ROBERT'S WEB SITE
Work Logs Found: 213
Category Work Time: 1553 Hours
 Date
Hours
Work Log Summary

Details

 07-01-2011
20.00
Wing prep and paint

 06-29-2011
7.00
Rear plexi wheel pants

 06-27-2011
8.00
FWF Canopy jettison, off jacks

 06-26-2011
8.00
Landing gear fairings wheel pant alignment

 06-25-2011
6.00
Brake bleed, canopy work

 06-24-2011
7.00
Brake fluid install
Details

 06-19-2011
4.00
Ignition wiring secure

 06-18-2011
4.00
Baffel seals

 06-13-2011
7.00
Wheel pant intersection fairings

 06-11-2011
5.00
Baffeling tension rods

 06-10-2011
7.00
More wheel pants

 06-03-2011
11.00
Wheel pants

 06-02-2011
7.00
Landing gear fairings.wheel pant brackets
     

 06-01-2011
5.00
Jack and level fuse on cribbing
       

 05-30-2011
8.00
Rudder cable fairings rear plexi

 05-28-2011
5.00
Rudder lower fairing

 05-25-2011
6.00
Wings transport for paint
Details

 05-17-2011
12.00
Rear nav, cockpit vents. rudder fairing fit

 05-16-2011
4.00
Rear nav light mount

 05-14-2011
9.00
Cowl inlet ramps fwf wings dismantel

 05-13-2011
5.00
Edgar Ruiz Painter planning meeting

 05-10-2011
6.00
Induction duct final and paint

 05-09-2011
9.00
Oil cooler mount refabricate,

 04-29-2011
7.00
Oil cooler mount hook ups

 04-23-2011
6.00
Alternate Air install

 04-21-2011
8.00
Engine induction

 04-20-2011
11.00
Baffels, Oil cooler mount
       

 04-20-2011
5.00
Air filter install

 03-28-2011
8.00
Baffel air ramps misc FWF

 03-19-2011
8.00
Baffels
       

 03-18-2011
8.50
Baffels
     

 03-15-2011
4.50
Cowl Oil door, inlet ramps

 03-14-2011
6.00
Cowl

 03-11-2011
9.00
Cowl mount fitt
       

 03-08-2011
2.00
Rudder peddal links fab install

 03-01-2011
5.00
Right brake line moved, cowl work

 02-28-2011
6.00
Alternator wirring, cowl init oil fill door
       

 02-27-2011
4.00
spinner fillets
     

 02-15-2011
11.00
Spinner back plate spinner init
       

 02-09-2011
8.00
Rear Plexi, Engine ground Propeller init
       

 02-07-2011
5.00
Aft top skin fit, Panel led flood lights
       

 02-05-2011
7.00
Rudder, Rudder cables, Aft Fuselage clean inspect
     

 01-28-2011
4.00
Magneto P leads Map FW back

 01-20-2011
2.00
Map final

 10-29-2010
11.00
Fuel flow cube, breather line, Alternator install
     

 10-28-2010
10.00
Prop gov control brackets vernier install

 10-22-2010
7.00
Egt Map install

 10-09-2010
4.00
Fuel Pump overflow

 10-08-2010
11.50
Throttle, Mixture, Heater linkages
       

 10-03-2010
10.00
Engine install misc connections

 09-25-2010
5.00
Radio comm coax AFS Update redo

 09-20-2010
3.00
RPM sense install Rt Mag, Oil temp, heater repair

 09-19-2010
2.00
Engine uncrate prep throttle body, mixture ect

 09-06-2010
7.00
Wheel nut drill cotter, fuel vent screens, rt brak

 08-17-2010
9.00
Landing gear intstall,Comm antanae doublers

 08-15-2010
3.00
Mic wiring corrected, GPS BNC connection

 08-02-2010
4.00
Brakes, Landing gear, tires, wheel pant brackets

 07-10-2010
5.00
A/P Pitch servo rewire, stick wire, Flap sense wir

 07-03-2010
6.00
Fuse trim for landing gear, wiring sticks, wiring

 06-26-2010
1.00
AFS Update intstall 7.1.4

 06-24-2010
5.00
Engine delivery, dolly build, MP block install

 05-02-2010
7.00
Power quadrant,seat belt mounts,wiring

 05-01-2010
10.00
Control stick wiring, ammeter shunt,

 04-25-2010
11.00
MFD wiring,Plumbing pitot static revision

 04-19-2010
8.00
Engine mount final

 04-18-2010
9.00
Engine mount initial,wiring fuel pump,GPS coax

 04-16-2010
9.00
ESS relay,Hbat bus wiring

 04-10-2010
6.00
Firewall penetrations, Park brake cable, Master sw

 03-19-2010
4.50
Parking Brake, Brake lines

 03-07-2010
5.00
Fuel pump fab, AHRS wiring

 03-04-2010
4.00
Fuel pump intit

 03-03-2010
5.00
Wiring

 02-28-2010
3.00
Fuel pump mount, Mstr/Str soliniod diodes

 02-27-2010
4.00
Pitot plumbing, batt box install

 02-06-2010
5.50
Strobe wiring, Mstr sol doubler plates fab mount

 02-04-2010
4.00
Flap motor wiring, Main ground block

 01-13-2010
5.50
Fwd deck, instrument panel right side mount

 12-29-2009
4.00
Canopy filet lay up and sand, sand, sand

 12-18-2009
3.00
Phone and mic jack wiring

 12-01-2009
8.00
Canopy fillet epoxy, mic and phone jacks

 11-10-2009
8.00
Instrument panel install, wiring ess primary ect

 10-04-2009
8.00
Wiring Elt, Fwd deck hatches

 09-20-2009
4.00
Piitot lines, wiring strobes

 09-19-2009
9.00
Strobe pack mount elt mount wire

 09-17-2009
4.00
Wire fuse nav and strobe lights

 09-04-2009
3.00
Canopy latches lift handle

 09-03-2009
8.00
Caopy side skirts

 08-21-2009
6.00
Canopy trim drill counter sink mounts

 08-14-2009
10.00
Canopy big cut, splice plate 704

 08-13-2009
8.00
Canopy lift struts install

 08-09-2009
6.00
Fwd structures prime paint install rivet

 08-08-2009
1.00
Kit log Pro set up computer

 08-06-2009
17.00
Instrument panel fit ship Steinair

 07-19-2009
2.00
fwd fuse sub structure finish

 07-18-2009
6.00
canopy frame fuse fit. Plexi inti cuts

 07-13-2009
2.50
reinforce kit rivet

 07-12-2009
10.00
Canopy frame dimple rivet paint

 07-10-2009
5.00
canopy frame adjustments

 07-09-2009
6.00
Canopy frame reinforce kit install, paint

 07-05-2009
9.00
Canopy frame

 06-28-2009
4.00
canopy frame mock up

 06-21-2009
8.00
Canopy hinge install

 06-20-2009
4.00
Canopy Latch

 06-05-2009
12.00
side handle rear canopy latch install

 06-05-2009
10.50
Canopy release and hinge blocks fabricate

 05-24-2009
4.00
pitot wiring canopy begin

 05-18-2009
5.00
L wing skin rivet final

 05-17-2009
5.00
Wing wiring internal final check skin rivet intit

 05-16-2009
6.00
Wing tip rib

 05-16-2009
7.00
Pitot tube intstall

 05-01-2009
10.00
L landing light nav light complete

 04-30-2009
8.00
L Landing light complete

 04-29-2009
8.00
Left landing light install

 04-28-2009
8.00
Service Bul L fuel pick up safety wire complete

 04-28-2009
4.50
Left wing to bench flap and ail jig install wing t

 04-27-2009
5.00
Roll servo D sub connector, final rivets
     

 04-10-2009
5.00
Wing tip epoxy Lower wing 705 panel rivets

 04-09-2009
2.00
A/P Roll Servo wiring

 03-29-2009
3.00
Rt wing tip nav light and foam rib
     

 03-28-2009
2.00
AOA Flap switch bracket install

 03-17-2009
6.50
wire. A/P Servo Link A/P servo install
Details

 03-17-2009
2.00
Eaa Tech visit.
Details

 03-10-2009
2.50
Static ports install lines install rudder cables i

 03-08-2009
5.00
AOA ports and pickup tubes install

 02-22-2009
4.50
Wing tip finial.nav lense nut plates, controll gri

 02-21-2009
2.00
Fuel quan float install
Details

 02-20-2009
4.20
Rt wing tip nav lense, tip final fit

 02-13-2009
4.50
Strobe lts wire, nav wire wing tip prep,dimple ski

 02-03-2009
4.00
Fuel pick up S/B 6.2.23 ok
Details

 01-29-2009
6.00
R wing tip init VOR ant install coax run

 01-27-2009
2.00
Battery box final

 01-21-2009
3.50
Magmometer tray fab and mount

 01-20-2009
4.00
Ele dsub wiring, R ail and flap install w730 jig i

 01-16-2009
5.00
Trim wire, rt ldg lgt

 01-02-2009
3.00
Rt wing nav light install wired w plug

 12-09-2008
6.00
wing stand, Landing light rt wing

 10-22-2008
8.00
Shop lights, work tables set up

 10-18-2008
6.00
Tip up Spacer S/B 5.1.1 instatll, fuel line instal
Details

 10-10-2008
5.00
tip up SB 05.1.0 inspct
Details

 10-10-2008
8.00
Shop heater install

 10-09-2008
6.00
elevator trim final, flap motor S/B 4.3.1
Details

 09-30-2008
2.00
electric ele trim install

 09-28-2008
6.00
remove man ail trim install ele version

 09-08-2008
6.00
prime and paint seat parts

 07-04-2008
8.00
kit puchase

 04-23-2007
8.00
epenage attach adjust
       

 12-19-2006
7.50
fiberglass prep

 09-10-2006
10.00
seat mounts
       

 08-29-2006
7.00
fwd fuse and instrument panel mounts
     

 08-06-2006
2.75
fwd fuse 768s
       

 07-22-2006
12.50
631
     

 07-16-2006
7.50
631

 07-09-2006
5.00
631s

 07-03-2006
6.00
brake resevoir

 06-25-2006
10.00
fuel valve and fuel lines
       

 06-19-2006
8.00
rudder and ele stops and mount
       

 06-12-2006
3.60
vert stab mount

 05-29-2006
6.40
elevator bell crank

 05-15-2006
14.00
fiberglass

 05-02-2006
4.20
rudder pedal install
       

 03-30-2006
8.50
wing rear spar drilled
       

 03-18-2006
3.00
flap hinges

 03-10-2006
5.25
flap to wing hinge

 02-25-2006
4.25
wing mate

 02-18-2006
8.25
wing mate

 08-28-2004
20.00
Flight control install, paint interior
       

 08-20-2004
7.00
ail push rods paint ect

 08-14-2004
6.50
paint interior

 07-18-2004
4.75
seat backs
       

 06-27-2004
4.00
flap acuator

 06-12-2004
16.00
back brace and flap actuator
       

 06-05-2004
12.00
ele flaps
Details
     

 05-30-2004
12.00
control rod tunnel

 05-23-2004
7.00
seat backs
       

 05-22-2004
5.75
baggage floor and wall

 05-16-2004
11.00
fwd rear top skin stringers

 05-16-2004
3.00
ele bell crank

 05-16-2004
3.00
bell crank

 04-29-2004
5.00
tail wheel, rudder pedals
       

 04-29-2004
15.50
rudder peddals
Details
     

 04-23-2004
7.70
fwd bulk heads

 04-16-2004
5.50
seat ribs

 03-27-2004
9.00
Flap actuator install, seat backs
       

 03-27-2004
9.00
control colums

 03-27-2004
7.00
center section sticks
Details
       

 03-13-2004
11.50
prep cener sec initial

 03-13-2004
11.50
fuse center sec
Details
     

 02-21-2004
7.00
bell cranks

 02-14-2004
7.50
ail gap seals

 02-13-2004
25.00
flaps
     

 02-13-2004
8.00
flap hinges

 01-31-2004
9.00
ail hinge brackets

 01-30-2004
19.00
aileron hinge brackets
Details
     

 01-24-2004
2.20
ele horns
Details
     

 01-23-2004
2.20
ele horns

 01-16-2004
13.50
elevators

 01-10-2004
9.60
elevators

 01-04-2004
7.30
elevators

 12-27-2003
46.00
elevators
Details
       

 12-26-2003
13.50
rudder

 11-19-2003
13.00
rudder 11/08 to11/19

 11-01-2003
4.00
rudder skins

 11-01-2003
38.00
rudder assy to 12/26
Details
       

 10-23-2003
17.00
vertical stab
Details
     

 10-23-2003
18.00
vertical stab

 10-18-2003
32.00
finished horz stab
Details
       

 08-22-2003
2.00
Harold Davis EAA 65995 TC#4348
Details

 08-06-2003
1.30
horz stab

 08-05-2003
0.75
rear spar
Details
       

 08-02-2003
4.00
cradle
Details
     

 07-26-2003
9.50
inventory
Details

 07-25-2003
6.00
inventory
Details
       

 01-17-2003
5.50
trim tab
Details
     