KitLog pro

Powered By Kitlog Pro v2.0

Hong Kong Waiex
Work Logs Found: 152
Category Work Time: 496 Hours
 Date
Hours
Work Log Summary

Details

 09-16-2020
30.00
Glare Shield Instrument panel and cross support
Details
     

 09-02-2020
12.00
Rear Spar Carry Thru
Details
       

 09-01-2020
8.00
Seat Installation
Details
     

 05-28-2017
2.50
Elevator cover, Flap lever mount bracket
Details

 02-13-2014
3.00
Upsize drilling
Details

 02-12-2014
4.00
Stiffeners, Gussets, cowl hinges
Details
       

 02-11-2014
2.00
Spar Tunnel
Details
     

 02-10-2014
4.00
Zee Tunnel
Details

 02-08-2014
3.00
Firewall
Details

 02-07-2014
2.00
Floor sheet
Details

 02-06-2014
3.00
Joining fuselages
Details
       

 02-04-2014
2.00
Upper firewall
Details
       

 01-30-2014
3.00
Firewall
Details
       

 01-28-2014
6.00
Firewall assembly
Details

 01-24-2014
3.00
Left side panel assembled
Details

 01-23-2014
3.00
Left Side Panel
Details

 11-24-2013
2.00
Rivetting
Details
     

 11-22-2013
4.00
Priming and assembly
Details

 11-20-2013
3.50
Right side Panel.
Details
     

 11-19-2013
4.00
Right Side Panel
Details
     

 11-18-2013
3.00
Rt Side panel
Details
       

 11-15-2013
4.00
Turtledeck assembly.
Details
       

 11-14-2013
2.50
Paint preparation
Details
     

 10-25-2013
2.00
Turtle Deck
Details
       

 10-24-2013
2.50
Drilling
Details
       

 04-16-2013
2.00
Attach Tail Y piece
Details
       

 09-13-2012
4.00
Tail box, also deburr and prime remaining pieces
Details
       

 09-13-2012
0.50
Fuselage pictures
Details
       

 09-11-2012
3.00
Tail box assembly
Details

 09-10-2012
3.00
Y Additional Brace and tail box assembly
Details
       

 09-07-2012
3.00
Bottom Skin
Details
       

 09-01-2012
4.00
Rivetting Left and right sides together
Details

 08-31-2012
3.00
Drilling of fuselage cross ties.
Details
       

 08-29-2012
3.00
Lower Cross tie drilling
Details

 08-05-2012
6.00
Tail Box assemblies, y pieces and Seat belts
Details
       

 08-04-2012
6.00
Seatbelt Attchment Assem and Y Tail Assem
Details
       

 08-03-2012
5.00
Right fuselage section
Details
       

 08-01-2012
3.00
Channel pieces.
Details

 07-31-2012
2.50
Channel pieces for fuselage
Details
       

 07-24-2012
0.10
Typhoon Vicente - force 10 Hurricane
Details

 06-19-2012
5.00
Rear Fuselage
Details
       

 06-18-2012
4.00
Rear fuselage
Details
       

 06-08-2012
4.00
Rear fuselage
Details
       

 06-07-2012
2.50
Vertical Channels
Details
     

 06-06-2012
2.00
Rear fuselage channels
Details
       

 06-05-2012
1.00
Wing Storage Box
Details
       

 04-24-2012
3.50
Right Wing Leading edge rivet
Details
       

 04-23-2012
4.00
Prime and rivet wing skin
Details

 04-21-2012
2.00
Right wing skins
Details

 04-20-2012
4.00
Right wing
Details

 03-30-2012
4.00
Pitot bracket asembly
Details
       

 03-27-2012
3.00
Aileron and flap hinge attachment and drilling
Details
       

 03-26-2012
2.50
Leading Edge skin drilling
Details
     

 03-22-2012
4.00
Pitot Assembly Fabrication
Details
       

 03-21-2012
2.50
Pitot fabrication
Details

 03-16-2012
3.00
Spar drilling and pitot preparation.
Details

 03-15-2012
4.00
Drilling
Details
       

 03-14-2012
4.00
Rear spar attachment
Details
       

 03-13-2012
4.00
Root rib
Details
     

 03-12-2012
4.00
Ribs and gussetts
Details
     

 03-01-2012
3.00
Rib attaching Rt wing
       

 02-29-2012
4.00
More rivetting
Details
       

 02-28-2012
4.00
Right Spar rivetting
Details
       

 02-17-2012
3.50
Right Spar preparation
Details

 02-16-2012
4.50
Drilling main spar web again.
Details
       

 02-15-2012
1.00
Left Wing Storage
Details
       

 02-13-2012
4.00
Wing Storage racks
Details
       

 02-13-2012
4.00
Wing storage racks
Details

 02-13-2012
0.10
Kit Log Interruption
Details

 02-11-2012
3.00
Rivet removal.
Details

 02-10-2012
4.00
Right Spar
Details

 01-10-2012
1.00
Left wing top skins rivetted
       

 12-24-2011
1.00
Drilling and aligning skins
       

 12-19-2011
1.00
Left Wing rivetted
       

 12-01-2011
1.00

       

 11-26-2011
1.00
Left wing Control fitting
       

 11-25-2011
1.00
Left Wing detail
       

 11-17-2011
1.00
Left Wing drilling skins continued
       

 11-14-2011
3.00
Left wing Assembly
Details
       

 11-12-2011
0.10
Left wing pictures
       

 11-12-2011
4.50
Left Wing Assembly
Details
       

 11-11-2011
4.00
Prep and Prime forward ribs and gussetts
Details
       

 11-09-2011
4.00
Ribs and gussetts
Details
       

 11-09-2011
0.10
More wing pictures
       

 11-03-2011
1.00
Root rib brackets
Details
       

 11-02-2011
3.50
Attaching ribs to left spar
Details
       

 11-01-2011
4.50
Wing Attach block remade
Details
       

 10-26-2011
0.10

Details

 10-13-2011
2.00
Wing Spar Drilling
Details
       

 10-13-2011
0.10
Spar drill photos continued
       

 10-12-2011
5.00
Rib preparation
Details
     

 10-11-2011
4.00
Aileron Bellcrank Assemblys - Priming and rivettin
Details
       

 10-10-2011
3.00
Rear Spars - Primed and assembled
Details
       

 10-09-2011
2.00
Gusset fabrication - Ribs
Details
     

 10-05-2011
2.00
Aileron Bellcrank Assemblys - Fabrication
Details
       

 10-04-2011
3.50
Rear Spars - Priming Preparation
Details
       

 10-03-2011
2.00
Rear Spars - Left rear Spar Drilling
Details
       

 09-29-2011
4.00
Rear Spars
Details
       

 09-28-2011
2.00
Rear Spars - Right rear spar
Details

 09-26-2011
5.50
Left Main Spar - Rivetting Left Spar
Details
       

 09-23-2011
5.50
Left Main Spar - Solid Rivetting
Details

 09-22-2011
3.00
Left Main Spar - Spar Caps & web - then assembly
Details
       

 09-21-2011
3.00
Left Main Spar - Prep and Prime
Details
     

 09-19-2011
1.00
Left Main Spar - Countersinking
Details

 09-17-2011
1.00
Left Main Spar - Dimpling Aft Spar web
Details

 09-16-2011
4.50
Left Main Spar - Upsizing holes and Deburring
Details

 09-15-2011
4.00
Left Main Spar - Drilling
Details
     

 09-14-2011
3.00
Left Main Spar Preparation
Details
     

 09-08-2011
2.00
Left Main Spar
Details

 09-08-2011
2.00
Counterbalance - 2nd Lead attempt
Details

 09-07-2011
2.00
Left Stabilator - Rivetting
Details
     

 09-06-2011
3.00
Left Stabilator - Final drilling clean up and prim
Details
     

 09-05-2011
3.00
Left Stabilator -Skin drilling
Details

 09-01-2011
0.10
Shed and Garden
       

 08-29-2011
4.00
Right Main Spar - Final rivetting Rt Spar
Details

 08-11-2011
2.00
Right Main Spar - More rivetting.
Details

 08-08-2011
2.00
Right Main Spar - Solid Rivetting
Details

 07-02-2011
3.50
Right Main Spar - Spar prep and Priming
Details

 06-29-2011
5.00
Right Main Spar - Spar tidy up and dimpling counte
Details
       

 06-28-2011
0.10
Left Stabilator - Replacement Tail skin delivered
Details

 06-20-2011
2.50
Right Main Spar
Details

 06-17-2011
3.00
Right Main Spar - Spar prep continued
Details

 06-16-2011
4.50
Right Main Spar - Spar Preparation
Details

 06-10-2011
3.00
Right Main Spar - Wing Attach Blocks
Details
       

 06-10-2011
0.10
Right Main Spar - Spar layout
       

 06-07-2011
0.10
Left Stabilator - Skin photos for Sonex
Details

 06-07-2011
4.50
Left Stabilator - 2 Right Stab skins - No left/ -
Details

 06-02-2011
3.00
Left Stabilator - Preparation
Details
       

 06-01-2011
6.00
Right Stabilator - clean prep and prime and assemb
Details
     

 05-31-2011
4.00
Right Stabilator - Skin
Details
       

 05-30-2011
3.00
Right Stabilator
Details
       

 05-24-2011
4.00
Right Stabilator - Cutting of stab pieces
Details

 05-23-2011
5.00
Right Stabilator - Stabilator Preparation
Details

 05-20-2011
1.80
Priming and final Assembly
Details
       

 05-20-2011
2.50
Priming and assembly
Details

 05-20-2011
5.00
Flap construction
Details
       

 05-19-2011
5.00
Left and right Ruddervator
Details
       

 05-18-2011
0.10
Limted primers in Hong Kong
Details
     

 05-17-2011
5.00
Vee Tail - Ruddervators
Details
       

 05-16-2011
6.00
Stubb Rudder No.2!
Details
       

 05-12-2011
4.50
Counterbalance - Drilling Lead
Details

 05-02-2011
6.00
Ribs and updrilling to 30 size holes
Details

 04-30-2011
8.00
Flap fabrication
Details

 04-29-2011
5.00
Fabrication on going.
Details
       

 04-27-2011
0.10
Workshop shed
Details
     

 04-26-2011
3.00
Counterbalance - Lead
Details
       

 04-26-2011
6.00
Building the ailerons
Details
       

 04-24-2011
6.00
Rudder No.1
Details

 04-04-2011
0.10
It's Home!
Details
       

 04-04-2011
0.10
In the workshop
       

 04-03-2011
0.10
USA to Hong Kong
Details

 02-02-2011
0.10
Kit Ordered
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.