Powered By Kitlog Pro v2.0
DONALD'S WEB SITE
Lancair Evolution
All
Work Logs Found:
47
Category Work Time:
185 Hours
Date
Hours
Work Log Summary
Details
08-26-2011
4.00
Fabricate Induction System
Details
08-26-2011
2.00
Assemble Induction System to Engine
Details
08-26-2011
4.00
Assemble Engine Cowling to Airframe
Details
08-25-2011
2.00
Fabricate Vertical Stabilizer
Details
08-25-2011
6.00
Assemble Seats to Cockpit
Details
08-24-2011
3.00
Landing Gear Actuation System
Details
08-24-2011
1.00
Landing Gear Actuation
Details
08-24-2011
3.00
Fabricate Seat Brackets and Fittings
Details
08-24-2011
3.00
Assemble Landing Gear
Details
08-23-2011
2.00
Fabricate Engine Cowling
Details
08-23-2011
2.00
Fabricate brackets and fittings
Details
08-23-2011
2.00
Assemble Propeller to Engine
Details
08-23-2011
4.00
Assemble Engine Cooling Baffles
Details
08-22-2011
8.00
Assemble Engine to Engine Mount
Details
07-15-2011
1.00
Conductive paint for radios
Details
07-14-2011
6.00
Rudder pedals
Details
07-13-2011
4.00
Instrument Panel
Details
07-13-2011
4.00
Elevator Trim
Details
07-12-2011
8.00
Rudder cables
Details
07-11-2011
8.00
Landing Gear Door
Details
06-10-2011
1.00
Fabricate Aileron Trim
Details
06-10-2011
2.00
Assemble Rudder to Vertical Stabilizer
Details
06-09-2011
4.00
Fabricate Main Gear Wheel
Details
06-08-2011
4.00
Main Gear Leg
Details
06-08-2011
4.00
Flaps
Details
06-08-2011
3.00
Ailerons
Details
06-07-2011
4.00
Cockpit door
Details
06-07-2011
3.00
AC duct
Details
06-06-2011
1.00
Fabricate Fuselage Fuel System Components
Details
06-06-2011
1.00
Fabricate Bulkead
Details
06-06-2011
1.00
Fabricate Brakets and Fittings
06-06-2011
1.00
Assemble Fueslage Fuel System Ccomponents
Details
06-06-2011
1.00
Assemble Control Yokes/Sticks
Details
06-06-2011
2.00
Assemble Brackets and Fittings
Details
04-22-2011
8.00
Finish Horizontal Stabilizer
Details
04-21-2011
8.00
Landing Gear
Details
04-20-2011
4.00
Install Horizontal Stabilizer
Details
04-19-2011
8.00
Set Horizontal Stabilizer
Details
04-18-2011
8.00
Window Installation
Details
04-18-2011
1.00
Fuel Cell Pressurization
Details
04-18-2011
1.00
Elevator trim
Details
04-15-2011
8.00
Trim Wings
Details
04-14-2011
8.00
Left Wing & Horizontal Stabilizer
Details
04-13-2011
8.00
Right Wing & Elevator
Details
04-12-2011
8.00
Wiring, tubes, nut plates
Details
04-11-2011
2.00
Fabricate tubes
Details
04-11-2011
4.00
Close Horizontal Stabilizer
Details
SITE NAVIGATION
Contact Builder
Lancair Evolution Home
Category
# Logs
# Hours
All
47
185
Avionics
1
4
Empennage
5
16
Engine
7
26
Fuselage
17
54
Interior
2
9
Wings
15
76
Copyright © 2001-2024 Matronics. All Rights Reserved.