Powered By Kitlog Pro v2.0
Freds Web Site
Pulsar XP
All
Work Logs Found:
100
Category Work Time:
283 Hours
Date
Hours
Work Log Summary
Details
05-18-2010
3.00
02-10-1996
2.50
Prepared and bonded 3 oz glass to the sanded radiu
Details
02-09-1996
1.25
Bonded micro to Vertical Stablizer and Rudder
Details
02-08-1996
0.50
Sanded the Vertical Stabilizer and Rudder
Details
02-07-1996
2.00
Drilled a hole and sanded the Vertical Stabilizer
Details
01-27-1996
2.50
Sanded and bonded 2 layers of 3 once glass
Details
01-26-1996
1.50
Filled the canopy lock catch hole in the fuselage
Details
01-21-1996
3.25
Prepared and bonded the canopy catch to the fusela
Details
01-20-1996
2.75
Fix - Ground out the canopy latch
Details
01-15-1996
4.00
Bonded nylon pads on the plywood blocks for the ca
Details
01-14-1996
1.00
Prepared, bonded and rivited the canopy latch
Details
01-10-1996
2.00
Prepared and bonded plywood blocks to the canopy
Details
01-09-1996
3.00
Cut slots thru the fuselage shell for the canopy h
Details
01-08-1996
1.50
Drilled1/4 inch holes where canopy alignment pins
Details
01-07-1996
3.00
Prepared Fuselage for canopy hold down pin
Details
01-06-1996
3.00
Mounted Slide Pin on Canopy
Details
01-04-1996
1.00
Bonded a plywood block onto the forward canopy fra
Details
01-03-1996
5.00
Rebonded the canopy side tracks with structural ad
Details
01-02-1996
1.00
Assembled the Canopy rollers
Details
01-01-1996
1.00
Prepared and bonded 2 layers of 2 inch glass tape
Details
12-31-1995
2.00
Bonded the vertical shear web with a fillet of mic
Details
12-30-1995
2.50
Fitted the Vertical shear web to the forward canop
Details
12-28-1995
5.00
Bonded these strips with Structural adhesive to th
Details
12-27-1995
1.00
Smoothed Canopy Frame
Details
12-26-1995
3.00
Bonded unidirectional glass to the canopy
Details
12-25-1995
4.50
Worked on Canopy
Details
12-24-1995
2.50
Worked on Canopy
Details
12-23-1995
4.00
Bonded the canopy to the frame
Details
12-21-1995
1.00
Bonded glass tape to the 4 frame joints.
Details
12-19-1995
1.00
Fit and bonded the canopy to the 4 frame joints
Details
12-18-1995
3.00
Fitted the wheel axles to the landing gear
Details
12-17-1995
1.00
Bonded the Rudder Pivot Plate
Details
12-16-1995
2.00
Checked Rudder for Twist and Found None
Details
12-10-1995
1.00
Fixed Rudder Twist
Details
12-09-1995
1.00
Fixed Rudder Twist
Details
12-08-1995
2.00
Fixing Rudder Twist Problem
Details
12-05-1995
2.00
Checked the verticle stabilizer for twist
Details
12-03-1995
1.00
Rebonded the front and top
Details
12-02-1995
2.00
Fitted and bonded a new back spar to the VS
Details
11-28-1995
1.00
Bonded a 4 inch tape down the back side of the fro
Details
11-26-1995
1.00
Rebonded the front spar of the vertical stabilizer
Details
11-25-1995
3.00
Found and Corrected the Verticle Stabilizer Twist
Details
11-24-1995
5.00
Prepared and bonded the rudder hinge tub plug.
Details
11-16-1995
2.50
Finished Out the Aft Bulkhead Bonding
Details
11-14-1995
2.50
Glassed in the Tail Light
Details
11-13-1995
3.50
Prepared and Bonded the Rudder Pivot Plate
Details
11-12-1995
5.00
Construction of Tail Light Mounting Plate
Details
11-11-1995
2.00
Removed Rudder and Inspected All Bonds
Details
11-10-1995
5.00
Sanded and fitted the rudder shells
Details
11-09-1995
2.00
Bonded Verticle Stabilizer to Fuselage
Details
11-08-1995
3.50
Fitted and bonded the vertical stabilizer to the f
Details
11-07-1995
3.00
Completed sanding a 3/4 inch deep channel
Details
11-06-1995
3.00
Inspected and sanded the aft bulkhead.
Details
11-05-1995
6.00
Prepared and bonded the two halfs of the vertical
Details
11-04-1995
2.00
Completed the final fitting of the Aft fuselage ac
Details
11-03-1995
6.00
Completed aft access door
Details
11-02-1995
2.00
Removed 1/8 inch around the Aft access door openin
Details
11-01-1995
2.00
Tail Skid and Aft Fuselage Access door
Details
10-31-1995
2.50
Fitted the tail skid to the fuselage
Details
10-30-1995
2.50
Sanded and fitted vertical stabilizer
Details
10-29-1995
3.50
Started construction of the verticle stabilizer
Details
10-28-1995
3.00
Fuselage Preparation for Landing gear
Details
10-27-1995
2.00
Fuselage Preparation for Landing Gear
Details
10-26-1995
1.00
Fuselage Preparation for Landing Gear
Details
10-25-1995
2.00
Fuselage Preparation for Landing gear
Details
10-24-1995
2.00
Landing Gear Assembly
Details
10-23-1995
7.00
Fuselage work for landing Gear
Details
10-16-1995
5.00
Fuselage Asembly for landing gear.
Details
10-15-1995
5.00
Fuselage preparation for landing gear attachement
Details
10-14-1995
1.00
Glassed hard points on seat back
Details
10-11-1995
3.00
Landing Gear Assembly
Details
10-10-1995
0.50
Landing Gear Assembly
Details
10-09-1995
1.50
Landing Gear Assembly
Details
10-08-1995
1.50
Landing Gear Assembly
Details
10-06-1995
4.50
Landing Gear Assembly
Details
10-05-1995
1.00
Landing Gear Assembly
Details
10-04-1995
1.00
Landing Gear Assembly
Details
10-03-1995
1.50
Landing Gear Assembly
Details
09-30-1995
8.25
Sanded and wetted out 2" tape
Details
09-29-1995
3.00
Inspected layup and corrected
Details
09-23-1995
6.00
Worked on Seatback installation
Details
09-21-1995
1.50
P46 Step 1 and P42 Step1
Details
09-19-1995
1.50
Fitted bulkheads
Details
09-17-1995
2.00
Completed Seat Back Reinforcement
Details
09-16-1995
7.50
Worked on seat back
Details
09-14-1995
1.25
Completed right flap
Details
09-13-1995
1.16
Worked on Right Flap
Details
09-12-1995
1.33
Started Right Flap
Details
09-10-1995
5.50
Completed Left Flap
Details
09-09-1995
6.83
Completed both ailerons
Details
09-06-1995
1.50
Completed steps 4-5 Right Aileron
Details
09-05-1995
2.00
Completed steps 1-3 Right and Left Ailerons
Details
09-04-1995
3.00
Left Aileron Construction Started
Details
09-03-1995
3.00
Fitting Fuselage bulkheads
Details
09-02-1995
3.55
Cutting out the blue print patterns
Details
08-29-1995
3.50
Cut blue print patterns
Details
08-26-1995
6.00
Resummed and completed Inventory
Details
08-25-1995
3.00
Resummed Inventory
Details
08-24-1995
2.50
Resummed Inventory
Details
08-23-1995
11.83
Unloaded Crate & Inspect & Inventory
Details
SITE NAVIGATION
Pulsar XP Home
Category
# Logs
# Hours
All
100
284
Avionics
1
3
Canopy
25
62
Fuselage
26
92
Inventory and Inspec
4
23
Landing Gear
11
21
Miscellaneous
1
4
Rudder
8
19
Vertical Stabilizer
16
37
Wings
8
23
Copyright © 2001-2024 Matronics. All Rights Reserved.