Powered By Kitlog Pro v2.0
GERALD'S WEB SITE
RV9-A
All
Work Logs Found:
204
Category Work Time:
730 Hours
Date
Hours
Work Log Summary
Details
03-15-2015
14.00
Riviting Bottom skin on center section
Details
03-07-2015
3.00
Lower Fusewlage Riveting
Details
02-08-2015
12.00
Lower center fuselage preping
Details
02-01-2015
6.00
Rivet Rear Lower Fuselage
Details
01-25-2015
16.00
Rear Fuselage Assembly
Details
12-20-2014
80.00
Fuselage Pre-Assembly
Details
04-06-2014
8.00
Fire Wall
Details
03-18-2014
5.00
Right Wing Completed
Details
03-17-2014
5.00
Right Wing Top Bottom Skins
Details
03-16-2014
8.00
Right Wing
Details
03-15-2014
8.00
Right Wing Bottom Skin
Details
03-11-2014
3.00
Rivet Right Wing top skins
Details
03-10-2014
5.00
Right top wing skin
Details
03-09-2014
3.50
Right Wing Top Skins
Details
03-08-2014
8.00
Right Wing Top Skins
Details
03-01-2014
6.00
Installed Aileron and Flap Hinges
Details
02-08-2014
3.00
Right wing Fuel Tank
Details
01-18-2014
1.00
Right wing inspection
Details
01-04-2014
40.00
Built Right Wing Structure and Fuel Tank
Details
09-22-2013
9.00
Right Wing
Details
09-02-2013
1.00
Move the left wing to the airport
Details
09-01-2013
8.00
Installing the bottom skins
Details
08-24-2013
8.00
Pitot Tube
Details
08-18-2013
6.00
Left wing wiring
Details
04-21-2013
5.00
Bell Crank
Details
04-21-2013
4.00
Aileron Push Rods
Details
04-14-2013
6.00
Flap & Aileron
Details
04-06-2013
8.00
Flap & Aileron
Details
01-27-2013
8.00
Flaps
Details
01-26-2013
8.00
Started the Flaps
Details
01-20-2013
16.00
Built both ailerons
Details
11-24-2012
6.00
Flap and Aileron Hinges
Details
11-17-2012
0.00
My Dad
Details
11-17-2012
3.00
Fuel tank mounted on the left wing
Details
11-17-2012
8.00
Flap & Aileron Hinges
Details
08-04-2012
4.00
Pro-Sealed Right Fuel Tank Ribs
Details
06-16-2012
6.00
Fuel Tanks
Details
02-25-2012
2.00
Leading Edge Installed
Details
02-23-2012
1.00
Ductworks HID Landing Light
01-28-2012
4.50
Landing Light
Details
01-14-2012
4.00
Still riveting on the top left wing skin
01-07-2012
4.00
Riveting Left top wing skin
12-26-2011
0.30
Counter Sinking
12-25-2011
0.30
Priming Inside of Left Wing
12-24-2011
4.50
Dimpling Left Wing Skins
12-18-2011
3.00
Debur Left Wing Skins
Details
11-13-2011
2.50
Rivet Left Wing Leading Edge
Details
11-06-2011
0.50
Dimple the Left Wing Leading Edge
Details
11-05-2011
3.00
Priming of Left Leading Edge Ribs
Details
10-30-2011
25.00
Match Drill Wing Skins
Details
10-30-2011
3.00
Leading edge match drilled
Details
05-28-2011
5.00
Inventory
Details
05-22-2011
0.00
Kit Arrival
Details
04-30-2011
9.00
Left Tank 4-6 Rib
Details
04-23-2011
3.00
Left Tank 3rd rib
Details
04-16-2011
3.00
Left Tank 2nd rib
Details
04-10-2010
3.00
Left fuel Tank Ribs
Details
04-03-2009
5.00
Left Fuel Tank Assembly
Details
04-03-2009
2.00
Fabricate Balance for Sealant
Details
03-11-2009
1.50
Left Tank Misc
Details
03-09-2009
2.00
Left Tank Prep
Details
03-08-2009
5.00
Dimpling left Tank Skin
Details
03-07-2009
5.00
DRDT-2 Support Table
Details
03-04-2009
3.00
DRDT-2 Support Table
Details
02-28-2009
3.00
Left Tank deburring
Details
02-27-2009
3.00
Left Fuel Tank Modifications
Details
02-25-2009
3.00
Left Tank inboard Rib Mods
Details
02-19-2009
3.00
T-410 Rib Reninforcements
Details
02-16-2009
2.00
T-905 Attach angles
Details
02-15-2009
2.00
Fabricate T-905
Details
02-14-2009
1.00
Tank attach brackets
Details
02-08-2009
1.00
Tank Attach Angles
Details
02-07-2009
3.00
More left tank prep
Details
02-07-2009
1.00
Countersink tank skin
Details
02-05-2009
2.50
Left tank brackets
Details
02-04-2009
3.00
Left Tank
Details
02-03-2009
2.00
Left Leading Edge
Details
02-02-2009
2.00
Left Tank Prep
Details
02-01-2009
2.00
Fit leading edge Splice piece
Details
01-31-2009
2.00
Pre-assembled outboard leading edge.
Details
01-19-2009
1.50
Mounting Left wing skeleton on Stand
Details
01-16-2009
1.00
Riveting Wing Ribs
Details
01-15-2009
2.50
Left Wing Skeleton assembly
Details
01-10-2009
3.50
Priming Left Wing Ribs
Details
10-01-2006
2.00
Deburring Wing Ribs
Details
09-23-2006
2.50
Wing Rib Deburring
Details
09-16-2006
4.00
Wing stands
Details
09-15-2006
2.00
Rear Spar Prep
Details
09-12-2006
1.00
Trimmed 907C Rear Spar Reinforcement
Details
09-10-2006
4.00
Rear Spar Prep
Details
09-08-2006
0.50
Begin rear wing spars
Details
09-07-2006
1.50
Fab Tie Down Points
Details
09-06-2006
2.00
Spar doubler attach plate nuts
Details
09-03-2006
4.00
Countersinking Fuel Tank Attach
Details
02-01-2006
1.00
CS Tank attach
Details
01-27-2006
1.00
Prepare spar
Details
09-22-2005
1.50
Deburring left elevator skin
Details
09-15-2005
1.00
Drilled left elevator tip
Details
09-14-2005
1.00
Drilled elvator trim hinge
Details
09-13-2005
1.00
Drilled elevator trim hinge
Details
06-28-2005
2.25
Right elevator assembly
Details
06-27-2005
1.00
Riveting right elevator spar
Details
06-26-2005
3.00
Riveting right elevator spar
Details
06-21-2005
4.00
Prime right elevator skin
Details
06-19-2005
3.00
Assemble right elevator skeleton
Details
06-18-2005
2.50
Primed right elevator skeleton
Details
06-10-2005
2.00
Dimpled right elevator skin
Details
06-09-2005
1.00
Dimpling right elevator skin
Details
06-06-2005
1.50
Dimpling right elevator
Details
05-21-2005
3.00
Drill, Deburr, Dimple Right Elevator
Details
05-18-2005
2.00
Drill right elevator trailing edge
Details
05-02-2005
1.00
Right elevator counterbalance arm
05-01-2005
0.25
Beveled Right elevator counterbalance skin
Details
04-22-2005
1.00
Dimple left elevator stiffeners
Details
04-21-2005
2.00
Dril left elevator stiffeners
Details
04-20-2005
1.50
Dimple right elevator stiffeners
Details
04-19-2005
1.50
Drilled and deburr right elevator
Details
04-18-2005
1.50
Drill right elevator stiffeners
Details
04-06-2005
1.00
Deburring elevator parts
Details
03-20-2005
3.00
Rudder botton fitting
Details
03-13-2005
1.50
Rivet Botton rudder rib
Details
03-12-2005
3.00
Bond Rudder Trailing Edge
Details
03-06-2005
3.00
Rivet rudder leading edge
Details
03-05-2005
2.50
Rivet Rudder Skin to skeleton
Details
03-01-2005
2.00
Elevator Stiffeners
Details
02-27-2005
1.50
Rivet Rudder stiffeners
Details
02-26-2005
3.00
Prime rudder parts
Details
02-24-2005
1.50
Rivet rudder skeleton
Details
02-22-2005
4.00
Prime Rudder Skeleton
Details
02-21-2005
1.00
Rolled Rudder Leading Edge
Details
02-20-2005
2.00
Finish deburring rudder parts
Details
02-19-2005
1.00
Countersink Rudder AEX Wedge
Details
02-13-2005
1.00
Finished Dimpling Rudder Skins
Details
02-06-2005
3.00
Technical Counselor Visit
Details
02-05-2005
2.00
Dimpling Rudder Skins
Details
02-04-2005
1.50
Dimpling Rudder parts
Details
02-03-2005
1.50
Deburring rudder parts
Details
02-01-2005
2.50
Deburring rudder parts
Details
01-31-2005
1.50
Dissassemled Rudder
Details
01-27-2005
1.50
Drilled rudder bottom attachments
Details
01-17-2005
4.50
Rudder initial assembly
Details
01-06-2005
1.50
Finished Rudder stiffeners
Details
01-04-2005
0.75
Deburr and dimple rudder stiffeners.
Details
12-29-2004
1.50
Rudder Stiffeners
Details
12-22-2004
1.00
Trimming rudder stiffeners.
Details
12-22-2004
2.00
Finished riveting VS
Details
12-21-2004
2.00
rivet VS skin
Details
12-20-2004
2.50
Rivet VS skin
Details
12-19-2004
2.50
Riveted VS Skeleton
Details
12-18-2004
2.00
Primed VS skin and spars
Details
12-16-2004
2.00
Primed VS ribs
Details
11-21-2004
0.25
Remove plastic from VS skin
Details
11-20-2004
0.25
Mixed Primer Sealer
Details
11-06-2004
2.00
Counteer VS spar doubler
Details
11-05-2004
1.00
Dimple VS rear spar
Details
10-30-2004
2.00
VS spar doubler lightening holes
Details
10-29-2004
1.00
Deburr VS rear spar doubler
Details
10-26-2004
0.50
VS skiin dimpling
Details
10-24-2004
0.75
VS skin Dimpling
Details
10-20-2004
0.50
VS skin dimpling
Details
10-15-2004
1.50
Deburr and Dimple VS spars
Details
10-14-2004
0.75
Dimple VS ribs
Details
10-13-2004
0.75
Drill VS Skin
Details
10-10-2004
2.50
VS Skeleton preassembly
Details
10-09-2004
1.00
VS rar spar assembly
Details
10-02-2004
2.00
HS rear spar riveting
Details
10-01-2004
2.00
Left HS skin and inboard bearing
Details
09-27-2004
2.00
HS outboard main ribs
Details
09-25-2004
4.00
Right HS skin
Details
09-24-2004
2.00
Riveting right HS
Details
09-23-2004
2.00
Finish right HS nose ribs
Details
09-22-2004
0.75
Right HS nose ribs
Details
09-21-2004
1.00
Rivet left HS skin
Details
09-20-2004
0.50
Riveting left HS skin
Details
09-19-2004
2.25
Riveting left HS skin
Details
09-18-2004
4.00
TC visit, begin assembly of right HS
Details
09-16-2004
2.50
Left HS int. ribs
Details
09-15-2004
1.50
Finish left HS nose ribs
Details
09-14-2004
1.00
Riveting left HS nose ribs
Details
09-13-2004
0.50
Left HS nose ribs
Details
09-12-2004
2.50
Finish HS Spars
Details
09-11-2004
5.00
HS Riveting
Details
09-07-2004
2.00
HS Priming
Details
09-06-2004
2.00
HS Priming
Details
09-04-2004
2.00
HS dimpling
Details
09-03-2004
2.00
Left HS spars
Details
09-02-2004
2.00
Left HS deburring and dimpling
Details
09-01-2004
2.00
left HS drilling
Details
08-31-2004
2.00
HS dimpling and countersinking
Details
08-30-2004
1.00
HS skin dimpling
Details
08-29-2004
2.50
C-frame table
Details
08-28-2004
2.75
C-Frame table
Details
08-27-2004
1.25
HS Countersinking
Details
08-26-2004
3.50
HS dimpling and countersinking
Details
08-25-2004
3.00
HS drilling/deburring
Details
08-24-2004
3.00
HS deburring/preassembly
Details
08-20-2004
2.00
HS deburring
Details
08-14-2004
3.00
HS skeleton match drilling/deburring
Details
08-14-2004
3.00
HS pre-assembly/deburr
Details
08-13-2004
3.50
Finish replacement attach angles
Details
08-12-2004
1.00
HS attach angle replacment
Details
08-11-2004
4.00
HS Attach Angles
Details
08-10-2004
3.00
HS Match Drilling
Details
08-09-2004
2.00
Empennage Inventory
Details
SITE NAVIGATION
Contact Builder
RV9-A Home
Category
# Logs
# Hours
All
204
730
Empennage
106
203
Fuselage
7
139
Kit Builder Transfer
2
5
Tools
5
15
Wings
84
368
Copyright © 2001-2024 Matronics. All Rights Reserved.