft turtle deck skins and w
Details

 06-29-2015
3.00
painting aft turtle deck inbd skin, fibrelass sant
Details

 06-24-2015
2.00
Cowl work, started putting on aft cabin skins
Details

 06-11-2015
3.00
Reinstalled Dynon backup battery, worked on cowl
Details

 06-10-2015
2.50
Complted install of valve cover vent
Details
       

 06-02-2015
1.50
Added Vent to Valve cover
Details

 05-26-2015
2.00
Finished fastening inst panel cover
Details

 05-19-2015
2.50
Misc. fixes
Details

 05-13-2015
2.50
Resetting Dynon EMS
Details

 05-08-2015
3.00
Completed Upholsery installation
Details
       

 05-06-2015
3.00
Working on installation of upholstery
Details

 05-04-2015
3.00
Completed floor install, Started Upholstery Instal
Details
       

 04-30-2015
3.00
Repared flare on Fuel Line
Details

 04-28-2015
2.50
More nutplate tapping, Part fitting
Details

 04-23-2015
3.50
Misc. Problems
Details

 04-16-2015
4.00
Fabricated 6 Bushings, Inatalled Seat Belts ect
Details

 04-09-2015
3.00
Still putting stuff back togther
Details

 04-06-2015
2.10
Reassemblng after installing SB 14-12-06
Details

 03-28-2015
4.00
Completed fab. and install of Bearing Brkt. Brace
Details
       

 02-13-2015
4.00
Completed SB 14-11-03 Wing doublers
Details
       

 02-10-2015
2.50
Completed Canopy switch install.
Details
       

 02-09-2015
5.00
Installed canopy lock switch hardware
Details

 02-06-2015
0.50
Updated Dynon software and checked wiring
Details

 02-02-2015
1.50
Completed installing wiring at instrument panel
Details

 01-30-2015
1.00
Working on installing wiring for Canopy latch
Details

 12-19-2014
3.50
Canopy latch install
Details

 12-15-2014
1.00
Completed installation of Gates idler pulley
Details
       

 12-11-2014
1.30
machined an aluminum spacer for the new idler pull
Details

 12-10-2014
1.00
Machined bushing for idler pulley
Details

 12-09-2014
1.00
Removed Idler Pulley
Details

 11-24-2014
3.00
Finishing fiberglass up on Cowl and Canopy
Details
       

 11-21-2014
8.00
More work on cowls , split top from bottom
Details

 11-11-2014
3.00
More sanding and filling on lower cowl
Details

 11-07-2014
5.00
More fiberglass work
Details

 11-04-2014
3.00
Added filler to cowl. Worked on wiring
Details
     

 11-03-2014
2.50
Trouble shoot oil pressure problem
Details

 10-31-2014
6.00
Working on Fibreglassing lower cowl
Details
       

 09-30-2014
2.00
Installed R.H. Stabilator Tip
Details

 09-29-2014
2.30
Installed L.H. stabilator tip
Details
     

 09-22-2014
1.00
Completed ADAHRS stiffner install
Details
     

 09-18-2014
1.00
Installed adahrs stiffner brace in place
Details

 09-08-2014
1.80
Started on ADAHR stiffner install
Details
       

 08-25-2014
1.50
Added Fibreglass to the exterior of the bottom cow
Details

 08-14-2014
1.50
Continued working on the lower cowl fibreglass
Details

 08-12-2014
1.50
Started the fibreglass work on the lower cowl

 08-08-2014
1.00
Added cushion clamps to support heater inlet hose
Details

 08-04-2014
1.50
Reinstalled flaperon control rods
Details

 07-11-2014
1.00
Working on installation of flaperon control rods
Details

 07-08-2014
1.00
Still working on the rear tunnel cover nutplates
Details

 07-07-2014
2.00
Repairing rear tunnel nutplates
Details

 07-05-2014
2.50
Grounded Oil Pressure Transducer, Removed floor pa
Details

 06-30-2014
2.00
C/W Notification 14-05-02
Details

 06-24-2014
3.00
Reinstalled floor panels. First full power runup
Details

 06-23-2014
2.00
Rerouted the lower elevator cable
Details

 05-08-2014
3.00
Trouble shoot Control Cables
Details

 05-06-2014
2.50
Checking things out
Details

 05-05-2014
2.50
Misc. Projects
Details

 05-03-2014
3.00
Fixed hyd. leak, Reinstalled canopy, Improved cano
Details

 05-02-2014
3.50
Filled fibreglass fairing using mocro beads
Details

 04-30-2014
1.00
Worked on fiberglass on canopy
Details

 04-28-2014
2.50
Working on Canopy Fairing, First run with prop
Details

 04-17-2014
3.00
Started rework on fibreglass on canopy
Details

 04-15-2014
4.00
REmoved canopy, riveted aft cabin l.h. side, Fitte
Details

 04-07-2014
3.00
INstalled shoulder harness, Reworked canopy shield
Details
       

 04-04-2014
3.00
Tapped nutplates, removed canopy fairings
Details
       

 04-02-2014
3.00
Reinstalled cowl and canopy
Details
       

 03-28-2014
3.50
Sanded and filled new fibreglass on upper cowl
Details
       

 03-27-2014
2.00
Fibreglassed upper cowl
Details
       

 03-26-2014
2.00
Painted Canopy fairing
Details
       

 03-21-2014
5.00
Installed fuel tank, Removed canopy
Details

 02-26-2014
3.50
Installed Canopy Latch
Details
       

 02-24-2014
2.50
Finishe riveting and sealing fuel tank
Details
       

 02-13-2014
2.00
Removed inlet fuel filters,completed r.h. instrume
Details

 02-12-2014
2.00
Worked on fuel tank,cowling and r.h. inst panel
Details

 02-11-2014
3.00
Removed ECU , Installed Guide for Cowl
Details

 02-06-2014
2.00
Pressure tested fuel tank, Started modifying the u
Details

 01-31-2014
2.50
Sealed doublers and fuel sender plate in place
Details
     

 01-30-2014
3.50
Prepped fuel tank for S/B 13-12-19, Asssembled tow
Details
     

 01-29-2014
3.50
S/B 13-12-19 Fuel Tank update
Details
     

 01-27-2014
3.00
Drained and removed fuel tank, Retorqued block he
Details

 01-24-2014
3.50
Set Prop Pitch, Installed Engine block heater
Details
       

 01-23-2014
2.00
Solved interference problem, Installed prop
Details
       

 01-22-2014
2.00
Completed lower cowl and painted interior of both
Details

 01-09-2014
3.50
Completed upper cowl air inlet
Details
       

 01-07-2014
2.50
Vented fuel cap, More fibreglass work
Details

 01-06-2014
3.50
Worked on fitting cowl/oil cooler
Details
       

 01-04-2014
4.00
Fibreglassing
Details
       

 01-02-2014
4.00
Attached oil cooler duct to lower cowl
Details
       

 12-31-2013
4.00
Started fibreglassing
Details
       

 12-20-2013
2.00
Reinstalled bulkhead fairing
Details

 12-18-2013
3.00
Trouble shoot fuel line leak
Details

 12-17-2013
4.50
Completed heater electrical, Ran Engine
Details
     

 12-16-2013
3.00
Reinstalled heater, filled with coolant
Details

 12-04-2013
2.50
Installed new muffler, rerouted coolant overflow
Details
       

 12-02-2013
4.00
Removed heater for return to Viking
Details

 11-15-2013
2.50
Removed muffler for rerturn to viking
Details

 11-06-2013
2.00
Instlled Coolant overflow tank, Reworked fuselage
Details
       

 10-21-2013
4.00
Installed Cabin Heat control
Details
       

 10-18-2013
5.00
Fabricated and installed crankcase breather tube
Details
       

 10-15-2013
3.00
Installed cover plate and Oil breather kit
Details
       

 09-30-2013
2.50
Installed rear bulkhead and fuel tank
Details

 09-24-2013
2.50
Fabricated and installed engine control switch gua
Details
       

 09-19-2013
3.00
Completed wiring checkout for strobe and nav light
Details
       

 09-18-2013
3.00
Still Trouble shooting the nav/strobe switch
Details

 09-17-2013
2.00
Trouble shooting the Nav/Strobe switch
Details

 09-13-2013
3.00
Fihished heater electrical connection
Details

 09-11-2013
3.00
Working on heaater fan electrical inatallation
Details

 09-06-2013
2.50
Trouble shoot wing lighting wiring r.h side
Details

 09-05-2013
10.00
Install wings connect flaperon lonkage
Details
       

 09-03-2013
3.00
nstalled hose clamps on heater, Moved fuselage and
Details

 08-28-2013
3.00
Completed ADSB install
Details
       

 08-26-2013
3.00
Installed heater mechanical
Details
       

 08-22-2013
6.00
Worked on heater install
Details
       

 08-21-2013
3.50
Worked on installing the heater
Details

 08-19-2013
3.00
Completed fitting of cowl
Details
       

 08-07-2013
4.50
Torqqued manifild,Extended engine intake temp. har
Details

 08-05-2013
7.50
Completed throttle cable installation
Details
       

 08-03-2013
2.00
Installed throttle cable.
Details

 08-02-2013
3.00
Modified front of canopy skirt
Details
       

 07-31-2013
2.50
Removed tape fron canopy fairing
Details
       

 07-30-2013
4.50
Trimmed fairing and cemented it on to canopy
Details
       

 07-29-2013
5.00
Installed canopy, prepping fwd fairing
Details

 07-26-2013
3.00
Reinstalled cowl
Details
       

 07-25-2013
4.50
Installed ADSB cables
Details
     

 07-23-2013
3.00
More engine work
Details

 07-18-2013
2.00
Installed updated ECU,Installed ADSB box
Details

 07-15-2013
3.50
Wiring, intake manifold fitting
Details

 07-12-2013
1.50
Installed Alternator out light
Details

 07-11-2013
3.00
Rework oil cooler hoses
Details
     

 07-10-2013
3.50
Reinstalled oil cooler, trial fitted new intake ma
Details
       

 07-03-2013
2.50
Rewire engine ground
Details

 07-02-2013
2.50
Disassembled engine components for update
Details

 06-18-2013
3.30
Update intake manifold and coolant system
Details

 06-14-2013
3.00
Installed Idler Pulley, Belt and Alternator
Details
     

 05-29-2013
2.00
Installed Craknshaft pulley and reinstalled ngine
Details
     

 05-28-2013
2.00
Removed engine for Pulley update
Details

 05-18-2013
1.50
Turned and installed Idler bushing
Details

 05-15-2013
1.50
Preparing for pulley update
Details
       

 05-13-2013
1.00
Reinstalled radiator
Details
     

 04-09-2013
4.00
Removed Radiator and ECU
Details

 02-02-2013
0.00
Shutting down for Shoulder Replacement
Details
       

 01-28-2013
2.50
More cowl fitting
Details

 01-22-2013
4.00
Finished SB 112-11-09 - Worked on fitting cowl
Details
       

 01-14-2013
3.50
Installed L.H. Landing Gear
Details

 01-10-2013
3.00
Prepared and installed outer gear wear plates and
Details

 01-09-2013
3.00
Fitting new landing gear mounts
Details
     

 01-07-2013
2.00
Working on SB 12-11-09
Details
     

 01-03-2013
5.00
Working on SB 12-11-09
Details
     

 12-19-2012
1.50
SB-12-11-09
Details
       

 12-19-2012
1.00
Added Dipstick to oil filler cap.
Details
       

 12-14-2012
8.00
Started installation of Landing gear SB-12-11-09
Details
       

 12-07-2012
6.00
Attached hinge to upper cowl
Details
       

 12-06-2012
4.50
Ready for final fit of top cowl
Details
       

 12-04-2012
8.00
Working on cowling
Details

 11-30-2012
8.00
Fitted top cowl
Details
       

 11-27-2012
10.00
Completed install of lower cowl
Details
       

 11-26-2012
8.00
First fit of lower cowl
Details
       

 11-21-2012
3.00
Completed trim servo setup
Details

 11-20-2012
3.50
Setting up Trim Servo
Details

 11-14-2012
2.50
Auto Pilot completed, It works!!!
Details

 11-13-2012
5.00
Still Working on Auto pilot disconnect switch
Details

 11-12-2012
2.00
Trouble shooting Auto Pilot Disconnect
Details

 11-08-2012
2.00
More Dynon Setup
Details

 11-01-2012
3.50
Trouble Shoot Auto Pilot servo power
Details

 10-31-2012
1.00
Beginning to set up Skyview
Details
       

 10-30-2012
2.00
Power on Dynon and other stuff
Details

 10-25-2012
3.50
wired firewall fwd connector and EMS connector
Details
       

 10-23-2012
2.50
Fabricated GPS mount
Details

 10-22-2012
5.00
C/W SB 12-09-26 and wiring
Details

 10-19-2012
4.00
Installed Fuse block and Dynon 60 amp shunt
Details
       

 10-18-2012
3.00
More wiring
Details

 10-17-2012
2.50
Completed SB 12-08-09 on nose wheel fairing
Details

 10-09-2012
3.00
Completed installation of master relay.
Details

 10-08-2012
1.50
Installed Master relay
Details

 10-02-2012
4.00
installed roll servo finished pitch servo
Details
       

 10-01-2012
1.00
Completed install of pitch servo
Details
     

 09-28-2012
2.80
Installed Auto Pilot Pitch Servo
Details
       

 09-27-2012
4.80
Finishing controls assembly
Details
       

 09-25-2012
3.00
Installed control stick links to mixer
Details
       

 09-20-2012
3.00
Started installing flight controls

 09-18-2012
2.00
More Wireing
Details
       

 09-17-2012
3.50
More engine wireing and power distribution wireing
Details
       

 09-13-2012
2.50
Figured out wimg/fuselage wireing
Details

 09-10-2012
4.00
More Wiring
Details

 09-04-2012
5.00
Wiring
Details

 08-31-2012
8.50
Installed fuel pump,Flow sender, bundled wiring
Details
     

 08-30-2012
3.50
Worked on Engine wiring
Details

 08-28-2012
2.00
Worked on Center instrument panel
Details

 08-27-2012
4.50
Wiring engine and panel
Details

 08-14-2012
3.50
Modified inst panel to mount ELT and Intercom
Details
     

 08-10-2012
4.00
Converted all Nylock locknuts to Steel locknuts
Details

 08-07-2012
3.00
Completd L.H. Fuselage Pitot/AOA connections
Details
       

 08-01-2012
3.50
Completed working on L.H. Wing
Details

 07-24-2012
2.00
Trial fit for L.H. Wing and connector
Details

 07-23-2012
3.50
Completed wiring for L.H. Wing
Details
       

 07-20-2012
3.00
Prepped wing for new cable pull
Details
       

 07-19-2012
4.00
Installed Wing to check connector fit.
Details
       

 07-17-2012
5.50
Completed Oil Cooler Mounting
Details
       

 07-16-2012
4.00
Fabricated new Oill Cooler brackets
Details

 07-09-2012
2.00
Installed connector at wing root.
Details

 07-06-2012
4.00
Working on Right wing wiring
Details
     

 07-02-2012
2.00
Prepped R.H. Wing for update
Details

 06-20-2012
2.50
Completed install of L.H. wing connector
Details
       

 06-18-2012
2.50
Drilled holes for mounts in fuselage floor
Details
       

 06-15-2012
4.50
Setting up the new wireing for the strobes
Details

 06-11-2012
8.00
Repaired interfence on engine mount
Details
       

 06-07-2012
1.00
Wired sensors on engine
Details
       

 06-05-2012
4.00
Installed Fittings and wired Fuel pump Assembly
Details
     

 06-04-2012
3.20
Modified Oil Cooler
Details
       

 05-29-2012
3.00
Installed ELT
Details
       

 05-28-2012
3.50
Avionic installation
Details
       

 05-22-2012
2.50
Started Instrumet panel assembly
Details
       

 05-22-2012
1.50
Pulled ECU harness through Firewall
Details
       

 05-21-2012
3.00
Insatalled Oil Cooler
Details
       

 05-15-2012
2.70
Routed cables and installed Skyview components
Details

 05-14-2012
2.50
Worked on cable routing and oilcooler install
Details
       

 05-12-2012
7.00
Installed gearbox and radiator
Details
       

 05-12-2012
3.00
Installed ADAHRS
Details
       

 05-09-2012
5.00
Prepped tunnel harness
Details

 05-08-2012
2.50
Pulled Tunnel wires
Details

 05-04-2012
5.00
Connected wires for intercom, Auto pilot disconnec
Details

 05-03-2012
2.00
Routed AOA and Pitot Tubing
Details

 04-25-2012
4.00
Miscellaneouse work
Details

 04-19-2012
5.00
Prepped Airframe for avionics mounts
Details
       

 04-18-2012
2.00
Started revising the avionics shelf
Details
     

 04-17-2012
2.00
Inventoried avionics kit
Details

 04-13-2012
2.00
Unpacked and studied installation manual
Details

 04-12-2012
7.00
Drove to VAns to pickup Avionics Kit
Details

 04-09-2012
4.00
Installed spacers, Worked on fuel system
Details
       

 04-06-2012
2.00
Still Working on Fuel system
Details
     

 04-03-2012
4.50
Partially Installed fuel pumps/lines
Details
     

 04-02-2012
2.00
Installing Fuel Pump System
Details
     

 03-15-2012
8.00
Installed Engine
Details
       

 03-14-2012
5.00
Installed Stabilator Cables
Details
       

 03-12-2012
10.50
Installed Rudder Cables
Details
       

 03-07-2012
2.50
Recieved Viking engine today
Details
       

 02-09-2012
8.00
Move to new hangar in Bend
Details
       

 01-28-2012
2.50
C/W SB 11-12-14
Details
       

 01-25-2012
3.50
Added clip to support return line fitting, Started
Details
       

 12-23-2011
2.00
Working on nose wheel fairing
Details
       

 12-20-2011
2.50
Finished fitting parts together
Details
       

 12-19-2011
4.50
Working on Nose wheel fairing
Details
       

 12-09-2011
3.50
Completed MLG wheel fairings
Details
       

 12-06-2011
2.00
Installed nutplates on R.H. wheel fairing
Details
       

 12-05-2011
4.50
Working on MLG Wheel Pants
Details
       

 11-30-2011
2.00
Intalled Wheel fairing mount plates into fairing
Details
       

 11-30-2011
2.00
Installed Cabling on Fwd Tail Cone bulkhead
Details
       

 11-28-2011
3.00
Started Wheel Fairings
Details
       

 11-18-2011
3.30
Completed Pitot Tube install
Details
       

 11-17-2011
4.00
Built Tail Stand, Moved wing to table. Started Pit
Details
       

 11-16-2011
4.20
Riveted TAil Cone shear clips to Fuse, Installed c
Details
       

 11-15-2011
2.30
Riveted bottom of Tail cone and Fuselage Joint
Details

 11-14-2011
1.50
Joined Tail Cone to Fuselage
Details
       

 11-14-2011
3.50
Joined Tail cone asm to Fuselage
Details
       

 11-14-2011
1.00
Helped position Tail Cone to Fuselage
Details

 11-14-2011
1.00
Helped position Tail Cone to Fuselage
Details

 11-11-2011
1.50
Preparing to install the Empennage to teh Fuselage
Details

 11-09-2011
2.00
Reassembling the rudder
Details

 11-07-2011
5.50
Finished install of Tail cone. Started Pitot Tube
Details
       

 11-03-2011
3.50
Fitted tail cone to fuselage
Details
       

 10-31-2011
2.50
Fitting and attaching tail cone
Details
       

 10-29-2011
3.50
Removed stabilator, Started fitting til cone
Details
       

 10-28-2011
3.50
Installed hardware in Flaperons, Ect.
Details
       

 10-25-2011
4.50
Wires, clamps, noise filter
Details

 10-20-2011
1.00
Installed OAT probe and harness
Details
       

 10-20-2011
3.00
Fitted and installed wings
Details
       

 10-18-2011
1.50
Installed Brake Lines
Details
       

 10-17-2011
5.00
Completed puting on the landing gear
Details
       

 10-15-2011
3.00
Installed L.H. MLG leg and Nose gear leg
Details
       

 10-12-2011
6.00
Installed fuel drain and R.H. MLG
Details
       

 10-11-2011
2.00
Checking Cable Routing
Details

 10-10-2011
8.00
Installing cabling and brake lines
Details
       

 09-27-2011
5.00
More cable installation
Details
       

 09-26-2011
4.50
Pulling wires
Details
       

 09-20-2011
5.00
Installing cabling, Setting reed switches
Details
       

 09-19-2011
6.50
Installing cableing
Details
       

 09-16-2011
6.00
Installed Wireing duct and Grommet
Details
       

 09-15-2011
7.00
Install lift handles, Attached canopy to frame
Details
       

 09-14-2011
3.50
Fabricated and installed Guide blocks
Details
       

 09-12-2011
4.00
Final Fitting and Drilling of Canopy
Details
       

 09-09-2011
4.00
Fitted and drilled canopy and skirts
Details
       

 09-08-2011
3.00
Retrieved fuselage from paint shop
Details
       

 09-08-2011
1.00
Fabricated Flaperon Push rods
Details
     

 09-07-2011
2.50
Trimmed Canopy & Fabricated control parts
Details
       

 09-05-2011
5.00
Moved Fuselage to paint shop
Details
       

 09-03-2011
4.50
Prepped fuse interioar for painting
Details
       

 09-02-2011
3.00
Fitted canopy. Fuel tank leak test good
Details
       

 09-01-2011
6.50
Readied for interior painting
Details
       

 08-31-2011
4.00
Working on canopy frame
Details
       

 08-30-2011
3.00
Started on Canopy frame
Details
       

 08-30-2011
2.00
Organized stuff in hangar
Details
       

 08-29-2011
4.00
Moved fuselage and tools to hangar
Details
       

 08-29-2011
2.00
Move to Hangar
Details
     

 08-29-2011
3.50
Helped move to hangar
Details
     

 08-26-2011
1.00
Upholstery arrived
Details
       

 08-12-2011
3.00
Built Support Box for Fuselage.
Details
     

 08-10-2011
5.00
Inventory Parts
Details
       

 08-06-2011
3.00
Unpacked crate
Details

 08-04-2011
4.50
Installed components for Fwd upper fuse and turtle
Details
       

 08-03-2011
4.00
Installed Oilt tank support, Canopy braces and Upp
Details
       

 08-02-2011
5.00
Worked on Panel Base. Installed it.
Details
       

 07-31-2011
3.10
Completed upper Firewall Install.
Details
       

 07-29-2011
4.50
Assembled upper Firewall and Installed it
Details
       

 07-28-2011
5.00
Fabricated and installed fuel lines
Details
       

 07-26-2011
5.50
Installed Rudder pedals, Fuel Pump and shutoff val
Details
       

 07-25-2011
3.00
Assembled Rudder and brake asm.
Details
     

 07-23-2011
7.40
Installed Roll Bar. Installed Baggage Bulkhead. Fa
Details
       

 07-19-2011
4.00
Fabricated Roll Bar, Prepped Baggage Bulkhead
Details
       

 07-18-2011
2.00
Working on Roll Bar Asm
Details
       

 07-15-2011
3.20
Installed Vent Doors and Cowl Hinges
Details
       

 07-14-2011
7.40
Installed Side Skins
Details
       

 07-13-2011
3.00
Fitted longerons, Fitted L.H. Side skin
Details
       

 07-12-2011
4.60
Installed Mid Fuse Brace. Built Mid Fuse Skeleton
Details
       

 07-11-2011
4.00
Formed Longerons
Details
       

 07-09-2011
3.00
Installed Gascolator bracket, Flo scan Mount. Ass
Details
       

 07-08-2011
3.00
Installed Shelf on Lower Firewall
Details
       

 07-06-2011
3.20
Installed Auto Pilot brackets, Started Lower fwd.
Details
       

 06-27-2011
5.20
Installed steps and seat floor
Details
       

 06-25-2011
6.00
attached bottom skin and doublers
Details
       

 06-10-2011
2.50
RIveted Floor supports and Bulkhead
Details

 06-01-2011
6.00
Assembling 1203 Bulkhead to Center Section
Details
       

 05-30-2011
2.00
Preparing Control column bulkhead
Details
       

 05-29-2011
1.70
Riveting Fuse Parts together
Details
       

 05-28-2011
5.50
Assembled Seat Floor Asms.
Details
       

 05-27-2011
3.80
Assembled Seat Ribs, Flaperon mixer and Pulley Bra
Details
       

 05-25-2011
5.00
Assembling Seat ribs and control parts
Details
       

 05-24-2011
4.00
Assembling Baggage floor
Details
       

 05-19-2011
6.00
Assembling Cargo floor
Details
       

 05-16-2011
6.00
Fabricated Center Section Bulkhead
Details
       

 05-15-2011
2.00
Completed parts inventory
Details

 05-14-2011
4.00
Unpack Crate and Inventory
Details

 03-21-2011
2.00
Completed riveting on flaperon
Details
       

 03-21-2011
1.50
Completed riveting flaperon
Details
       

 03-20-2011
1.50
Installing R.H. flaperon leading edge skins
Details
       

 03-17-2011
3.50
Riveted training edge skins to R.H. flaperon
     

 03-16-2011
4.50
Completed Nav/strobe install. Started on flaperon
Details
       

 03-15-2011
4.50
Fitted Nav/Strobe light extension
Details
       

 03-14-2011
4.50
Installed Tip closeout and fitted Tip extensijon
Details
       

 03-11-2011
3.50
Riveted remaing leading edge skins. Riveted aft to
Details
       

 03-11-2011
6.00
Riveted remaing leading edge skins. Riveted aft to
Details
       

 03-10-2011
2.50
Riveted leading edge R.H. wing. Fitted aft top win
Details
       

 03-10-2011
2.00
Fabricated R.H wing cradle
Details
     

 03-08-2011
3.50
Installing Landing Light and Wiring
Details
       

 03-07-2011
1.50
Turned wing over. Clecoed fwd skins. Stared landin
Details
       

 03-07-2011
5.50
Completed riveting bottom skins. Started installat
Details
       

 03-05-2011
4.50
Clecoing and riveting bottom R.H. wing skins
Details
       

 03-03-2011
4.00
Assembling R.H. Wing
Details
       

 02-28-2011
2.50
Placed L.H. wing in cradle. Started R.H wing asm
Details
       

 02-28-2011
5.50
Adjusted Stall Warning. Checked Nav/strobe wiring,
Details
       

 02-26-2011
3.50
Installed wing tip light fairing
Details
       

 02-25-2011
2.00
Installed Nav.strobe connector. Loctite added to B
Details
       

 02-23-2011
5.00
Flox applied to L.H. tip fairing. Deburred R.H. w
Details
       

 02-22-2011
4.00
Completed L.H. flaperon. started L.H. nav/strobe i
Details
       

 02-22-2011
3.50
Completed L.H. flaperon Started L.H. hnv/strobe in
Details
       

 02-21-2011
1.00
Riveted skins to ribs and spar
Details
       

 02-21-2011
2.00
Deburred Flaperon ribs
Details
       

 02-21-2011
6.50
Assembled L.H. Flaperon
Details
       

 02-19-2011
3.50
Finished L.H. wing tip, Fabricated Flaperon Bracke
Details
       

 02-17-2011
3.00
Closed out L.H. Wing tip
Details
       

 02-16-2011
3.50
Riveted wing tip components
Details
       

 02-15-2011
1.00
Completed Wing Cradle
Details
       

 02-15-2011
2.00
Completed riveting top skins on wing
Details
     

 02-15-2011
5.00
Completed riveting on top skins on L.H. wing
Details
     

 02-14-2011
2.00
fitted and riveted wing walk doubler to l.h. wing
Details
     

 02-14-2011
2.50
Fabricated wing support
Details
       

 02-12-2011
5.00
Fitted top l.h. wing skins
Details
       

 02-10-2011
1.50
Installed Flaperon hinge brackets
Details
     

 02-09-2011
5.00
Completed riveting L.H. Bottom skins.
Details
       

 02-08-2011
4.50
Riveting bottom skins
Details
       

 02-05-2011
1.50
Final adjust stall warning, instslled terminal bra
Details
       

 02-04-2011
5.50
Riveted L.H. Wing ribs, Fabricated stall warner
Details
       

 02-03-2011
4.00
Assembled main ribs to main and rear spar
Details
       

 02-02-2011
2.00
Prepped fwd wing ribs
Details
       

 02-01-2011
1.00
Assemembled wing rear spars
Details
       

 01-31-2011
1.50
Riveted Rib Clips to Left wing spar
Details
       

 01-31-2011
4.50
Fabricated Flaperon Hinges
Details
     

 01-30-2011
3.00
Labled storage boxes, Stored parts
Details
     

 01-29-2011
3.00
Completed Inventory of parts
Details
       

 01-29-2011
2.00
Broke down shipping crates
Details

 01-26-2011
2.00
Took Delivery of Wing and Lighting Kits
Details
       

 12-31-2010
1.50
Installed Vstab and Rudder top fairings
Details
       

 12-29-2010
2.00
Fabricated anti servo Linkage
Details
       

 12-27-2010
5.00
Installed anti Servo Tabs, started trim system
Details
       

 12-24-2010
2.00
Installed stabilator
Details
       

 12-24-2010
2.00
Installed the stabilator
Details
       

 12-24-2010
2.00
Install Stabilator
Details
       

 12-22-2010
3.00
Installed vertical stab and rudder
Details
       

 12-22-2010
3.00
Installed Vertical Stab and rudder
Details
       

 12-22-2010
1.00
Fabricate support for empennage
Details
       

 12-22-2010
1.00
Fabricate empennage support
       

 12-18-2010
1.50
Finished riveting top skin
Details
       

 12-18-2010
1.50
Brokedown and salvaged Empennage shipping crate

 12-17-2010
4.00
Assembled and clecoed top skin
       

 12-15-2010
4.00
Asm. Side Skins
Details
       

 12-14-2010
2.00
Installed Static ports/Clecoed Upper L.H. Skin
Details
       

 12-11-2010
1.50
Assembling Empennage
Details
       

 12-10-2010
5.50
Rear Empennage Assembly
Details
       

 12-10-2010
4.00
Assemble Rear empennage
Details
       

 12-08-2010
3.00
Complete Aft Bulkhead
Details
     

 12-07-2010
2.50
Fabricate the Aft Bulkhead
Details
       

 12-06-2010
3.50
Fabricating frames
Details
       

 12-05-2010
2.00
Completed riveting on Hstab
Details
       

 12-04-2010
4.00
Riveting hstab skins
Details
       

 12-03-2010
2.00
Prep hstab for riveting
Details
       

 12-02-2010
2.00
Assemble hstab ribs
Details
     

 11-28-2010
3.00
Assemble hstab ribs
Details
       

 11-27-2010
5.00
Assemble hstab spar box
Details
     

 11-26-2010
3.50
Start Hstab spar box
Details
       

 11-25-2010
7.00
Fabricate anti-servo tabs
Details

 11-22-2010
4.00
Final asm. rudder
Details
     

 11-20-2010
3.50
Prep, assemble rudder
Details
       

 11-19-2010
3.50
final asm. vstab
Details
       

 11-19-2010
6.50
final asm vstab
Details
     

 11-17-2010
2.00
Fab vertical stab - csking, lable making, inventor
Details
       

 11-14-2010
1.00
fab V-stab main spar - deburring
       

 11-13-2010
4.00
Fab v-stab spar
Details
       

 11-10-2010
2.00
Inventory
Details
       

 10-26-2010
8.00
Build Tables
       