Date
|
Hours
|
Work Log Summary
|
Details
|
10-20-2013
|
2.00
|
Adjusting Canopy Frame
|
Details
|
|
|
09-10-2013
|
0.00
|
Removed paint from part of Canopy Frame
|
Details
|
|
|
09-08-2013
|
4.00
|
Rivetted Canopy Slide Rail
|
Details
|
|
|
09-04-2013
|
2.00
|
Drilled canopy slide rail
|
Details
|
|
|
09-01-2013
|
2.00
|
Cut C-666
|
Details
|
|
|
03-03-2013
|
2.00
|
Drilled C-661 rear slider block.
|
Details
|
|
|
03-02-2013
|
3.00
|
Rivetted battery tray ribs
|
Details
|
|
|
02-17-2013
|
2.00
|
Added nutplates for battery hold-down
|
Details
|
|
|
02-04-2013
|
2.00
|
Mounting VP-400 PDU
|
Details
|
|
|
01-31-2013
|
4.00
|
Mounting VP-400 PDU
|
Details
|
|
|
01-10-2013
|
1.00
|
Fabricated aux fuel lines.
|
Details
|
|
|
12-16-2012
|
3.00
|
Adjusted canopy frame
|
Details
|
|
|
12-15-2012
|
4.00
|
Trial-fit of roll bar on fuselage frame
|
Details
|
|
|
12-14-2012
|
3.00
|
Installing transfer pump and tubing
|
Details
|
|
|
12-13-2012
|
4.00
|
Fabricated doubler for transfer fuel pump
|
Details
|
|
|
12-11-2012
|
3.00
|
Manufactured C-668 spacer
|
Details
|
|
|
12-09-2012
|
2.00
|
Reworked return fuel line
|
Details
|
|
|
12-01-2012
|
2.00
|
Continued fuel lines
|
Details
|
|
|
11-27-2012
|
3.00
|
Started routing fuel line provision for aux-tank
|
Details
|
|
|
11-17-2012
|
3.00
|
Fabricated fuel lines
|
Details
|
|
|
11-13-2012
|
2.00
|
Rivetted center cabin cover and EPU plug
|
Details
|
|
|
11-10-2012
|
2.00
|
Primed center cabin cover
|
Details
|
|
|
11-07-2012
|
1.00
|
Fitted contactors to aft left bay
|
Details
|
|
|
11-04-2012
|
3.00
|
Prepared pump cover
|
Details
|
|
|
11-02-2012
|
3.00
|
Fitted cover for fuel pump
|
Details
|
|
|
10-21-2012
|
4.00
|
Started fuel lines
|
Details
|
|
|
10-13-2012
|
5.00
|
Located and drilled holes for battery hold-down
|
Details
|
|
|
10-09-2012
|
1.00
|
Painted EPU plug
|
Details
|
|
|
10-04-2012
|
3.00
|
Rivetted ribs for avioncs bay
|
Details
|
|
|
10-02-2012
|
1.00
|
CS holes in EPU plug
|
Details
|
|
|
09-30-2012
|
3.00
|
Drilled EPU plug, cut hole in fuselage
|
Details
|
|
|
09-29-2012
|
3.00
|
Backing plate for EPU plug
|
Details
|
|
|
09-27-2012
|
2.00
|
Trimmed and sanded EPU plug
|
Details
|
|
|
09-26-2012
|
1.00
|
Deburred AntiSplat Seat Mod parts
|
Details
|
|
|
09-26-2012
|
1.00
|
Bonded EPU plug housing to doubler
|
Details
|
|
|
09-23-2012
|
3.00
|
Continued assembling avioncs shelf
|
Details
|
|
|
09-22-2012
|
1.00
|
Started assembling avionics shelf
|
Details
|
|
|
09-19-2012
|
3.00
|
Primed shelf parts; Fibreglass layup for GPU plug
|
Details
|
|
|
09-17-2012
|
1.00
|
Drilled holes for GADAHRS brace
|
Details
|
|
|
09-16-2012
|
3.00
|
Manufactured support for GADAHRS shelf
|
Details
|
|
|
09-15-2012
|
6.00
|
Drilled aft left bay
|
Details
|
|
|
09-14-2012
|
3.00
|
Drilled avionics shelf top sheet
|
Details
|
|
|
09-13-2012
|
2.00
|
Started drilling top sheet of avionics shelf
|
Details
|
|
|
09-12-2012
|
3.00
|
Continue construction of avionics shelf
|
Details
|
|
|
09-07-2012
|
2.00
|
Finished lightening holes in battery hold-down
|
Details
|
|
|
09-06-2012
|
3.00
|
Lightening holes in Battery hold-downs
|
Details
|
|
|
09-05-2012
|
3.00
|
Added third upper angle for Avionics Shelf
|
Details
|
|
|
09-04-2012
|
3.00
|
Continue manufacture Avionics Shelf
|
Details
|
|
|
09-02-2012
|
3.00
|
Fabricated GADAHRS Tray
|
Details
|
|
|
08-15-2012
|
5.00
|
Fuselage Static System
|
Details
|
|
|
08-01-2012
|
4.00
|
Primed various parts
|
Details
|
|
|
07-30-2012
|
6.00
|
Drilled attach angles for avionics ribs
|
Details
|
|
|
07-29-2012
|
6.00
|
Dimpled holes for additional shelves
|
Details
|
|
|
07-28-2012
|
5.00
|
Finished fabricating inertia reel mounting
|
Details
|
|
|
07-27-2012
|
4.00
|
Fabricated Inertia Reel Fixture
|
Details
|
|
|
07-25-2012
|
3.00
|
Continued fabricating avionics rib
|
Details
|
|
|
07-24-2012
|
2.00
|
Drilled aft avionics ribs
|
Details
|
|
|
07-21-2012
|
2.00
|
Drilled third AHRS bracket rib
|
Details
|
|
|
07-19-2012
|
2.00
|
Drilled second AHARS bracket shelf
|
Details
|
|
|
07-19-2012
|
1.00
|
Drilled RH brake cylinder holes
|
Details
|
|
|
07-18-2012
|
2.00
|
Drilled holes for brake calinder (LH)
|
Details
|
|
|
07-17-2012
|
2.00
|
Fabricated left F-6119 rudder cable link
|
Details
|
|
|
07-16-2012
|
2.00
|
Fabricated right F-6119 rudder cabel link
|
Details
|
|
|
07-15-2012
|
4.00
|
Added second AHARS rib
|
Details
|
|
|
07-14-2012
|
4.00
|
Deburred and dimpled fwd fuselage parts
|
Details
|
|
|
07-13-2012
|
1.00
|
Drilled F-7108B angle
|
Details
|
|
|
07-13-2012
|
3.00
|
Drilled and deburred F-7106 fwd top skin
|
Details
|
|
|
07-11-2012
|
1.00
|
Fitted Instrument Panel angles
|
Details
|
|
|
07-09-2012
|
2.00
|
Fitted F-7108C angle
|
Details
|
|
|
07-04-2012
|
1.00
|
Trial fit of the inertia reel bracket
|
Details
|
|
|
07-03-2012
|
1.00
|
Drilled fuel pump doubler plate
|
Details
|
|
|
07-01-2012
|
6.00
|
Finished design of Inertia Reel Mount
|
Details
|
|
|
06-30-2012
|
7.00
|
Design of Inertia Reel Mount
|
Details
|
|
|
06-24-2012
|
3.00
|
Rivetted seat backs
|
Details
|
|
|
06-23-2012
|
5.00
|
Primed and rivetted elevator pushrods
|
Details
|
|
|
06-22-2012
|
2.00
|
Primed more parts
|
Details
|
|
|
06-21-2012
|
2.00
|
Rivetted several small parts
|
Details
|
|
|
06-20-2012
|
3.00
|
Primed parts
|
Details
|
|
|
06-19-2012
|
3.00
|
Priming parts
|
Details
|
|
|
06-18-2012
|
3.00
|
Modified rudder stops for maximum rudder travel
|
Details
|
|
|
06-16-2012
|
0.00
|
Trial fit of fuel pump switch
|
Details
|
|
|
06-16-2012
|
5.00
|
Fitted elevator and rudder
|
Details
|
|
|
06-12-2012
|
1.00
|
Dimpled and screwed clamp for rudder cable tube
|
Details
|
|
|
06-10-2012
|
3.00
|
Fabricated F-782D and fitted F-7114
|
Details
|
|
|
05-30-2012
|
4.00
|
Started construction of aileron trim
|
Details
|
|
|
05-28-2012
|
3.00
|
Drilled angles for upper fwd fuselage
|
Details
|
|
|
05-27-2012
|
4.00
|
Started construction for fwd fuselage
|
Details
|
|
|
05-27-2012
|
3.00
|
Installed nutplates for seat rib access plate
|
Details
|
|
|
05-26-2012
|
5.00
|
(Temporarily) installed control system
|
Details
|
|
|
05-21-2012
|
1.00
|
Rivetting remaining nutplates for baggage and seat
|
Details
|
|
|
05-20-2012
|
1.00
|
Cut AN832-4D union for vent
|
Details
|
|
|
05-19-2012
|
2.00
|
Deburred and dimpled F-7112 skin
|
Details
|
|
|
05-18-2012
|
3.00
|
Drilled all holes on F-7112 top skin to size
|
Details
|
|
|
05-17-2012
|
1.00
|
Drilled holes in the F-766B flap angle
|
Details
|
|
|
05-15-2012
|
1.00
|
Clecko'ed forward top skin to fuselage
|
Details
|
|
|
05-13-2012
|
6.00
|
Continued work on the electric flap
|
Details
|
|
|
05-12-2012
|
1.00
|
Drilled holes for F-6111 reinforcing rib
|
Details
|
|
|
05-12-2012
|
2.00
|
Drilled and installed nutplates for F-680
|
Details
|
|
|
05-11-2012
|
3.00
|
Continued on electric flap assembly
|
Details
|
|
|
05-09-2012
|
2.00
|
Continued on electric flap assembly
|
Details
|
|
|
05-08-2012
|
3.00
|
Started on electrical flap installation
|
Details
|
|
|
05-06-2012
|
5.00
|
Continued work on F-982 center cabin cover
|
Details
|
|
|
05-05-2012
|
4.00
|
Started construction on F-982 center cabin cover
|
Details
|
|
|
05-01-2012
|
4.00
|
More nutplates for baggage floor
|
Details
|
|
|
04-29-2012
|
4.00
|
Nutplates for seat and baggage floor
|
Details
|
|
|
04-28-2012
|
3.00
|
Nutplates for seat floor
|
Details
|
|
|
03-07-2012
|
1.00
|
Test fit of seat and rudder pedals
|
Details
|
|
|
02-29-2012
|
2.00
|
Rivetted nutplates on aft seat ribs
|
Details
|
|
|
02-26-2012
|
1.00
|
Installed nutplates for tunnel cover on seat ribs
|
Details
|
|
|
02-26-2012
|
1.00
|
Drilled upper seat back angle
|
Details
|
|
|
02-26-2012
|
5.00
|
Drilled and dimpled nutplates for aft seat floor
|
Details
|
|
|
02-25-2012
|
2.00
|
Drilled right bushing and rudder pedal brace
|
Details
|
|
|
02-25-2012
|
5.00
|
Deburred all seat back components
|
Details
|
|
|
02-19-2012
|
6.00
|
Continued fabricating seat backs
|
Details
|
|
|
02-18-2012
|
4.00
|
Fabricating seat backs
|
Details
|
|
|
02-18-2012
|
1.00
|
Enlarged lightening hole in F-916 set ribs
|
Details
|
|
|
02-18-2012
|
1.00
|
Dimpled holes in F-976
|
Details
|
|
|
02-13-2012
|
2.00
|
Rivetted brake pedals
|
Details
|
|
|
02-12-2012
|
4.00
|
Drilled rudder pedal bearing blocks
|
Details
|
|
|
02-11-2012
|
4.00
|
Fabricated F-6117 brake pedals
|
Details
|
|
|
02-02-2012
|
1.00
|
Rivetted seat adjustment components to frame
|
Details
|
|
|
02-02-2012
|
0.00
|
Rivetted AHARS bracket together
|
Details
|
|
|
02-02-2012
|
1.00
|
Drilled strobe/ELT bracket
|
Details
|
|
|
02-01-2012
|
3.00
|
Primed AHARS bracket parts
|
Details
|
|
|
01-29-2012
|
2.00
|
Drilled wiring holes in F-706
|
Details
|
|
|
01-29-2012
|
3.00
|
Drilled AHARS bracket to fuselage
|
Details
|
|
|
01-28-2012
|
2.00
|
Drilled seat adjustment components
|
Details
|
|
|
01-26-2012
|
1.00
|
Fabricated elevator bellcrank spacers
|
Details
|
|
|
01-23-2012
|
1.00
|
Rivetted up elevator stop and vert. stab. attach
|
Details
|
|
|
01-18-2012
|
1.00
|
Fabricated F-635 bellcrank parts
|
Details
|
|
|
01-17-2012
|
25.00
|
Fabricated F-705K, F-705L and F-705J
|
Details
|
|
|
01-15-2012
|
2.00
|
Deburred attachment holes of VS
|
Details
|
|
|
01-14-2012
|
4.00
|
Fitted and drilled VS
|
Details
|
|
|
01-13-2012
|
0.00
|
Trimmed VS-702
|
Details
|
|
|
01-13-2012
|
2.00
|
Rivetted F-601TD brake plate
|
Details
|
|
|
01-12-2012
|
3.00
|
Drilled HS rear spar to fuselage
|
Details
|
|
|
01-10-2012
|
3.00
|
Drilled horizontal stabilizer forward attachment
|
Details
|
|
|
01-09-2012
|
3.00
|
Rivetted F-712 aft bulkhead
|
Details
|
|
|
01-08-2012
|
3.00
|
Fabricated F-601TD brake plate
|
Details
|
|
|
01-06-2012
|
1.00
|
Rivetted tail spring mount to aft bulkhead
|
Details
|
|
|
01-04-2012
|
3.00
|
Welded nutplate on WD-409
|
Details
|
|
|
01-03-2012
|
2.00
|
Drilled keeper rivets on tailspring mount
|
Details
|
|
|
01-01-2012
|
3.00
|
Drilled hole in tail spring mount for tail spring
|
Details
|
|
|
12-20-2011
|
2.00
|
Drilled fwd end of WD-409
|
Details
|
|
|
12-08-2011
|
0.00
|
Removed fuel tank sealant for fitting fuel tempera
|
Details
|
|
|
12-07-2011
|
2.00
|
Fitted fuel temperature probe in right tank
|
Details
|
|
|
12-06-2011
|
2.00
|
Primed wing access plates
|
Details
|
|
|
12-04-2011
|
5.00
|
Deburred and dimpled holes in right wing
|
Details
|
|
|
12-03-2011
|
3.00
|
Deburred right lower outboard wing skin
|
Details
|
|
|
12-02-2011
|
3.00
|
Matchdrilled right lower outboard wing skin
|
Details
|
|
|
11-30-2011
|
3.00
|
Finished right fuel trap
|
Details
|
|
|
11-29-2011
|
3.00
|
Finished manufacture of right fuel return in fuel
|
Details
|
|
|
11-27-2011
|
3.00
|
Installed wiring conduit in right wing
|
Details
|
|
|
11-26-2011
|
4.00
|
Manufactured flap brass bushings
|
Details
|
|
|
11-23-2011
|
2.00
|
Installed landing light
|
Details
|
|
|
11-21-2011
|
2.00
|
Rivetted landing light strips
|
Details
|
|
|
11-20-2011
|
0.00
|
Scuffed and degreased stall warner parts
|
Details
|
|
|
11-19-2011
|
3.00
|
Finished left fuel return line
|
Details
|
|
|
11-17-2011
|
3.00
|
Built fuel return lines
|
Details
|
|
|
11-15-2011
|
2.00
|
Drilled and CS left lens
|
Details
|
|
|
11-13-2011
|
3.00
|
Return line in tank v1
|
Details
|
|
|
11-06-2011
|
3.00
|
Dimpled Wing Acces Plates
|
Details
|
|
|
11-03-2011
|
2.00
|
Bevelled lower wing skins
|
Details
|
|
|
11-02-2011
|
2.00
|
Dimpled outboard lower wing skin
|
Details
|
|
|
11-01-2011
|
5.00
|
Deburred wing skin, installed conduit
|
Details
|
|
|
10-30-2011
|
3.00
|
Matchdrilled wing skin
|
Details
|
|
|
10-29-2011
|
2.00
|
Cut hole for pitot mast in wing skin
|
Details
|
|
|
10-23-2011
|
3.00
|
Drilled conduit holes in ribs
|
Details
|
|
|
09-21-2011
|
4.00
|
Made access hatch for stall warning
|
Details
|
|
|
09-19-2011
|
1.00
|
Drilled stall warning sub-assembly
|
Details
|
|
|
09-18-2011
|
3.00
|
Rivetted right gap fairings
|
Details
|
|
|
09-18-2011
|
3.00
|
Drilled and rivetted nutplates in right ribs
|
Details
|
|
|
09-17-2011
|
5.00
|
Rivetted aileron hinges, cut landing light hole
|
Details
|
|
|
09-16-2011
|
1.00
|
Scuffed right gap fairings
|
Details
|
|
|
09-15-2011
|
2.00
|
Deburred and dimpled right gap fairings
|
Details
|
|
|
09-14-2011
|
5.00
|
Enlarged left rear aileron pushrod hole
|
Details
|
|
|
09-13-2011
|
1.00
|
Match-drilled right aileron attachment brackets
|
Details
|
|
|
09-11-2011
|
3.00
|
Drilled holes for coax cable
|
Details
|
|
|
09-10-2011
|
2.00
|
Rivetted aileron stops to aileron hinge brackets
|
Details
|
|
|
09-10-2011
|
2.00
|
Final fit for landing light
|
Details
|
|
|
09-08-2011
|
2.00
|
Glued retaining strips to Lens
|
Details
|
|
|
09-06-2011
|
2.00
|
Drilled lens
|
Details
|
|
|
09-05-2011
|
3.00
|
Rivetted both reflector mounts
|
Details
|
|
|
09-04-2011
|
8.00
|
Drilled and primed landing light parts
|
Details
|
|
|
09-03-2011
|
4.00
|
Installed nutplates in nose ribs
|
Details
|
|
|
09-01-2011
|
5.00
|
Cut landing light hole to size, drilled ribs
|
Details
|
|
|
08-31-2011
|
1.00
|
Deburred deflector mounts
|
Details
|
|
|
08-30-2011
|
2.00
|
Started Wing Cut-out for Landing Light
|
Details
|
|
|
08-27-2011
|
1.00
|
Cut and bent trim tab hinge pin
|
Details
|
|
|
08-26-2011
|
1.00
|
Prepared W-918 for welding
|
Details
|
|
|
08-22-2011
|
2.00
|
Enlarged rear spar hole for aileron pushrod
|
Details
|
|
|
08-21-2011
|
4.00
|
Rivetted right rudder and aileron gap fairings
|
Details
|
|
|
08-19-2011
|
4.00
|
Primed and rivetted Gap Fairings
|
Details
|
|
|
08-18-2011
|
2.00
|
Rivetted W-913 and installed on rear spar
|
Details
|
|
|
08-17-2011
|
2.00
|
Drilled, deburred and primed W-913
|
Details
|
|
|
08-16-2011
|
2.00
|
Rivetted W-918 aileron pushrod
|
Details
|
|
|
08-10-2011
|
1.00
|
Rivetted outboard aileron hinge bracket
|
Details
|
|
|
08-03-2011
|
2.00
|
Rivetted W-917 aileron pushrods
|
Details
|
|
|
08-02-2011
|
6.00
|
Primed aileron pushrods
|
Details
|
|
|
08-01-2011
|
2.00
|
Drilled and dimpled right aileron gap fairing
|
Details
|
|
|
07-31-2011
|
3.00
|
Cut bellcrank, drilled/dimpled flap gap fairing
|
Details
|
|
|
07-30-2011
|
2.00
|
Cut bellcrank and bellcrank bushing
|
Details
|
|
|
07-29-2011
|
3.00
|
Cut and drilled aileron pushrods
|
Details
|
|
|
07-28-2011
|
6.00
|
Attached aileron brackets on right aileron
|
Details
|
|
|
07-27-2011
|
4.00
|
Attached aileron brackets on left aileron
|
Details
|
|
|
07-26-2011
|
3.00
|
Fabricated aileron hinge brackets (sort of)
|
Details
|
|
|
07-25-2011
|
3.00
|
Primed aileron hinge brackets
|
Details
|
|
|
07-24-2011
|
3.00
|
Drilled and deburred W-913 and W-914
|
Details
|
|
|
07-23-2011
|
2.00
|
Fabricated one A-914
|
Details
|
|
|
05-30-2011
|
1.00
|
Trimmed glass cloth from right HS tip
|
Details
|
|
|
05-29-2011
|
4.00
|
Plugged the left HS and VS tips
|
Details
|
|
|
05-26-2011
|
2.00
|
Drilled nutplate holes elevator fairing
|
Details
|
|
|
05-23-2011
|
1.00
|
Cut glassed elevator tips, fitted HS tips
|
Details
|
|
|
05-22-2011
|
4.00
|
Glassed the inside elevator and rudder tips
|
Details
|
|
|
05-19-2011
|
1.00
|
Started drilling elevator tips
|
Details
|
|
|
05-16-2011
|
1.00
|
Drilled elevator horn, continued with fairing work
|
Details
|
|
|
05-15-2011
|
3.00
|
Fibreglass work
|
Details
|
|
|
05-11-2011
|
2.00
|
Glassed rudder bottom cut-out
|
Details
|
|
|
05-10-2011
|
2.00
|
Fitting tips
|
Details
|
|
|
05-08-2011
|
3.00
|
Set rod end bearing
|
Details
|
|
|
05-07-2011
|
3.00
|
Rivetted right elevator trailing edge
|
Details
|
|
|
05-05-2011
|
2.00
|
Finished rivetting left elevator
|
Details
|
|
|
05-04-2011
|
5.00
|
Fitted Rudder and VS Tips
|
Details
|
|
|
05-03-2011
|
4.00
|
Glued elevator trailing edge and trim ribs
|
Details
|
|
|
05-02-2011
|
1.00
|
Fitted Rudder Tip
|
Details
|
|
|
04-30-2011
|
3.00
|
Rivetted bottom of trim tab spar
|
Details
|
|
|
04-29-2011
|
2.00
|
Drilled trim tab hinge
|
Details
|
|
|
04-28-2011
|
2.00
|
Drilled trim tab spar
|
Details
|
|
|
04-27-2011
|
2.00
|
Reinforced trim tab horn; Drilled trailing edge
|
Details
|
|
|
04-26-2011
|
2.00
|
Drilled and deburred elevator piano hinge
|
Details
|
|
|
04-24-2011
|
4.00
|
Closed up left elevator (almost)
|
Details
|
|
|
04-22-2011
|
3.00
|
Bent trim tab end ribs
|
Details
|
|
|
04-21-2011
|
4.00
|
Cut foam ribs, started bending trim tab end ribs
|
Details
|
|
|
04-20-2011
|
3.00
|
Rivetted stiffeners and spar to left elevator
|
Details
|
|
|
04-17-2011
|
4.00
|
Rivetted Trim Servo Brackets, Started on Trimtab
|
Details
|
|
|
04-16-2011
|
2.00
|
Drilled electric pitch trim to cover plate
|
Details
|
|
|
04-14-2011
|
3.00
|
Dimpled and CS right elevator trailing edge
|
Details
|
|
|
04-13-2011
|
2.00
|
Drilled right elevator trailing edge
|
Details
|
|
|
04-12-2011
|
2.00
|
Rivetted right elevator ribs to skin
|
Details
|
|
|
04-11-2011
|
2.00
|
Rivetted lower right elevator skin to spar
|
Details
|
|
|
04-10-2011
|
4.00
|
Rivetted top elevator skin to right spar
|
Details
|
|
|
04-09-2011
|
4.00
|
Rivetted right elevator horn
|
Details
|
|
|
04-08-2011
|
3.00
|
Rivetted tiprib, counterbalance rib and -skin
|
Details
|
|
|
04-07-2011
|
2.00
|
Backrivetted stiffeners to left and right elevator
|
Details
|
|
|
04-06-2011
|
1.00
|
Primed left elevator parts
|
Details
|
|
|
04-05-2011
|
2.00
|
Scuffed right elevator parts
|
Details
|
|
|
04-04-2011
|
2.00
|
Dimpled elevator skins; Fitted rudder
|
Details
|
|
|
04-03-2011
|
3.00
|
Dimpled/CS left elevator spars and root rib
|
Details
|
|
|
04-02-2011
|
3.00
|
Deburring left elevator holes
|
Details
|
|
|
04-01-2011
|
3.00
|
Completing the leading edge of the rudder
|
Details
|
|
|
03-31-2011
|
3.00
|
Matchdrilled ribs and spars of the left elevator
|
Details
|
|
|
03-30-2011
|
3.00
|
Rivetted rudder trailing edge
|
Details
|
|
|
03-29-2011
|
3.00
|
Trimmed elevator counterweights
|
Details
|
|
|
03-28-2011
|
3.00
|
Bonded rudder trailing edge
|
Details
|
|
|
03-27-2011
|
4.00
|
Primed (right) elevator parts
|
Details
|
|
|
03-26-2011
|
4.00
|
Rivetted rudder
|
Details
|
|
|
03-25-2011
|
2.00
|
Scuffed elevator stiffeners
|
Details
|
|
|
03-23-2011
|
3.00
|
Began rivetting rudder
|
Details
|
|
|
03-21-2011
|
2.00
|
Aligned right elevator control horn
|
Details
|
|
|
03-20-2011
|
5.00
|
Matchdrilled right elevator skin to spar and ribs
|
Details
|
|
|
03-19-2011
|
8.00
|
Dimpled elevator stiffeners
|
Details
|
|
|
03-17-2011
|
2.00
|
Deburred and dimpled both elevator skins
|
Details
|
|
|
03-16-2011
|
3.00
|
Matchdrilled and deburred elevator stiffeners
|
Details
|
|
|
03-15-2011
|
3.00
|
Matchdrilled right elevator stiffeners
|
Details
|
|
|
03-14-2011
|
2.00
|
Fabricated elevator stiffeners
|
Details
|
|
|
03-13-2011
|
3.00
|
Rivetted rudder reinforcement plates
|
Details
|
|
|
03-12-2011
|
2.00
|
Finished rivetting the VS
|
Details
|
|
|
03-11-2011
|
5.00
|
Rivetted the rear and front VS spar
|
Details
|
|
|
03-10-2011
|
2.00
|
Primed rudder
|
Details
|
|
|
03-09-2011
|
3.00
|
Scuffed and degreased rudder
|
Details
|
|
|
03-08-2011
|
4.00
|
Dimpled and CS rudder
|
Details
|
|
|
03-07-2011
|
5.00
|
Deburred rudder
|
Details
|
|
|
03-06-2011
|
4.00
|
Matchdrilled the rudder trailing edge
|
Details
|
|
|
03-04-2011
|
3.00
|
Matchdrilled rudder
|
Details
|
|
|
03-03-2011
|
4.00
|
Prepared rudder ribs, backriveted rudder stiffener
|
Details
|
|
|
03-02-2011
|
4.00
|
Primed VS and rudder stiffeners
|
Details
|
|
|
03-01-2011
|
2.00
|
Deburred and dimpled R-915 stiffeners
|
Details
|
|
|
02-28-2011
|
2.00
|
Deburred R-915 stiffeners
|
Details
|
|
|
02-27-2011
|
4.00
|
Fabricated R-915 stiffeners
|
Details
|
|
|
02-24-2011
|
1.00
|
Finished HS
|
Details
|
|
|
02-23-2011
|
3.00
|
Closed the HS
|
Details
|
|
|
02-22-2011
|
3.00
|
Rivetted left HS ribs and forward spar
|
Details
|
|
|
02-21-2011
|
4.00
|
Rivetted right HS ribs and forward spar to skin
|
Details
|
|
|
02-19-2011
|
4.00
|
Rivetted HS noseribs and ribs
|
Details
|
|
|
02-18-2011
|
5.00
|
Rivetted HS spars
|
Details
|
|
|
02-17-2011
|
2.00
|
Primed HS (again)
|
Details
|
|
|
02-14-2011
|
2.00
|
Scuffed VS spars and spar doubler
|
Details
|
|
|
02-12-2011
|
3.00
|
Repaired extra CS hole in HS spar
|
Details
|
|
|
02-10-2011
|
4.00
|
Deburred, dimpled and CS the VS
|
Details
|
|
|
02-09-2011
|
4.00
|
Matchdrilled the VS
|
Details
|
|
|
02-08-2011
|
3.00
|
Started on the Vertical Stabilizer
|
Details
|
|
|
02-07-2011
|
2.00
|
Degreased and Primed the HS parts
|
Details
|
|
|
02-06-2011
|
3.00
|
Scuffed all HS parts
|
Details
|
|
|
02-05-2011
|
4.00
|
Deburred, dimpled, countersunk the right HS
|
Details
|
|
|
02-04-2011
|
3.00
|
Matchdrilled right HS, Drilled HS-908 angles
|
Details
|
|
|
02-02-2011
|
2.00
|
Cleckoed right HS skin to ribs and spars
|
Details
|
|
|
02-01-2011
|
4.00
|
Dimpled left HS skin, CS spars and doubler
|
Details
|
|
|
01-31-2011
|
2.00
|
Dimpled HS ribs and countersunk spar flanges
|
Details
|
|
|
01-29-2011
|
2.00
|
Deburred skin holes.
|
Details
|
|
|
01-28-2011
|
3.00
|
Match drilled skin to skeleton
|
Details
|
|
|
01-27-2011
|
4.00
|
Cleckoed the left HS skin
|
Details
|
|
|
01-26-2011
|
2.00
|
Matchdrilled ribs and spars
|
Details
|
|
|
01-25-2011
|
2.00
|
Deburred and straightened HS-904 Main Ribs
|
Details
|
|
|
01-24-2011
|
4.00
|
Match-drilled the rear HS spar; Deburred HS ribs
|
Details
|
|
|
01-23-2011
|
4.00
|
Fabricated HS-908-L
|
Details
|
|
|
01-22-2011
|
1.00
|
Matchdrill fwd HS spar and spar doubler
|
Details
|
|
|
01-14-2011
|
3.00
|
Started Training Project Wing Section
|
|
|