Magnificent Adventure
RV-9A
All
Work Logs Found:
272
Category Work Time:
1570 Hours
Date
Hours
Work Log Summary
Details
09-07-2015
1.00
2015 visit to Oklahoma
Details
10-05-2014
1.00
Airplane delivered to new owner
Details
05-20-2014
2.50
Second Flight
Details
05-19-2014
5.00
Repairing a couple glitches
Details
05-07-2014
6.00
Inaugural Flight
Details
05-05-2014
2.00
FAA inspection
Details
04-25-2014
4.00
First Engine Start
Details
04-23-2014
3.00
Intalled Canopy
Details
04-22-2014
5.00
Fueled aircraft
Details
04-21-2014
4.50
Registration Numbers
Details
04-18-2014
4.00
Forward Fuse Skin
Details
04-17-2014
5.00
Floor Pans and Fwd Fuse Skin
Details
04-15-2014
4.00
Aircraft Weighing
Details
04-14-2014
5.00
EAA inspection
Details
04-11-2014
6.00
Finishing up Prop work
Details
04-10-2014
6.00
Details
04-09-2014
5.00
Prop and engine work
Details
04-07-2014
6.00
Propeller work
Details
04-06-2014
6.00
More cowl work
Details
04-05-2014
4.00
Fiberglass work
Details
04-04-2014
5.00
Engine work
Details
04-03-2014
6.00
Torque check
Details
04-01-2014
4.00
Calibrating EFIS
Details
03-31-2014
2.50
Empannage work
Details
03-27-2014
4.00
Trim indicator wiring adjusment
Details
03-26-2014
3.00
Lower gap seals
Details
03-25-2014
3.00
Wiring and test brake fittings
Details
03-24-2014
4.00
Empannage work and brakes
Details
03-22-2014
3.50
Lighting and tip work
Details
03-20-2014
6.50
Install left wingtip
Details
03-19-2014
22.00
Assorted wing and empannge work
Details
03-12-2014
6.00
Wingtips
Details
03-11-2014
4.00
Wingtips
Details
02-26-2014
4.00
Wingtips
Details
02-25-2014
4.00
Wingtips
Details
02-20-2014
5.00
Wing work
Details
02-19-2014
4.00
Dynon work
Details
02-18-2014
4.00
Install panel avionics
Details
02-17-2014
3.00
Brakes
Details
02-14-2014
3.00
Flap and stick adjustments
Details
02-12-2014
6.00
Wing and Flap work
Details
02-11-2014
5.00
Wing and Flap work
Details
02-03-2014
5.00
Wing wiring
Details
01-31-2014
5.00
Torque wings
Details
01-29-2014
5.00
Install wings
Details
01-27-2014
6.00
Rudder cable connect
Details
01-23-2014
4.00
Aileron fitting
Details
01-22-2014
14.00
Rudder bottom and HS tips
Details
01-16-2014
14.00
Empennage work
Details
01-03-2014
5.00
Remove wing tips and wiring work
Details
12-31-2013
24.00
Wing preparation
Details
12-26-2013
2.00
Remove wings
Details
12-24-2013
4.00
Wiring
Details
12-17-2013
6.00
Wing Gap seal work
Details
12-16-2013
1.00
Trim indicator
Details
12-13-2013
5.00
Wiring in center console area
Details
12-12-2013
2.00
Fuel line Prep
Details
11-25-2013
5.00
Wing Gap Seals
Details
11-23-2013
6.00
Wing work
Details
11-22-2013
5.00
Install Wings on fuselage
Details
11-16-2013
5.00
Install wing bottom skins
Details
11-15-2013
5.00
Wing wiring
Details
11-11-2013
6.00
Wing work
Details
11-08-2013
10.00
Hangar setup
Details
11-01-2013
2.00
Moving Day
Details
10-30-2013
10.00
Prepare for Hangar move
Details
10-18-2013
3.00
Cowling Priming
Details
09-24-2013
24.00
Finish work on cowling
Details
09-08-2013
12.00
Wing Tip Work
Details
09-05-2013
4.00
Sealing inside of cowling
Details
09-02-2013
2.00
Fuel sender and Roll Servo wiring
Details
08-31-2013
4.00
Tail pipes and hangers
Details
08-30-2013
4.00
Bracket for lower cowl
Details
08-29-2013
4.00
VS tip fitting
Details
08-27-2013
6.00
Rudder and HS tips
Details
08-26-2013
10.50
Inspection Panels
Details
08-22-2013
3.00
Wiring
Details
08-20-2013
2.00
Wiring
Details
08-05-2013
14.00
Sensor Wiring
Details
08-02-2013
12.00
Engine sensors
Details
07-29-2013
6.00
Finishing Air Scoop opening
Details
07-28-2013
4.00
Air Inlet and upper cowl oil door
Details
07-27-2013
3.00
Extending the cowl air inlet
Details
07-26-2013
6.00
Finish Airbox and Cowl "Bubble"
Details
07-22-2013
13.00
Air intake work
Details
07-12-2013
2.00
Airbox and Fuel Servo
Details
07-11-2013
6.00
Finishing up the baffle work
Details
07-07-2013
9.00
Baffle Work
Details
06-27-2013
5.00
Cowling Work
Details
06-24-2013
7.00
Baffle Work Continues
Details
05-17-2013
6.00
More Baffle Work
Details
05-16-2013
4.00
Air Inlet Ducts
Details
05-06-2013
8.00
Cowl Hinges
Details
04-27-2013
6.00
Cowl Hinges
Details
04-26-2013
4.00
Cowl Work
Details
04-25-2013
3.00
Magneto Wiring
Details
04-22-2013
6.00
Cowl work
Details
04-17-2013
5.00
Engine Cowling
Details
04-06-2013
5.00
Cowling Work
Details
04-04-2013
5.00
More baffle work
Details
04-03-2013
2.00
Mag Harness
Details
03-28-2013
5.50
Baffle work
Details
03-21-2013
6.00
Engine Stand and Engine baffles
Details
03-19-2013
8.00
Breather Tube, Alternator
Details
03-18-2013
5.50
Exhaust System and hoses
Details
03-15-2013
8.50
Engine and Landing Gear
Details
02-26-2013
3.50
Wiring fuse blocks and dash switches
Details
02-25-2013
2.00
Test
Details
02-22-2013
7.00
Details
02-13-2013
5.00
Work on Panel
Details
02-12-2013
2.00
Panel Switches
Details
02-11-2013
4.50
Details
02-06-2013
6.00
EMS mounting
Details
02-05-2013
6.00
Wiring goes on
Details
01-31-2013
4.00
More wiring
Details
01-30-2013
5.00
Control Stick wiring
Details
01-29-2013
4.00
Install Junction blocks
Details
01-25-2013
19.00
Details
01-17-2013
6.00
Audio panel tray
Details
01-14-2013
5.00
Mic and phone jacks
Details
01-09-2013
8.00
Side Skins rivet + wiring
Details
11-20-2012
18.00
Wiring
Details
11-19-2012
9.00
Cowling hinges and engine mount
Details
11-17-2012
7.00
Painting and pull wires
Details
11-16-2012
5.00
Painting
Details
11-15-2012
10.00
Canopy and Main Gear
Details
11-13-2012
4.00
Canopy Work
Details
11-11-2012
8.00
Canopy fiberglass work
Details
11-09-2012
4.00
ELT installation
Details
11-08-2012
4.00
Canopy Latch Hook
Details
11-07-2012
5.00
Fiberglass work
Details
10-23-2012
14.00
Dynon arrives
Details
10-22-2012
7.00
Dash work
Details
10-19-2012
5.00
Firewall work
Details
10-17-2012
3.00
Glareshield work
Details
10-05-2012
5.00
Engine and Prop arrive
Details
10-03-2012
6.00
Canopy Prep for Sika seal
Details
09-28-2012
9.00
Battery box and solenoids
Details
09-27-2012
2.00
Details
08-31-2012
5.00
Canopy and frame
Details
08-29-2012
5.00
Canopy Drilling
Details
08-28-2012
7.00
Canopy Drilling
Details
08-27-2012
8.00
Canopy trimming
Details
08-26-2012
6.00
Cutting Canopy again
Details
08-24-2012
6.00
Parking Brake
Details
08-22-2012
8.00
Trip to Van's
Details
08-10-2012
4.00
Cracked Canopy
Details
08-09-2012
4.00
Gas Struts
Details
08-08-2012
8.00
Rear window work
Details
08-07-2012
6.00
Baggage window
Details
07-30-2012
4.00
Canopy Trimming
Details
07-28-2012
7.00
Canopy Cut and trim
Details
07-26-2012
4.50
Canopy Work
Details
07-22-2012
8.00
Canopy Reinforcement Bracing
Details
07-21-2012
8.00
Canopy frame prep work
Details
07-20-2012
3.00
Firewall Top Cowl Hinge
Details
07-17-2012
4.00
New Frame bracing
Details
07-16-2012
2.00
Canopy work continued
Details
07-14-2012
5.00
Canopy work
Details
07-10-2012
3.00
More canopy frame fitting
Details
07-09-2012
3.00
Canopy Frame fitting
Details
07-06-2012
6.50
Frame fitting continued
Details
07-04-2012
8.00
Forward Fuselage and Canopy Frame
Details
06-30-2012
5.00
Canopy Latch
Details
06-28-2012
7.00
Forward Fuselage
Details
06-27-2012
2.00
Details
06-26-2012
3.00
Cabin Frame Sub-Assembly
Details
06-25-2012
9.00
Firewall forward
Details
06-22-2012
2.50
Forward Fuselage
Details
06-16-2012
5.00
Inventory Finish Kit
Details
06-14-2012
10.00
Finish Kit
Details
05-21-2012
5.00
Miscellaneous
Details
05-17-2012
13.00
Wing Bottom Skins
Details
05-03-2012
1.50
ADAHRS
Details
04-29-2012
2.00
Painting
Details
04-27-2012
6.00
Forward Fuse
Details
04-26-2012
4.00
Finish Kit ordered
Details
04-20-2012
7.00
Forward top cover area
Details
04-19-2012
6.00
Brake Lines, Pitch Servo Harness
Details
04-16-2012
2.00
Longer bolts in main gear legs
Details
04-12-2012
1.00
Forward top ribs
Details
04-03-2012
12.00
Leg mounts and fuel lines
Details
03-31-2012
3.00
Main Gear
Details
03-29-2012
6.00
Center Covers
Details
03-28-2012
8.00
Forward center cover panels
Details
03-27-2012
4.00
ADAHRS mount and Pitch Servo
Details
03-26-2012
3.00
Cabin Support Finish
Details
03-23-2012
5.50
Cabin Support
Details
03-22-2012
7.00
Cabin Support
Details
03-21-2012
7.00
Center Cabin Support
Details
03-20-2012
3.00
RePaint
Details
03-14-2012
2.00
Painting
Details
03-13-2012
4.00
Cockpit finishing
Details
03-12-2012
6.00
Seat Backs and priming prep
Details
03-09-2012
2.00
Plane Wash
03-06-2012
10.50
Seat Backs
Details
03-01-2012
4.50
Fuel Tank Attaching angles
Details
02-29-2012
6.50
Pitch Servo
Details
02-27-2012
12.00
Leg mount and Flap motor work
Details
02-24-2012
7.00
Control column and leg mount
Details
02-21-2012
13.00
Empannage mounting
Details
02-20-2012
6.50
Emmpanage Mounting
Details
02-17-2012
7.00
Mounting HS
Details
02-16-2012
6.00
Steps and baggage area work
Details
02-15-2012
7.00
Step work and forward tunnel cover and mount
Details
02-12-2012
4.00
Baggage floor and Steps
Details
02-10-2012
8.00
Fuselage work
Details
02-09-2012
4.00
Trim Tab re-skin
Details
02-08-2012
1.00
Inspection of Progress
Details
02-07-2012
3.00
Wiring Wings
Details
02-06-2012
3.00
Forward Aft Skin
Details
01-30-2012
14.00
Rudder/Brake pedal assembly
Details
01-28-2012
8.00
Rudder/Brake assembly
Details
01-27-2012
8.00
Tank seal
Details
01-26-2012
6.00
Tank Sealing and Servo wiring
Details
01-12-2012
2.00
Tank Work
Details
01-11-2012
5.00
Tank Work
Details
01-07-2012
6.00
Tank Leaks
Details
01-04-2012
6.00
Gap seals
Details
12-15-2011
5.50
Tank Leaks
Details
12-13-2011
4.00
Tank Leaks
Details
12-07-2011
4.00
Tank Leaks
Details
12-05-2011
5.00
Leaks
Details
11-29-2011
6.00
Tanks
Details
11-26-2011
1.50
Details
11-11-2011
5.00
Back to business
Details
08-24-2011
4.00
Aileron Adjust
Details
08-23-2011
5.00
Aileron work
Details
08-22-2011
7.00
Aileron work
Details
08-19-2011
7.00
Wing work
Details
08-17-2011
8.00
Wing work
Details
08-15-2011
7.00
Shop reorganization
Details
08-10-2011
56.00
Wyoming Trip
Details
08-08-2011
2.00
Trailing edges on elevators and rudder
Details
08-06-2011
1.50
Trailing edge sealing
Details
08-04-2011
7.00
Trim tab construction
Details
08-03-2011
6.00
Left elevator trailing edge
Details
08-02-2011
8.00
Left elevator assembly
Details
08-01-2011
5.00
Left elevator assembly
Details
07-29-2011
7.00
Left Elevator assembly
Details
07-28-2011
1.00
Left elevator skeleton
Details
07-27-2011
5.50
Right elevator assembly
Details
07-23-2011
5.50
Right elevator skeleton
Details
07-21-2011
3.50
Right elevator assembly
Details
07-20-2011
5.00
Right Elevator
Details
07-19-2011
5.00
More Rudder work
Details
07-11-2011
3.00
Rudder and VS work
Details
07-09-2011
4.00
Rudder work
Details
07-07-2011
5.00
Rudder pre-assembly
Details
07-06-2011
5.00
Rudder Construction
Details
07-05-2011
3.00
Assembling VS
Details
07-03-2011
5.00
Vertical Stabilizer
Details
06-30-2011
3.50
Vertical Stabilizer
Details
04-27-2011
5.00
Finish HS skin riveting
Details
04-26-2011
3.00
Assembling HS
Details
04-23-2011
1.50
Spars
Details
04-22-2011
1.50
Spar riveting
Details
04-21-2011
5.00
Right side HS
Details
04-20-2011
4.50
Right side HS assembly
Details
04-19-2011
6.00
Horizontal Stabilizer
Details
04-18-2011
6.00
HS skin and skeleton assembly
Details
04-15-2011
6.00
HS Skeleton
Details
04-12-2011
2.00
Ready for the BIG Project
Details
04-11-2011
6.50
Training Kit
Details
04-09-2011
2.50
Tool orientation
Details
04-08-2011
3.00
Shop work
Details
04-07-2011
3.00
Tool box training package
Details
04-03-2011
1.50
Mini Orientation
Details
03-30-2011
5.00
More shop work
Details
03-29-2011
6.00
Trip to Van's
Details
03-29-2011
2.00
Tool order
Details
03-28-2011
12.00
Shop set up
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
272
1569
Avionics
10
52
Canopy
29
159
Electrical
19
103
Empennage
40
197
Engine
16
100
Final Assembly
1
2
Finish Kit
11
78
Firewall Fwd
22
124
Flying
2
8
Fuselage
51
296
Miscellaneous
23
110
Shop Supplies
2
8
Tools
1
2
Transportation and T
1
56
Wings
44
274