Date
|
Hours
|
Work Log Summary
|
Details
|
06-20-2016
|
1.50
|
install nutplates fwd fuse bulkheads, prep for ski
|
|
|
|
01-16-2016
|
4.00
|
final install wheel pants and fairings
|
Details
|
|
|
01-10-2016
|
5.00
|
sanded, filled, primed and clear coated fairings
|
Details
|
|
|
01-09-2016
|
8.00
|
painted wheel pants and first coat on fairings
|
Details
|
|
|
01-08-2016
|
7.00
|
sanded and primed wheel pants.
|
Details
|
|
|
01-07-2016
|
9.00
|
complete construction of nose gear leg fairings
|
|
|
|
01-06-2016
|
8.00
|
complete construction nosewheel pant
|
Details
|
|
|
01-05-2016
|
0.00
|
brake line repair
|
Details
|
|
|
01-04-2016
|
5.50
|
wheel pants and fairings cont.
|
|
|
|
01-02-2016
|
5.00
|
fit R main gear and intersection fairings
|
|
|
|
12-31-2015
|
8.00
|
work on gear leg and intersection fairings
|
|
|
|
12-29-2015
|
7.00
|
finish construction and mounting of main gear whee
|
|
|
|
12-24-2015
|
2.00
|
wheel pants cont.
|
Details
|
|
|
12-23-2015
|
5.00
|
installed main wheel pant brackets
|
Details
|
|
|
12-22-2015
|
7.00
|
fit and trim pant halves, install nutplates, sand
|
Details
|
|
|
12-21-2015
|
5.00
|
organize wheel pant parts, install lip skid
|
Details
|
|
|
10-09-2015
|
0.00
|
final pics
|
|
|
|
10-09-2015
|
1.50
|
AIRWORTHY!
|
Details
|
|
|
10-08-2015
|
3.00
|
prep for inspection
|
Details
|
|
|
10-07-2015
|
3.00
|
First Engine Start
|
Details
|
|
|
10-03-2015
|
13.00
|
complete FF wiring + weight and balance
|
Details
|
|
|
10-02-2015
|
5.00
|
FWF wiring and terminations
|
|
|
|
10-01-2015
|
3.50
|
finish baffles
|
Details
|
|
|
09-30-2015
|
4.00
|
fine tune inlet seal strips
|
Details
|
|
|
09-28-2015
|
1.00
|
layed up plugs for upper cowl ramps
|
Details
|
|
|
09-27-2015
|
6.00
|
baffle skirts
|
|
|
|
09-26-2015
|
10.00
|
oil system, baffles
|
Details
|
|
|
09-24-2015
|
6.00
|
baffle tension rods
|
Details
|
|
|
09-21-2015
|
4.00
|
measure and cut upper baffles
|
Details
|
|
|
09-20-2015
|
4.00
|
scat hoses and baffles
|
Details
|
|
|
09-19-2015
|
8.00
|
baffles cont.
|
Details
|
|
|
09-16-2015
|
2.00
|
more baffle work
|
|
|
|
09-14-2015
|
2.50
|
baffles again
|
|
|
|
09-13-2015
|
10.00
|
baffle work cont.
|
|
|
|
09-09-2015
|
2.50
|
baffle cont.
|
|
|
|
09-06-2015
|
7.00
|
baffles cont.
|
|
|
|
09-05-2015
|
8.00
|
baffles
|
|
|
|
08-30-2015
|
5.00
|
finish oil seperator, prep and debur baffle plates
|
|
|
|
08-29-2015
|
2.50
|
install Reiff heaters
|
Details
|
|
|
08-29-2015
|
9.00
|
fuel and oil plumbing FF
|
|
|
|
08-26-2015
|
3.00
|
install alt and starter cables, finalize cabin hea
|
|
|
|
08-23-2015
|
7.00
|
finalize exhaust system
|
Details
|
|
|
08-22-2015
|
5.00
|
finish painting top cowl
|
Details
|
|
|
08-19-2015
|
9.00
|
finish FAB; prime and paint cowl
|
Details
|
|
|
08-18-2015
|
6.50
|
FAB cont.
|
Details
|
|
|
08-17-2015
|
8.00
|
filtered air box cont.
|
Details
|
|
|
08-15-2015
|
3.50
|
FAB continued
|
|
|
|
08-14-2015
|
3.50
|
decals, grab handles
|
|
|
|
08-13-2015
|
3.00
|
filtered air box
|
Details
|
|
|
08-10-2015
|
5.00
|
alternator, carb controls, N numbers
|
|
|
|
08-08-2015
|
7.00
|
exhaust system work
|
Details
|
|
|
08-07-2015
|
2.00
|
test fit exhaust system
|
|
|
|
08-07-2015
|
5.00
|
prep cowl for paing
|
Details
|
|
|
08-06-2015
|
9.00
|
close up wings
|
Details
|
|
|
08-05-2015
|
2.50
|
install root fairings
|
Details
|
|
|
08-04-2015
|
9.00
|
cockpit final assy, decal application
|
Details
|
|
|
08-03-2015
|
11.50
|
final install flaps and ailerons
|
Details
|
|
|
08-01-2015
|
7.00
|
final assembly cont
|
Details
|
|
|
07-31-2015
|
7.00
|
final assembly
|
Details
|
|
|
07-30-2015
|
8.50
|
wings on!
|
Details
|
|
|
07-29-2015
|
8.00
|
installed gear leg brake lines and bled brakes
|
Details
|
|
|
07-28-2015
|
7.00
|
cowl pinhole cont.
|
Details
|
|
|
07-27-2015
|
4.00
|
cowl pinhole filling
|
Details
|
|
|
07-25-2015
|
4.50
|
cowl cont.
|
|
|
|
07-24-2015
|
10.00
|
cowl work
|
|
|
|
07-18-2015
|
2.00
|
install anti-splat nosejob
|
|
|
|
07-16-2015
|
3.00
|
repaint black top fuse, cowl finishing work
|
Details
|
|
|
07-15-2015
|
7.50
|
cut & buff fuselage, respray black top
|
Details
|
|
|
07-14-2015
|
3.00
|
de-mask, reinstall canopy rail and canopy
|
Details
|
|
|
07-11-2015
|
5.50
|
primed and painted fuselage
|
Details
|
|
|
07-10-2015
|
10.00
|
prep and begin painting fuse
|
Details
|
|
|
07-09-2015
|
8.00
|
prep and begin painting fuselage
|
Details
|
|
|
07-08-2015
|
9.00
|
finish oil door, mount nose gear
|
|
|
|
07-07-2015
|
8.50
|
cowl fasteners cont., oil door
|
|
|
|
07-06-2015
|
5.00
|
lower cowl fasteners
|
|
|
|
07-03-2015
|
2.00
|
lower cowl fit and trim
|
|
|
|
07-02-2015
|
8.50
|
cowl fasteners cont.
|
Details
|
|
|
07-01-2015
|
7.00
|
trim and fit upper cowl, install skybolt fasteners
|
|
|
|
06-30-2015
|
9.00
|
fit and trim cowl halves
|
Details
|
|
|
06-29-2015
|
5.50
|
removed red stripes
|
Details
|
|
|
06-25-2015
|
6.00
|
striped flaps
|
|
|
|
06-24-2015
|
7.00
|
finish cut & buff empenage
|
Details
|
|
|
06-22-2015
|
7.00
|
finish R wing +VS cut & buff
|
Details
|
|
|
06-20-2015
|
5.00
|
paint misc parts, touch up run in HS, repaint R wi
|
Details
|
|
|
06-19-2015
|
4.00
|
prep R wing for partial repaint
|
Details
|
|
|
06-18-2015
|
4.00
|
finish striping R wing
|
|
|
|
06-17-2015
|
6.00
|
R wing sand, compound, begin stripes
|
|
|
|
06-15-2015
|
4.00
|
R wing paint cont.
|
Details
|
|
|
06-12-2015
|
6.50
|
prep and paint R wing
|
|
|
|
06-11-2015
|
8.00
|
apply invasion stripes vinyl to R wing
|
Details
|
|
|
06-10-2015
|
5.00
|
color sand and compound R wing
|
Details
|
|
|
06-08-2015
|
7.00
|
prep prime paint R wing
|
|
|
|
06-07-2015
|
5.00
|
configure booth and stands for wing
|
|
|
|
06-06-2015
|
5.00
|
prep, prime, and paint elevators and rudder
|
|
|
|
06-05-2015
|
4.00
|
reconfigured paint booth and stands for elevators
|
Details
|
|
|
06-04-2015
|
7.00
|
prep, prime and paint ailerons and flaps
|
|
|
|
06-03-2015
|
4.00
|
set up paint stands for ailerons and flaps
|
|
|
|
06-01-2015
|
10.00
|
prep and paint HS, VS, misc. small parts
|
Details
|
|
|
05-30-2015
|
4.50
|
color and clearcoat emp tips
|
|
|
|
05-29-2015
|
4.00
|
wing and emp tips
|
Details
|
|
|
05-29-2015
|
2.00
|
install fire extinguisher
|
|
|
|
05-28-2015
|
4.00
|
prep tail for tip painting
|
Details
|
|
|
05-27-2015
|
9.00
|
mount engine #3
|
Details
|
|
|
05-26-2015
|
4.00
|
engine mount try #2
|
Details
|
|
|
05-20-2015
|
4.50
|
mount engine #1
|
Details
|
|
|
05-20-2015
|
4.00
|
fire ext., wheels and brakes
|
Details
|
|
|
05-18-2015
|
5.00
|
canopy finishing touches
|
Details
|
|
|
05-15-2015
|
5.50
|
start putting plane back together
|
Details
|
|
|
05-15-2015
|
4.00
|
finish winscreen fairing
|
|
|
|
05-14-2015
|
2.00
|
install F810-A, trim elevator to HS gap
|
|
|
|
05-14-2015
|
6.00
|
canopy work cont.
|
Details
|
|
|
05-13-2015
|
4.25
|
windscreen fairng sand and prime
|
|
|
|
05-11-2015
|
5.50
|
finish up rear canopy, cont. work on windscreen
|
|
|
|
05-08-2015
|
7.00
|
final finish canopy skirt
|
Details
|
|
|
05-06-2015
|
6.00
|
painted skirt, more sand and fill on fairing
|
Details
|
|
|
05-05-2015
|
1.00
|
re-caulk windscreen fairing, skirt fill cont.
|
Details
|
|
|
05-04-2015
|
5.00
|
glued windscreen fairing on, more primer on skirts
|
Details
|
|
|
05-02-2015
|
4.00
|
prepped and primed canopy skirts and fairing
|
|
|
|
05-01-2015
|
5.00
|
more sanding, filling, masking
|
|
|
|
04-29-2015
|
4.00
|
fairing and skirt work cont.
|
Details
|
|
|
04-27-2015
|
4.00
|
windscreen fairing work
|
Details
|
|
|
04-25-2015
|
4.00
|
windscreen fairing layup
|
Details
|
|
|
04-24-2015
|
7.00
|
canopy fit and finish
|
Details
|
|
|
04-10-2015
|
3.00
|
install canopy mid-position latch
|
Details
|
|
|
04-08-2015
|
4.00
|
install canopy latch
|
Details
|
|
|
03-25-2015
|
0.00
|
more interior
|
|
|
|
03-25-2015
|
0.00
|
interior pics
|
|
|
|
03-23-2015
|
0.00
|
so off come the decals and begin refinish work
|
Details
|
|
|
03-23-2015
|
0.00
|
pics after purchase
|
Details
|
|
|
03-23-2015
|
0.00
|
next weeks project
|
Details
|
|
|
03-23-2015
|
0.00
|
more purchase pics
|
|
|
|
03-23-2015
|
0.00
|
after refinish pics
|
Details
|
|
|
03-19-2015
|
2.00
|
part 2 skirt bonding
|
|
|
|
03-16-2015
|
4.00
|
bonded and riveted skirts to canopy frame
|
Details
|
|
|
03-14-2015
|
5.00
|
paint inside skirt, other misc parts
|
Details
|
|
|
03-11-2015
|
8.00
|
more skirt fitting
|
Details
|
|
|
03-10-2015
|
6.50
|
skirt work cont.
|
Details
|
|
|
03-07-2015
|
6.00
|
more panel labels
|
Details
|
|
|
03-06-2015
|
8.00
|
canopy skirts and emp fairing
|
Details
|
|
|
03-05-2015
|
7.00
|
re-caulk canopy
|
Details
|
|
|
03-03-2015
|
8.00
|
cut, adjust, and fit canopy halves on plane
|
Details
|
|
|
03-02-2015
|
5.00
|
bonded rear canopy
|
|
|
|
02-28-2015
|
8.00
|
glued windscreen to fuselage
|
Details
|
|
|
02-27-2015
|
7.50
|
prep for windscreeen install
|
Details
|
|
|
02-26-2015
|
9.00
|
the Big Cut
|
Details
|
|
|
02-25-2015
|
4.50
|
side rail work cont.
|
|
|
|
02-23-2015
|
9.00
|
install side rails, initial fit of frame
|
Details
|
|
|
02-21-2015
|
7.00
|
completed and mounted center slide rail
|
Details
|
|
|
02-20-2015
|
8.00
|
top skin riveting, emp fairing, canopy
|
Details
|
|
|
02-19-2015
|
6.00
|
begin installing top fuse skin
|
|
|
|
02-18-2015
|
6.50
|
prep and paint top front skin for installation
|
Details
|
|
|
02-16-2015
|
7.00
|
mount roll bars, R side spar cap, fire extinguishe
|
|
|
|
02-14-2015
|
6.00
|
throttle quad, non-skid, emp fairing
|
Details
|
|
|
02-13-2015
|
8.00
|
comlete VS repair, lengthen stick
|
Details
|
|
|
02-12-2015
|
9.00
|
emp fairing cont., redo VS attach
|
Details
|
|
|
02-11-2015
|
5.50
|
emp. fairing cont.
|
Details
|
|
|
02-10-2015
|
8.00
|
emp fairing
|
Details
|
|
|
02-09-2015
|
6.00
|
complete wing construction
|
Details
|
|
|
02-07-2015
|
4.50
|
finished nutplates L wing
|
Details
|
|
|
02-06-2015
|
8.00
|
finished flap fairing / boareding step, nutplate w
|
Details
|
|
|
02-05-2015
|
6.50
|
rework boarding step
|
Details
|
|
|
02-04-2015
|
5.50
|
pulled flaps, ailerons, wings
|
Details
|
|
|
02-03-2015
|
7.00
|
flap fairings and wing root fairings cont.
|
|
|
|
01-31-2015
|
8.00
|
complete front attach plates, start on root fairin
|
Details
|
|
|
01-30-2015
|
4.50
|
fabricate front wing attach brackets F-863A
|
|
|
|
01-29-2015
|
8.50
|
finish L and R wing flap and aileron rigging
|
Details
|
|
|
01-28-2015
|
4.50
|
rig and adjust L flap
|
|
|
|
01-27-2015
|
9.00
|
set wing incidence, triangulation, sweep & drill r
|
Details
|
|
|
01-24-2015
|
6.50
|
fit brakes, test fit wings
|
Details
|
|
|
01-23-2015
|
6.00
|
rig aileron trim, reinstall panel and seats for fi
|
Details
|
|
|
01-22-2015
|
3.50
|
reinstall control tube, recheck rigging and adjust
|
Details
|
|
|
01-21-2015
|
8.00
|
finish baggage door
|
Details
|
|
|
01-20-2015
|
8.00
|
panel wiring modifications, baggage door work
|
Details
|
|
|
01-19-2015
|
6.00
|
install cabin and carb heat cables, MP nipple thro
|
Details
|
|
|
01-17-2015
|
3.00
|
install heater box
|
|
|
|
01-16-2015
|
5.00
|
emp fairing
|
Details
|
|
|
01-15-2015
|
7.00
|
mount NACA vents, fit empenage fairing
|
|
|
|
01-14-2015
|
6.00
|
reassemble (final?) control tube, mount empenage f
|
|
|
|
01-14-2015
|
2.00
|
install wingtip lights, and fit finished tips
|
|
|
|
01-10-2015
|
5.00
|
final paint and clearcoat wingtips
|
Details
|
|
|
01-09-2015
|
6.00
|
prep and prime wing tips, control tube, misc. part
|
Details
|
|
|
01-08-2015
|
9.00
|
wingtip work cont.
|
Details
|
|
|
01-07-2015
|
7.00
|
control system rigging
|
Details
|
|
|
01-06-2015
|
2.50
|
wingtip work cont.
|
|
|
|
01-03-2015
|
4.50
|
wingtip fiberglas work cont.
|
|
|
|
01-02-2015
|
3.00
|
R wingtip mount light blister
|
|
|
|
12-30-2014
|
8.00
|
fit and drill R wing tip, remove and modify contro
|
Details
|
|
|
12-29-2014
|
8.00
|
reinstall VS & HS and verified alignment, cont. wi
|
|
|
|
12-27-2014
|
4.00
|
finish rigging R wing, fiberglas work cont.
|
|
|
|
12-26-2014
|
7.50
|
R wing cont
|
|
|
|
12-23-2014
|
3.00
|
R wing bottom skin
|
Details
|
|
|
12-22-2014
|
2.00
|
countersink bottom R wing skin
|
|
|
|
12-20-2014
|
5.00
|
install R wing bellcrank, NACA vents
|
|
|
|
12-19-2014
|
8.00
|
R Wing
|
|
|
|
12-17-2014
|
0.00
|
paint booth light REDO
|
Details
|
|
|
12-13-2014
|
3.00
|
leak test wings, wing tip fiberglas work cont.
|
Details
|
|
|
12-12-2014
|
0.00
|
upgraded paint booth lights
|
Details
|
|
|
12-10-2014
|
5.50
|
fiberglas work on tips
|
|
|
|
12-09-2014
|
7.00
|
rebuilt tank access plates and installed
|
Details
|
|
|
12-08-2014
|
6.50
|
fiberglass work on L wing tip, leak test R wing
|
Details
|
|
|
12-06-2014
|
4.00
|
finish flap controller installation
|
|
|
|
12-05-2014
|
7.00
|
finish L wing tip fit, rig flap controls
|
|
|
|
12-04-2014
|
8.50
|
install flap hinge, fit wing tip
|
|
|
|
12-03-2014
|
3.00
|
fabricate aileron control stops, install on L wing
|
|
|
|
12-02-2014
|
5.00
|
modify aileron bracket for proper operation
|
Details
|
|
|
12-01-2014
|
8.00
|
finish riveting L wing bottom skin, test fit airle
|
|
|
|
11-24-2014
|
6.00
|
begin installing final skin L wing
|
|
|
|
11-22-2014
|
6.00
|
redo landing light lens, rig aileron bellcrank
|
|
|
|
11-20-2014
|
9.00
|
prep pitot tube, install landing light in L wing
|
Details
|
|
|
11-19-2014
|
4.50
|
install conduit and pitot heat box in L wing
|
|
|
|
11-17-2014
|
5.00
|
wings assembly
|
Details
|
|
|
11-15-2014
|
4.50
|
install throttle and mixture firewall penetrations
|
|
|
|
11-14-2014
|
6.00
|
test fit engine
|
Details
|
|
|
11-13-2014
|
8.50
|
complete testing
|
Details
|
|
|
11-12-2014
|
6.00
|
elec testing and tweaking cont..
|
Details
|
|
|
11-10-2014
|
4.00
|
test avionics for proper wiring
|
Details
|
|
|
11-05-2014
|
9.00
|
finish airframe wiring, power up panel and elec sy
|
Details
|
|
|
11-04-2014
|
6.00
|
finish L sub panel wiring and J1
|
|
|
|
10-29-2014
|
8.00
|
firewall forward wiring
|
Details
|
|
|
10-28-2014
|
6.00
|
wire intercom, complete audio wiring
|
|
|
|
10-27-2014
|
6.00
|
install and wire audio jacks
|
|
|
|
10-25-2014
|
6.00
|
airframe wiring cont.
|
|
|
|
10-23-2014
|
3.00
|
airframe wiring cont.
|
|
|
|
10-22-2014
|
9.00
|
airframe wiring cont.
|
Details
|
|
|
10-21-2014
|
6.00
|
battery and fuel gage wiring
|
|
|
|
10-20-2014
|
6.00
|
rebuild main connectors, wire fuel gages
|
|
|
|
10-14-2014
|
8.00
|
forward airframe wiring
|
Details
|
|
|
10-13-2014
|
6.50
|
airframe wiring cont.
|
Details
|
|
|
10-12-2014
|
8.00
|
wiring cont.
|
|
|
|
10-07-2014
|
6.50
|
install and wire seat heaters
|
|
|
|
10-06-2014
|
4.00
|
wire flap controller
|
|
|
|
10-04-2014
|
8.50
|
airframe wiring cont.
|
Details
|
|
|
10-03-2014
|
7.50
|
wire pitch servo, GPS antenna, adsb antenna, insta
|
|
|
|
10-02-2014
|
8.50
|
fab ELT bracket and install. Install Transponder b
|
|
|
|
10-01-2014
|
5.50
|
finish trim wiring
|
|
|
|
09-30-2014
|
6.00
|
stick grip wiring
|
Details
|
|
|
09-29-2014
|
4.00
|
trim and autopilot wiring
|
|
|
|
09-27-2014
|
7.00
|
fuselage wiring
|
Details
|
|
|
09-26-2014
|
8.00
|
redo contactor configuration and fuel line, plan a
|
|
|
|
09-25-2014
|
7.00
|
finish battery box, mount contactors, cover plate
|
Details
|
|
|
09-24-2014
|
4.00
|
continue battery box construction
|
|
|
|
09-22-2014
|
5.00
|
finish battery box and paint
|
|
|
|
09-22-2014
|
0.00
|
asphalt approach
|
|
|
|
09-20-2014
|
7.00
|
fabricate custom battery mount for lithium battery
|
|
|
|
09-19-2014
|
6.00
|
rerouted rudder cables
|
Details
|
|
|
09-18-2014
|
8.00
|
finish cockpit hardline plumbing fuel and brakes
|
|
|
|
09-17-2014
|
8.00
|
fuel system plumbing
|
|
|
|
09-15-2014
|
4.00
|
plan fuel system layout
|
|
|
|
09-13-2014
|
4.00
|
mount transponder antenna
|
Details
|
|
|
09-13-2014
|
1.00
|
install ELT antenna
|
|
|
|
09-12-2014
|
8.50
|
finish cb panel, install com and ADSB antennas
|
|
|
|
09-11-2014
|
8.00
|
put fuse back on rotisserrie, begin wiring cb pane
|
|
|
|
09-10-2014
|
8.00
|
misc brake, wiring, empenage
|
Details
|
|
|
09-09-2014
|
8.00
|
begin wiring
|
Details
|
|
|
09-08-2014
|
5.50
|
fab doubler for VS attach
|
|
|
|
09-05-2014
|
2.50
|
fab plywood work floor per drawing 85
|
|
|
|
09-04-2014
|
7.00
|
complete service bulletin, mount and check stab
|
|
|
|
09-03-2014
|
4.50
|
service bulleitn cont.
|
|
|
|
08-30-2014
|
5.50
|
HS service bulletin cont.
|
|
|
|
08-09-2014
|
4.00
|
final ergonomics check before wiring and plumbing
|
|
|
|
08-06-2014
|
1.50
|
fab custom plate for carb and cabin heat controls
|
|
|
|
08-04-2014
|
1.50
|
finish and test fit mixture bracket
|
|
|
|
08-02-2014
|
2.50
|
custom fab mixture bracket
|
|
|
|
07-12-2014
|
3.50
|
service bulletin 14-01-31 cont.
|
Details
|
|
|
07-07-2014
|
2.00
|
service bulletin 14-01-31 cont.
|
Details
|
|
|
07-02-2014
|
3.00
|
service bulletin 14-01-13
|
Details
|
|
|
06-13-2014
|
5.00
|
add primer button, re-label panel
|
|
|
|
06-11-2014
|
6.00
|
label cb panel
|
|
|
|
05-31-2014
|
4.00
|
layout, drill, test fit CB panel
|
|
|
|
05-12-2014
|
2.50
|
panel final assembly
|
|
|
|
05-08-2014
|
7.00
|
finish panel (not!!)
|
Details
|
|
|
05-07-2014
|
6.00
|
panel finish work
|
Details
|
|
|
05-03-2014
|
4.00
|
panel labeling
|
Details
|
|
|
05-02-2014
|
7.00
|
strip down panel and paint
|
Details
|
|
|
05-01-2014
|
8.00
|
finish wiring panel and test fit
|
Details
|
|
|
04-30-2014
|
5.00
|
panel wiring cont.
|
|
|
|
04-28-2014
|
4.50
|
more panel wiring
|
|
|
|
04-26-2014
|
5.00
|
panel wiring cont.
|
|
|
|
04-24-2014
|
2.00
|
test fit Hooker Harnesses
|
|
|
|
04-22-2014
|
4.00
|
panel wiring cont.
|
|
|
|
04-21-2014
|
4.00
|
wiring cont
|
|
|
|
04-19-2014
|
4.00
|
panel wiring cont.
|
|
|
|
04-18-2014
|
4.00
|
panel wiring cont.
|
|
|
|
04-17-2014
|
5.00
|
panel wiring cont.
|
|
|
|
04-16-2014
|
5.00
|
panel wiring
|
|
|
|
04-12-2014
|
5.00
|
finish and test fiber optic lighting
|
|
|
|
04-11-2014
|
6.00
|
fab side panel side bezels, begin wiring fiber opt
|
|
|
|
04-10-2014
|
8.00
|
tweaked 430W mounting and test fit assembled panel
|
|
|
|
03-29-2014
|
6.00
|
finish panel metal fab & avionics test fit
|
|
|
|
03-27-2014
|
4.00
|
cut holes in outer panel
|
|
|
|
03-27-2014
|
9.00
|
cut and drill interior panel, test fit instruments
|
|
|
|
03-24-2014
|
6.00
|
lay out panel, drill, begin cutting holes
|
|
|
|
02-28-2014
|
0.00
|
finish wiring RV9A panel
|
Details
|
|
|
02-27-2014
|
0.00
|
RV9 panel cont
|
|
|
|
02-24-2014
|
0.00
|
reconfigure RV9A panel
|
|
|
|
02-17-2014
|
7.00
|
rebuild rudder stops to prevent cable interference
|
|
|
|
02-12-2014
|
7.00
|
fab and glue in foam tip inserts on elevators, hor
|
Details
|
|
|
02-11-2014
|
5.00
|
finish elec. plan & diagrams. order parts.
|
|
|
|
02-10-2014
|
8.00
|
fiberglass tips + misc.
|
Details
|
|
|
02-08-2014
|
7.00
|
panel layout #2
|
Details
|
|
|
02-07-2014
|
8.00
|
finish emp mounting, adjust rudder pedals, layout
|
|
|
|
02-06-2014
|
6.00
|
install L gear, begin reinstalling emp
|
Details
|
|
|
02-05-2014
|
4.00
|
install L gear, test panel recess mod
|
|
|
|
02-04-2014
|
6.50
|
reinstall control tube, interiro panels
|
Details
|
|
|
02-03-2014
|
7.00
|
reassemble fuse after paint
|
|
|
|
01-31-2014
|
8.00
|
finish bottom fuse polish, begin reassembly
|
Details
|
|
|
01-30-2014
|
5.00
|
wheel prep
|
Details
|
|
|
01-25-2014
|
6.00
|
cut & buff cont.
|
Details
|
|
|
01-24-2014
|
4.00
|
color sand and buff fuse bottom
|
|
|
|
01-18-2014
|
4.00
|
paint fuse bottom - grey finish 2 coats
|
|
|
|
01-17-2014
|
6.00
|
re-do fuselage bottom: sand, prime
|
|
|
|
01-11-2014
|
5.00
|
paint and clearcoat interior
|
|
|
|
01-10-2014
|
7.50
|
scuff, clean, mask interior for paint
|
|
|
|
01-09-2014
|
2.00
|
mask for interior paint
|
|
|
|
01-09-2014
|
3.00
|
inventory FWF kit
|
|
|
|
01-08-2014
|
7.00
|
prep, mask, paint and clear coat fuse bottom
|
Details
|
|
|
01-04-2014
|
5.00
|
reassemble rudder pedal assy, prep fuselage for pa
|
|
|
|
01-03-2014
|
1.00
|
reassemble and adjust throttle quadrant after pain
|
|
|
|
12-31-2013
|
4.00
|
finish paint / clear coat on interior panels
|
|
|
|
12-30-2013
|
2.00
|
unpack engine and inventory accessories
|
Details
|
|
|
12-29-2013
|
9.00
|
create schematics and wiring diagrams
|
|
|
|
12-28-2013
|
3.00
|
clear coat interior panels cont.
|
|
|
|
12-26-2013
|
5.00
|
paint interior panels cont.
|
|
|
|
12-23-2013
|
4.00
|
clear sealer on interiior panels
|
|
|
|
12-20-2013
|
5.00
|
prep parts for paint
|
|
|
|
12-19-2013
|
7.00
|
prep and paint cabin panels
|
|
|
|
12-16-2013
|
0.00
|
build paint table and rig air hoses
|
|
|
|
12-14-2013
|
0.00
|
paint booth complete!
|
Details
|
|
|
12-13-2013
|
0.00
|
finish paint booth plastic
|
|
|
|
12-12-2013
|
0.00
|
plastic installation
|
|
|
|
12-11-2013
|
0.00
|
paint booth continued
|
|
|
|
12-09-2013
|
0.00
|
install paint booth lights, fan
|
|
|
|
12-07-2013
|
0.00
|
paint booth construction
|
Details
|
|
|
11-25-2013
|
4.00
|
finish fwd baggage mod
|
|
|
|
11-23-2013
|
3.00
|
modify fwd baggage compartment
|
Details
|
|
|
11-18-2013
|
0.00
|
misc. finishing
|
|
|
|
11-04-2013
|
0.00
|
install floor heat vents & fill system
|
|
|
|
10-24-2013
|
0.00
|
gravel approach
|
|
|
|
10-19-2013
|
0.00
|
movin in
|
|
|
|
10-16-2013
|
0.00
|
install in floor heat backboard
|
|
|
|
10-12-2013
|
0.00
|
new air compressor
|
|
|
|
10-10-2013
|
0.00
|
install air distribution
|
|
|
|
10-08-2013
|
0.00
|
add electrical outlets
|
|
|
|
10-01-2013
|
0.00
|
apply epoxy floor coating
|
|
|
|
09-30-2013
|
0.00
|
add 2 lights, prep floor for epoxy
|
|
|
|
09-28-2013
|
0.00
|
finish interior steel
|
|
|
|
09-27-2013
|
0.00
|
install upper facia trim
|
|
|
|
09-26-2013
|
0.00
|
hangar door repair complete, gutters installed
|
|
|
|
09-25-2013
|
0.00
|
hangar door rep arrived to fix door
|
|
|
|
09-24-2013
|
0.00
|
paint upper trim, begin installing interior steel
|
|
|
|
09-22-2013
|
0.00
|
insutate hangar door
|
|
|
|
09-21-2013
|
0.00
|
insulate above door and by new man door
|
|
|
|
09-20-2013
|
0.00
|
insulate south wall, outside is done
|
|
|
|
09-19-2013
|
0.00
|
install man door, finish outside steel
|
|
|
|
09-18-2013
|
0.00
|
test and skin door
|
|
|
|
09-17-2013
|
0.00
|
mount door, run hydraulics and electrics
|
Details
|
|
|
09-16-2013
|
0.00
|
paint door truss
|
|
|
|
09-13-2013
|
0.00
|
foam board and trim
|
|
|
|
09-12-2013
|
0.00
|
add purlins e and s
|
|
|
|
09-11-2013
|
0.00
|
spray foam e and s walls
|
|
|
|
09-10-2013
|
0.00
|
framing e wall
|
|
|
|
09-08-2013
|
1.50
|
fab rear map pockets
|
|
|
|
09-05-2013
|
0.00
|
west wall insulation
|
|
|
|
09-04-2013
|
0.00
|
frame for interior finish
|
|
|
|
08-28-2013
|
0.00
|
begin door installation
|
|
|
|
08-27-2013
|
0.00
|
elec panel installed
|
|
|
|
08-12-2013
|
0.00
|
concrete
|
|
|
|
08-09-2013
|
0.00
|
rebar
|
|
|
|
08-08-2013
|
0.00
|
floor heat manifold
|
|
|
|
08-05-2013
|
0.00
|
floor heat tubing
|
|
|
|
08-02-2013
|
0.00
|
grading and steel installation
|
|
|
|
07-31-2013
|
0.00
|
|
Details
|
|
|
07-30-2013
|
0.00
|
|
|
|
|
07-27-2013
|
0.00
|
|
|
|
|
07-25-2013
|
0.00
|
|
|
|
|
07-20-2013
|
0.00
|
|
|
|
|
07-19-2013
|
0.00
|
|
|
|
|
07-18-2013
|
0.00
|
|
|
|
|
07-05-2013
|
2.00
|
re-fab map pockets
|
|
|
|
06-12-2013
|
0.00
|
seats arrived
|
|
|
|
05-23-2013
|
0.00
|
PVC rack to hold emp, flaps, ailerons
|
|
|
|
05-21-2013
|
3.00
|
install HS caps
|
|
|
|
04-02-2013
|
1.50
|
fabricate custom abs map compartment
|
|
|
|
04-01-2013
|
3.00
|
fab and install rudder stops
|
|
|
|
03-27-2013
|
3.00
|
install rudder, rig cables
|
|
|
|
03-25-2013
|
2.00
|
remount vert stab for rudder installation
|
|
|
|
03-24-2013
|
3.00
|
finish elevator control rigging
|
|
|
|
03-23-2013
|
6.50
|
rivet elevator fairings, fit sticks to control tub
|
|
|
|
03-22-2013
|
3.50
|
fit right elevator & HS fairing
|
|
|
|
03-20-2013
|
4.00
|
L elevator / stab tips
|
|
|
|
03-19-2013
|
4.00
|
elevator control rigging
|
|
|
|
03-18-2013
|
4.50
|
elevator horn, cup holder
|
Details
|
|
|
03-17-2013
|
2.00
|
finish inst. panel access cover
|
|
|
|
03-14-2013
|
8.00
|
finish cabin cover, begin fab on custom instrument
|
|
|
|
03-13-2013
|
5.50
|
fab rudder stops, rebuild L cabin cover
|
|
|
|
03-10-2013
|
3.00
|
elevator control alignment
|
|
|
|
03-09-2013
|
6.00
|
fit elevators to Horiz stab, connect push rod, tes
|
|
|
|
03-08-2013
|
5.00
|
finish mounting vert stab, test fit L elevator
|
|
|
|
03-07-2013
|
4.00
|
vert. stab cont.
|
|
|
|
03-06-2013
|
4.00
|
vertical stab mount cont.
|
|
|
|
03-04-2013
|
5.00
|
begin mounting vertical stab
|
|
|
|
03-03-2013
|
5.00
|
rudder pedals and brake master cyls
|
|
|
|
02-28-2013
|
5.00
|
modify fuel selector bracket for Andair unit
|
|
|
|
02-27-2013
|
3.00
|
wiring diagram work
|
|
|
|
02-25-2013
|
2.50
|
rivet front baggage door
|
Details
|
|
|
02-25-2013
|
2.00
|
mount fuel gages in left console; modify baggage d
|
Details
|
|
|
02-24-2013
|
6.00
|
panel layout and wiring diagram work
|
|
|
|
02-23-2013
|
4.00
|
rear rod end covers
|
|
|
|
02-22-2013
|
7.00
|
mount horizontal stab
|
|
|
|
02-21-2013
|
4.00
|
nut plates & cosmetics
|
|
|
|
02-18-2013
|
8.00
|
install aileron trim system
|
|
|
|
02-17-2013
|
2.00
|
roll autopilot servo
|
|
|
|
02-16-2013
|
2.00
|
work on electrical system design
|
|
|
|
02-15-2013
|
0.00
|
test out new painting suit
|
|
|
|
02-15-2013
|
4.00
|
autopilot pitch servo
|
|
|
|
02-13-2013
|
4.00
|
test fit autopilot servos to bellcrank, brackets
|
|
|
|
02-12-2013
|
2.00
|
rework baggage door hinges, dimple
|
|
|
|
02-10-2013
|
3.00
|
replace stock control hangar with one-piece unit
|
Details
|
|
|
02-08-2013
|
2.00
|
test fit panel modification
|
Details
|
|
|
02-07-2013
|
5.00
|
baggage door and mid fuselage
|
|
|
|
02-06-2013
|
1.50
|
fwd baggage door cont.
|
|
|
|
02-05-2013
|
5.00
|
fwd. baggage door fit, debur and dimple
|
|
|
|
02-02-2013
|
5.00
|
roll bar and rear headrest weldment + front seat
|
|
|
|
02-01-2013
|
5.00
|
top skin and baggage door
|
|
|
|
01-29-2013
|
0.00
|
added a bench
|
|
|
|
01-28-2013
|
4.00
|
modified and finished back seat back
|
Details
|
|
|
01-26-2013
|
4.00
|
mid cabin covers
|
|
|
|
01-25-2013
|
4.50
|
custom throttle quadrant, bulkhead channels
|
|
|
|
01-23-2013
|
5.50
|
interior fuselage
|
|
|
|
01-22-2013
|
6.00
|
flap and aileron controls
|
|
|
|
01-22-2013
|
2.00
|
fit rear side panels
|
|
|
|
01-17-2013
|
4.50
|
prep and install floor panels and baggage floor
|
Details
|
|
|
01-16-2013
|
2.50
|
install rudder cable, front seat floor
|
|
|
|
01-15-2013
|
3.50
|
inspect and verify fuse construction pgs 8-5 thru
|
|
|
|
01-14-2013
|
1.20
|
inspect and verify floor assy construction p.8-4
|
|
|
|
01-11-2013
|
6.00
|
boarding step
|
Details
|
|
|
01-10-2013
|
2.50
|
fit and rivet bulkhead doubler for entry step
|
|
|
|
01-09-2013
|
2.00
|
fuselage inspect & verify
|
|
|
|
01-09-2013
|
3.50
|
fit and drill F812OB step bulkhead reinforcement
|
|
|
|
12-30-2012
|
5.00
|
nut plates cont.
|
|
|
|
12-28-2012
|
2.00
|
receive and inventory finish kit
|
|
|
|
12-15-2012
|
3.00
|
nut plates
|
|
|
|
12-14-2012
|
3.00
|
plate nuts
|
|
|
|
12-01-2012
|
0.00
|
organize hardware
|
Details
|
|
|
11-18-2012
|
0.00
|
new shop cont.
|
Details
|
|
|
11-18-2012
|
0.00
|
new shop
|
Details
|
|
|
03-04-2012
|
4.00
|
complete L elevator
|
|
|
|
02-20-2012
|
3.00
|
complete elevator trim tab
|
|
|
|
01-15-2012
|
3.50
|
elevator trim tab prep
|
|
|
|
01-05-2012
|
3.00
|
rivet L elevator
|
|
|
|
01-04-2012
|
2.00
|
bend tabs in L elevator skin
|
|
|
|
01-01-2012
|
8.00
|
prep L elevator
|
|
|
|
12-28-2011
|
3.00
|
rivet R elevator
|
|
|
|
12-28-2011
|
3.00
|
leading edge R elevator
|
|
|
|
12-26-2011
|
3.00
|
debur all elevator parts
|
|
|
|
12-25-2011
|
2.00
|
rivet R elevator skeleton
|
|
|
|
12-24-2011
|
4.00
|
R elevator prep
|
|
|
|
12-17-2011
|
3.00
|
prep elevators and throttle bracket
|
|
|
|
12-04-2011
|
3.00
|
rivet elevator stiffeners
|
|
|
|
12-03-2011
|
4.00
|
prep elevator
|
|
|
|
11-28-2011
|
2.00
|
prep elevator stiffeners
|
|
|
|
11-20-2011
|
3.50
|
disassemble vertical stab, debur, dimple, prime
|
|
|
|
11-06-2011
|
2.50
|
prep veritcal stab
|
Details
|
|
|
11-04-2011
|
3.00
|
complete horizontal stab
|
|
|
|
11-03-2011
|
3.00
|
rivet R. horizontal stab skin
|
|
|
|
10-16-2011
|
0.00
|
purchased QB kit
|
Details
|
|
|
06-12-2011
|
6.50
|
prep and rivet HS skelton
|
Details
|
|
|
06-11-2011
|
2.25
|
prep emp for riveting
|
Details
|
|
|
05-22-2011
|
3.00
|
continue R HS
|
|
|
|
05-20-2011
|
1.50
|
begin R horizontal stab
|
|
|
|
04-30-2011
|
1.25
|
drill L HS skins
|
|
|
|
04-17-2011
|
4.50
|
HS skeleton and skin
|
Details
|
|
|
04-15-2011
|
1.00
|
prep HS ribs
|
Details
|
|
|
04-13-2011
|
1.75
|
prep HS front spar
|
Details
|
|
|
04-10-2011
|
4.00
|
rudder leading edge and top cap
|
Details
|
|
|
03-25-2011
|
2.50
|
rivet rudder skin to skeleton
|
|
|
|
03-20-2011
|
3.50
|
rudder work cont.
|
Details
|
|
|
03-16-2011
|
1.75
|
continue rudder work
|
Details
|
|
|
03-15-2011
|
3.25
|
finish rudder riveting, bend, assemble
|
Details
|
|
|
03-14-2011
|
3.00
|
debur and rivet new rudder skin
|
Details
|
|
|
03-13-2011
|
3.50
|
dimpled new rudder skin and stiffeners.
|
Details
|
|
|
03-12-2011
|
4.50
|
shape HS parts. prep rudder.
|
Details
|
|
|
03-06-2011
|
3.25
|
rear spar horizontal stab
|
Details
|
|
|
02-28-2011
|
3.00
|
rudder work
|
Details
|
|
|
02-26-2011
|
2.00
|
back rivet stiffeners to rudder skins
|
|
|
|
02-25-2011
|
4.00
|
prep rudder for riveting
|
Details
|
|
|
02-20-2011
|
1.00
|
cut, trim and debur 6 rudder stiffeners
|
|
|
|
02-19-2011
|
0.00
|
practice tool box project
|
Details
|
|
|
02-08-2011
|
1.50
|
inventory emp kit
|
|
|