NORMAN'S WEB SITE
Work Logs Found: 121
Category Work Time: 360 Hours
 Date
Hours
Work Log Summary

Details

 12-25-2011
3.00
Installed wire run hardware and wiring for flaps,
       

 12-24-2011
6.00
Removed wiring and aft fus top skin
       

 12-20-2011
6.00
Removed wiring

 12-17-2011
4.00
Removed wiring

 12-04-2011
7.00
More wiring removal/fix
       

 12-03-2011
6.00
Began wiring removal on purchased RV-10 Fuselage
       

 11-22-2011
3.00
Pick up RV-10 Fus
       

 11-13-2011
2.00
mounted steps

 11-12-2011
6.00
rivweted top fowd fus structure and skin

 11-10-2011
2.00
fwd fus structure

 11-08-2011
7.00
upper fowd fus

 11-07-2011
6.00
upper fwd fus

 11-03-2011
2.00
torqued gear suport bolts

 11-02-2011
5.00
mounted gear supports

 10-31-2011
1.00
finished riveting skins!!!!

 10-30-2011
1.50
rivet lower fwd skins

 10-27-2011
6.00
finished mid-fus riveting; partially completed fwd

 10-26-2011
6.00
finished mid-fus skins

 10-25-2011
1.50
riveted most of rt mid skin to sub structure

 10-18-2011
5.00
riveted left mid fus skin

 10-16-2011
1.00
Began riveting skins and pro sealing firewall

 10-09-2011
4.00
clecoed skins to fuselage for riveting

 10-08-2011
2.00
riveted fus structure

 09-22-2011
1.50
Began riveting fus structure

 09-20-2011
2.00
primed skins

 09-05-2011
1.50
Installe dsound insulation in fus floor

 08-23-2011
2.50
dimpled aft side skins

 08-22-2011
2.00
dimpled forward side skins

 08-21-2011
8.00
deburred, c/s and dimpled structure and ribs

 08-20-2011
4.50
Drilled enge mount brackets. Began DDD

 08-19-2011
3.00
drilled for side skis -- ready to DDD!
       

 08-18-2011
3.00
bent and dry fit for fus side skins

 08-17-2011
3.00
drilled aft fus skins, mounted forw fus ribs

 08-15-2011
2.50
dry fit aft fus skins
     

 08-13-2011
2.50
bent longerons
     

 08-10-2011
1.00
prepped mid-fus longerons

 08-09-2011
2.00
finished fus floors;started longeron bends
     

 08-08-2011
1.50
fit and drilled LG assemblies

 08-07-2011
4.00
bent fus sides; mounted nid fus long

 08-05-2011
1.00
joined forward floor halves
     

 08-01-2011
2.00
riveted forward ribs to floor

 07-25-2011
1.00
pro sealed firewall and forward floor

 07-23-2011
1.50
riveted system ribs and 1043D

 07-22-2011
1.00
riveted ribs to forw bot skin

 07-19-2011
2.00
primed bottom for fus skin riveted rib assembly

 07-16-2011
2.00
dry fit for and aft fus

 07-09-2011
1.00
fabbed seat pans

 07-07-2011
4.00
Dry forward fus floors

 06-27-2011
2.50
riveted firewall support structure

 06-20-2011
3.00
prepped center fus parts
     

 06-17-2011
3.00
rivet firewall
     

 06-16-2011
2.00
finished floor, started riveting firewall
     

 06-15-2011
2.00
prepped firewall

 06-14-2011
2.00
rivet fus bottom skin

 06-13-2011
2.00
rivet fus bottom skin

 06-07-2011
1.00
Rivet bottom skin

 06-06-2011
1.50
dimpled and primed bottom skins

 06-02-2011
2.00
deburred and dimpled bottom skins

 05-31-2011
4.00
drilled and c/s floor and ribs

 05-30-2011
4.50
riveted floor ribs

 05-29-2011
4.00
riveted seat pan ribs

 05-28-2011
4.00
prepped ribs and rear spar

 05-27-2011
2.00
riveted rear spar attch

 05-24-2011
4.00
riveted spar attachments

 05-23-2011
3.50
prepped rear spar structure

 05-22-2011
3.00
rear spar prep

 05-21-2011
1.00
prepped aft main spar

 05-20-2011
1.00
main spar prep

 05-07-2011
2.00
drill wing spar
     

 05-06-2011
1.00
fit wing tips
     

 05-02-2011
1.50
spar prep

 05-02-2011
5.00
nutplates in wing tips

 05-01-2011
1.00
started fus kit

 05-01-2011
2.00
installed al strips in wing tips

 05-01-2011
1.00
finished fus inventory
     

 04-30-2011
2.00
install wing tips

 04-29-2011
2.00
install wing tips

 04-26-2011
4.00
Installed flaps & ailerons. Adjsuted control link
       

 04-22-2011
1.00
Startesd unpacking/inventory for fus kit

 04-18-2011
4.00
Assembled and installed ail control assemblly

 04-04-2011
2.00
right flap

 03-31-2011
1.00
primed flap skins

 03-28-2011
2.00
riveted ribs to left flap

 03-26-2011
1.00
left flap riveting

 03-25-2011
2.00
riveted left flap

 03-22-2011
3.00
Flap bebur & c/s

 03-21-2011
2.00
finished rt aileron; left flap prep

 03-19-2011
2.00
left flap prep

 03-17-2011
1.50
FLt flap prep; pro seal rt aileron trail. edge

 03-16-2011
1.50
flasp skelton assembly

 03-14-2011
3.00
flap prep

 03-13-2011
2.50
Finished rivets on ailerons -- pro sealed traling

 03-09-2011
2.50
Riveted aileron skins

 03-08-2011
3.00
Aileron prep

 03-07-2011
2.00
left aileron

 03-03-2011
2.00
ailerons

 02-28-2011
3.00
prepped stiffeners and ail skins

 02-27-2011
2.50
prepped ailerons

 02-25-2011
1.50
riveted rt tank baffle

 02-24-2011
2.00
Rivweted wing gap seals

 02-23-2011
2.00
Finished pro seal on right tank

 02-20-2011
3.00
Pro sealed rt tank, prepped flap gap seals

 02-19-2011
1.50
Pro sealed right tank ribs

 02-18-2011
2.50
Riveted right tank ribs

 02-16-2011
4.00
Finished left tank baffle, prosealed ribs in right

 02-15-2011
3.00
riveted baffle to lseft tank

 02-14-2011
0.50
installed pitot tube mount

 02-11-2011
1.00
Dimple right tank

 02-09-2011
6.50
Pro sealed left tank
       

 02-08-2011
4.00
riveted left tank ribs; prepped right tank

 02-07-2011
5.00
Prepped right fuel tank

 02-06-2011
3.00
Pro sealed left tank ribs
       

 02-04-2011
4.50
Wing stand and left fuel tank

 02-02-2011
5.50
Finished riveting right wg leading edge

 02-01-2011
4.50
Riveted right leading edge skin

 01-31-2011
4.00
finished left leading edge

 01-30-2011
2.00
Rivet lt leading edge to ribs

 01-29-2011
2.00
Alodine leading edge ribs

 01-23-2011
5.00
Left Fuel tank
Details

 01-20-2011
3.00
Prep tank ribs

 01-19-2011
20.00
Left leading edge
Details