Powered By Kitlog Pro v2.0
Paul Besing Glasair II
IIS
All
Work Logs Found:
14
Category Work Time:
65 Hours
Date
Hours
Work Log Summary
Details
02-15-2011
3.00
Finished Bellcrank Installation
Details
02-13-2011
4.00
C Rib Laminates
Details
02-12-2011
3.00
Roving Laminates
Details
02-08-2011
2.50
Cut and bonded lower roving laminate
Details
02-07-2011
2.50
Bonded C Rib caps in place
Details
02-06-2011
1.00
Prepped C Ribs for rib caps
Details
02-06-2011
6.00
Left Aileron Bellcrank Installation
Details
01-18-2011
3.50
Layed up C Rib Spar caps
Details
01-15-2011
4.50
Glassed final support layup on gear cutouts
Details
01-12-2011
5.00
Worked on gear cutouts
Details
01-11-2011
3.00
Cut Landing gear cutouts
Details
01-10-2011
4.00
Fabricated bellcrank inspection covers
Details
01-04-2011
8.00
Built vacuum system and fiberglass cut table
Details
01-03-2011
15.00
Built Wing and Fuselage Cradles
Details
SITE NAVIGATION
Contact Builder
IIS Home
Category
# Logs
# Hours
All
14
65
Shop Setup
2
23
Wings
12
42
Copyright © 2001-2024 Matronics. All Rights Reserved.