Date
|
Hours
|
Work Log Summary
|
Details
|
07-09-2012
|
3.00
|
Remounted wheel fairings
|
Details
|
|
|
07-08-2012
|
3.00
|
Finished rear cowl attachment
|
Details
|
|
|
07-08-2012
|
4.00
|
Finished oil fillter door
|
Details
|
|
|
07-04-2012
|
3.00
|
Fitted oil filler door to the upper cowl
|
Details
|
|
|
07-04-2012
|
1.00
|
Fabricated latch open limiters
|
Details
|
|
|
06-30-2012
|
2.00
|
Finished rear fitment of vertical stabilizer fairi
|
Details
|
|
|
06-30-2012
|
4.00
|
Attached vertical stabilizer fairing
|
Details
|
|
|
06-11-2012
|
4.00
|
Fixed clearance between spinner and cowl
|
Details
|
|
|
05-19-2012
|
3.00
|
Radio and electrical checkout
|
Details
|
|
|
05-13-2012
|
6.00
|
Windshield fairing attached
|
Details
|
|
|
05-12-2012
|
3.00
|
Added rudder and elevators
|
Details
|
|
|
05-10-2012
|
2.00
|
Recieved the upholstery
|
Details
|
|
|
05-07-2012
|
3.00
|
Reattached the empanage
|
Details
|
|
|
05-06-2012
|
4.00
|
Attached the wings
|
Details
|
|
|
05-05-2012
|
3.00
|
Moving fuselage out of the shop
|
Details
|
|
|
04-19-2012
|
3.00
|
Canopy closure treatment
|
Details
|
|
|
04-17-2012
|
6.00
|
Cleanup windshield fairing
|
Details
|
|
|
04-15-2012
|
3.00
|
Prep fpor windshield fairing layu
|
Details
|
|
|
04-15-2012
|
5.00
|
Applied glass to the windshield area
|
Details
|
|
|
04-14-2012
|
3.00
|
Initial windshield fairing layup
|
Details
|
|
|
04-14-2012
|
3.00
|
Final clearance check
|
Details
|
|
|
04-01-2012
|
4.00
|
Lay up cowl supports
|
Details
|
|
|
04-01-2012
|
5.00
|
Covers laid up
|
Details
|
|
|
03-31-2012
|
4.00
|
Preparing pin cover molds
|
Details
|
|
|
03-31-2012
|
4.00
|
Cut holes for hinge pin cover.
|
Details
|
|
|
02-11-2012
|
2.00
|
Reattached Cowl to Finish Horizontal Seam
|
Details
|
|
|
01-22-2012
|
2.00
|
Mounted canopy with windshield
|
Details
|
|
|
01-21-2012
|
5.00
|
Mounted windshield
|
Details
|
|
|
01-15-2012
|
4.00
|
Finished canopy details
|
Details
|
|
|
01-14-2012
|
4.00
|
Mounted wing tip lens hardware
|
Details
|
|
|
01-14-2012
|
3.00
|
Finished wings
|
Details
|
|
|
01-08-2012
|
2.00
|
Rivetted rear wing tip ribs
|
Details
|
|
|
01-07-2012
|
4.00
|
Fabricated right wing tip support baffles
|
Details
|
|
|
01-07-2012
|
3.00
|
Cut and trimmed wing tip lenses
|
Details
|
|
|
01-01-2012
|
2.00
|
Fabricated spacers for wing tips
|
Details
|
|
|
01-01-2012
|
4.00
|
Fabricated left wing tip support baffles
|
Details
|
|
|
12-31-2011
|
2.00
|
Secured wing tip hinge pins
|
Details
|
|
|
12-31-2011
|
4.00
|
Rivetted left wing tip hinge to wing tip
|
Details
|
|
|
12-29-2011
|
6.00
|
Rivetted right wing tip hinge to wing tip
|
Details
|
|
|
12-17-2011
|
4.00
|
Mounted wing tip antenna and lights
|
Details
|
|
|
12-16-2011
|
2.00
|
Mounted rear left wing tip rib
|
Details
|
|
|
12-15-2011
|
3.00
|
Drilled holes to mount left wing tip
|
Details
|
|
|
12-11-2011
|
4.00
|
Mounted left wing tip hinges and fitted wing tip
|
Details
|
|
|
12-10-2011
|
4.00
|
Drilled holes to mount right wing tip
|
Details
|
|
|
12-09-2011
|
3.00
|
Fitted right wing tip to wing
|
Details
|
|
|
12-08-2011
|
5.00
|
Mounted wing tip hinges on right wing
|
Details
|
|
|
12-04-2011
|
5.00
|
Rivetted left wing bottom skin
|
Details
|
|
|
12-04-2011
|
4.00
|
Rivetted joint fairing nut plates on left wing
|
Details
|
|
|
12-03-2011
|
3.00
|
Wired left lights, OAT, and antenna
|
Details
|
|
|
12-03-2011
|
2.00
|
Coupled pitot and aoa lines to pitot tube
|
Details
|
|
|
12-01-2011
|
3.00
|
Mounted pitot controller
|
Details
|
|
|
11-29-2011
|
3.00
|
Installed Dynon pitot in left wing
|
Details
|
|
|
11-26-2011
|
4.00
|
Wired right wing lights, antenna, fuel sensor
|
Details
|
|
|
11-26-2011
|
5.00
|
Installed OAT, rivetted lower right wing skin
|
Details
|
|
|
11-25-2011
|
4.00
|
Wired right wing roll servo
|
Details
|
|
|
11-25-2011
|
3.00
|
Wired right wing roll servo
|
Details
|
|
|
11-25-2011
|
3.00
|
Assembled fuel pump and sticks
|
Details
|
|
|
11-24-2011
|
8.00
|
Assembled canopy
|
Details
|
|
|
11-22-2011
|
2.00
|
Built wheel rollers
|
Details
|
|
|
11-20-2011
|
2.00
|
Tested avionics
|
Details
|
|
|
11-19-2011
|
4.00
|
Rivetted cabin top skin
|
Details
|
|
|
11-06-2011
|
4.00
|
Painted canopy parts
|
Details
|
|
|
11-05-2011
|
3.00
|
Installled handles on canopy bar
|
Details
|
|
|
10-31-2011
|
6.00
|
Installed new brake lines
|
Details
|
|
|
10-30-2011
|
3.00
|
Finished cable firewall feedthroughs
|
Details
|
|
|
10-30-2011
|
2.00
|
Fabricated passenger side vent panel
|
Details
|
|
|
10-29-2011
|
3.00
|
Wired compass and cabin lights
|
Details
|
|
|
10-23-2011
|
3.00
|
Mounted compass to center strut
|
Details
|
|
|
10-22-2011
|
4.00
|
Tested windshield fit
|
Details
|
|
|
10-20-2011
|
6.00
|
Rivetted brackets on cabin top skin
|
Details
|
|
|
10-16-2011
|
3.00
|
Secured brake lines
|
Details
|
|
|
10-13-2011
|
4.00
|
Installed remaining engine control cables
|
Details
|
|
|
10-11-2011
|
2.00
|
Installed throttle control
|
Details
|
|
|
10-09-2011
|
3.00
|
Installed engine control cables
|
Details
|
|
|
10-08-2011
|
3.00
|
Installed cooling vents
|
Details
|
|
|
10-06-2011
|
1.00
|
Installed oil vent control cable
|
Details
|
|
|
10-06-2011
|
3.00
|
Finished air vent control installation
|
Details
|
|
|
10-02-2011
|
1.00
|
Installed forward center cover
|
Details
|
|
|
10-02-2011
|
3.00
|
Installed antenna leads
|
Details
|
|
|
10-02-2011
|
1.00
|
Installed air vents
|
Details
|
|
|
10-02-2011
|
2.00
|
Completed ignition system wiring
|
Details
|
|
|
09-29-2011
|
2.00
|
Buttoned up flap mechanism
|
Details
|
|
|
09-25-2011
|
6.00
|
Wired up control sticks
|
Details
|
|
|
09-24-2011
|
6.00
|
Installed GTX-327 Transponder
|
Details
|
|
|
09-23-2011
|
1.00
|
First lesson for Kay
|
Details
|
|
|
09-22-2011
|
3.00
|
Tested the GNS-430
|
Details
|
|
|
09-21-2011
|
3.00
|
Tested SL-30
|
Details
|
|
|
09-20-2011
|
3.00
|
Powered up GMA 340 Audio panel
|
Details
|
|
|
09-19-2011
|
4.00
|
Build roller carts for wheels
|
Details
|
|
|
09-17-2011
|
5.00
|
GPSMAP-696 Testing
|
Details
|
|
|
09-15-2011
|
3.00
|
Powered up Skyview systems
|
Details
|
|
|
09-12-2011
|
3.00
|
Wired status lights
|
Details
|
|
|
09-11-2011
|
4.00
|
Wired ignition modules
|
Details
|
|
|
09-10-2011
|
6.00
|
Finsih assembled intstrument panel
|
Details
|
|
|
09-08-2011
|
3.00
|
Sprayed clear coad
|
Details
|
|
|
09-07-2011
|
6.00
|
Decalled main panel
|
Details
|
|
|
09-06-2011
|
3.00
|
Started decaling panels
|
Details
|
|
|
09-05-2011
|
4.00
|
Mounted antenna diplexer
|
Details
|
|
|
09-04-2011
|
8.00
|
Rewired stick controls
|
Details
|
|
|
09-03-2011
|
6.00
|
Ran antennal wires
|
Details
|
|
|
09-02-2011
|
3.00
|
Plumbed manifold pressure lines
|
Details
|
|
|
08-28-2011
|
5.00
|
Mounted ELT antenna bracket
|
Details
|
|
|
08-27-2011
|
5.00
|
Finsh mounted GPS antenna shelf
|
Details
|
|
|
08-26-2011
|
4.00
|
Mounted avionics fan
|
Details
|
|
|
08-25-2011
|
4.00
|
Mounted center harnes point brackets
|
Details
|
|
|
08-22-2011
|
4.00
|
Wired rudder strobe
|
Details
|
|
|
08-21-2011
|
6.00
|
Painted parts
|
Details
|
|
|
08-20-2011
|
4.00
|
Removed front panal for finishing
|
Details
|
|
|
08-19-2011
|
6.00
|
Fabricated mounting for avionics fan
|
Details
|
|
|
08-18-2011
|
7.00
|
Fabricated backing plates for shelf
|
Details
|
|
|
08-17-2011
|
4.00
|
Fabricated ELT antenna mount
|
Details
|
|
|
08-13-2011
|
8.00
|
Added GPS Antenna shelf on the firewall
|
Details
|
|
|
08-07-2011
|
4.00
|
Powered up lights and Skyview system
|
Details
|
|
|
08-06-2011
|
6.00
|
Wired headsets
|
Details
|
|
|
08-05-2011
|
7.00
|
Wired front panel controls
|
Details
|
|
|
08-03-2011
|
5.00
|
Mounted COM antennas
|
Details
|
|
|
08-02-2011
|
3.00
|
Mounted GNS 430 GPS antenna
|
Details
|
|
|
07-23-2011
|
4.00
|
Finish wired GPSMAP 696
|
Details
|
|
|
07-16-2011
|
6.00
|
Finished wiring Skyview 700
|
Details
|
|
|
07-07-2011
|
4.00
|
Prepare for front panel wiring
|
Details
|
|
|
07-02-2011
|
4.00
|
Complete fuse block wiring
|
Details
|
|
|
06-18-2011
|
3.00
|
Wire Skynet bus connector
|
Details
|
|
|
06-04-2011
|
6.00
|
Wire main Skyview connector
|
Details
|
|
|
05-31-2011
|
6.00
|
Finish wirng fuse blocks
|
Details
|
|
|
05-29-2011
|
0.50
|
My favorite birds visit me
|
Details
|
|
|
05-28-2011
|
6.00
|
Laced front panel wiring
|
Details
|
|
|
05-21-2011
|
6.00
|
Initial finish wiring fuse blocks
|
Details
|
|
|
05-14-2011
|
6.00
|
Finish wired heat sinks
|
Details
|
|
|
05-07-2011
|
8.00
|
Finish wired dimmer modules
|
Details
|
|
|
04-23-2011
|
7.00
|
Finish wired EMS module
|
Details
|
|
|
04-16-2011
|
8.00
|
Prepare for finish wiring
|
Details
|
|
|
04-10-2011
|
6.00
|
Assembled Fuseholder shelf
|
Details
|
|
|
04-09-2011
|
6.00
|
Routing wires and lacing
|
Details
|
|
|
04-05-2011
|
4.00
|
Laced wiring
|
Details
|
|
|
04-04-2011
|
4.00
|
Mounted heat sinks and lighting controllers
|
Details
|
|
|
04-03-2011
|
6.00
|
Completed Secondary Regulator wiring
|
Details
|
|
|
04-02-2011
|
8.00
|
Completed Ignition Wiring
|
Details
|
|
|
03-29-2011
|
5.00
|
Completed firewall wiring
|
Details
|
|
|
03-28-2011
|
6.00
|
Mounted Skyview Modules and Ignition
|
Details
|
|
|
03-27-2011
|
6.00
|
Final assembly firewall penetrations
|
Details
|
|
|
03-26-2011
|
7.00
|
Final assembly for mountings
|
Details
|
|
|
03-25-2011
|
5.00
|
Parts final assembly
|
Details
|
|
|
03-22-2011
|
4.00
|
Painted parts
|
Details
|
|
|
03-06-2011
|
8.00
|
Fabricated ignition battery box
|
Details
|
|
|
03-05-2011
|
8.00
|
Mounted Fuel Flow Sensor
|
Details
|
|
|
02-27-2011
|
2.00
|
Secured fuel line
|
Details
|
|
|
02-27-2011
|
6.00
|
Fabricated firewall penetrations
|
Details
|
|
|
02-26-2011
|
6.00
|
Finished firewall wiring
|
Details
|
|
|
02-12-2011
|
3.00
|
Finished up power cable runs
|
Details
|
|
|
02-06-2011
|
6.00
|
Power Cable runs
|
Details
|
|
|
02-05-2011
|
8.00
|
Terminated Power Cables
|
Details
|
|
|
01-15-2011
|
8.00
|
Mounting Firewall Components
|
Details
|
|
|
01-08-2011
|
7.00
|
Ran ground wires
|
Details
|
|
|
01-01-2011
|
6.00
|
Wired ARINC-429 Module connector
|
Details
|
|
|
12-19-2010
|
8.00
|
Wired Network to Modules
|
Details
|
|
|
12-18-2010
|
5.00
|
Wire runs to the panel
|
Details
|
|
|
12-11-2010
|
8.00
|
Lacing cables
|
Details
|
|
|
12-04-2010
|
10.00
|
Rewiring Fuselage
|
Details
|
|
|
11-28-2010
|
6.00
|
Reworked Autopilot Trim Servo
|
Details
|
|
|
11-27-2010
|
8.00
|
Wired and Mounted ADAHRS Platform
|
Details
|
|
|
11-26-2010
|
15.00
|
Reworked the fuselage wiring
|
Details
|
|
|
11-25-2010
|
6.00
|
Fitted Main Control Cables
|
Details
|
|
|
11-24-2010
|
2.00
|
Preparing Skyview Network Junctions
|
Details
|
|
|
11-23-2010
|
2.00
|
Preparing Skyview Network Junctions
|
Details
|
|
|
11-22-2010
|
6.00
|
Preparing Skyview Network Junctions
|
Details
|
|
|
11-21-2010
|
8.00
|
Mounted auxilary control cables
|
Details
|
|
|
11-14-2010
|
7.00
|
Installed Parking Brake
|
Details
|
|
|
11-10-2010
|
0.75
|
Assembled Regulator Mounting Plate
|
Details
|
|
|
11-09-2010
|
2.00
|
Second Bulkhead Mountings Assembly
|
Details
|
|
|
11-09-2010
|
1.00
|
GPS 696 Mounting
|
Details
|
|
|
11-09-2010
|
2.00
|
Front Panel Mounting Assembly
|
Details
|
|
|
11-08-2010
|
1.00
|
Component Mountings Final Assembly
|
Details
|
|
|
11-07-2010
|
8.00
|
Spray parts
|
Details
|
|
|
11-06-2010
|
9.00
|
Parts preparation
|
Details
|
|
|
10-31-2010
|
8.00
|
Front panel switch mounting
|
Details
|
|
|
10-30-2010
|
8.00
|
Mounted Panel Switches
|
Details
|
|
|
10-25-2010
|
10.00
|
Mounted ADAHRS Modules
|
Details
|
|
|
10-23-2010
|
6.00
|
Mounted the secodary alternator regulator
|
Details
|
|
|
10-09-2010
|
5.00
|
Mounted Firewall Componenets
|
Details
|
|
|
10-08-2010
|
8.00
|
Completed mounting of bulkhead components
|
Details
|
|
|
10-02-2010
|
6.00
|
Mounted dimmer controls and heat sink
|
Details
|
|
|
09-27-2010
|
2.00
|
Cut holes for Skyview USB ports
|
Details
|
|
|
09-25-2010
|
7.00
|
Refined 696 mounting.
|
Details
|
|
|
09-23-2010
|
5.00
|
Mounted GPSMAP-696
|
Details
|
|
|
09-19-2010
|
4.00
|
Assembled bulkhead and panel to top skin
|
Details
|
|
|
09-18-2010
|
6.00
|
Mounted backup battery and relays
|
Details
|
|
|
09-11-2010
|
8.00
|
Mounted Skyview Modules
|
Details
|
|
|
09-05-2010
|
8.00
|
Built Fuse Panel Under Pilot Panel
|
Details
|
|
|
08-29-2010
|
8.00
|
Prepared wiring harness for Garmin stack
|
Details
|
|
|
08-22-2010
|
20.00
|
Created Skyview Schematic
|
Details
|
|
|
08-15-2010
|
20.00
|
Prepared Avionics Schematics
|
Details
|
|
|
08-07-2010
|
6.00
|
Fitted Garmin stack to second bulkhead
|
Details
|
|
|
07-25-2010
|
10.00
|
Mounted SV-D700
|
Details
|
|
|
07-24-2010
|
5.00
|
Cut hole for GPSMAP-696
|
Details
|
|
|
07-22-2010
|
4.00
|
Prepared instrument side panels
|
Details
|
|
|
07-20-2010
|
3.00
|
Measuring up Garmin components
|
Details
|
|
|
07-19-2010
|
3.00
|
Cut hole for Garmin stack
|
Details
|
|
|
07-18-2010
|
3.00
|
Cut hole for the SV-D1000
|
Details
|
|
|
07-17-2010
|
3.00
|
Marked panel for major cuts
|
Details
|
|
|
07-17-2010
|
5.00
|
Layout Instrument Panel
|
Details
|
|
|
07-10-2010
|
20.00
|
Design Instrument Panel
|
Details
|
|
|
06-26-2010
|
4.00
|
Routed ignition leads
|
Details
|
|
|
06-26-2010
|
1.00
|
Planning fuel flow sensor installation
|
Details
|
|
|
06-26-2010
|
3.00
|
Built desecant holders for exhaust systems
|
Details
|
|
|
06-14-2010
|
3.00
|
Installed right EFIS backup battery
|
Details
|
|
|
06-13-2010
|
7.00
|
Attached ignition system rails
|
Details
|
|
|
06-12-2010
|
3.00
|
Mounted ignition systems to rails
|
Details
|
|
|
06-07-2010
|
3.00
|
Sniffle valve install
|
Details
|
|
|
06-06-2010
|
4.00
|
Reattached prop. Spinner cutout layup
|
Details
|
|
|
06-05-2010
|
5.00
|
Finished ignition system install and test
|
Details
|
|
|
06-05-2010
|
2.00
|
Final assembly of skybolt assembly
|
Details
|
|
|
06-04-2010
|
1.00
|
Received Dynon gear
|
Details
|
|
|
05-31-2010
|
3.00
|
Finished lower baffle attachment
|
|
|
|
05-31-2010
|
6.00
|
Final assembly for baffles
|
Details
|
|
|
05-30-2010
|
9.00
|
Finsh paint baffle parts
|
Details
|
|
|
05-29-2010
|
9.00
|
Primed baffle parts
|
Details
|
|
|
05-29-2010
|
4.00
|
Prepared parts for priming
|
Details
|
|
|
05-28-2010
|
4.00
|
Made plug hole covers
|
Details
|
|
|
05-27-2010
|
3.00
|
Fabricated fin extensions for cylinder cooling
|
Details
|
|
|
05-23-2010
|
1.00
|
Removed baffles for painting
|
Details
|
|
|
05-22-2010
|
6.00
|
Finished lower ignition system installation
|
Details
|
|
|
05-21-2010
|
2.00
|
Sanded snorkel and fitted flanges
|
Details
|
|
|
05-18-2010
|
1.00
|
Final layup on snorkel
|
Details
|
|
|
05-16-2010
|
4.00
|
Installed alternator cooling hose
|
Details
|
|
|
05-15-2010
|
5.00
|
Installed cabin heat hoses
|
Details
|
|
|
05-14-2010
|
1.00
|
Ignition coil fitting
|
Details
|
|
|
05-09-2010
|
7.00
|
Mounted 2nd set of ignition coils
|
Details
|
|
|
05-09-2010
|
2.00
|
Fuel injection system hookup
|
Details
|
|
|
05-08-2010
|
1.00
|
Drilled holes for ignition wires
|
Details
|
|
|
05-02-2010
|
8.00
|
Installed 1st set of ignition coils
|
Details
|
|
|
05-01-2010
|
2.00
|
Finish baffle cleanup
|
Details
|
|
|
05-01-2010
|
2.00
|
Added oil cooler shutter
|
|
|
|
04-25-2010
|
3.00
|
Final fitting of snorkel flange
|
Details
|
|
|
04-25-2010
|
7.00
|
Adjusted the height of the baffles
|
Details
|
|
|
04-23-2010
|
2.00
|
Cutting snorkel flange
|
Details
|
|
|
04-18-2010
|
6.00
|
Fitted oil filter to baffles
|
Details
|
|
|
04-03-2010
|
3.00
|
Fitted upper cowl
|
Details
|
|
|
04-02-2010
|
2.00
|
Garmin equipment arrived
|
Details
|
|
|
03-06-2010
|
2.00
|
Snorkel sanded
|
Details
|
|
|
03-06-2010
|
2.00
|
Snorkel fitting
|
Details
|
|
|
03-05-2010
|
2.00
|
Snorkel second layup.
|
Details
|
|
|
02-28-2010
|
2.00
|
Preparing snorkel transition form and first layup
|
Details
|
|
|
02-28-2010
|
3.00
|
Making transition form
|
Details
|
|
|
02-28-2010
|
2.00
|
Further measurements for snorkel fit
|
Details
|
|
|
02-28-2010
|
2.00
|
First cut not good
|
Details
|
|
|
02-27-2010
|
2.00
|
Worked on left inlet baffles
|
Details
|
|
|
02-27-2010
|
4.00
|
Preparing for snorkel attachment
|
Details
|
|
|
02-27-2010
|
3.00
|
First cut to shrink snorkel
|
Details
|
|
|
02-27-2010
|
2.00
|
Baffle mounting brackets
|
Details
|
|
|
02-14-2010
|
3.00
|
Inlet snorkel attachment
|
Details
|
|
|
02-13-2010
|
5.00
|
Engine baffle kit
|
Details
|
|
|
02-13-2010
|
2.00
|
Attached inlet fairings
|
Details
|
|
|
02-07-2010
|
4.00
|
Miscellaneous work
|
Details
|
|
|
02-06-2010
|
4.00
|
Rivetting and gluing the top hinges
|
Details
|
|
|
02-06-2010
|
2.00
|
Prepared top cowl for Sky Bolts
|
Details
|
|
|
02-06-2010
|
3.00
|
Prepared flanges for Sky Bolts
|
Details
|
|
|
02-01-2010
|
2.00
|
Upper horizontal cowl hinge views
|
Details
|
|
|
02-01-2010
|
4.00
|
Spacing the cowl halves
|
Details
|
|
|
02-01-2010
|
2.00
|
Drilled holes for hinge pins
|
Details
|
|
|
01-31-2010
|
4.00
|
Lower hnge attachment
|
Details
|
|
|
01-31-2010
|
3.00
|
Horizontal cowl hinge after drilling
|
Details
|
|
|
01-31-2010
|
4.00
|
Clamping horizontal hinges to cowl
|
Details
|
|
|
01-31-2010
|
3.00
|
Attaching rear edge hinges to cowl
|
Details
|
|
|
01-30-2010
|
7.00
|
Adjusting lower cowl fit
|
Details
|
|
|
01-25-2010
|
2.00
|
Trimming the top edges
|
Details
|
|
|
01-25-2010
|
2.00
|
Drilling side hinges for the cowl
|
Details
|
|
|
01-24-2010
|
3.00
|
Shimming the sides of the cowl
|
Details
|
|
|
01-24-2010
|
3.00
|
Setting the side cowl hinge pins
|
Details
|
|
|
01-24-2010
|
3.00
|
Installing bottom cowl hinges
|
Details
|
|
|
01-23-2010
|
3.00
|
Drilling holes for Sky Bolts
|
Details
|
|
|
01-23-2010
|
4.00
|
Cutting back edge of bottom cowl
|
Details
|
|
|
01-18-2010
|
3.00
|
Finishing top cowl flanges
|
Details
|
|
|
01-18-2010
|
6.00
|
Cutting top cowl to length
|
Details
|
|
|
01-17-2010
|
6.00
|
Start Sky Bolt installation
|
Details
|
|
|
01-02-2010
|
5.00
|
Adjusting cowl fit
|
Details
|
|
|
01-01-2010
|
4.00
|
Initial cowl fitting
|
Details
|
|
|
12-20-2009
|
3.00
|
Spinner fillin plates added
|
Details
|
|
|
12-20-2009
|
1.00
|
Lower canopy fitted
|
Details
|
|
|
12-19-2009
|
4.00
|
Spinner attached
|
Details
|
|
|
12-19-2009
|
4.00
|
Propeller mounted to the engine
|
Details
|
|
|
12-16-2009
|
1.00
|
Propeller arrives
|
Details
|
|
|
11-03-2009
|
0.50
|
Fitted top cowl
|
Details
|
|
|
11-03-2009
|
1.50
|
Fitted cabin heat muff to exhaust
|
Details
|
|
|
11-03-2009
|
1.00
|
Attached tail pipe support
|
Details
|
|
|
11-02-2009
|
3.00
|
Attached exhaust system
|
Details
|
|
|
11-01-2009
|
2.00
|
Ran fuel line to injector intake
|
Details
|
|
|
11-01-2009
|
0.50
|
Mounted throttle cable
|
Details
|
|
|
11-01-2009
|
0.50
|
Mounted oil pressure transducer hose
|
Details
|
|
|
11-01-2009
|
2.00
|
Mounted fuel pump overflow line
|
Details
|
|
|
11-01-2009
|
1.00
|
Mounted alternator
|
Details
|
|
|
11-01-2009
|
1.00
|
Added firewall to pump fuel line
|
Details
|
|
|
10-31-2009
|
3.00
|
Mounted firewall components and engine mount
|
Details
|
|
|
10-31-2009
|
3.00
|
Mounted engine
|
Details
|
|
|
10-31-2009
|
0.50
|
Engine on fuselage
|
Details
|
|
|
10-29-2009
|
3.00
|
Relieved main wheel clearance
|
Details
|
|
|
10-27-2009
|
3.00
|
Nose fairing assembly
|
Details
|
|
|
10-26-2009
|
2.00
|
Finish assembly of main gear
|
Details
|
|
|
10-25-2009
|
5.00
|
Painted parts
|
Details
|
|
|
10-24-2009
|
5.00
|
Mounted prop governor to engine
|
Details
|
|
|
03-07-2009
|
3.00
|
Fabricated ELT antenna backing plate
|
Details
|
|
|
03-05-2009
|
2.00
|
Mounted wing root connectors
|
Details
|
|
|
03-01-2009
|
2.00
|
Finished wiring barriers
|
Details
|
|
|
02-28-2009
|
5.00
|
Canted grips 15 degrees
|
Details
|
|
|
02-14-2009
|
3.00
|
Finished wiring grips into barrier strip
|
Details
|
|
|
02-13-2009
|
3.00
|
Ran grip wires to barrier strips
|
Details
|
|
|
02-12-2009
|
3.00
|
Wired pilot grip
|
Details
|
|
|
02-11-2009
|
1.00
|
Routed copilot grip wires to barrier strip
|
Details
|
|
|
02-10-2009
|
3.00
|
Mounted base assembly
|
Details
|
|
|
02-08-2009
|
4.00
|
Prepare base wiring
|
Details
|
|
|
02-07-2009
|
3.00
|
Assembled base connector
|
Details
|
|
|
02-06-2009
|
3.00
|
Prepared copilot stick base
|
Details
|
|
|
02-05-2009
|
3.00
|
Brazed pins into copilot stick
|
Details
|
|
|
02-04-2009
|
2.00
|
Prepared copilot stick mounting
|
Details
|
|
|
01-31-2009
|
4.00
|
Wired and mounted copilot grip
|
Details
|
|
|
01-30-2009
|
3.00
|
Laced wires for copilot grip connector
|
Details
|
|
|
01-29-2009
|
3.00
|
Continued connector assembly
|
Details
|
|
|
01-28-2009
|
2.00
|
Started copilot grip connector wiring
|
Details
|
|
|
01-27-2009
|
1.00
|
Prepared joystick grips
|
Details
|
|
|
01-26-2009
|
3.00
|
Added braces to ELT panel, ran wires
|
Details
|
|
|
01-25-2009
|
7.00
|
Ran wires, mounted barrier strip panel
|
Details
|
|
|
01-24-2009
|
5.00
|
Mounted ELT in fuselage
|
Details
|
|
|
01-23-2009
|
3.00
|
Mounted and wired ELT.
|
Details
|
|
|
01-19-2009
|
3.00
|
Laced wires running to fuselage tail
|
Details
|
|
|
01-18-2009
|
5.00
|
Finished elevator autopilot servo install
|
Details
|
|
|
01-17-2009
|
7.00
|
Final assembly of flap position sensor
|
Details
|
|
|
01-12-2009
|
5.00
|
Primed aluminum parts
|
Details
|
|
|
01-11-2009
|
3.00
|
Assembled barrier strip panel
|
Details
|
|
|
01-10-2009
|
9.00
|
Wired flap controls and relays
|
Details
|
|
|
01-09-2009
|
3.00
|
Wired elevator autopilot servo
|
Details
|
|
|
01-08-2009
|
3.00
|
Mounted trim lockout relays
|
Details
|
|
|
01-06-2009
|
4.00
|
Wired trim lockout relays
|
Details
|
|
|
01-05-2009
|
2.00
|
Spliced cable to elevator trim servo
|
Details
|
|
|
01-04-2009
|
2.00
|
Routed static pressure line
|
Details
|
|
|
01-03-2009
|
3.00
|
Mounted barrier strip for flap control
|
Details
|
|
|
12-31-2008
|
4.00
|
Installed trim servo relay decks
|
Details
|
|
|
12-30-2008
|
3.00
|
Started servo relay deck wiring
|
Details
|
|
|
12-27-2008
|
3.00
|
Finished installing flap position transducer
|
Details
|
|
|
12-21-2008
|
4.00
|
Mounted Flap Position Transducer
|
Details
|
|
|
12-20-2008
|
8.00
|
Build magnetometer mount
|
Details
|
|
|
12-19-2008
|
2.00
|
Mounted Elevator Servo
|
Details
|
|
|
12-18-2008
|
1.00
|
Mounted Strobe Power Supply
|
Details
|
|
|
12-07-2008
|
7.00
|
Assembled canopy handle
|
Details
|
|
|
12-06-2008
|
5.00
|
Drilled and tapped holes for windscreen
|
Details
|
|
|
06-22-2008
|
5.00
|
Drilled and countersunk canopy holes
|
Details
|
|
|
05-26-2008
|
8.00
|
Adjusted canopy fit to frame
|
Details
|
|
|
05-25-2008
|
6.00
|
Fitted windscreen to frame
|
Details
|
|
|
05-24-2008
|
8.00
|
Fitted windscreen to frame
|
Details
|
|
|
05-17-2008
|
9.00
|
Drilled attachment holes through canopy
|
Details
|
|
|
05-11-2008
|
5.00
|
Cut forward windscreen from canopy
|
Details
|
|
|
02-13-2008
|
3.00
|
Fitted canopy frame to canopy
|
Details
|
|
|
02-12-2008
|
4.00
|
Finished canopy stand.
|
Details
|
|
|
02-10-2008
|
6.00
|
Built stand for cutting canopy
|
Details
|
|
|
02-09-2008
|
5.00
|
Mount rear sliding rail
|
Details
|
|
|
02-09-2008
|
4.00
|
Finished canopy frame alignment
|
Details
|
|
|
02-08-2008
|
3.00
|
Started canopy frame alignment
|
Details
|
|
|
01-12-2008
|
6.00
|
Mounted forward canopy frame
|
Details
|
|
|
01-12-2008
|
5.00
|
Mounted forward brace. Started canopy frame
|
Details
|
|
|
01-06-2008
|
4.00
|
Finished wing root fairings
|
Details
|
|
|
11-22-2007
|
2.00
|
Attached left wing root fairing
|
Details
|
|
|
11-12-2007
|
2.00
|
Attached aileron pushrods
|
Details
|
|
|
11-11-2007
|
7.00
|
Drilled incidence holes, set tank brackets
|
Details
|
|
|
11-10-2007
|
7.00
|
Mounted wings, trimmed flaps, set incidence
|
Details
|
|
|
11-09-2007
|
1.00
|
Fineished wing horses
|
Details
|
|
|
11-08-2007
|
3.00
|
Started wing horses
|
Details
|
|
|
11-06-2007
|
1.00
|
Reattached top front cabin
|
Details
|
|
|
11-05-2007
|
2.00
|
Finished brakes
|
Details
|
|
|
11-04-2007
|
5.00
|
Assembled NACA vents, rudder fairings, brakes
|
Details
|
|
|
11-03-2007
|
10.00
|
Reassembled fuel pump, flaps, empenagge
|
Details
|
|
|
11-02-2007
|
1.00
|
Riveted flap hinges
|
Details
|
|
|
11-01-2007
|
6.00
|
Finished riveting inside bottom wing skins
|
Details
|
|
|
10-31-2007
|
2.00
|
Clean up, move fuselage to hangar.
|
Details
|
|
|
10-30-2007
|
4.00
|
Spray cabin interior
|
Details
|
|
|
10-29-2007
|
2.00
|
Prep cabin interior
|
Details
|
|
|
10-25-2007
|
2.50
|
Rivet inside right lower wing skin
|
Details
|
|
|
10-24-2007
|
5.00
|
Spray interior parts - finish kit arrives
|
Details
|
|
|
10-23-2007
|
2.00
|
Prep interior parts
|
Details
|
|
|
10-22-2007
|
2.50
|
Spray finish on interior parts
|
Details
|
|
|
10-17-2007
|
4.00
|
Assemble pitot to wing, rivet lower interior skin
|
Details
|
|
|
10-15-2007
|
3.00
|
Prime pitot parts
|
Details
|
|
|
10-14-2007
|
6.00
|
Mounted pitot on left wing
|
Details
|
|
|
10-14-2007
|
2.00
|
Cut pitot hole in skin
|
Details
|
|
|
10-11-2007
|
1.50
|
Primed test sheets
|
Details
|
|
|
10-11-2007
|
2.00
|
Masked cabin interior
|
Details
|
|
|
10-10-2007
|
1.00
|
Prep test sheets
|
Details
|
|
|
10-09-2007
|
2.00
|
Spray primer on riveted parts
|
Details
|
|
|
10-07-2007
|
6.00
|
Prep parts, rivet rear skin to skin
|
Details
|
|
|
10-04-2007
|
4.00
|
Final assembly, painted parts
|
Details
|
|
|
10-01-2007
|
1.50
|
Small assembly, nutplates and pushrods
|
Details
|
|
|
09-30-2007
|
6.00
|
Primed parts
|
Details
|
|
|
09-29-2007
|
9.00
|
Scrubbed, etched, and alodined parts
|
Details
|
|
|
09-28-2007
|
2.00
|
Remove empennage to prime parts
|
Details
|
|
|
09-27-2007
|
2.00
|
Install wiring conduit in the tail
|
Details
|
|
|
09-20-2007
|
3.00
|
Fitted rudder fairings
|
Details
|
|
|
09-19-2007
|
2.00
|
Fiberglassed rudder fairings
|
Details
|
|
|
09-18-2007
|
3.00
|
Made rudder fairing mold
|
Details
|
|
|
09-17-2007
|
2.00
|
Fitted rudder stops
|
Details
|
|
|
09-15-2007
|
2.00
|
Riveted nutplates for access hole
|
Details
|
|
|
09-15-2007
|
5.00
|
Mounted vert stab tip, drilled rudder tip
|
Details
|
|
|
09-14-2007
|
3.00
|
Prepared elevator tips for mounting
|
Details
|
|
|
09-13-2007
|
2.50
|
Installed strobe/elt mounting brackets
|
Details
|
|
|
09-11-2007
|
2.50
|
Fiberglassed horizontal stabilizer tip ends
|
Details
|
|
|
09-10-2007
|
2.00
|
Installed electric elevator trim assembly
|
Details
|
|
|
09-09-2007
|
3.00
|
Installed NACA ducts for ventilation
|
Details
|
|
|
09-08-2007
|
3.00
|
Installed NACA ducts for ventilation
|
Details
|
|
|
09-07-2007
|
1.00
|
Worked on horizontal stabilizer tips
|
Details
|
|
|
09-06-2007
|
2.00
|
Worked on horizontal stabilizer tips
|
Details
|
|
|
09-04-2007
|
2.00
|
Worked on horizontal stabilizer tips
|
Details
|
|
|
09-03-2007
|
8.00
|
Finished rudder light install, started elevator ti
|
Details
|
|
|
09-02-2007
|
6.00
|
Worked on elevator tips
|
Details
|
|
|
09-01-2007
|
3.00
|
Fitted lower rudder tip
|
Details
|
|
|
08-31-2007
|
2.00
|
Cut hole in rudder for tail light
|
Details
|
|
|
08-28-2007
|
3.00
|
Install flap position system, static ports.
|
Details
|
|
|
08-27-2007
|
3.00
|
Finished tank selector, fuel pump install
|
Details
|
|
|
08-26-2007
|
5.00
|
Fuel pump, ridgid brake lines, rudder cables
|
Details
|
|
|
08-25-2007
|
6.00
|
Worked on fuel pump
|
Details
|
|
|
08-24-2007
|
3.00
|
Installed fuel tank vent lines
|
Details
|
|
|
08-21-2007
|
3.00
|
Installed left landing gear mount, right fuel line
|
Details
|
|
|
08-20-2007
|
2.00
|
Installed the right landing gear mount
|
Details
|
|
|
08-16-2007
|
3.00
|
Finished aileron trim installation
|
Details
|
|
|
08-14-2007
|
3.00
|
Finished elevator pushrod and aileron trim
|
Details
|
|
|
08-13-2007
|
1.50
|
Built control pushrods
|
Details
|
|
|
08-12-2007
|
7.00
|
Assembled front top cabin
|
Details
|
|
|
08-11-2007
|
5.00
|
Assembled front top cabin
|
Details
|
|
|
08-05-2007
|
5.00
|
Finished vertical stabilizer, attach rudder
|
Details
|
|
|
08-03-2007
|
3.50
|
Assembled vertival stabilizer
|
Details
|
|
|
07-29-2007
|
6.00
|
Built main elevator control rod
|
Details
|
|
|
07-22-2007
|
4.00
|
Attached horizontal stabilizer
|
Details
|
|
|
07-21-2007
|
5.00
|
Assembled elevators to horizontal stab
|
Details
|
|
|
07-19-2007
|
3.00
|
Seat back final assembly
|
Details
|
|
|
07-17-2007
|
2.50
|
Fuselage assembly
|
Details
|
|
|
07-16-2007
|
1.00
|
Aft Seat floor assembly
|
Details
|
|
|
07-15-2007
|
7.00
|
Started final assembly
|
Details
|
|
|
07-14-2007
|
10.00
|
Primed fuselage parts
|
Details
|
|
|
07-13-2007
|
4.00
|
Alodined parts
|
Details
|
|
|
07-12-2007
|
2.00
|
Done scrubbing parts
|
Details
|
|
|
07-11-2007
|
1.00
|
Finish floor box assembly
|
Details
|
|
|
07-10-2007
|
2.00
|
Floor box assembly
|
Details
|
|
|
07-08-2007
|
6.00
|
Continue floor box assembly
|
Details
|
|
|
07-05-2007
|
2.00
|
Start floor box assembly
|
Details
|
|
|
06-23-2007
|
7.00
|
Dimple, deburr, and scrub parts
|
Details
|
|
|
06-21-2007
|
3.00
|
Deburr parts
|
Details
|
|
|
05-13-2007
|
5.00
|
Deburr parts
|
Details
|
|
|
05-12-2007
|
2.00
|
Forward covers
|
Details
|
|
|
05-12-2007
|
6.00
|
Electric flaps
|
Details
|
|
|
05-11-2007
|
3.50
|
Assemble seat backs
|
Details
|
|
|
05-10-2007
|
1.50
|
Assemble seat backs
|
Details
|
|
|
05-06-2007
|
4.00
|
Seat backs
|
Details
|
|
|
05-05-2007
|
2.50
|
Forward set floors and control rod tunnel
|
Details
|
|
|
05-03-2007
|
3.00
|
Attach seat adjusters to aft seat floors
|
Details
|
|
|
05-02-2007
|
5.00
|
Finished baggage compartment
|
Details
|
|
|
04-27-2007
|
3.50
|
Drilled top skins and riveted baggage floor
|
Details
|
|
|
04-26-2007
|
3.00
|
Gussets, elevator bell crank, rear top skin
|
Details
|
|
|
04-25-2007
|
2.00
|
Installed side rails and gussets
|
Details
|
|
|
04-24-2007
|
3.00
|
Attach aft deck
|
Details
|
|
|
04-22-2007
|
2.50
|
Finished riveting, turned canoe over
|
Details
|
|
|
04-21-2007
|
16.00
|
Riveted round 4
|
Details
|
|
|
04-20-2007
|
6.00
|
Riveted round 3
|
Details
|
|
|
04-19-2007
|
6.00
|
Riveted round 2
|
Details
|
|
|
04-17-2007
|
5.00
|
Riveted round 1
|
Details
|
|
|
04-15-2007
|
5.00
|
Clecoed fuselage
|
Details
|
|
|
04-14-2007
|
5.00
|
Started assembly
|
Details
|
|
|
04-13-2007
|
12.00
|
Finished alodine, primed all parts
|
Details
|
|
|
04-12-2007
|
4.00
|
Scrubbed/alodined parts
|
Details
|
|
|
04-08-2007
|
8.00
|
Deburr aft fuse, longerons, ready for paint prep
|
Details
|
|
|
04-07-2007
|
10.00
|
Deburr, dimple skins
|
Details
|
|
|
03-31-2007
|
8.00
|
Deburr, dimple parts
|
Details
|
|
|
03-29-2007
|
2.50
|
Deburr, dimple parts
|
Details
|
|
|
03-27-2007
|
2.00
|
Cleanup and disassemble fuselage
|
Details
|
|
|
03-26-2007
|
2.00
|
Match drill skins
|
Details
|
|
|
03-25-2007
|
7.00
|
Finished up step installation
|
Details
|
|
|
03-24-2007
|
10.00
|
Finished brake assembly intall
|
Details
|
|
|
03-23-2007
|
1.50
|
Completed brake pedal assembly
|
Details
|
|
|
03-22-2007
|
3.00
|
Started brake pedal assembly
|
Details
|
|
|
03-21-2007
|
1.00
|
Fabricated brake pedal angles
|
Details
|
|
|
03-20-2007
|
3.50
|
Deburred brake pedals
|
Details
|
|
|
03-19-2007
|
1.50
|
Worked on forward fuselage
|
Details
|
|
|
03-18-2007
|
3.00
|
Worked on forward bulkheads
|
Details
|
|
|
03-17-2007
|
7.00
|
Fit and drilled auxiliary longerons
|
Details
|
|
|
03-15-2007
|
3.00
|
Cut holes for landing gear brackets
|
|
|
|
03-11-2007
|
7.00
|
Finished working side skins
|
Details
|
|
|
03-08-2007
|
2.00
|
Bent side skin to fit rear section
|
Details
|
|
|
03-04-2007
|
8.00
|
Riveted the bottom skin onto the center section
|
Details
|
|
|
03-03-2007
|
8.00
|
Rivetted center section skeleton
|
Details
|
|
|
02-14-2007
|
5.50
|
Completed aft fuselage riveting
|
Details
|
|
|
02-13-2007
|
3.50
|
Started riveting aft fuselage
|
Details
|
|
|
02-12-2007
|
2.00
|
Clecoed aft fuselage for final assembly
|
Details
|
|
|
02-11-2007
|
11.00
|
Primed parts
|
Details
|
|
|
02-10-2007
|
6.00
|
Scrubbed and alumidined parts.
|
|
|
|
02-04-2007
|
6.00
|
Finished preping center section parts
|
Details
|
|
|
02-03-2007
|
11.00
|
Deburr and dimple the center section
|
Details
|
|
|
02-02-2007
|
2.00
|
Disassembled center section.
|
Details
|
|
|
02-01-2007
|
2.00
|
Finished the seat and baggage compartment skins
|
Details
|
|
|
01-22-2007
|
3.00
|
Started the seat and baggage skins
|
Details
|
|
|
01-21-2007
|
7.50
|
Prepared and drilled center section
|
Details
|
|
|
01-20-2007
|
6.50
|
Deburred and dimpled aft fuselage parts
|
Details
|
|
|
01-19-2007
|
3.00
|
Finished the aft fuselage drilling
|
Details
|
|
|
01-16-2007
|
2.00
|
Started drilling the aft fuselage
|
Details
|
|
|
01-14-2007
|
7.00
|
Prepared the aft fuselage assembly
|
Details
|
|
|
01-13-2007
|
10.00
|
Prepared longerons
|
Details
|
|
|
01-12-2007
|
4.00
|
Finished assembling bulkheads
|
Details
|
|
|
01-11-2007
|
2.00
|
Finish F-704 bulkhead
|
Details
|
|
|
01-10-2007
|
1.00
|
Assembled F-704 bulkhead
|
Details
|
|
|
01-09-2007
|
1.00
|
Finished firewall
|
Details
|
|
|
01-07-2007
|
5.00
|
Assembled firewall
|
Details
|
|
|
01-06-2007
|
10.00
|
Scrubbed, alumidyned, and primed parts
|
Details
|
|
|
01-05-2007
|
4.00
|
Finished F-711, F-712 bulkheads
|
Details
|
|
|
01-04-2007
|
3.00
|
Prepared F-710 thru F-711 bulkheads
|
Details
|
|
|
01-03-2007
|
2.50
|
Prepare F-706, F-707, F708 bulkheads
|
Details
|
|
|
01-02-2007
|
4.00
|
Started F-706 bulkhead
|
Details
|
|
|
01-01-2007
|
3.00
|
Sealed tank
|
Details
|
|
|
01-01-2007
|
5.00
|
Finished right wing
|
Details
|
|
|
12-31-2006
|
7.00
|
Finished prep of F-705 bulkhead
|
Details
|
|
|
12-31-2006
|
3.00
|
Cut cover plate for wing tank
|
Details
|
|
|
12-30-2006
|
9.00
|
Prepare F-705 bulkhead
|
Details
|
|
|
12-27-2006
|
2.50
|
Started F-705 bulkhead
|
Details
|
|
|
12-26-2006
|
5.00
|
Assembled F-704 bulkhead
|
Details
|
|
|
12-25-2006
|
4.00
|
Fabricated stiffeners and plates for F-704 bulkhea
|
Details
|
|
|
12-24-2006
|
4.00
|
Finished firewall prep, started center section
|
Details
|
|
|
12-23-2006
|
8.00
|
Flute ribs, fit & drill firewall parts
|
Details
|
|
|
12-23-2006
|
2.50
|
Deburr and dimple firewall parts
|
Details
|
|
|
12-21-2006
|
3.00
|
Ran plastic conduit, worked on tank
|
Details
|
|
|
12-19-2006
|
2.00
|
Attach right flap
|
Details
|
|
|
12-18-2006
|
3.00
|
Attach flap brace, aileron right wing
|
Details
|
|
|
12-17-2006
|
5.00
|
Inventory main boxes
|
Details
|
|
|
12-16-2006
|
11.00
|
Inventory small parts
|
Details
|
|
|
12-15-2006
|
4.00
|
Inventory small parts
|
Details
|
|
|
12-14-2006
|
2.00
|
Attach aileron brackets and gap fairing
|
Details
|
|
|
12-13-2006
|
4.00
|
Fuselage arrived
|
Details
|
|
|
12-11-2006
|
1.00
|
Leak tested right wing
|
Details
|
|
|
12-10-2006
|
9.00
|
Riveted right wing
|
Details
|
|
|
12-07-2006
|
3.00
|
Prepared wing for flap attachment
|
Details
|
|
|
12-06-2006
|
1.50
|
Attached aileron to left wing
|
Details
|
|
|
12-04-2006
|
2.00
|
Installed bellcrank
|
Details
|
|
|
12-03-2006
|
5.00
|
Completed left flap assembly
|
Details
|
|
|
12-02-2006
|
4.00
|
Completed right flap assembly
|
Details
|
|
|
12-01-2006
|
2.00
|
Began right flap assembly
|
Details
|
|
|
11-30-2006
|
5.00
|
Assembled ailerons to completion
|
Details
|
|
|
11-29-2006
|
2.50
|
Riveted aileron stiffeners and frame
|
Details
|
|
|
11-28-2006
|
3.00
|
Assembled aileron hinge brackets, etc
|
Details
|
|
|
11-22-2006
|
7.00
|
Sprayed remaining parts
|
Details
|
|
|
11-21-2006
|
3.50
|
Setup spray booth for painting
|
Details
|
|
|
11-19-2006
|
6.50
|
Riveted leading edge to right wing
|
Details
|
|
|
11-19-2006
|
5.00
|
Prepared paint booth and parts
|
Details
|
|
|
11-18-2006
|
7.00
|
Alumidined all aileron and flap parts - ready to p
|
Details
|
|
|
11-12-2006
|
2.00
|
Set right wing skeleton on frame
|
Details
|
|
|
11-12-2006
|
11.00
|
Riveted top skin to left wing
|
Details
|
|
|
11-11-2006
|
4.00
|
Scrubbed aileron and flap parts
|
Details
|
|
|
11-11-2006
|
4.50
|
Riveted leading edge, mounted tank, clecoed top sk
|
Details
|
|
|
11-11-2006
|
1.50
|
Prepared wing access panels
|
Details
|
|
|
11-10-2006
|
2.00
|
Scrubbed aileron and flap parts
|
Details
|
|
|
11-09-2006
|
2.00
|
Scrubbed aileron and flap parts
|
Details
|
|
|
11-07-2006
|
1.50
|
Scrubbed aileron and flap parts
|
Details
|
|
|
11-02-2006
|
2.50
|
Prepared pushroads - ready for paint prep
|
Details
|
|
|
11-01-2006
|
2.50
|
Prepared pushrods
|
Details
|
|
|
10-31-2006
|
3.50
|
Prepared flaps - ready for paint prep
|
Details
|
|
|
10-30-2006
|
3.00
|
Prepared flaps
|
Details
|
|
|
10-29-2006
|
6.00
|
Prepared flaps
|
Details
|
|
|
10-29-2006
|
5.00
|
Prepared ailerons - ready for paint prep
|
Details
|
|
|
10-28-2006
|
8.00
|
Prepared ailerons
|
Details
|
|
|
10-27-2006
|
4.00
|
Riveted left leading edge to spar
|
Details
|
|
|
10-26-2006
|
7.00
|
Riveted leading edges
|
Details
|
|
|
10-24-2006
|
2.50
|
Deburred and clecoed stiffeners to skins
|
Details
|
|
|
10-20-2006
|
2.00
|
Cut aileron skin stiffeners
|
Details
|
|
|
10-17-2006
|
2.50
|
Match drilled aileron brackets
|
Details
|
|
|
10-16-2006
|
2.50
|
Finished landing light assemblies
|
Details
|
|
|
10-15-2006
|
5.00
|
Riveted right wing baffle
|
Details
|
|
|
10-15-2006
|
1.50
|
Finished riveting left tank
|
Details
|
|
|
10-14-2006
|
4.00
|
Riveted baffle to left tank
|
Details
|
|
|
10-14-2006
|
2.00
|
Installed fuel pickups and plates
|
Details
|
|
|
10-14-2006
|
2.00
|
Finished installing sensor plates
|
Details
|
|
|
10-14-2006
|
2.50
|
Cleaned up clecos and tools
|
Details
|
|
|
10-13-2006
|
6.00
|
Riveted T-410's and T-405's to leading edges
|
Details
|
|
|
10-12-2006
|
3.50
|
Riveted outside ribs to left tank
|
Details
|
|
|
10-10-2006
|
3.50
|
Riveted outside ribs to right tank
|
Details
|
|
|
10-09-2006
|
7.00
|
Riveted 4 ribs to tanks
|
Details
|
|
|
10-08-2006
|
13.00
|
Riveted 6 internal tank ribs
|
Details
|
|
|
10-08-2006
|
2.50
|
Finished fuel pickups and vent tubes
|
Details
|
|
|
10-06-2006
|
5.00
|
Riveted ribs to main spars
|
Details
|
|
|
10-05-2006
|
2.00
|
Masked tanks for rib assembly
|
Details
|
|
|
10-03-2006
|
3.00
|
Fabricated fuel vent lines.
|
Details
|
|
|
10-01-2006
|
10.00
|
Assemble stiffeners to right tank
|
Details
|
|
|
09-30-2006
|
2.00
|
Clean parts for tank assembly
|
Details
|
|
|
09-30-2006
|
2.00
|
Attached ribs to right rear spar
|
Details
|
|
|
09-30-2006
|
6.00
|
Assembled stiffeners to left tank
|
Details
|
|
|
09-29-2006
|
2.00
|
Final assembly of rear spars
|
Details
|
|
|
09-29-2006
|
1.50
|
Attached ribs to left rear spar
|
Details
|
|
|
09-28-2006
|
3.00
|
Attacked nutplates to main spars
|
Details
|
|
|
09-25-2006
|
3.00
|
Prime front spars and nutplates
|
Details
|
|
|
09-24-2006
|
9.00
|
Scrub and prime leading edge skins and ribs
|
Details
|
|
|
09-23-2006
|
14.00
|
Preped and primed small parts and ribs
|
Details
|
|
|
09-17-2006
|
8.00
|
Primed right wing ribs and skins
|
Details
|
|
|
09-16-2006
|
14.50
|
Preped right wing ribs and skins for priming
|
Details
|
|
|
09-03-2006
|
0.00
|
Built filter unit and mounts for spray equipment
|
Details
|
|
|
08-19-2006
|
0.00
|
Put up plastic curtains for spray booth
|
Details
|
|
|
08-08-2006
|
2.50
|
Trim lenses, countersink holes
|
Details
|
|
|
08-08-2006
|
1.00
|
Drill lens holes
|
Details
|
|
|
08-07-2006
|
1.50
|
Install lights in brackets
|
Details
|
|
|
08-06-2006
|
3.00
|
Start landing light installation
|
Details
|
|
|
08-06-2006
|
6.00
|
Deburr and dimple skins - right wing ready for pri
|
Details
|
|
|
08-05-2006
|
7.00
|
Dimple ribs, spars, and prepare parts
|
Details
|
|
|
08-04-2006
|
2.00
|
Prepare skins for dimpling
|
Details
|
|
|
08-03-2006
|
1.00
|
Dissasemble right wing
|
Details
|
|
|
08-02-2006
|
0.50
|
Drill holes for filler flange and drain
|
Details
|
|
|
08-01-2006
|
1.50
|
Prepare capacitive fuel sensor plates
|
Details
|
|
|
07-31-2006
|
1.75
|
Final prep on inboard tank rib
|
Details
|
|
|
07-31-2006
|
0.25
|
Drill T405 tank attach angle
|
Details
|
|
|
07-30-2006
|
0.50
|
Match drill leading edge
|
Details
|
|
|
07-30-2006
|
1.00
|
Machine countersink tank skin
|
Details
|
|
|
07-30-2006
|
1.50
|
Install fuel tank baffle
|
Details
|
|
|
07-30-2006
|
0.50
|
Disassemble tank
|
Details
|
|
|
07-30-2006
|
1.00
|
Attach tank skin to baffle and adjust
|
Details
|
|
|
07-30-2006
|
2.50
|
Attach ribs and tank skin and match drill
|
Details
|
|
|
07-29-2006
|
1.00
|
Started right wing - cleco and match drill ribs to
|
Details
|
|
|
07-29-2006
|
0.25
|
Redrilled holes for electrical conduit to 3/4"
|
|
|
|
07-29-2006
|
0.50
|
Prepare scarf joint on skins
|
|
|
|
07-29-2006
|
0.50
|
Mount wing skeleton to framd
|
|
|
|
07-29-2006
|
1.00
|
Mount and match drill top skins
|
|
|
|
07-29-2006
|
0.75
|
Mount and match drill bottom skins
|
|
|
|
07-29-2006
|
0.50
|
Make root doubler plate
|
|
|
|
07-29-2006
|
1.50
|
Dimpled top skins
|
Details
|
|
|
07-29-2006
|
0.50
|
Dimpled tank ribs and skin
|
Details
|
|
|
07-29-2006
|
2.00
|
Dimpled bottom skins - left wing ready to prime
|
Details
|
|
|
07-29-2006
|
0.50
|
Cleco leading edge to spar, drill joint plate
|
|
|
|
07-29-2006
|
0.50
|
Cleco leading edge in cradle
|
|
|
|
07-28-2006
|
1.00
|
Dimpled skins
|
Details
|
|
|
07-28-2006
|
1.00
|
Dimpled ribs
|
Details
|
|
|
07-28-2006
|
0.50
|
Deburr skins
|
Details
|
|
|
07-27-2006
|
2.50
|
Deburr skins
|
Details
|
|
|
07-25-2006
|
1.25
|
Deburr skins
|
Details
|
|
|
07-25-2006
|
0.75
|
Deburr joint plate for nutplates
|
Details
|
|
|
07-25-2006
|
0.75
|
Deburr and countersink rear spar
|
Details
|
|
|
07-25-2006
|
0.75
|
Countersink main spar for skin
|
Details
|
|
|
07-24-2006
|
1.50
|
Deburr rib holes
|
Details
|
|
|
07-24-2006
|
1.00
|
Countersink main spar for skin
|
Details
|
|
|
07-23-2006
|
2.50
|
Rivet stiffener ring to rib
|
Details
|
|
|
07-23-2006
|
2.00
|
Drill tank plate holes & make anti-rotation bracke
|
Details
|
|
|
07-23-2006
|
0.75
|
Drill holes in filler flange
|
Details
|
|
|
07-23-2006
|
0.25
|
Drill holes for tank drain fitting
|
Details
|
|
|
07-23-2006
|
1.50
|
Disassemble left wing and start to deburr parts
|
Details
|
|
|
07-23-2006
|
2.00
|
Deburr tank parts
|
Details
|
|
|
07-23-2006
|
0.50
|
Cut hole in inboard tank rib
|
Details
|
|
|
07-22-2006
|
0.50
|
Solder wire to BNC connector
|
Details
|
|
|
07-22-2006
|
0.25
|
Modified snap bushings
|
Details
|
|
|
07-22-2006
|
1.00
|
Match drill tank holes
|
|
|
|
07-22-2006
|
0.20
|
Match drill joint plate
|
Details
|
|
|
07-22-2006
|
0.25
|
Install plate 2
|
Details
|
|
|
07-22-2006
|
3.00
|
Fabricate tank brackets
|
Details
|
|
|
07-22-2006
|
0.50
|
Fabricate & drill nose reinforcement plate
|
Details
|
|
|
07-22-2006
|
0.25
|
Drill out screw holes
|
|
|
|
07-22-2006
|
0.40
|
Disassemble tank
|
|
|
|
07-22-2006
|
1.40
|
Countersink baffle holes
|
Details
|
|
|
07-22-2006
|
1.20
|
Capacitive sensors - install plate 1
|
Details
|
|
|
07-22-2006
|
0.50
|
Attach wire to outboard plate
|
Details
|
|
|
07-22-2006
|
0.25
|
Attach nutplates to sensor plates
|
Details
|
|
|
07-10-2006
|
0.50
|
Mount ribs to baffle
|
Details
|
|
|
07-10-2006
|
0.50
|
Fit tank skin to baffle
|
Details
|
|
|
07-10-2006
|
0.50
|
Cleco skins to ribs
|
Details
|
|
|
07-09-2006
|
0.50
|
Match drill leading edge
|
Details
|
|
|
07-09-2006
|
0.50
|
Match drill holes in T-712's to main spar
|
Details
|
|
|
07-09-2006
|
1.50
|
Make tank stiffeners and cleco
|
Details
|
|
|
07-09-2006
|
0.20
|
Drill holddown hole in bottom of leading edge
|
Details
|
|
|
07-09-2006
|
1.00
|
Drill for nutplates
|
Details
|
|
|
07-09-2006
|
0.50
|
Drill center holes in T-712's
|
Details
|
|
|
07-09-2006
|
0.10
|
Draw center lines on T-712's
|
Details
|
|
|
07-09-2006
|
0.20
|
Cleco baffel to main spar
|
Details
|
|
|
07-09-2006
|
0.30
|
Back drill T-712 number 1
|
Details
|
|
|
07-08-2006
|
0.50
|
Remove bottom skins
|
Details
|
|
|
07-08-2006
|
1.00
|
Match drill top skins
|
Details
|
|
|
07-08-2006
|
1.00
|
Match drill bottom skins
|
Details
|
|
|
07-08-2006
|
0.50
|
Insert joint plate into leading edge
|
Details
|
|
|
07-08-2006
|
0.50
|
Cleco outboard leading edge to spar
|
Details
|
|
|
07-08-2006
|
0.50
|
Cleco outboard leading edge
|
Details
|
|
|
07-08-2006
|
0.50
|
Cleco bottom skins
|
Details
|
|
|
07-07-2006
|
1.00
|
Mount wing to frame (left wing)
|
Details
|
|
|
07-07-2006
|
0.50
|
Match Drill main rib holes
|
Details
|
|
|
07-07-2006
|
1.00
|
Drill wing doubler plate
|
Details
|
|
|
07-07-2006
|
0.75
|
Cleco top skins
|
Details
|
|
|
07-06-2006
|
1.00
|
Straighten Main Ribs
|
|
|
|
07-06-2006
|
1.50
|
Drill holes for wiring conduit
|
Details
|
|
|
07-06-2006
|
0.50
|
Cleco main ribs to spars (left wing)
|
Details
|
|
|
07-05-2006
|
1.00
|
Straighten main ribs
|
Details
|
|
|
07-04-2006
|
3.50
|
Straightend leading edge ribs
|
Details
|
|
|
07-04-2006
|
2.75
|
Straighten main ribs
|
Details
|
|
|
07-04-2006
|
2.00
|
Deburred main ribs
|
Details
|
|
|
07-03-2006
|
3.50
|
Deburr leading edge ribs
|
Details
|
|
|
07-02-2006
|
1.20
|
Trimmed ends of rear spar inside doubler plates
|
Details
|
|
|
07-02-2006
|
1.70
|
Prepared doubler plates.
|
Details
|
|
|
07-02-2006
|
1.20
|
Prepared doubler plates for spars
|
Details
|
|
|
07-02-2006
|
0.30
|
Drilled out holds for inside doubler plates
|
Details
|
|
|
07-02-2006
|
0.20
|
Clamped doubler plates to rear spar
|
Details
|
|
|
07-01-2006
|
0.50
|
Spot primed the spar
|
Details
|
|
|
07-01-2006
|
1.25
|
Fabricate the tie-down assembly
|
Details
|
|
|
07-01-2006
|
0.60
|
Drilled holes and countersunk for tie-down rivets
|
Details
|
|
|
07-01-2006
|
2.00
|
Deburred edges of rear spars
|
Details
|
|
|
07-01-2006
|
0.30
|
Countersunk center spar for nutplates
|
Details
|
|
|
07-01-2006
|
1.50
|
Countersinked main spar for access plate platenuts
|
Details
|
|
|
07-01-2006
|
2.00
|
Completed platenut countersinking
|
Details
|
|
|
06-29-2006
|
3.00
|
Continued platenut countersinking
|
Details
|
|
|
06-28-2006
|
1.00
|
Made countersink template
|
Details
|
|
|
06-27-2006
|
0.50
|
Started drilling main spars for plate nuts
|
Details
|
|
|
06-25-2006
|
0.00
|
Wing Holder
|
Details
|
|
|
06-24-2006
|
0.00
|
Built the leading edge jig
|
Details
|
|
|
06-24-2006
|
0.00
|
Build Leading Edge Jig
|
Details
|
|
|
06-17-2006
|
0.00
|
Shop preparation - bench top
|
Details
|
|
|
05-27-2006
|
0.00
|
Shop preparation - table drawers
|
Details
|
|
|
05-06-2006
|
0.00
|
Shop preparation - Dry erase board
|
Details
|
|
|
04-29-2006
|
0.00
|
Shop Preparation - drawing boards
|
Details
|
|
|
03-18-2006
|
0.00
|
Shop preparation - hand tool panel
|
Details
|
|
|
02-04-2006
|
0.00
|
Shop preparation - power tool panel
|
Details
|
|
|
01-21-2006
|
0.00
|
Shop preparation - clamp panel
|
Details
|
|
|
01-07-2006
|
0.00
|
Shop preparation
|
Details
|
|
|
12-16-2005
|
0.00
|
Built empenagge holder
|
Details
|
|
|
12-02-2005
|
4.00
|
Skin vertical stab, roll and rivet leading edge
|
|
|
|
12-02-2005
|
0.00
|
Build crate to bring empennage home
|
Details
|
|
|
12-02-2005
|
2.00
|
Assemble trim tab to elevator
|
|
|
|
12-02-2005
|
1.00
|
Assemble trim tab
|
|
|
|
12-02-2005
|
3.00
|
Assemble elevator frames and skin them
|
|
|
|
12-01-2005
|
2.00
|
Rivet vert stab frame and skin stabilizers
|
|
|
|
12-01-2005
|
2.00
|
Rivet skins to vertical stabilizer
|
|
|
|
12-01-2005
|
6.00
|
Rivet skins to horizontal stabilizer
|
|
|
|
12-01-2005
|
2.00
|
Rivet horizontal stabilzer ribs to front spar
|
|
|
|
11-30-2005
|
6.00
|
Prepare elevator components for priming
|
Details
|
|
|
11-30-2005
|
3.00
|
Assemble rear spar
|
Details
|
|
|
11-30-2005
|
3.00
|
Assemble rear spar
|
Details
|
|
|
11-29-2005
|
6.00
|
Prepare rudder for priming
|
Details
|
|
|
11-29-2005
|
6.00
|
Prep Vertical Stabilizer components
|
Details
|
|
|
11-28-2005
|
12.00
|
Prepare horizontal stabilizer components
|
Details
|
|
|
11-27-2005
|
2.00
|
Inventory Kit
|
Details
|
|