Work Logs Found: 623
Category Work Time: 1329 Hours
 Date
Hours
Work Log Summary

Details

 12-28-2013
2.00
DAR N913BC APPROVAL
Details
       

 12-26-2013
1.50
Completed prep for inspection
Details
     

 12-25-2013
2.50
Repaired cowl
Details
       

 12-23-2013
2.00
Prep for inspection. Fuel tank removal.
Details

 12-15-2013
1.00
Performed another fuel flow test
Details
       

 12-15-2013
2.50
Misc Final PA items
Details
       

 12-08-2013
2.00
Balanced carbs
Details
       

 12-07-2013
1.50
Repitched prop and began carb sync

 12-01-2013
1.00
Ran engine, check ignition modules
Details
     

 12-01-2013
2.50
Calibrated Fuel System
Details

 11-24-2013
1.00
Completed weighing aircraft
Details
       

 11-23-2013
3.00
Attached fairings, cowl and began W&B
Details

 11-17-2013
6.00
Worked on items to get ready for weight and balanc
Details

 11-11-2013
3.00
Installed interior carpet, sidewalls
Details
       

 11-10-2013
5.00
Began installing interior kit in order to do weigh
Details

 11-09-2013
4.50
Ran Engine, began other tests
Details

 10-29-2013
2.00
Oil purged engne
Details

 10-26-2013
3.00
Test run engine 3X
Details
       

 10-26-2013
2.50
Finished tidying up hanger
       

 10-26-2013
2.00
Adjusted right stabilator aft skin to better align
Details
       

 10-25-2013
0.25
Reinstalled Wings after panels, seatbelts attached
       

 10-25-2013
2.50
Moved Hanger
Details

 10-25-2013
4.00
Installed center channel panel and seat belts

 10-21-2013
1.00
Checked rocker arms after engine test run
Details

 10-20-2013
2.50
Test Run Engine
Details

 10-20-2013
3.00
Fabricated tool for propeller pitch measures
Details
       

 10-19-2013
1.50
Added coolant and air filters to engine
Details
     

 10-06-2013
4.50
Fuel System Test
Details
       

 10-06-2013
0.50
AST alignment
Details
       

 09-29-2013
1.00
Reinstalled the upper fuselage
Details
     

 09-29-2013
1.50
Rechecked torques, spark plug gaps
Details

 09-29-2013
2.00
Added FTS and installed fuel filler tube
Details
       

 09-29-2013
0.50
Added FTC to firewall wire opening
     

 09-28-2013
5.00

Details
     

 09-27-2013
1.50
Reinstalled ELT to aircraft and tested
Details
       

 09-22-2013
3.00
Trimmed flapperons and wing skins
Details
       

 09-15-2013
1.25
Purged oil into engine
Details
     

 09-15-2013
2.50
Bled brake lines
Details
       

 09-14-2013
3.25
Updated S/W and other misc steps
Details
       

 09-02-2013
0.50
Loaded latest S/W and began configuration

 09-02-2013
2.00
Began to add warnings & placards to aircraft
       

 09-02-2013
1.00
Attached spinner, cleaned up hanger took pictures

 08-30-2013
0.25
Temp Wired Oil Cooler to engine for test firing.

 08-30-2013
3.00
Installed rear window into aircraft
Details
       

 08-30-2013
0.25
Completed SB 13-08-08
Details
       

 08-30-2013
0.75
Added air to tires and cleaned up shop

 08-18-2013
3.00
Reattached turtle deck window to the fuselage
Details
       

 08-17-2013
2.00
Removed vinyl from fuselage
Details
       

 08-10-2013
3.75
Installed flaperon control hardware
Details
     

 08-10-2013
0.50
Corrected connector wiring for the pulse lighting
Details

 08-10-2013
1.50
Began to remove turtle deck window

 08-09-2013
3.50
Matched drilled flaperon torque tubes
Details
       

 07-28-2013
1.00
Misc work in hanger
Details

 07-28-2013
1.50
Completed stabilator cable install
Details

 07-28-2013
0.50
Attached flapperons to wings
Details
     

 07-27-2013
4.00
Fit wings and temporarily installed them
Details
       

 07-26-2013
3.00
Installed stabilator cables
Details
       

 07-14-2013
1.00
Finished AST assemblies install and trim servo att
Details
       

 07-13-2013
0.75
Rudder fully installed with cables
     

 07-13-2013
1.50
Installed stabilator to tailcone.
Details
       

 07-13-2013
1.00
Installed Control Horns & Counter balance to stabi

 07-13-2013
0.75
Finished attachment of rudder to aircraft

 07-12-2013
1.00
Reattached spinner and propeller

 07-12-2013
1.00
Attached V-stabilator to aircraft

 07-07-2013
2.50
Finished fabrication of spacer
Details
       

 07-06-2013
2.50
Began fabrication of propeller spacer
Details
     

 07-05-2013
1.00
Removed propeller spinner from aircraft
Details

 07-05-2013
2.50
Organized and cleaned hanger

 07-04-2013
1.00
Began organizing hanger
Details

 06-29-2013
4.00
Moved fuselage to Hanger
Details
       

 06-25-2013
1.50
Fabricated wood frame chocks for aircraft move

 06-24-2013
1.50
Sanded aft edge of spinner
Details
       

 06-21-2013
1.00
Began sanding spinner backplate
Details

 06-17-2013
1.50
Reinstalled pushrods
Details

 06-15-2013
1.50
Installed tubing for AOA option later
Details

 06-15-2013
3.00
Installed most of throttle and choke cables
Details
       

 06-15-2013
1.00
Begain reinstalling h/w to center channel per plan

 06-15-2013
0.50
Added tie wraps to antenna cable in tail
       

 06-14-2013
2.50
Installed most of ADS-B antenna in tailcone
Details

 06-13-2013
2.00
Removed center channel hardware
Details
       

 06-11-2013
1.50
Re-attached rudder petals and wire guard
Details
       

 06-10-2013
1.75
Removed Rudder Petals, fed antenna cable
Details
     

 06-09-2013
1.50
Installed Blasttube and Regulator Cooling Shroud
       

 06-09-2013
2.00
Finished install of oil cooler and repaired sensor
Details
     

 06-08-2013
1.00
Installed oil hoses up to step 6.
Details
       

 06-08-2013
0.25
Epoxy glued lable to inside of lower cowl
     

 06-08-2013
1.50
Added seals to cowl vent
Details
       

 06-07-2013
2.50
Wet sanded cowl and removed tape
Details
       

 06-07-2013
1.00
Added epoxy/flox to lower cowl gap
Details
     

 06-04-2013
2.50
Moved wings from storage to Hanger
Details

 06-02-2013
0.25
Primed / debured / painted F-00002 Cooling Shroud

 06-02-2013
1.50
Moved tail parts to rented hanger
Details

 06-02-2013
2.00
Epoxy/floxed cooling and interface ducts to cowl
Details
       

 06-01-2013
4.50
Fit the cooling duct to the lower cowl
Details
       

 06-01-2013
1.00
Cut tailpipe
Details
     

 05-31-2013
2.50
Installed oil cooler to cooler duct
Details
     

 05-30-2013
3.00
Completed install of heater door control cable
Details
       

 05-29-2013
1.50
Began installing heater door control cable
     

 05-28-2013
2.00
Installed heat exchanger and hoses
       

 05-26-2013
1.25
Completed oil cooler assembly
Details
       

 05-25-2013
5.00
Installed overflow bottle and began working on coo
Details
       

 05-24-2013
6.00
Installed cooling door and oil tank
Details
       

 05-22-2013
0.50
Installed springs into coolant hoses
Details
       

 05-22-2013
1.00
Installed EGT probes
       

 05-21-2013
2.50
Completed most of muffler install
Details
       

 05-19-2013
0.50
Installed ADS-B box and brackets to SL40 rack
Details
     

 05-18-2013
3.00
Completed spinner install
Details
       

 05-16-2013
2.00
Fabricated and primed back plates for spinner

 05-14-2013
2.00
Aligned spinner and fabricated gap fillers
Details
       

 05-13-2013
2.00
Attached Hub and Propeller
Details
       

 05-12-2013
1.50
Organized tools and cleaned up workshop

 05-12-2013
2.00
Completed prep of the spinner
Details
       

 05-12-2013
1.50
Cleaned up workshop and organized tools

 05-11-2013
0.50
Replaced exisiting oil fitting with new one
Details
     

 05-11-2013
25.00
Completed install of the pitot tube
Details
       

 05-10-2013
1.00
Installed Fuel Drain tube and hose to engine
Details
       

 05-07-2013
2.50
Added additional electical connections to engine
Details
       

 05-06-2013
2.50
Began connecting fuel lines & wiring to engine
Details
       

 05-05-2013
2.00
Mounted Engine
Details
       

 05-05-2013
3.50
Finished stiffener install.
Details
       

 05-05-2013
1.00
Began working on ADS-B install
Details

 05-04-2013
1.00
Riveted firwall brace and cut F-1202N-R & L
Details
       

 05-03-2013
1.00
Match drilled firewall brace
Details

 05-02-2013
2.75
Began Stiffener Retrofit install
Details
       

 05-01-2013
0.75
Inventoried ADS-B Kit from Vans
Details
       

 05-01-2013
1.50
Installed chain hoist in garage
Details
       

 04-29-2013
1.50
Sanded and final epoxed the canopy fairing.

 04-29-2013
0.25
Completed step and read ahead in plans

 04-28-2013
1.00
Sanded fairings and put them in temp storage

 04-28-2013
1.50
Sanded and added another coat of epoxy
Details
     

 04-28-2013
0.50
Installed WH-RV12 Ignition Harness to modules
Details

 04-28-2013
0.45
Drilled 3/8" hole in both gas struts
Details

 04-26-2013
1.00
Removed wheel fairings
Details

 04-23-2013
1.50
Clamp block assembly
Details
       

 04-22-2013
1.25
Installed L & R Drip Pans under carburetor
Details
       

 04-21-2013
2.50
Rotated headset Jacks from L to R
Details

 04-21-2013
0.50
Installed Oil Tank Mount Bracket
Details
       

 04-21-2013
2.00
Drilled holes in lower firewall for the engine att
Details
       

 04-20-2013
1.25
Installed Manifolds and attached ignition module
Details
       

 04-18-2013
0.25
Worked on avionics control module
Details

 04-18-2013
0.50
Began prep on oil tank brace
Details
     

 04-18-2013
1.25
Added RTV to cooling shroud and reattached cooling
Details
       

 04-14-2013
4.00
Worked on fine tuning Skyview adjustments
Details

 04-14-2013
2.50
Completed more engine prep
Details
       

 04-13-2013
3.00
Trim speed adjustment and began working on Skyview
Details
       

 04-13-2013
0.25
Removed crackcase allen screw
     

 04-13-2013
0.75
Finished fitting shroud and removed coolant hoses
Details
       

 04-10-2013
0.75
Installed replacement starter relay
Details

 04-10-2013
1.50
Completed fitting of cooling shroud
Details
       

 04-08-2013
2.75
Continued to work on engine
Details
       

 04-08-2013
0.25
Another coat on part of canopy
Details
     

 04-07-2013
1.50
Removed several items from engine per plans
       

 04-07-2013
1.00
Prepared canopy for another coat of black epoxy
Details
       

 04-06-2013
2.50
Began working on Rotax engine
Details
       

 04-03-2013
3.00
Installed various wire connectors in firewall area
Details

 04-02-2013
2.75
Installed several firewall forward wire harnesses
Details
       

 04-01-2013
3.00
Begain installing firewall wiring
Details
       

 03-31-2013
1.00
Inventoried and partially fabricated towbar
Details
     

 03-31-2013
5.00
Finished inventory of the engine kit
Details
       

 03-30-2013
0.45
Continued unpacking engine kit crate
Details
       

 03-29-2013
1.50
Began unpacking engine kit crate
       

 03-20-2013
1.50
Sanded canopy to prep for next epoxy coat

 03-17-2013
3.50
Installed ELT into fuselage
Details
       

 03-17-2013
1.50
Installed ADHRS to tailcone bracket
Details
       

 03-17-2013
1.50
Cleared around shop and vaccumed interior of fusel

 03-13-2013
1.50
Misc
Details

 03-12-2013
2.00
Installed the GPS antenna
Details
       

 03-11-2013
1.50
Installed battery into ELT interior warning
Details
     

 03-10-2013
3.00
Partially installed ELT H/W
Details
       

 03-09-2013
5.00
Installed most of SkyView Avionics
Details
       

 03-07-2013
3.00
Began installing Avionics
Details
       

 03-06-2013
2.00
Inventory of Avionics Shipment
Details
       

 02-24-2013
0.50
Drilled out and epoxyed right side fairing
Details
       

 02-24-2013
2.50
Applied fuel tank sealant to firewall
Details
     

 02-24-2013
0.50
Adjusted fit of left fairing front/rear halves

 02-09-2013
4.00
Completed Installation of Main Wheel Fairings
Details
       

 02-02-2013
4.00
Trimmed and attached both main wheel fairings
Details
       

 01-30-2013
1.25
Attached Right Wheel Fairing
Details

 01-20-2013
2.00
Fit left wheel pant to gear leg
Details
       

 01-17-2013
3.00
Installed brake lines along gear legs
Details
       

 01-10-2013
0.00
Purchased tool bench
Details
     

 01-07-2013
1.50
Torqued all the center channel bolts
Details

 01-06-2013
5.00
Re-attached main gear legs to center fuselage
Details
       

 12-30-2012
3.75
Match drilled outboard attach wear plates
Details
       

 12-29-2012
3.25
Added bevels to U-1202 and deburred U-1202C/D wear
Details
       

 12-28-2012
4.50
Riveted brackets & skin doublers to fuselage
Details
       

 12-26-2012
5.75
Completed steps 21 to 29
Details
       

 12-25-2012
2.00
Completed steps 13-20
Details

 12-24-2012
1.00
Completed Step 12
Details

 12-21-2012
0.50
Tapped main gear fairing attach plates

 12-21-2012
0.50
Misc. shop cleanup

 12-21-2012
2.50
Finalized canopy install
Details
       

 12-21-2012
1.50
Began work on SB 12-11-09
Details
       

 12-20-2012
6.50
Completed Nose Wheel Fairing
Details
       

 12-18-2012
3.00
Additional work on nose wheel fairing
Details

 12-17-2012
1.50
Riveted nose wheel fairing
Details
       

 12-17-2012
1.00
Inventoried SB parts for side skin stiffening
Details

 12-16-2012
2.25
Epoxy and riveted splice strip to nose wheel fairi
Details
     

 12-16-2012
1.00
Began work on hinge for gear leg fairing
Details
     

 12-16-2012
2.75
Added H/W to nose fork and fitted nose leg fairing
Details
       

 12-15-2012
2.25
Fitted nose wheel fairing halves and worked on spl
Details
       

 12-13-2012
2.00
Wet and dry sanded fairing - removed tape
Details
       

 12-10-2012
1.50
Added epoxy coat to fairing

 12-09-2012
3.50
Trimmed, sanded and fitting of nose wheel fairing
Details
       

 12-09-2012
1.25
Filled canopy attach holes with epoxy/flox
Details
       

 12-08-2012
0.50
Workshop Cleanup

 12-08-2012
4.50
Trimmed Canopy Fairing
Details
       

 12-04-2012
1.00
Sanded and added another epoxy coat

 12-04-2012
1.50
Added nutplates to wheel pant brackets
     

 11-30-2012
1.50
Sanded and added another epoxy coat

 11-28-2012
1.50
Sanded then added epoxy layer to fairing
       

 11-24-2012
2.50
Sanded fairing and added epoxy/micro balloon mixtu
Details
       

 11-24-2012
3.25
Continued to work on main wheel pants
Details
       

 11-22-2012
2.00
Began work on wheel fairings
Details
       

 11-22-2012
0.25
Added more epoxy to aft edge of canopy
     

 11-21-2012
2.50
Sanded and added epoxy coat to fairing
       

 11-11-2012
1.00
Sanded canopy fairing

 11-03-2012
3.50
Layup of top fairing
Details
       

 10-29-2012
1.50
Light sanding of first stage of fairing layup
       

 10-28-2012
3.25
Began layup of canopy fairing left and right sides
Details
       

 10-25-2012
1.00
Cut glass for side fairings
Details
       

 10-24-2012
1.25
Final Fairing Surface Prep
Details
       

 10-23-2012
1.50
Sanded fairing foam and taped template outline
Details
       

 10-21-2012
1.25
Expoxy glued foam fillers to L/R canopy frame
       

 10-21-2012
1.75
Cut glass strips and other canopy fairing prep
       

 10-17-2012
1.25
Canopy foam prep and fitting
       

 10-14-2012
0.50
Shop cleanup

 10-14-2012
1.50
Finished install of rudder petal hardware
Details
     

 10-14-2012
1.25
Began work on canopy skirt
Details

 10-13-2012
3.75
Fit and installed rudder cables
Details
       

 10-07-2012
1.00
Installed pulleys for stabiliator cables
Details
       

 10-07-2012
4.00
Install rudder cable & built rigging stop
Details
       

 10-02-2012
0.50
Removed cowl and tapped remaining nutplates
Details

 10-02-2012
1.50
Organized parts for control parts install
Details

 10-01-2012
0.25
Drilled trim servo linkage hole into lower tailcon

 10-01-2012
2.00
Completed oil door assembly
Details
       

 09-30-2012
5.75
Mostly completed tailcone fairing
Details
       

 09-29-2012
0.50
Temporarily added V.stab to the tailcone
Details
       

 09-29-2012
2.50
Riveted nutplates and cut lower fairing
Details
     

 09-29-2012
1.75
Countersunk tabs
Details
       

 09-28-2012
1.50
Match drilled tabs to fairing
Details
       

 09-27-2012
0.50
Riveted bottom flange of F-1211 to tailcone skins

 09-27-2012
1.50
Attach fitting of tail fairing to tailcone
Details
       

 09-25-2012
1.50
Unpacked seats/interior kit
Details
       

 09-25-2012
0.50
Reinstalled top cowl
Details
       

 09-24-2012
1.50
Installed close out door
Details
       

 09-24-2012
1.00
Cut oil door opening
     

 09-23-2012
1.00
Misc workshop cleanup and organizing

 09-23-2012
3.00
Countersinking then hinge riveting to cowls
Details
       

 09-23-2012
1.50
Added nutplates to front of lower cowl.
Details
       

 09-22-2012
5.00
Cowl hinge drilling and fitting onto fuselage
Details
       

 09-22-2012
1.50
Countersinking of cowl #40 holes
Details
       

 09-20-2012
2.50
Fit Lower Cowl to Fuselage
Details
       

 09-18-2012
2.00
Fabricated and marked cowl hinges
Details
       

 09-15-2012
1.50
Riveted canopy skirt to canopy
Details
       

 09-15-2012
1.50
Installed D-Handle to canopy frame
Details
     

 09-15-2012
1.50
Fabricated hinges and bent hinge pins
Details
       

 09-15-2012
1.00
Added C-1214 Latch Block and trimmed it
Details
     

 09-14-2012
4.00
Attached canopy to frame
Details
       

 09-13-2012
1.50
Cowl trimming and work on hinge pins
Details
       

 09-12-2012
2.00
More upper/lower cowl sanding
Details
       

 09-11-2012
2.00
Began sanding the cowl pieces
Details
     

 09-10-2012
1.50
Began cowl trim and sanding
Details
       

 09-08-2012
0.30
Replaced Forward Upper Fuse Skin
Details

 09-08-2012
0.25
More tank painting
     

 09-08-2012
0.75
Attached guide blocks to roll bar
Details
       

 09-08-2012
0.50
8/31/12 NOTIFICATION
Details
       

 09-06-2012
0.75
Fabricated two guide blocks for canopy frame
     

 09-06-2012
1.00
Added sealant to canopy rib assembly
       

 09-06-2012
0.25
Added finish paint to parts of tank and fill tube
     

 09-05-2012
0.75
Primed exterior of fuel tank
       

 09-05-2012
1.25
Fabricated L/R latch handles for canopy frame
       

 09-03-2012
5.00
Completed Canopy Fitting
Details
       

 09-03-2012
1.00
Cleaned and organized workshop

 09-02-2012
6.50
Fit canopy to frame
Details
       

 09-01-2012
0.45
Resinstalled back window to fuselage
Details
     

 09-01-2012
0.50
Placed canopy onto the canopy frame/fuselage
Details
       

 09-01-2012
3.75
Installed canopy onto fuselage
Details
       

 09-01-2012
1.00
Began pressure test on fuel tank
Details
       

 08-31-2012
1.50
Moved aircraft across garage
Details
     

 08-31-2012
2.00
Installed tunnel access brackets
Details
     

 08-31-2012
0.50
Did more access panel priming
     

 08-31-2012
2.00
Began working on canopy frame
Details
       

 08-27-2012
1.50
Workshop cleanup misc activites
Details
     

 08-26-2012
1.50
Temp install of tank into fuselage
Details
       

 08-26-2012
3.00
Finished assembly of fuel tank
Details
       

 08-25-2012
2.00
Installed fuel window.
Details
       

 08-25-2012
1.00
Fitted Fuel Float arm to tank
Details

 08-19-2012
1.50
Misc deburring and priming of covers ect...
Details
     

 08-19-2012
2.50
Additional Fuel Tank Sealing
Details
       

 08-18-2012
2.50
Sanded and cut tail cone fairings
Details
       

 08-18-2012
3.75
First round of tank sealing
Details
       

 08-18-2012
0.50
Began prep for tank sealing
Details
       

 08-17-2012
1.50
Preparation and deburing of alum. parts
Details
     

 08-17-2012
1.50
Additional prep of tank parts
Details

 08-16-2012
3.00
Assembled, match drilled and deburred tank
Details

 08-13-2012
1.75
Deburred, Primed Fuel Tank Parts
       

 08-12-2012
1.50
Tapped roll bar for Aft Window screws
Details
       

 08-12-2012
1.00
Fabricated Brake Lines
Details
       

 08-12-2012
3.00
Began Fabricating Fuel Tank
Details
       

 08-11-2012
3.00
Completed Aft Window preparation
Details
       

 08-10-2012
1.50
Match Drilled Aft Window to Roll Bar
Details
       

 08-09-2012
2.00
Clecoed Turtle Decks & Aft Window to Fuse
Details

 08-08-2012
0.50
Tested trim tab wires and finished harness
Details
     

 08-08-2012
1.00
Began to unpacked Seats / Interior Kit
Details
       

 08-06-2012
0.50
Riveted nutplates to fork for nose fairing
Details
     

 08-06-2012
2.00
Installed nose wheel to aircraft
Details
       

 08-05-2012
2.50
Packed bearings and installed wheels
Details
       

 08-05-2012
1.00
Installed Axels to Main Gear legs
Details
       

 08-05-2012
3.00
Began install of nose gear
Details
       

 08-04-2012
6.00
Installed both main gear legs to fuselage
Details
       

 08-04-2012
2.00
Installed & inflated tubes in main wheels
Details
       

 08-03-2012
2.00
Worked on nose and main wheels
Details
       

 08-03-2012
1.00
Installed Engine Mount Standoff
Details
       

 08-02-2012
1.50
Riveted Detent Bracket Assembly
Details
       

 08-01-2012
1.50
Flap Handle and F-1261 spacers
Details
       

 08-01-2012
0.25
Attached Pitch Servo Push Rod
Details
     

 07-30-2012
0.50
Roll Servo Push Rod
Details
     

 07-30-2012
1.75
Flaperon Push Rods and torque arms
Details
       

 07-29-2012
2.00
Contructed both Flapperon Push Rods
Details
       

 07-29-2012
1.00
Completed install of control stick h/w
Details
       

 07-28-2012
2.00
Installed control stick hardware
Details
     

 07-27-2012
1.50
Tailcone ADAHRS D Sub connector & OAT, pitot tube
Details
       

 07-27-2012
0.75
Installed noise filter zip ties/RTV to fuel pump a
Details
       

 07-27-2012
0.75
Installed noise filter to left strobe wing connect
Details

 07-27-2012
2.00
Installed flapperon mixer and flap handle to fusel
Details
     

 07-27-2012
1.00
Fed aft pitot line & trim control line through fus
       

 07-27-2012
1.00
Added tops to control system blocks with washers/n

 07-26-2012
4.50
Riveted Tailcone to Fuselage
Details
       

 07-19-2012
1.50
Attached tailcone
Details
       

 07-18-2012
1.25
Additional control rod fabrication
Details
     

 07-17-2012
2.00
Fabrication of more control system parts
Details
       

 07-15-2012
1.00
Primed and prepared parts for tailcone/flapperon c
Details
       

 07-15-2012
1.00
Control Mod Attach & Vent. Holes
Details
       

 07-14-2012
1.00
Installed Outside Temp Probe and wiring

 07-14-2012
1.50
Installed most of Wing/Fuse Connectors
Details
       

 07-14-2012
1.50
Installed Headphone Jacks
Details
       

 07-14-2012
1.50
Installed brake clamp & prepared parts
Details
     

 07-14-2012
1.00
Finished wiring install of PTT for Control Sticks
Details
     

 07-13-2012
1.50
Installed Ray Allen PTT & Grips
Details
       

 07-13-2012
0.50
Installed Over Rudder Wireway
Details

 07-10-2012
0.50
Worked on wire flange prep

 07-10-2012
1.50
Installed Rudder Petals into Fuselage
Details
     

 07-10-2012
0.50
Attached brake reservoir
Details
     

 07-09-2012
2.00
Misc Fuse Wiring additions
Details
     

 07-07-2012
2.00
Wire Harness 00045 & misc installations.
Details
       

 07-07-2012
1.50
Installed Cockpit Light
Details
       

 07-07-2012
2.00
Additional AP servo wiring
Details
       

 07-06-2012
3.50
Worked on control sticks.
Details
       

 07-05-2012
4.50
Wiring and spar pin switch testing
Details
       

 07-05-2012
1.50
Fabricated the Fuselage Pin Assembly
Details
     

 07-04-2012
3.00
Installed fans & WH-00046 Wire Bundle
Details
       

 07-03-2012
1.75
Began Finish Kit Build
Details
       

 07-02-2012
2.50
Finished Finish Kit Inventory
Details

 07-01-2012
3.00
Continued Hardware Inventory
       

 06-30-2012
5.00
Unpacked Finish Kit
Details
       

 06-16-2012
1.00
Finished install of roll/pitch servos to fuselage
Details
       

 06-11-2012
2.00
Prepared wiring and temp install pitch servo
Details
       

 06-10-2012
2.50
Wing Electical Brackets
Details
       

 06-10-2012
2.50
Autopilot servo assemblies
Details
       

 05-25-2012
2.50
Completed Map Box Assembly
Details
       

 05-24-2012
0.25
Sealed WD-1233 L/R Steps
Details

 05-24-2012
0.75
Riveted hardware to panels
Details

 05-24-2012
1.75
Misc Tailcone attach section steps
Details

 05-22-2012
2.00
Additional Panel Section prep
Details
       

 05-20-2012
5.00
Panel Attach Strips and Began Map Box
Details
       

 05-19-2012
3.00
Oil Tank Braces and Upper Fuse Skin
Details
       

 05-17-2012
1.50
Riveted Panel Base to Fuselage
Details
       

 05-17-2012
0.75
Match Drilled Upper Firewall per template
Details
     

 05-16-2012
1.00
Drilled changes to Panel Base for Skyview
Details
       

 05-16-2012
1.50
Added nutplates to Panel Flange
Details

 05-15-2012
2.00
Additional work on Panel Base and related parts
Details
       

 05-14-2012
2.50
Continued work on upper fuselage parts prep
Details
       

 05-13-2012
4.50
Additonal work on upper fuselage parts
Details
       

 05-12-2012
0.50
Painted oil tank braces with red enamal

 05-11-2012
2.50
Further preparation of upper fuse parts
Details
       

 05-10-2012
3.00
Began working on Upper Fuse parts for panel
Details
       

 05-08-2012
2.75
Attached F-1201A assembly to fuselage
Details
       

 05-07-2012
2.50
Re-fabricated hinges for doubler.
Details
       

 05-06-2012
2.75
Match drilled piano hinges
Details

 05-05-2012
1.50
Final riveted baggage assembly to fuselage
Details
       

 05-05-2012
0.50
Fabricated wires for seat attachments

 05-05-2012
3.00
Began working on upper forward fuselage
Details
       

 05-03-2012
0.50
Riveted ADAHRS brackets
Details
       

 05-03-2012
2.50
Assembled the baggage bulkhead
Details
       

 05-02-2012
1.00
Updated static system lines for Skyview
Details
     

 05-02-2012
1.50
Match drilled shear clips to Baggage Bulkheads
Details
       

 05-01-2012
2.75
Completed Sect 28 Fuel System
Details
       

 04-30-2012
2.25
Completed aft fuel return line
Details
       

 04-29-2012
4.75
Completed the 3/8" fuel lines
Details
       

 04-28-2012
2.50
Began fabrication of fuel system
Details
       

 04-22-2012
4.50
Finished assembly of rudder petals and brakes
Details
       

 04-21-2012
4.75
Began assembly of Rudder Petals & Brakes
Details
       

 04-20-2012
2.00
Riveted Seat Backs and Painted
Details
     

 04-20-2012
1.50
Final riveted roll bar to fuselage
Details
       

 04-19-2012
3.50
Seat back preparation
Details
       

 04-18-2012
1.25
More interior painting and bulkhead part preparati
Details

 04-18-2012
1.00
Began preparing seat back parts.
Details

 04-17-2012
2.75
Prepared and primed more bulkhead parts
Details
       

 04-15-2012
3.75
Riveted and Painted Roll Bar
Details
       

 04-14-2012
4.00
Prepared and assembled Roll Bar Assembly
Details
       

 04-13-2012
2.25
Match drilled roll bar and deburred
Details
     

 04-12-2012
2.50
Assembled Roll Bar Assembly
Details
       

 04-11-2012
3.25
Finished Vent Door and Lwr Cowl Hinges
Details
       

 04-10-2012
3.00
Finished riveting side skins
Details
       

 04-09-2012
2.00
Riveted right fuselage skin
Details

 04-08-2012
6.00
Finished deburing and primed skins - re-attached.
Details
       

 04-07-2012
4.00
Debured and primed skins and Longerons.
Details
       

 04-06-2012
2.00
Match Drilled Longerons & Skins
Details
     

 04-05-2012
2.75
Prepared and Clecoed Side Skins to Fuselage
Details
       

 04-04-2012
3.00
Attached side frame pieces to fuselage
Details
       

 04-03-2012
3.25
Prepared various parts for side skin attachment
Details
       

 04-02-2012
2.50
Match Drilled Longerons to Canopy Decks
Details
       

 04-01-2012
4.00
Fabricated both Longerons
Details
       

 03-31-2012
0.50
Cut Longerons to 82 3/8 inches
Details

 03-31-2012
2.00
Completed forward lower fuse
Details
       

 03-30-2012
3.50
Nearing completion of fwd lower fuse
Details
       

 03-29-2012
3.25
Continued to add nutplates etc.. to forward fuse
Details
     

 03-28-2012
3.50
Began assembly and additonal parts prep
Details
       

 03-27-2012
3.00
Deburred and prepared fwd fuse parts

 03-26-2012
0.50
Finished section 21
Details

 03-26-2012
1.00
Collected section 22 parts and began deburring
Details

 03-24-2012
2.50
Prepared bulkhead and installed steps
Details
       

 03-24-2012
3.00
Prepared and installed step floors
Details
       

 03-24-2012
2.00
Baggage bulkhead, pump bracket and AP bracket
Details
       

 03-22-2012
3.50
Prepared and clecoed bottom skin to fuselage
Details
       

 03-21-2012
3.00
Primed and installed corner skins
Details
       

 03-20-2012
3.00
Prepared parts for corner skins and main skin
Details
     

 03-18-2012
4.50
Completed Floor Seat Bulkhead and Control Assembly
Details
       

 03-17-2012
3.00
Riveted Bulkhead Assembly Parts
Details
       

 03-17-2012
3.00
Completed assembly and attachment of bulkhead
Details
       

 03-16-2012
3.50
Riveted Floors to Mid Fuse and worked on bulkhead
Details
       

 03-16-2012
5.00
Riveted Bottom Skin & prepared step parts
Details
       

 03-15-2012
2.50
Prepared bulkhead
Details

 03-14-2012
2.50
Prepared parts for bulkhead
Details

 03-13-2012
2.50
Re-riveted Seat Floors and Ribs
Details
       

 03-12-2012
2.75
Seat Ribs & Floors Riveted Backwards
Details
       

 03-11-2012
1.50
Riveted seat ribs together
Details
       

 03-11-2012
1.50
Cut seat hinges and prepared them and floors
Details
       

 03-10-2012
6.50
Prepared and assembled seat rib assembly
Details
       

 03-09-2012
3.25
Riveted Mixer Arm & Began Seat Ribs
Details
       

 03-08-2012
2.50
Riveted Bearing Assembly & Parts Prep
Details
       

 03-07-2012
3.50
Further baggage ribs and parts preparation
Details
       

 03-06-2012
3.00
Riveted baggage floor skins
Details
       

 03-05-2012
2.50
Riveted Baggage Floor
Details
       

 03-04-2012
1.00
Finished Step 2 20-04
Details

 03-04-2012
3.50
Began Section 21 with Spencer's help
Details
       

 03-03-2012
3.00
Finished Inventory & Organizing
Details

 03-03-2012
6.50
Begain contruction of center bulkhead
Details
       

 03-02-2012
3.50
Continued Hardware Inventory
Details
       

 03-01-2012
3.75
Fuselage Kit Arrives - Inventory Begun
Details
       

 02-12-2012
0.00
Tested interior paint options (Part 2)
Details
       

 02-12-2012
0.50
Tested interior paint options (Part 1)
Details
     

 02-12-2012
1.25
Framed worktable
Details
       

 12-29-2011
1.50
Moved Wings from garage to storage unit for winter
Details
       

 12-17-2011
4.50
Finished assembly of both flapperons
Details
       

 12-15-2011
2.50
Riveting flapperon skins to spar
Details
       

 12-14-2011
3.00
Continued to assemble the flapperon
Details
       

 12-13-2011
2.50
Assembled actuation and pivot brackets
Details
       

 12-11-2011
6.00
Fabricated actuation and pivot brackets and began
Details
       

 12-10-2011
5.00
More deburring and priming of flapperon parts
Details
       

 12-07-2011
2.50
More deburring and priming of flapperon skins
Details
     

 12-06-2011
2.00
Removed vinyl and began deburing nose and trailing

 12-05-2011
2.00
More priming and prep of the flapperon nose skins
Details
       

 12-04-2011
1.50
Finished preparing flapperon ribs
Details
       

 12-04-2011
0.00
9" Band Saw
     

 12-04-2011
0.00
6" Drill Press
     

 12-03-2011
3.00
Put wings on stand and begain deburring flapperon
Details
       

 12-01-2011
2.00
Completed intallation of wing root electrical conn
Details
       

 11-30-2011
2.00
Began working on new wing electical interconnecto
Details
       

 11-28-2011
3.00
Finished installing wing tip lights
Details
       

 11-27-2011
2.00
Begain working on the flapperon actenuators
Details
       

 11-27-2011
1.00
Applied resin/flox mixture to wing tip extensions
Details
       

 11-26-2011
1.00
Practised making up flox/epoxy mixture
Details
       

 11-26-2011
3.50
Match drilled wing tip extensions and worked on el
Details
       

 11-25-2011
1.50
Trimmed and filed W-1222-R/L wing extensions
Details
       

 11-24-2011
2.75
Completed riveting final right wing tip sheets
Details
       

 11-22-2011
2.00
Completed deburing, filing and priming W-1204D-R f

 11-20-2011
3.50
Right wing doubler and wing tip
Details
       

 11-20-2011
2.00
Cut openings for wing tip lights
Details
       

 11-19-2011
2.50
Right wing leading edge skin
Details
       

 11-19-2011
2.50
Right wing landing light.
Details
       

 11-18-2011
2.00
Riveted several right wing tip parts
Details

 11-17-2011
2.50
Deburred and primed skins and parts for right wing
Details
       

 11-16-2011
0.00
Molex crimp tool
Details
     

 11-16-2011
2.00
Finished riveting last main skin to right wing
Details
     

 11-15-2011
2.75
Attached final main skins on right wing
Details
       

 11-13-2011
7.00
Finished riveting bottom skins and begain working
Details
       

 11-12-2011
4.00
Almost completed right wing bottom skin riveting
Details
     

 11-11-2011
3.00
Continued working on bottom right wing skins
       

 11-10-2011
1.50
Prepared, primed and clecoed inboard skin to right
Details
     

 11-09-2011
2.00
Finished landing light ribs
Details

 11-08-2011
2.50
Worked on Landing Light brackets and wiring
Details
       

 11-06-2011
6.00
Began lighting kit installation for right wing
Details
       

 11-05-2011
0.50
Finsihed Riveting Nose Ribs on Rgiht Wing
     

 11-05-2011
4.50
Built EAA Wing Stand
Details
       

 11-03-2011
2.50
Riveted most of ribs to right wing spar
Details
       

 11-02-2011
2.50
Began Assembly of Right Wing
Details
       

 11-01-2011
2.50
Essentially Finished Left Wing - need to install w
Details
       

 10-29-2011
5.00
Riveting more of left wing and prepared additional
Details
       

 10-28-2011
3.00
Began Assembling / Riveting the left wing tip part
Details
       

 10-27-2011
2.00
Finished left wing doubler and began working on wi
Details
       

 10-26-2011
1.50
Finished riveting top skins to left wing and began
Details
       

 10-25-2011
2.00
Riveted most of remaining top skins to left wing
Details
       

 10-19-2011
2.50
Clecoed last of the large skins to the left wing
Details
       

 10-18-2011
2.25
Riveted W-1201B-L and begain preparing last two la
Details
       

 10-16-2011
5.00
Riveted last skin to bottom of left wing and attac
Details
       

 10-15-2011
3.50
Prepared W-1202-L skin
Details
       

 10-14-2011
3.00
Riveted W-1203-L skin to left wing and began prep
       

 10-13-2011
2.50
Riveted W-1201-L skin to left wing
Details
       

 10-11-2011
2.50
Finished priming and clecoed first skin to left wi
Details
       

 10-10-2011
3.50
Preparing first two left wing skins
Details
     

 10-09-2011
1.00
Tested fit of 1202-L skin and stall warning assemb
Details
       

 10-08-2011
4.50
Installed Stall Warning Sub-Assembly and wiring fo
Details
       

 10-07-2011
3.00
Completed riveting ribs to Left Wing
Details
       

 10-05-2011
2.50
Attached Aft Ribs to Left Spar
Details
       

 10-02-2011
6.00
Finished Fluting, Priming and began riveting aft r
Details
       

 10-01-2011
4.00
Finsihed scuffing and cleaning deburred aft ribs

 09-29-2011
1.75
Scuffed all the right aft ribs

 09-25-2011
1.00
Finished deburring Aft Ribs
Details

 09-24-2011
2.50
Contined Deburring Aft Ribs

 09-20-2011
2.00
Continued deburing aft ribs
Details

 09-18-2011
2.50
More deburring of Aft Ribs
       

 09-17-2011
2.50
Deburring of Aft Ribs
Details
       

 09-15-2011
0.50
Deburred several aft ribs

 09-14-2011
1.50
Trimmed flanges and deburred aft ribs
Details

 09-08-2011
1.25
Added nutplates to nose ribs
Details
       

 09-07-2011
1.25
Finished Fluting and Priming Nose Ribs
Details
       

 09-06-2011
2.00
Flute and prime most nose ribs
Details
       

 09-05-2011
2.50
Cleaned all nose ribs with acetone and began to fl
Details

 09-04-2011
4.00
Finished deburing and skuffed up all the ribs for
Details

 09-03-2011
6.00
Rib deburing
Details
       

 09-02-2011
2.75
Deburred several 1208R nose ribs
Details
     

 09-01-2011
0.30
Riveted Rear Spar per section 14
Details
       

 09-01-2011
1.50
Begain preparing nose ribs
Details
       

 08-31-2011
1.75
Deburing and primed both rear spar webs
Details
       

 08-30-2011
1.50
Riveted hinge brackets and began to debur spar
Details
     

 08-29-2011
1.00
Countersunk and primed hinge brackets
Details

 08-28-2011
0.50
Replacement hinge bracket parts prep
Details

 08-18-2011
3.00
Riveting of Hinge Assembly and Hinge Brackets
Details
       

 08-17-2011
3.50
More Section 14 parts prep and priming
Details
       

 08-16-2011
1.75
Prepared L/R Sub Spar Assembly pieces
Details
       

 08-14-2011
0.50
Pulled parts for section 14 and cleaned up workspa
Details
       

 08-14-2011
2.50
Completed riveting attach angles to spars in secti
Details
       

 08-14-2011
1.50
Built mini stand to hold wing spars in place for c
Details
       

 08-13-2011
4.75
Began spar assembly
Details
       

 08-12-2011
3.00
Completed fulll inventory and parts storage
Details
       

 08-10-2011
1.50
Day 2 unpacking wing crates and inventory of parts
Details
       

 08-09-2011
1.60
Began to unpack wings crates
Details
       

 08-01-2011
0.00
Visit to AirVenture
Details
       

 07-08-2011
3.00
Finished preparing and riveted tips to rudder and
Details
       

 07-07-2011
1.50
Removed material from R-1206 & VS-1213 tips
Details

 07-04-2011
1.00
Hung completed tailcone to garage ceiling
Details
       

 07-04-2011
2.00
Completed Trim/Servo Assembly
Details
       

 07-03-2011
1.00
Prepared parts for Trim/Servo assembly
Details

 07-02-2011
2.50
Clecoed and riveted topskin to tailcone
Details
       

 07-02-2011
2.00
Added spade connectors to the leads from servo
Details
     

 07-01-2011
1.50
Match drilled and prepared top tailcone skin
Details
       

 06-24-2011
3.25
Riveted F1280 and F1279 L/R skins to frame
Details
       

 06-24-2011
1.00
Completed static system - attached tubes
Details
       

 06-19-2011
0.50
Primed inner surface of F-1279 L/R skins
       

 06-19-2011
1.50
Assembled servo tray
Details
       

 06-18-2011
1.00
Riveted nutplates to F12106 Fwd Skin Rib
Details
       

 06-18-2011
2.50
Began preping the parts for the AST attachment
Details
       

 06-18-2011
2.00
Began preping the 1279 L/R skins for tailcone
Details
       

 06-17-2011
3.00
Trim wire and static system install
Details
       

 06-17-2011
1.00
Clecoed F-1280 R/L to tailcone
Details
       

 06-17-2011
1.00
Began prep of snap bushing bracket and F-12106
Details

 06-16-2011
2.50
Prepared 1280 L R Side Skins
Details
       

 06-12-2011
2.00
Riveted aft hinge and aft skins to stabilator
Details
       

 06-12-2011
1.50
Measured and glued washers for F-1211 assembly to
Details
       

 06-12-2011
0.50
Clecoed F-1211 assemble to the tailcone
Details
       

 06-11-2011
4.50
Assembled and riveted skins to stabilator skeleton
Details
       

 06-10-2011
1.50
Drilled and deburred stab hinges
Details
       

 06-09-2011
1.00
Began working on replacement AST hinges
Details
       

 06-08-2011
3.00
Riveted bottom and side skins on tailcone
Details
       

 06-07-2011
1.25
Primed 1281 L/R tail skins
Details
       

 06-06-2011
0.00
Confirmation from FAA on tail number reservation
Details

 06-06-2011
3.50
Clecoed bottom skins and began working on 1281 L/R
Details
       

 06-05-2011
1.75
Began working on bottom tail skins
Details
       

 06-05-2011
5.00
Assembled and riveted bulkhead
Details
       

 06-04-2011
2.00
Prepared bulkhead and other parts.
Details
       

 06-03-2011
1.50
Prepared bulkhead doubler - primed and painted par
Details
       

 06-02-2011
2.50
Riveted fuselage and fabricated skid bracket
Details
       

 05-30-2011
4.00
Began working on tailcone
Details
       

 05-30-2011
1.00
Added lead weights to counterbalance arm
Details
       

 05-28-2011
0.50
Stored stabilator parts in overhead loft
Details

 05-27-2011
2.00
Prepared Stabilator Skins
Details
       

 05-27-2011
8.00
Assembled Stabilator Skeleton Assembly
Details
       

 05-24-2011
3.00
HS-1203 spar arrived - completed steps passed over
Details
       

 05-23-2011
0.00
Torque wrench arrived from Sears
     

 05-22-2011
5.00
Deburred, primed ribs and began preping parts for
Details
       

 05-21-2011
1.50
Sourced ribs for spar and began deburing them
Details
       

 05-20-2011
2.50
Riveted spar and began adding nutplates
Details
       

 05-19-2011
3.00
Primed and began assembling spar
Details
       

 05-18-2011
3.00
Began preparing stabilizer spar parts
Details
       

 05-17-2011
0.50
Organized parts for stabilizer spar
Details

 05-14-2011
0.00
Hillary learning to build an airplane!
       

 05-14-2011
4.50
Finished right and left ASTs
Details
       

 05-13-2011
1.00
Removed plastic and preped anti-servo tab parts
Details
       

 05-11-2011
2.00
Finished Rudder
Details
       

 05-10-2011
3.50
Measured rudder to V-stab & primed frame
Details
       

 05-09-2011
2.50
Began work on rudder
Details
       

 05-08-2011
0.00
Vertical Stablizer (some more pictures)
       

 05-08-2011
6.00
Finished Vertical Stabilizer
Details
       

 05-07-2011
0.00
Went Flying - finished biannual in N9081H (C172)
Details

 05-06-2011
0.00
Hand rivet squeezer
     

 05-05-2011
4.00
Primed and riveted V-frame structure
Details
       

 05-04-2011
0.20
Reserved N number
Details

 05-03-2011
3.50
Spar Cap deburring, countersink & priming
Details
       

 05-02-2011
3.50
First day building - hinge bracket and spar cap
Details
       

 05-01-2011
1.50
Built framed screen for painting
Details
       

 04-30-2011
3.50
Unpack / Inventory parts
Details
       

 04-29-2011
1.50
Updated garage workshop - lights, bins
Details
       

 04-29-2011
2.00
Began to unpack kit #1 from Vans crate
Details
       

 04-28-2011
0.00
Tail kit arrives from Fed Ex
Details
       

 04-27-2011
0.00
Workshop Overview
Details
       

 04-18-2011
0.00
Pneumatic rivet puller
Details
     

 04-18-2011
0.50
Ordered RV-12 Kit from Vans
Details
     

 04-18-2011
0.00
Favorite deburring tools
Details
     

 11-16-2010
0.00
Rivet gun
Details
     

 11-16-2010
0.00
Air drill
     

 10-15-2010
0.00
Kobalt Compressor
Details
       