Larrys Web Site
Work Logs Found: 385
Category Work Time: 1414 Hours
 Date
Hours
Work Log Summary

Details

 03-10-2020
1.00
Repairman Certificate
Details

 12-04-2019
1.00
Test Flight
Details

 07-11-2019
5.00
Transition Training
Details

 04-03-2019
1.00
Tow Bar Installation
Details
       

 01-28-2019
4.00
Airworthiness Inspection Completed
Details
       

 01-22-2019
1.00
Airworthiness Inspection
Details

 12-28-2018
1.00
Picture Day and Engine Run
Details
       

 12-18-2018
2.00
Engine Run and Labeling
Details

 12-12-2018
4.00
MIsc Items
Details
       

 12-07-2018
1.00
Engine Run
Details

 12-03-2018
2.00
Flap Motor
Details

 11-28-2018
4.00
Fuel Sensor Calibration
Details

 11-15-2018
4.00
Seats in place
Details
       

 11-02-2018
4.00
Seat backs and canopy frame side covers installed
Details
       

 11-01-2018
4.00
Forward top skin installed
Details
       

 10-29-2018
4.00
Install fire extinguisher and misc items
Details
       

 10-24-2018
2.00
Cockpit Carpet Installed
Details
       

 10-22-2018
4.00
Rivet seat bottom and baggage area
Details
       

 10-21-2018
1.00
Rivet rudder cable covers
Details
     

 09-24-2018
4.00
Wing Fairings Rivetted
Details
       

 09-19-2018
4.00
Safety wire rudder cables
Details
       

 09-18-2018
2.00
Connect OAT to ADAHRS
Details
     

 09-17-2018
4.00
Safety Wire Elevator Cables
Details
     

 09-10-2018
4.00
Wing Fairings
Details
       

 08-30-2018
1.00
Final Canopy Rivets
Details
     

 08-30-2018
4.00
Decals, Side panels and Rivets on Canopy
Details
       

 08-29-2018
4.00
Aileron Stop and N numbers
Details
       

 08-21-2018
4.00
Problem with aileron turnbuckles
Details
       

 08-20-2018
4.00
Need to Redo/Alter Aileron Cables
Details
       

 08-15-2018
4.00
Aileron Stop
Details
     

 08-08-2018
3.00
Aileron Rigging and Pitot/Static lines
Details
       

 08-07-2018
8.00
Fuel Flow Test
Details
       

 08-06-2018
4.00
Fuel Flow Test
Details
       

 08-02-2018
4.00
Interior Fuel lines
Details
       

 07-19-2018
2.00
Install fuel hose braces
Details
     

 07-12-2018
2.00
Install Fuel Supply exterior hose
Details
     

 07-07-2018
4.00
Drilling Center Console
Details
       

 07-06-2018
3.00
Begin Installing Fuel Hoses
Details
       

 07-05-2018
2.00
Fuel Hoses
Details

 06-22-2018
3.00
Bolt flap rod to coupling
Details
       

 06-21-2018
2.00
Fix Right Wing Strobe
Details
       

 06-15-2018
4.00
Flaps Installed
Details
       

 06-10-2018
3.00
Torque all wing bolts
Details
       

 06-09-2018
2.00
Wings Atached and Supports Removed
Details
     

 05-17-2018
1.00
Photos of Plane with Wings
Details
       

 05-16-2018
3.00
Left wing inserted
Details
       

 05-09-2018
4.00
Right Wing Attached
Details
       

 05-07-2018
4.00
Flap Rod L angle Braces
Details
       

 05-03-2018
4.00
Continue Flap Rod and Bearing Installation
Details
       

 04-14-2018
3.00
Flaps Rod Installation
Details
       

 04-13-2018
3.00
Test Fit Right Wing
Details
       

 04-05-2018
2.00
First Engine Start
Details
     

 03-23-2018
4.00
Fuselage Moved to New Home
Details
       

 03-15-2018
4.00
Connect wiring to ELT
Details
     

 03-04-2018
2.00
Power Up Avionics
Details
     

 03-01-2018
2.00
Install headphone jacks
Details
     

 02-27-2018
1.00
Outside air vent duct connected to left side
Details
     

 02-27-2018
4.00
ELT wiring
Details
       

 02-27-2018
2.00
ELT accesories
Details
       

 02-26-2018
2.00
ELT installed and wiring clips installed
Details
       

 02-25-2018
4.00
More Wiring
Details
       

 02-23-2018
6.00
Wiring Continues
Details
       

 02-21-2018
3.00
Install Stick Grips
Details
       

 02-19-2018
2.00
Stick Grip and ELT Buzzer
Details
       

 02-18-2018
4.00
ELT Support Bracing/Mounting Tray
Details
       

 02-06-2018
3.00
Install ELT Panel Switch and Antenna
Details
       

 01-31-2018
2.00
ADS-B Antenna Cable
Details
       

 01-28-2018
3.00
Mount ADAHRS
Details
       

 01-22-2018
2.00
Elevator trim
Details
       

 01-06-2018
2.00
Comm Cable
Details
       

 12-22-2017
4.00
Radio/Circuit Breaker panel
Details
       

 12-05-2017
3.00
Mounted and wired ECU power panel
Details
       

 12-04-2017
1.00
Cable from transponder to antenna
Details
     

 12-03-2017
2.00
Throttle installation
Details
       

 12-03-2017
2.00
Radio and Intercom Installed
Details
       

 11-30-2017
4.00
Instrument panel work
Details
       

 11-29-2017
4.00
Avionics work continues
Details
       

 11-17-2017
4.00
Continue work on Avionics shelf
Details
       

 11-15-2017
3.00
Antenna work and shelf layout
Details
       

 11-13-2017
2.00
GPS Wire
Details
       

 11-11-2017
3.00
GPS Mounted and Nutplates Installed
Details
       

 11-10-2017
3.00
VHF Antenna
Details
       

 11-09-2017
4.00
Instrument panel and GPS bracket
Details
       

 11-06-2017
5.00
instrument Panel work
Details
       

 11-04-2017
4.00
Power wiring and Network hub location
Details
       

 11-03-2017
6.00
Instrument panel cutouts
Details
       

 10-31-2017
1.00
Avionics Arrives
Details
     

 10-16-2017
2.00
Install Saddle on fuselage
Details
       

 10-12-2017
4.00
Connect Elevator cables to Control Stick
Details
       

 09-28-2017
4.00
Finish Oil Door on Cowling
Details
       

 09-25-2017
4.00
Installed Oil dip stick door in cowling
Details
       

 09-22-2017
1.00
Attended Zenith Open Hangar days
Details

 09-12-2017
1.00
Throttle test installation
Details
     

 09-12-2017
3.00
Install seat belt and shoiulder harness brackets
Details
       

 08-27-2017
1.00
Added some ground connectors to wiring
Details
     

 08-26-2017
2.00
Welded spring clips and exhaust pipe
Details
     

 08-25-2017
2.00
Brake fluid added to Master cylinders
Details
       

 08-16-2017
3.00
Move Wings to Hangar
Details
       

 08-14-2017
2.00
Ignition wire to starter
Details
       

 08-12-2017
2.00
GPS Shelf
Details
       

 08-07-2017
2.00
Ignition switch wiring
Details
       

 08-06-2017
2.00
Installing Amp Shunt
Details
       

 07-27-2017
2.00
Fuel pump wiring
Details
       

 07-25-2017
4.00
More sensor wiring
Details
       

 07-24-2017
4.00
Sensor wiring continues
Details
       

 07-24-2017
2.00
More sensor wiring
Details
       

 07-20-2017
4.00
Avionics shelf installed
Details
     

 07-19-2017
2.00
Wiring looms and other wiring
Details
       

 07-16-2017
2.00
Starter Diode and wiring loom
Details
       

 07-13-2017
4.00
Mount ECU and Cable
Details
       

 07-07-2017
6.00
Power and Ground Wiring
Details
       

 07-06-2017
2.00
Painted lower cowling
Details
     

 07-05-2017
5.00
Continued installing sensors
Details
       

 07-01-2017
4.00
Engine Monitoring Sensors
Details
       

 06-29-2017
4.00
Install baffle material
Details
     

 06-28-2017
4.00
Finish Cowl nutplates and Painted Top Cowl
Details
       

 06-25-2017
4.00
Cowl Nutplates
Details
     

 06-24-2017
4.00
Aligning Cowling and adding baffle plates
Details
       

 06-22-2017
4.00
Install Cowling
Details
       

 06-20-2017
4.00
Install Prop
Details
       

 06-19-2017
3.00
Exhaust System
Details
       

 06-18-2017
2.00
Hangar Workbench
Details
     

 06-15-2017
8.00
Installed More Engine Accessories
Details
       

 06-13-2017
2.00
Fuel return line
Details
       

 06-12-2017
8.00
Rinish Attaching canopy
Details
       

 06-11-2017
4.00
Fine fuel filter and oil cooler
Details
       

 06-09-2017
2.00
Mount engine to firewall
Details
       

 06-08-2017
4.00
Attaching engine to mounting
Details
       

 06-07-2017
4.00
Painting Engine Mount and Made Furl filter bracket
Details
       

 06-06-2017
2.00
Install Battery
Details
       

 06-04-2017
4.00
Battery shelf and fuel pumps
Details
       

 06-03-2017
4.00
FWF Box
Details
       

 06-02-2017
6.00
Rear canopy and trim
Details
       

 06-02-2017
3.00
Rear Canopy
Details
       

 06-01-2017
2.00
Rollover bar and rear rube frame installed
Details
       

 06-01-2017
4.00
Baggage Area
Details
       

 05-31-2017
2.00
Picked up engine and FWF kit
Details
       

 05-17-2017
2.00
Trim Pieces
Details
     

 05-16-2017
4.00
Remove Canopy and other pieces
Details
       

 05-11-2017
4.00
Canopy Front tube rail drilled
Details
       

 05-01-2017
4.00
Finish Rear Canopy trim
Details
       

 04-29-2017
4.00
Canopy Trimming Continues
Details
       

 04-28-2017
4.00
Left side rear canopy trim
Details
     

 04-27-2017
4.00
Rront canopy tube frame
Details
       

 04-26-2017
3.00
Trim for rear canopy
Details
     

 04-25-2017
4.00
Side Rails drilled and clecoed
Details
       

 04-20-2017
2.00
Drilling Front Canopy
Details
       

 04-19-2017
3.00
Front canopy fitting
Details
       

 04-18-2017
4.00
Hangar Cleanup
Details

 04-12-2017
3.00
Front Canopy fitting
Details
       

 04-10-2017
2.00
Front Canopy Brackets
Details
       

 04-06-2017
2.00
Drilled Rear Canopy to tube frame
Details
       

 04-05-2017
1.00
Acquired Hangar
Details
       

 03-31-2017
3.00
Cut Rear Canopy to size
Details
       

 03-29-2017
2.00
Rear Canopy Fitting
Details
       

 03-20-2017
3.00
Wheel Chocks
Details
     

 03-09-2017
1.00
Ordered Engine
Details

 02-27-2017
3.00
Air Scoops and Misc.
Details
       

 02-25-2017
4.00

Details
       

 02-24-2017
4.00
Install lower engine mount brackets and air scoops
Details
       

 02-23-2017
2.00
Set rudder cable tension
Details
       

 02-21-2017
1.00
Bottom enigne mounting brackets
Details
       

 02-20-2017
4.00
Upper Engine Mount Brackets
Details
       

 02-10-2017
4.00
Installed bolts in HT and repositioned airplane
Details
       

 02-09-2017
4.00
Front Top Skin
Details
       

 02-08-2017
4.00
More Riveting of Fuselage
Details
       

 02-07-2017
4.00
Canopy Latch System Reassembled
Details
       

 02-06-2017
4.00
Odds and Ends
Details
       

 01-31-2017
4.00
Completed Parking Brake
Details
       

 01-30-2017
4.00
Painted Latching Hardware
Details
       

 01-19-2017
3.00
Install gas springs and brackets
Details
       

 01-18-2017
4.00
Front canopy rear tube frame
Details
       

 01-16-2017
5.00
Canopy Frame
Details
       

 01-14-2017
6.00
Installing Top Front Skin
Details
       

 01-11-2017
4.00
Finish Latching System
Details
       

 01-10-2017
4.00
Install right side canopy latch
Details
     

 01-03-2017
4.00
Mount Canopy Latches
Details
       

 01-02-2017
5.00
Canopy Open/Close Lever
Details
       

 01-01-2017
4.00
Finished Mounting Parking Brake
Details
       

 12-29-2016
6.00
Begin installation of canopy
Details
       

 12-27-2016
4.00
Brake Lines
Details
       

 12-14-2016
2.00
Canopy Inventory
Details
       

 11-28-2016
3.00
Connect and Safety wire calipers
Details
       

 11-12-2016
4.00
Finishing up gear
Details
       

 11-11-2016
4.00
Mounted wheels and brakes
Details
       

 11-10-2016
6.00
Painted and mounted landing gear
Details
       

 10-31-2016
3.00
Drill Gear for Stop Blocks
Details
       

 10-29-2016
2.00
Tires/Tubes/Wheels
Details
       

 10-27-2016
5.00
Spring Landing Gear
Details
       

 10-27-2016
3.00
Packed Wheel Bearings
Details
       

 09-15-2016
3.00
Flap motor wiring and center console
Details
       

 09-14-2016
3.00
Cleaned and painted firewall
Details
       

 09-11-2016
3.00
Bottom Access Door Nutplates
Details
       

 09-08-2016
6.00
Steel Bungee and other gear items
Details
       

 09-07-2016
3.00
Steel Bungee Installation
Details

 09-06-2016
6.00
Nose wheel assembly
Details
       

 09-05-2016
3.00
Paint nose gear and pack bearings
Details
     

 09-04-2016
4.00
Nose Gear drilled and assembled
Details
       

 09-03-2016
3.00
Drill nose gear and doubler
Details
     

 09-03-2016
5.00
Center Console
Details
       

 09-02-2016
3.00
Assembly of Center Console
Details
       

 09-01-2016
2.00
Cleaned and primed nose gear
Details
     

 08-30-2016
6.00
Step Fairing and step cover
Details
       

 08-27-2016
3.00
Step fairing fitted
Details
     

 08-26-2016
2.00
Assembled nose wheel
Details
       

 08-26-2016
1.00

Details
     

 08-25-2016
4.00
Bottom Access Door Installed
Details
       

 08-24-2016
4.00
Attached steps to fuselage side skins
Details

 08-23-2016
4.00
Install Lower nose gear support bracket
Details
       

 08-18-2016
3.00
Routed elevator trim wire to fuselage
Details
       

 08-17-2016
2.00
Finish Rivets on Left side of fuselage
Details
     

 08-15-2016
4.00
Installed fairleads
Details
       

 08-12-2016
6.00
Connected elevator control cables
Details
       

 08-09-2016
1.00
Right wing moved to Carrier
Details
     

 08-08-2016
4.00
Top of right wing completed
Details
     

 08-07-2016
5.00
Cables Connected to elevator horn
Details
       

 08-04-2016
6.00
Right Wing work continues
Details
       

 08-03-2016
6.00
Continuing assembly of right wihg
Details
       

 08-02-2016
4.00
Assembly right wing top for riveting
Details
       

 07-29-2016
4.00
Bottom skin ready for rivets
Details
       

 07-22-2016
4.00
Reassemble bottom skin for riveting
Details
     

 07-19-2016
5.00
Right wing reassembly
Details
     

 07-12-2016
4.00
Disassembly continues
Details
       

 07-11-2016
4.00
Right wing disassembly
Details
       

 06-30-2016
4.00
Ldft wing stored for now
Details
       

 06-26-2016
4.00
Test fit and drill holes for aileron and flap
Details
       

 06-23-2016
4.00
Right wing in progress
Details
     

 06-20-2016
3.00
Left Wing Completed
Details
     

 06-15-2016
5.00
Saddle for elevator
Details
     

 05-18-2016
4.00
Mark wing for fuel tank
Details
       

 05-18-2016
6.00
Left Top Finished
Details
       

 05-17-2016
4.00
Right Wing Fuel Tank
Details
       

 05-16-2016
5.00
Left wing ready for riveting
Details
       

 05-14-2016
4.00
Right wing nose skin drilled
Details
     

 05-13-2016
4.00
Left fuel tank test
Details
       

 05-12-2016
3.00
Final items on Nose Ribs on Left Wing
Details
       

 05-11-2016
4.00
Ruel Hose
Details
       

 05-10-2016
2.00
Rudder stops and fuel tank calibration
Details
       

 05-10-2016
6.00
Rudder Cables
Details
       

 05-09-2016
2.00
Getting rudder fixed to neutral position
Details
     

 05-09-2016
5.00
Fuel System/Tank
Details
     

 05-03-2016
3.00
Rudder cables
Details
       

 05-03-2016
3.00
Fuel sender hole cut in tank
Details
     

 05-02-2016
5.00
Nicopress Swaging Tool
Details
     

 04-20-2016
4.00
Elevator Stops
Details
       

 04-19-2016
5.00
Right wing rear skin
Details
       

 04-12-2016
5.00
Right Wing Work Continues
Details
       

 04-08-2016
5.00
Right Wing Plumbing/Electrical
Details
       

 04-06-2016
4.00
Rear channel attached to rear ribs
Details
     

 04-05-2016
5.00
Right Wing Construction Begins
Details
     

 03-31-2016
5.00
Aileron Connected and Bellcrank work
Details
       

 03-30-2016
6.00
Interior of left wing and aileron fitting
Details
       

 03-29-2016
3.00
Install Left navigation light
Details
     

 03-18-2016
5.00
Reassemble left wing
Details
       

 03-17-2016
5.00
Left Wing debur and corrosion protection
Details
       

 03-15-2016
5.00
Wing Ready for Disassembly
Details
       

 03-12-2016
5.00
Wing Disassembly for deburring and corrosion prote
Details
       

 03-11-2016
3.00
Nose skin hole for fuel tank filler cap
Details
       

 03-10-2016
2.00
Top Rear Skin Bracing
Details
     

 03-02-2016
3.00
Access Cover :Plates and Rear Spar
Details
       

 03-01-2016
5.00
Fit Aileron and Flap/ Balance Arm
Details
       

 02-28-2016
5.00
Added left flap and aileron stop
Details
       

 02-27-2016
5.00
Wingtip, tie down ring and rear skin bracing
Details
       

 02-26-2016
5.00
Bottom skins drilled to final size
Details
       

 02-25-2016
2.00
Drill Top Skins
Details
     

 02-23-2016
5.00
Left wing fuel tank
Details
       

 02-22-2016
5.00
Top Nose Skin and Spar
Details
       

 02-21-2016
4.00
Top Leading Edge skin Installation
Details
       

 02-18-2016
5.00
Nose ribs and Leading edge skin
Details
     

 02-17-2016
6.00
Work on Bottom Skim
Details
       

 02-16-2016
5.00
Drilled top skin and fabicated L braces
Details
     

 02-15-2016
5.00
Rear Top; Skin
Details
       

 02-11-2016
5.00
Rear spar Channel and Left Wing Work
Details
     

 02-10-2016
5.00
Working on Main and Rear Spar
Details
       

 02-09-2016
5.00
Assembled Aileron bellcrank and stiffeners
Details
       

 02-08-2016
5.00
Aileron Bell Crank
Details
       

 02-05-2016
5.00
Rear Wing Ribs
Details
       

 02-04-2016
5.00
Right Aileron Ready to Rivet
Details
       

 02-02-2016
5.00
One Down and One to Go
Details

 01-31-2016
1.00
Upgrades
Details
     

 01-31-2016
5.00
Left Aileron
Details
       

 01-31-2016
3.00
Balance Arms
Details
     

 04-04-2014
4.00
Left Flap
Details
     

 03-12-2014
2.00
Rudder spar fairing
Details
       

 02-15-2014
8.00
Install Elevator,Rudder and Saddle
Details
       

 09-29-2013
4.00
Elevator trim wired
Details
       

 09-22-2013
1.00
Riveted fiberglass end pieces and installed elevat
Details
       

 09-22-2013
4.00
Installed Fiberglass end tail pieces
Details
       

 09-21-2013
4.00
Stabilizerr fiberglass tips installed
Details
       

 09-20-2013
4.00
Drilled/installed bolts for stabilizer
Details
       

 09-14-2013
4.00
Front skin pilots side
Details
       

 09-13-2013
6.00
Install Aileron Stop
Details
       

 09-08-2013
2.00
Install Flap Actuaor

 09-07-2013
6.00
Riveted fight front side skin
       

 09-06-2013
2.00
Lowerf Engine Mounts
Details
       

 08-31-2013
6.00
Attach cabin floor to fuselage
Details
       

 08-30-2013
8.00
Reassembled cabin floor
Details
       

 07-28-2013
6.00
Primed and painted steel parts
Details
       

 07-27-2013
8.00
Disassemble front fuselage
Details
       

 04-09-2013
6.00
Drill out Top skin
Details
       

 09-30-2012
6.00
Arm Rest and Seat Bottom
Details
       

 09-29-2012
6.00
Pilot's side seat
Details
       

 09-10-2012
3.00
Test fit rear top skin
       

 09-09-2012
8.00
Left Seat Bottom
Details
       

 09-08-2012
2.00
Test Fit Left Main Spar
Details
       

 09-06-2012
4.00
Flap Brace
Details
       

 09-01-2012
2.00
Install rear bracing for control stick
     

 09-01-2012
6.00
Install control stick
     

 08-31-2012
4.00
Baggage Floor
Details
     

 08-12-2012
4.00
Right Seat Bottom
Details
     

 04-15-2012
6.00
Gussets installed
Details
       

 04-14-2012
1.00
Upper longeron splice
Details
       

 04-14-2012
6.00
Front side skin L angles
Details
       

 02-18-2012
6.00
Baggage area supports
Details
       

 01-29-2012
4.00
Rear seat frame uprights
Details
       

 01-28-2012
6.00
Installed rear bulkheads
Details
       

 01-27-2012
4.00
Install gear gussets
Details
       

 01-14-2012
2.00
Gear Upright Gussetts
Details
     

 01-07-2012
6.00
Gear Uprights and Side skin gussett
Details
       

 01-01-2012
4.00
Main gear attachment
Details
       

 12-31-2011
4.00
Front Side Skins
Details
       

 12-28-2011
4.00
Mount instrument panel
Details
       

 12-27-2011
4.00
Mount rear seat back
Details
       

 12-26-2011
4.00
Mount rear channel frame
Details
       

 12-21-2011
3.00
Rear frame channel and attachment plate
Details
       

 12-20-2011
3.00
Upper engine mount
Details
       

 10-08-2011
6.00
Continued Leveling fuselage
Details
       

 10-07-2011
4.00
Install firewall and longerons
Details
       

 10-02-2011
2.00
Leveling fuselage
Details

 10-01-2011
8.00
Join Gear channel to cabin floor
Details
       

 09-30-2011
8.00
Assembled brakes to cabin floor
Details
       

 09-29-2011
4.00
Rudder pedals and brakes
Details
     

 09-05-2011
6.00
Riveted firewall
Details
       

 09-04-2011
4.00
Completed clecoing firewall
Details
       

 09-03-2011
3.00
Continued work on firewall

 08-27-2011
3.00
Join cabin floor section to gear channel
       

 08-21-2011
2.00
Cabin Floor
Details
     

 08-20-2011
2.00
Rear Seat Panel and Gear Channel
Details
     

 07-31-2011
2.00
Removed rear side skins for deburring
Details
       

 07-30-2011
2.00
Drilled rear side skins to final rivet size
       

 07-29-2011
2.00
Reworked firewall top stiffner

 07-23-2011
4.00
Front floor panel
Details
     

 07-22-2011
2.00
Firewall
Details
     

 07-17-2011
4.00
Rear Tail Section
Details
       

 07-16-2011
4.00
Rear Tail Section
Details
       

 07-15-2011
6.00
Rear Tail Panel Assembly
Details
       

 07-09-2011
5.00
Drill and cleco L angle diagonals
Details
     

 07-05-2011
1.00
Installed right elevator mounting bracket
Details
     

 07-04-2011
5.00
Added L angle diagonals
Details
       

 05-21-2011
10.00
Rear sides
Details
       

 05-06-2011
10.00
Riveted bottom fuselage
Details
     

 05-01-2011
2.00
Rudder Hinge Assembly
Details
       

 03-01-2011
2.00
Fit Z angles
Details
       

 02-28-2011
2.00
Drilled bottom fuselage
Details
     

 02-27-2011
4.00
Longerons for bottom fuselage
Details
       

 02-26-2011
5.00
Fuselage Bottom
Details
       

 02-25-2011
2.00
Inventory Parts
Details
       

 02-25-2011
2.00
Fuselage Kit Arrives
       

 01-18-2011
1.00
Ordered fuselage kit

 12-29-2010
8.00
Deburred/ Corrosion proteciton / rivet elevator

 11-14-2010
4.00
Elevator Trim tab and Motor

 11-13-2010
8.00
Drill skin to ribs
Details

 11-11-2010
2.00
Drill skin to ribs
       

 11-06-2010
3.00
Fit hinge to stabilizer and drill holes
     

 11-05-2010
4.00
Drill skin / trim flanges
     

 11-01-2010
2.00
Set upstabilizer for drilling

 10-31-2010
4.00
Fit stabilizer skin and drill
     

 10-31-2010
4.00
Deburr/ Corrosion protection/rivet
     

 10-30-2010
2.00
Rront spar to ribs

 10-29-2010
2.00
Drill rear spar attachment

 10-23-2010
8.00
Elevator center section and other ribs

 10-22-2010
4.00
Ribs to spar
     

 10-22-2010
4.00
Rear spar attachment/doublers

 10-21-2010
2.00
Complete Doubler Work on Front Spar

 10-20-2010
2.00
Small Doublers to Spar

 10-19-2010
2.00
Drill doublers to spar

 10-18-2010
2.00
Stabilizer and Elevator Parts Inventory
     

 08-28-2010
4.00
Corrosion protection and rivets
     

 08-26-2010
3.00
All holes drilled and deburred
 

 08-25-2010
2.00
Nose skin taped in place

 08-20-2010
4.00
Skin to ribs

 08-18-2010
4.00
Drill out holes/deburr and ready for rivets

 08-17-2010
3.00
Ribs to Spar
     

 08-16-2010
3.00
Doublers to Spar

 08-15-2010
1.00
Inventory Parts
     