Powered By Kitlog Pro v2.0
Marks Sling Project
Sling
All
Work Logs Found:
133
Category Work Time:
550 Hours
Date
Hours
Work Log Summary
Details
08-20-2012
8.00
ZU-FUA new name!
Details
07-24-2012
0.00
Engines
Details
07-23-2012
0.00
Oshkosh
Details
07-17-2012
5.00
Start prepping
Details
07-15-2012
10.00
Side skin & seat area
Details
07-11-2012
5.00
Roll cage
Details
07-09-2012
2.00
wing spacer lug
Details
07-05-2012
1.00
Antenna doubler
Details
07-02-2012
10.00
Internal Skins
Details
07-01-2012
3.00
Throttle control
Details
07-01-2012
5.00
Controls
Details
06-23-2012
10.00
Parachute Box
Details
06-23-2012
0.50
Nosewheel
Details
06-23-2012
0.50
Inspection hatch
Details
06-23-2012
0.25
Hydrolic resevoir
Details
06-23-2012
0.00
Completed Parachute box
Details
06-21-2012
2.50
Rudder Pedals
Details
06-20-2012
1.00
Side rail
Details
06-20-2012
1.00
Firewall
Details
06-20-2012
2.00
Collect finishing kit
Details
06-20-2012
1.00
Canopy rails
Details
06-18-2012
3.00
FIt interior skins
Details
06-13-2012
2.00
Canopy Rail
Details
06-05-2012
6.00
fixes after inspection
Details
06-05-2012
5.00
cowl retaining strips
Details
06-04-2012
3.00
Inspection
Details
06-02-2012
5.00
Fit wheel assembly
Details
05-31-2012
5.00
ready for inspection?
Details
05-20-2012
5.00
Realign skins and firewall
Details
05-19-2012
5.00
Detailing Fuselage
Details
05-18-2012
4.00
Fit Undercarriage
Details
05-16-2012
5.00
Prepare for painting
Details
05-14-2012
1.00
Paint Parachute box assembly
Details
05-14-2012
1.00
Main Wheels
Details
05-14-2012
2.00
Front Fork Assembly
Details
05-09-2012
5.00
Slider Rails
Details
05-07-2012
3.00
Canopy slider
Details
05-06-2012
5.00
sundry
Details
05-05-2012
5.00
Lining Up
Details
05-05-2012
5.00
Joining front and rear
Details
05-04-2012
1.00
Soundproofing
Details
05-04-2012
1.00
Skins and Rails
Details
05-04-2012
1.00
Hooking up
Details
05-04-2012
7.00
Floor
Details
05-04-2012
0.25
Autopilot Bracket
Details
05-04-2012
0.00
Aeleron and elevator stops
Details
05-03-2012
8.00
Top Skins
Details
05-03-2012
3.00
Fit upper skins
Details
05-02-2012
8.00
Fit skins
Details
04-30-2012
2.00
Details
04-27-2012
8.00
Assemble and check Golf club luggage assembly
Details
04-24-2012
4.00
Seat sliders
Details
04-23-2012
1.00
Wing tips
Details
04-04-2012
2.50
Rivet centre fuselage components
Details
04-02-2012
3.00
Centre fuselage
Details
04-01-2012
16.00
Centre Fuselage
Details
03-29-2012
6.00
Factory visit
Details
03-28-2012
2.00
Mid fuselage
Details
03-27-2012
2.00
Mid fuselage
Details
03-26-2012
2.00
Centre Fuselage gear and seat mounting
Details
03-26-2012
1.00
Cent Fuselage rear cap assly
Details
03-25-2012
1.50
Cleco skins
Details
03-22-2012
1.00
Start fitting skins
Details
03-22-2012
3.00
Rivet tail tie down assy
Details
03-21-2012
0.50
Fit Rudder cable guides
Details
03-20-2012
3.00
Rear fuselage
Details
03-19-2012
2.00
Route Wiring
Details
03-15-2012
6.00
Preparation
Details
03-14-2012
3.00
Assembly
Details
03-13-2012
4.00
Ribs
Details
03-13-2012
8.00
Rear fuselage
Details
03-11-2012
5.00
Complete riveting
Details
03-10-2012
5.00
Seats
Details
03-05-2012
2.50
Seat
Details
02-29-2012
15.00
Seats
Details
02-29-2012
4.00
Seat
Details
02-27-2012
1.00
Headrests
Details
02-16-2012
7.00
Fuel tank
Details
02-15-2012
2.00
Collect Fuselage
Details
02-14-2012
2.00
lower skin - tiedown bracket
Details
02-14-2012
2.00
Fit lower skin
Details
02-11-2012
4.00
ribs
Details
02-09-2012
1.00
wing inspection before closing
Details
02-09-2012
5.00
Inspection
Details
02-08-2012
5.00
Wings and things
Details
02-06-2012
2.00
Strobe wiring & skin preparation
Details
02-03-2012
14.00
Wing assembly
Details
02-02-2012
3.00
Rear spar problem
Details
02-02-2012
1.00
Fuel tank rear plate
Details
01-31-2012
3.00
Jig setup
Details
01-30-2012
2.00
Paint
Details
01-14-2012
14.00
wing tips
Details
01-10-2012
6.00
fit fuel tank left
Details
12-08-2011
13.00
fuel tanks -
Details
11-28-2011
5.00
Fuel tanks
Details
11-22-2011
11.00
left fuel tank
Details
11-17-2011
12.00
Rivet
Details
11-16-2011
5.00
visit factory
Details
11-14-2011
6.00
Fuel tanks
Details
11-12-2011
3.00
Left fuel tank
Details
11-02-2011
11.00
Wing
Details
10-31-2011
9.00
Preparation
Details
10-29-2011
3.50
lose wing
Details
10-27-2011
1.00
inspection
Details
10-21-2011
2.00
Step Forming Tool
Details
10-20-2011
2.00
Pitot tubing fit
Details
10-13-2011
2.00
Step tool
Details
09-22-2011
5.00
Jig setup
Details
09-18-2011
20.00
update
Details
08-31-2011
6.00
Preparation -
Details
08-17-2011
1.00
Collect wings and unpack
Details
08-16-2011
0.50
Laser Level
Details
08-13-2011
2.00
First AP inspection
Details
07-23-2011
10.00
Summary so far...........
Details
07-20-2011
10.00
Elevator & HS - Rivet skins
Details
07-18-2011
3.00
Fit skin to elevator
Details
07-17-2011
3.00
Redo bracket cover / support
Details
07-16-2011
10.00
Questions for factory
Details
07-12-2011
0.10
Rivet Shortening
Details
07-12-2011
0.50
Bending brake
Details
07-06-2011
4.00
Preparation of elevator and trim
Details
06-30-2011
4.00
Vertical stabiliser - asmbly
Details
06-29-2011
6.00
Rudder & Vert stabiliser
Details
06-28-2011
2.50
Rudder preparation
Details
06-27-2011
3.50
Preparation - rudder
Details
06-22-2011
2.00
Paint Primer
Details
06-21-2011
2.00
Vertical Stabiliser - preparation
Details
06-20-2011
3.00
Plastic removal and deburring
Details
06-19-2011
0.50
Inventory Check
Details
06-19-2011
3.00
Dry fitting support spars
Details
06-15-2011
0.00
Collect first part of kit - empennage
Details
06-14-2011
4.00
Workshop preparation
Details
05-18-2011
0.00
Visit Factory and test drive!
Details
SITE NAVIGATION
Contact Builder
Sling Home
Category
# Logs
# Hours
All
133
549
Empennage
15
64
Engine
1
0
Fuselage
60
239
Gadgets and Gizmos
5
5
Inspections
5
9
Miscellaneous
4
8
Paint
3
8
Preliminary
1
Undercarriage
7
24
Wings
31
188
Workshop
1
4
Copyright © 2001-2024 Matronics. All Rights Reserved.