KitLog pro

Powered By Kitlog Pro v2.0

Mikes Helicycle
Work Logs Found: 384
Category Work Time: 1064 Hours
 Date
Hours
Work Log Summary

Details

 09-21-2013
0.00
Tulsa Fly-in, Bartlesville, OK
Details
       

 09-14-2013
0.00
Neosho Mo, Baugh Airpark Fly-in
Details
       

 07-21-2013
0.00
40 hour Phase 1 complete
Details
       

 06-18-2013
1.00
Airspeed calibration, Tail rotor oil change
Details
       

 03-02-2013
0.50
My first flight
Details
       

 02-25-2013
18.00
Factory Checkout
Details
       

 01-20-2013
1.00
Auxilary instrument power
Details
     

 01-19-2013
3.00
Rotor tach upgrade
Details
       

 01-16-2013
2.00
Side strobes
Details
       

 01-12-2013
3.00
Tail weight tube
Details
       

 11-16-2012
0.50
Headset hanger
Details
       

 11-14-2012
0.50
Switch guard
Details
       

 11-13-2012
2.00
Switch guard
Details
       

 11-10-2012
6.00
Skid step
Details
       

 11-04-2012
1.50
New cyclic mixer mounted
Details
       

 11-03-2012
2.50
Upgraded cyclic mixer
Details
       

 11-03-2012
2.00
Trans oil cooler
Details
       

 11-01-2012
5.00
Walking beams re-visited
Details
       

 10-25-2012
1.50
Transmission oil cooler
Details
       

 07-15-2012
3.00
Lock nuts and safety wire
Details

 06-27-2012
0.50
Inspection Program
Details
     

 06-23-2012
3.00
Inspection Program
Details

 06-21-2012
4.00
Maintenance & Inspection Manual
Details

 06-09-2012
2.00
Factory checkout checklist
Details
     

 06-04-2012
1.00
Document holder
Details
       

 05-28-2012
2.00
Tail drive shaft alignment, empty CG
Details
       

 05-27-2012
1.00
Throttle actuator brace
Details
       

 05-27-2012
2.00
Instrument markings, temp labels, fuel line clamps
Details
       

 05-26-2012
2.00
Labels, engine alignment
Details
       

 05-25-2012
3.00
Data plate, labels
Details
       

 05-23-2012
1.00
Drained fuel
Details

 05-21-2012
2.00
Clutch bearing shims, labels
Details
       

 05-20-2012
3.50
Sight tube labels, clutch bearing shims, labels
Details
       

 05-19-2012
5.00
Empty weight, fuel sight tube markings
Details
       

 05-18-2012
2.00
Windshield, gear spread
Details
       

 05-16-2012
1.50
Airworthiness, potentiometer cover, data plate
Details
       

 05-14-2012
3.00
Airworthiness paperwork
Details

 05-12-2012
2.00
Additional labels
Details

 05-09-2012
1.50
Throttle potentiometer holder
Details
       

 05-07-2012
1.00
Throttle potentiometer
Details
       

 04-30-2012
1.00
Clutch adjustment
Details
     

 04-29-2012
3.50
Static balance, drag links, tail rotor
Details
       

 04-28-2012
3.50
Static balancing
Details
       

 04-28-2012
2.00
Skid plugs, main rotor lead-lag
Details
       

 04-28-2012
2.00
Exhaust heat shield
Details
       

 04-27-2012
1.00
EXPERIMENTAL placard
Details
       

 04-26-2012
2.50
N-numbers
Details
       

 04-25-2012
4.50
Heat shield, rotor supports, N-number
Details
       

 04-24-2012
1.00
Heat shield
Details
       

 04-23-2012
3.00
Custom wrench, mount blade #1, heat shield
Details
       

 04-22-2012
6.00
Balde #1 polish, teeter bumper, tail rotor
Details
       

 04-21-2012
9.00
Blade polishing, mounting
Details
       

 04-18-2012
2.50
Blade support, pop cans, blade sanding
Details
       

 04-17-2012
1.50
Front blade supoprt
Details

 04-16-2012
1.50
Rear blade support
Details
     

 04-15-2012
3.00
Blade supports
Details
       

 04-15-2012
2.00
Blade supports
Details
       

 04-14-2012
1.00
Blade polishing
Details

 04-10-2012
1.00
More blade polishing
Details

 04-09-2012
1.00
More blade polishing
Details

 04-08-2012
1.50
Blade polishing
Details
     

 04-07-2012
6.00
Blade plug screen, Blade balancing holes
Details
       

 04-06-2012
2.00
FAA Registration
Details

 04-05-2012
3.00
Paint protection, blade plugs
Details
       

 04-04-2012
5.00
#2 Blade plug
Details
       

 04-03-2012
1.50
Blade two end plug
Details
       

 04-02-2012
1.50
Blade end plug
Details
       

 04-01-2012
3.00
Ground wheels, rotor blade plug
Details
       

 03-31-2012
3.00
Rotor end plug
Details
       

 03-30-2012
3.00
Windshield cleaning
Details

 03-26-2012
2.00
Pitot tube, exhaust plug, door hinges
Details
       

 03-25-2012
5.00
Windshield, throttle, door
Details
       

 03-24-2012
7.00
Cabin install, pinstriping
Details

 03-23-2012
4.00
Tail fins, cabin halves
Details
       

 03-22-2012
4.00
Door latch plates, paint, tail fins
Details
       

 03-21-2012
4.00
Cabin paint, tail fins
Details
       

 03-19-2012
3.00
Blade end plugs
Details
       

 03-18-2012
3.00
Tail drive shaft alignment
Details
       

 03-17-2012
1.00
Tail fin paint, pinstripe
Details
       

 03-17-2012
4.00
Swash collars, control stop bumpers, driveshaft
Details
       

 03-08-2012
1.00
Drive pin bolt, cyclic stick bolts
Details
       

 03-07-2012
2.50
Collective friction
Details
       

 03-05-2012
2.50
Fuel system primed, blade plugs, seatbelts, swash
Details
       

 03-04-2012
3.00
Rotor head, pitch links
Details
       

 03-03-2012
3.00
Collective down stop, Rotor head install
Details
       

 02-29-2012
1.00
Rotor head, pitch block
Details
       

 02-28-2012
1.00
Rotor head, main blades
Details
       

 02-27-2012
2.00
Half doors
Details
     

 02-26-2012
1.50
Pitch block, door hinges and latches
Details
       

 02-25-2012
2.50
Cleanup, doors, seatbelts
Details
     

 02-19-2012
1.00
Cabin to painter, replace fuel line
Details
       

 02-13-2012
2.00
Vertical fin, LED strobes
Details
       

 02-11-2012
1.50
Vertical fin
Details
       

 02-09-2012
2.50
Remove cabin, more tail fin work
Details
       

 02-08-2012
1.50
Horizontal Stab
Details
       

 02-07-2012
1.00
Horizontal stab, cabin paint lines
Details
       

 02-06-2012
2.00
Tail fin alignment
Details
       

 02-05-2012
1.00
External power cable, Horiz. stab mount
Details
       

 02-01-2012
1.50
Cyclic boot
Details
       

 01-29-2012
4.00
Oil line change, Cabin/tail paint lines
Details
       

 01-28-2012
2.00
Anti-collision LEDs, Tail fins
Details
       

 01-27-2012
2.00
Cabin trimming, anti-collision lights
Details
       

 01-26-2012
1.50
Antenna routing
Details
       

 01-25-2012
2.00
Capacitor
Details
       

 01-24-2012
2.50
Pedal plugs, filter vent, Left cabin half
Details
       

 01-23-2012
2.00
Anti-torque pedals, Foot well carpet
Details
       

 01-21-2012
3.00
Capacitor wiring, drain fuel, cabin install
Details
       

 01-18-2012
2.00
Instrument power diode, anti-torque pedals
Details
       

 01-16-2012
4.00
Panel mounting
Details
       

 01-15-2012
7.00
Cyclic grip, instrument pod
Details
       

 01-14-2012
7.00
Radio wiring, Instrument pod
Details
       

 01-13-2012
1.00
Anti- collision lights
Details
       

 01-12-2012
4.00
Radio harness
Details
       

 01-10-2012
4.00
Upper panel connector, power up test
Details
       

 01-09-2012
3.50
More panel wiring
Details
       

 01-08-2012
4.00
Panel wiring
Details
       

 01-07-2012
7.00
Panel wiring
Details
       

 01-05-2012
1.50
Fuel flow meter wiring
Details
       

 01-04-2012
3.00
Fuel system flush, fuel flow meter test
Details
       

 01-03-2012
2.00
Fuel flow transducer
Details
       

 01-02-2012
2.00
Right side wiring
Details
       

 01-01-2012
5.00
Wiring, labels, routing, bundling
Details
       

 12-31-2011
6.00
Still more wiring
Details
       

 12-30-2011
8.00
More wiring
Details
       

 12-29-2011
5.00
Governor wiring
Details
       

 12-28-2011
4.00
Clutch position switch, oil pressure, hour meter
Details
       

 12-27-2011
1.50
Left side wiring
Details
     

 12-26-2011
1.50
Aux battery fuse, Governor
Details
       

 12-25-2011
4.00
Right side wiring
Details
       

 12-24-2011
3.50
Right side Wiring
Details
       

 12-19-2011
1.00
Front pulley, scavenge pumps
Details

 12-17-2011
2.50
Backup battery
Details
       

 12-15-2011
2.00
Aux Battery
Details
       

 11-17-2011
0.50
Static pressure plumbing
Details
     

 11-13-2011
3.00
More panel wiring
Details
       

 11-12-2011
5.00
Panel wiring
Details
       

 11-10-2011
1.00
Compass issue
Details
       

 11-09-2011
2.50
Instrument panel
Details
       

 11-08-2011
0.50
Volt meter
Details
       

 11-07-2011
2.00
Governor throttle wires
Details
       

 11-06-2011
3.00
Governor wiring
Details
       

 11-05-2011
2.50
Governor box, governor wiring
Details
       

 11-01-2011
1.50
Seat pan switches, clutch wiring
Details
       

 10-31-2011
2.00
Fuel sight gauge
Details
       

 10-30-2011
1.50
Labels, fuel sight gauge
Details
       

 10-29-2011
2.00
Applying labels
Details
       

 10-26-2011
2.00
Seat pan bolts, Instrument pod shims
Details
       

 10-25-2011
0.50
Instrument pod
Details
       

 10-23-2011
0.50
Seat pan back from painter
Details
       

 10-18-2011
2.00
Filter mount brace
Details
       

 10-17-2011
3.00
Fuel filter mount & plumbing
Details
       

 10-11-2011
0.50
Fuel fittings
Details
       

 10-09-2011
4.00
Panel labels
Details
       

 10-07-2011
2.00
N.O. MFS, wiring
Details
       

 10-02-2011
2.00
Frame ground, Exciter, Start fuel
Details
       

 09-29-2011
2.00
Battery cables, engine tach
Details
       

 09-27-2011
3.00
Battery power straps
Details
       

 09-25-2011
5.00
Battery cables
Details
       

 09-24-2011
3.00
Engine RPM sensor, Battery wiring, First starter s
Details
       

 09-21-2011
2.50
Safety wiring, Battery boxes
Details
       

 09-20-2011
3.00
Engine oil, Tail pipe
Details
       

 09-18-2011
2.00
Tail pipe, engine tach sensor
Details
       

 09-18-2011
1.00
Engine tach sensor
Details
       

 09-18-2011
2.00
Clutch actuator final install
Details
       

 09-17-2011
3.00
Clutch, throttle spring
Details
       

 09-15-2011
0.50
Test fit exhaust pipe
Details
       

 09-13-2011
1.50
Breaker bus bar, second governor switch
Details
       

 09-11-2011
0.50
Installed jumpers
Details
       

 09-09-2011
1.50
Lower panel wiring
Details
       

 09-05-2011
1.00
Wire crimpers, Rectifier terminals
Details
       

 09-03-2011
1.00
Safety wiring, torque seal
Details
     

 09-03-2011
2.00
Idler pulley, igniter
Details
       

 09-02-2011
4.00
Final alignment of engine
Details
       

 09-01-2011
1.00
Idler pulley and engine alignment
Details
     

 08-31-2011
3.00
Pulley alignment, belt tension, idler pulley
Details
       

 08-29-2011
2.50
Seat pan, engine alignment
Details
       

 08-28-2011
2.00
Throttle return spring, painting
Details
       

 08-28-2011
4.00
Hanging the engine
Details
       

 08-27-2011
7.00
Rotor tach, engine mounts, oil tank, fuel line
Details
       

 08-26-2011
3.00
Governor box, engine mounts
Details
       

 08-25-2011
1.50
Oil tank, rotor tach pickup
Details
       

 08-24-2011
1.00
Rotor tach pickup
Details
     

 08-23-2011
1.50
Governor box, rotor tach pickup
Details
       

 08-22-2011
1.00
Instrument pod, rotor tach
Details
     

 08-21-2011
1.50
Transmission pulley, lift strut, seatpan
Details
       

 08-14-2011
4.00
Instrument panels, Governor box
Details
       

 08-13-2011
5.00
Instrument panels
Details
       

 08-13-2011
1.00
Cabin, seat pan, Inst. pod
Details

 08-11-2011
0.50
Seat upholstery
Details
       

 08-11-2011
2.00
Governor box
Details
       

 08-10-2011
2.00
Clutch switch, governor
Details
       

 08-09-2011
1.00
Clutch actuator
Details
       

 08-09-2011
2.00
Clutch actuator
Details

 08-07-2011
1.00
Governor box
Details
       

 08-05-2011
1.00
Exciter mounting, drill jig
Details
       

 08-04-2011
1.00
Jeweled exciter box and mount
Details
     

 08-03-2011
2.00
Exciter mount
Details
       

 08-02-2011
0.50
OIl tank leak test
Details

 08-01-2011
1.00
Voltage regulator
Details
       

 07-31-2011
1.50
Voltage regulator mount
Details
       

 07-30-2011
2.00
Paint tank mounts, regulator mount
Details

 07-29-2011
4.00
Remove oil tank, safety wiring
Details
       

 07-28-2011
1.00
Clutch
Details
     

 07-22-2011
0.00
Attended Homer's Helicopter Meet
Details
       

 07-20-2011
2.00
Oil tank vent, clutch
Details
       

 07-19-2011
2.00
Clutch
Details
     

 07-18-2011
2.00
Last of the oil lines
Details

 07-17-2011
5.00
Oil lines
Details
       

 07-16-2011
6.00
More oil lines
Details
       

 07-15-2011
3.00
Engine oil lines
Details
       

 07-14-2011
3.50
Engine oil lines, pressure switch
Details
       

 07-12-2011
2.00
Oil fittings
Details
       

 07-11-2011
2.50
Oil lines
Details
     

 07-09-2011
3.00
OIl tank mounting
Details
       

 07-09-2011
3.00
Engine oil lines
Details
       

 07-08-2011
3.00
OIl tank mounts
Details
       

 07-06-2011
4.00
Battery box jeweling
Details
       

 07-04-2011
3.00
Oil tank brackets
Details

 07-03-2011
3.50
Clutch, oil tank
Details
       

 07-02-2011
4.00
Oil tank, Clutch
Details
       

 07-01-2011
2.50
Turbine oil tank
Details
       

 06-27-2011
3.00
Painting clutch parts
Details
       

 06-05-2011
1.50
Oil filter mount
Details
       

 06-04-2011
5.00
OIl tank, Cabin paint
Details
       

 06-03-2011
3.00
Reinforced door sill
Details
       

 06-03-2011
1.50
Clutch bolt anti-rotation
Details
       

 06-01-2011
2.00
Turbine oil tank
Details
       

 05-30-2011
6.50
Cyclic L/R stop, Cabin interior paint
Details
       

 05-29-2011
3.00
Seatpan paint, Cyclic rigging
Details
       

 05-27-2011
5.00
Safety wiring, smoothing T/R shaft - slider
Details
       

 05-26-2011
2.00
Tail rotor removal, gearbox oil
Details
     

 05-25-2011
2.00
Tail rotor polish, gearbox plug
Details
       

 05-24-2011
5.00
More polishing, seat foam, safety wiring
Details
       

 05-23-2011
2.00
Tail driveshaft polishing
Details
       

 05-22-2011
6.00
Torque pedal rigging, Drive shaft polishing
Details
       

 05-22-2011
3.50
Cabin trimming
Details
       

 05-21-2011
2.00
Uncrated engine
Details
       

 05-21-2011
5.00
Removed cabin, safety belts, pitot static
Details
       

 05-20-2011
4.00
Oil tank cap
Details
       

 05-19-2011
3.50
Chin window, cabin cut outs
Details
       

 05-18-2011
4.00
Windshield
Details
       

 05-18-2011
1.50
Pitot tube
Details
       

 05-17-2011
3.00
Doors, engine
Details
     

 05-16-2011
1.00
Oil tank
Details

 05-15-2011
4.00
Doors
Details
       

 05-13-2011
4.00
Doors
Details
       

 05-12-2011
5.50
Half door prep and paint
Details
       

 05-11-2011
5.50
Half doors
Details
       

 05-10-2011
5.00
Half doors
Details
       

 05-09-2011
6.00
Half doors
Details
       

 05-08-2011
1.00
Work bench
Details
       

 05-08-2011
2.50
Half doors
Details
       

 05-07-2011
4.50
Half doors, collective pocket
Details
       

 05-06-2011
2.00
Half doors, interior paint
Details
       

 04-26-2011
2.50
Door latches
Details
       

 04-25-2011
4.00
Door latches
Details
       

 04-24-2011
6.50
Half Doors
Details
       

 04-23-2011
8.00
Half doors
Details
       

 04-11-2011
5.00
Seat pan & switches
Details
       

 04-11-2011
2.00
Installed cabin
Details
       

 04-10-2011
1.00
Seat pan
Details

 04-06-2011
3.00
Mounted compass and radio in panel
Details
       

 04-05-2011
3.00
More filling and sanding
Details
       

 04-05-2011
2.50
Instrument panel
Details
       

 04-04-2011
3.00
Fixing voids in cabin fiberglass
Details
       

 04-02-2011
4.00
Half doors, Cabin prep
Details
       

 04-01-2011
1.00
Tail drive shaft bolts
Details
       

 04-01-2011
2.50
Cabin hole reinforcement, door frames
Details
       

 03-31-2011
1.50
Reinforced cabin mounting holes
Details
       

 03-29-2011
5.50
Tail drive shaft, Collective friction, Shaft plug
Details
       

 03-28-2011
4.50
Tail drive shaft, Main shaft plug
Details
       

 03-25-2011
3.00
Clutch assembly
Details
       

 03-21-2011
2.00
Tail drive shaft
Details
     

 03-20-2011
9.50
Tail drive shaft
Details
       

 03-19-2011
6.00
Tail drive shaft
Details
       

 03-18-2011
4.00
Tail drive shaft, collective friction
Details
       

 03-18-2011
2.50
More tail rotor work
Details
       

 03-17-2011
4.00
Tail rotor rigging
Details
       

 03-16-2011
2.00
Tail rotor scissors
Details
       

 03-14-2011
2.00
Directional pedals
Details
       

 03-13-2011
2.00
Torque pedals
Details
       

 03-12-2011
3.00
Directional pedals
Details
       

 03-11-2011
2.00
Drained fuel
Details
     

 03-08-2011
2.00
Fuel system leak test
Details
       

 03-07-2011
3.00
Fuel vent lines
Details
       

 03-06-2011
4.00
Swashplate clear coating
Details
       

 03-05-2011
2.50
Lower fuel tanks
Details
       

 03-03-2011
5.00
Final install controls
Details
       

 03-02-2011
6.00
Swash final adjustment
Details
     

 03-01-2011
1.50
Cyclic travel
Details
       

 02-28-2011
2.50
Cyclic travel
Details
       

 02-27-2011
4.50
Swashplate rigging
Details
       

 02-26-2011
4.00
Installing control tubes
Details
       

 02-25-2011
2.00
Control tube clear coating
Details
     

 02-24-2011
2.00
Tube sanding
Details

 02-23-2011
1.50
Cyclic arms
Details
       

 02-22-2011
3.00
Control tubes
Details

 02-21-2011
2.50
Polishing
Details
       

 02-20-2011
5.00
Control re-assembly
Details
       

 02-19-2011
4.50
Painted controls
Details
       

 02-19-2011
2.50
Paint prep on controls
Details
     

 02-18-2011
6.00
Trans fittings, Hood bearing
Details
       

 02-18-2011
3.50
Leak test, Trans oil
Details
       

 02-17-2011
5.00
Transmission cooler
Details
       

 02-17-2011
4.00
Trans oil cooler
Details
       

 02-17-2011
0.50
Tail drive couplers
Details
       

 02-16-2011
2.00
Tank sumps
Details
       

 02-16-2011
4.00
Hood bearing, anti-rotation bracket
Details
       

 02-14-2011
0.50
Line wrench
Details
       

 02-13-2011
3.00
Transmission oil line, touchup paint
Details
       

 02-12-2011
3.00
Upper tank
Details
       

 02-12-2011
3.00
Install Main Trans
Details
       

 02-12-2011
1.50
Door hinges
Details
       

 02-06-2011
7.00
Transmission oil lines
Details
       

 02-05-2011
4.00
Clear coat transmission
Details
       

 02-04-2011
3.00
Main transmission prep
Details
       

 02-02-2011
0.50
Main transmission prep
Details
       

 02-02-2011
5.00
Door latches and frames
Details
       

 02-01-2011
4.00
Door latches
Details
       

 01-31-2011
5.00
Lower tanks
Details
       

 01-31-2011
3.00
Half Doors
Details
       

 01-30-2011
4.00
Top fuel tank
Details
       

 01-29-2011
5.00
Gear install
Details
       

 01-28-2011
3.50
Reassemble landing gear
Details
       

 01-28-2011
1.50
Haul frame
Details

 01-28-2011
1.00
Door latches
Details
       

 01-26-2011
3.00
Fuel tank prep
Details
       

 01-23-2011
2.50
Polished landing skids
Details
       

 01-20-2011
1.50
Hole sanding tool
Details
     

 01-14-2011
2.00
Instrument mounting
Details
     

 01-14-2011
1.00
Frame hauling
Details
       

 01-13-2011
2.00
Instrument Panel
Details

 01-13-2011
4.00
Frame prep
Details

 01-11-2011
1.50
Removed Transmission
Details

 01-10-2011
2.00
Tear down
Details
       

 01-09-2011
3.50
Teardown, prep for powder coat
Details
     

 01-08-2011
5.00
Pod brackets, seatpan removal
Details
       

 01-08-2011
1.50
Lift attachment
Details
       

 01-07-2011
7.00
Inst. Panel construction
Details
       

 01-06-2011
2.00
Panel Layout
Details
       

 01-05-2011
2.50
Pod, panel, Collective friction
Details
       

 01-05-2011
3.50
Instrument panel mounting
Details
       

 01-03-2011
4.50
Instrument panel
Details
     

 12-31-2010
3.00
Instrument Panel
Details
       

 12-30-2010
4.00
Panel, inst. pod
Details
       

 12-30-2010
1.50
Collective friction
Details

 12-29-2010
3.00
Panel
Details
     

 12-24-2010
3.00
Cabin nut plates
Details
       

 12-23-2010
4.00
Cabin nut plates
Details
       

 12-22-2010
4.00
Seatpan - Lift Strut
Details
       

 12-20-2010
2.00
Throttle friction, potentiometer adapter
Details
       

 12-20-2010
2.50
Cabin triming and sanding
Details
       

 12-19-2010
2.50
Remove and trim cabin
Details
       

 12-09-2010
5.00
Lift Strut
Details
       

 12-08-2010
4.00
Lift strut
Details
       

 12-05-2010
2.50
Trans lift strut
Details
     

 12-05-2010
1.00
Tail drive shaft alignment
Details

 12-04-2010
2.00
Clean up of cabin markings
Details

 12-03-2010
2.50
Trans lift strut
Details

 12-03-2010
1.50
Cabin screws
Details

 12-02-2010
2.00
Cabin screws, windshield
Details

 11-28-2010
4.00
Windshield
Details
       

 11-27-2010
5.00
Windshield
Details
       

 11-24-2010
2.50
Removed tabs
Details
       

 11-22-2010
1.00
Test fit windscreen
Details

 11-22-2010
1.50
Rear lower cover
Details
     

 11-21-2010
2.00
Bottom gear covers, cabin trimming, Chin window
Details
       

 11-19-2010
0.50
Vert Trim Fin
Details
     

 11-19-2010
2.00
Marked windshield hole locations
Details
       

 11-19-2010
1.00
Final fitting of anti-rotation bracket
Details
     

 11-18-2010
1.50
Windshield drill prep.
Details
       

 11-16-2010
2.00
Anti-rotation bracket
Details
       

 11-14-2010
1.00
Anti-rotation bracket
Details

 11-13-2010
0.50
Swash plate anti-rotation bracket
Details
       

 11-13-2010
1.50
Installed hang strap in hangar
Details
     

 11-13-2010
2.00
Fit chin window
Details
       

 11-09-2010
6.00
Ground handling wheels
Details
       

 11-09-2010
1.00
Drilled tail rotor hub/shaft
Details
       

 11-09-2010
1.00
Drilled tail blade retaining bolts
Details

 11-07-2010
2.00
Test fit and sanded main windscreen.
Details
       

 11-01-2010
1.00
Safety wire holes, tail rotor trans
Details
       

 11-01-2010
2.00
Fuel tank bolts
Details
       

 10-30-2010
2.00
Parts bin
Details
     

 10-16-2010
3.00
Helicycle Kit 5-12
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.