KitLog pro

Powered By Kitlog Pro v2.0

Paul Besing Glasair II
Work Logs Found: 14
Category Work Time: 65 Hours
 Date
Hours
Work Log Summary

Details

 02-15-2011
3.00
Finished Bellcrank Installation
Details
       

 02-13-2011
4.00
C Rib Laminates
Details
     

 02-12-2011
3.00
Roving Laminates
Details
       

 02-08-2011
2.50
Cut and bonded lower roving laminate
Details
     

 02-07-2011
2.50
Bonded C Rib caps in place
Details
       

 02-06-2011
1.00
Prepped C Ribs for rib caps
Details
       

 02-06-2011
6.00
Left Aileron Bellcrank Installation
Details
       

 01-18-2011
3.50
Layed up C Rib Spar caps
Details
       

 01-15-2011
4.50
Glassed final support layup on gear cutouts
Details
       

 01-12-2011
5.00
Worked on gear cutouts
Details
       

 01-11-2011
3.00
Cut Landing gear cutouts
Details
       

 01-10-2011
4.00
Fabricated bellcrank inspection covers
Details
       

 01-04-2011
8.00
Built vacuum system and fiberglass cut table
Details
       

 01-03-2011
15.00
Built Wing and Fuselage Cradles
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.