KitLog pro

Powered By Kitlog Pro v2.0

Build Log
Work Logs Found: 307
Category Work Time: 872 Hours
 Date
Hours
Work Log Summary

Details

 10-20-2013
2.00
Adjusting Canopy Frame
Details

 09-10-2013
0.00
Removed paint from part of Canopy Frame
Details

 09-08-2013
4.00
Rivetted Canopy Slide Rail
Details
       

 09-04-2013
2.00
Drilled canopy slide rail
Details
       

 09-01-2013
2.00
Cut C-666
Details
     

 03-03-2013
2.00
Drilled C-661 rear slider block.
Details

 03-02-2013
3.00
Rivetted battery tray ribs
Details
     

 02-17-2013
2.00
Added nutplates for battery hold-down
Details
     

 02-04-2013
2.00
Mounting VP-400 PDU
Details
       

 01-31-2013
4.00
Mounting VP-400 PDU
Details
       

 01-10-2013
1.00
Fabricated aux fuel lines.
Details
     

 12-16-2012
3.00
Adjusted canopy frame
Details

 12-15-2012
4.00
Trial-fit of roll bar on fuselage frame
Details
       

 12-14-2012
3.00
Installing transfer pump and tubing
Details
       

 12-13-2012
4.00
Fabricated doubler for transfer fuel pump
Details
       

 12-11-2012
3.00
Manufactured C-668 spacer
Details
     

 12-09-2012
2.00
Reworked return fuel line
Details
     

 12-01-2012
2.00
Continued fuel lines
Details
       

 11-27-2012
3.00
Started routing fuel line provision for aux-tank
Details
     

 11-17-2012
3.00
Fabricated fuel lines
Details
       

 11-13-2012
2.00
Rivetted center cabin cover and EPU plug
Details
       

 11-10-2012
2.00
Primed center cabin cover
Details

 11-07-2012
1.00
Fitted contactors to aft left bay
Details
     

 11-04-2012
3.00
Prepared pump cover
Details
       

 11-02-2012
3.00
Fitted cover for fuel pump
Details
     

 10-21-2012
4.00
Started fuel lines
Details
       

 10-13-2012
5.00
Located and drilled holes for battery hold-down
Details
       

 10-09-2012
1.00
Painted EPU plug
Details
     

 10-04-2012
3.00
Rivetted ribs for avioncs bay
Details
       

 10-02-2012
1.00
CS holes in EPU plug
Details
     

 09-30-2012
3.00
Drilled EPU plug, cut hole in fuselage
Details
       

 09-29-2012
3.00
Backing plate for EPU plug
Details
       

 09-27-2012
2.00
Trimmed and sanded EPU plug
Details
       

 09-26-2012
1.00
Deburred AntiSplat Seat Mod parts
Details
     

 09-26-2012
1.00
Bonded EPU plug housing to doubler
Details
     

 09-23-2012
3.00
Continued assembling avioncs shelf
Details
     

 09-22-2012
1.00
Started assembling avionics shelf
Details

 09-19-2012
3.00
Primed shelf parts; Fibreglass layup for GPU plug
Details
     

 09-17-2012
1.00
Drilled holes for GADAHRS brace
Details
     

 09-16-2012
3.00
Manufactured support for GADAHRS shelf
Details
     

 09-15-2012
6.00
Drilled aft left bay
Details
     

 09-14-2012
3.00
Drilled avionics shelf top sheet
Details
       

 09-13-2012
2.00
Started drilling top sheet of avionics shelf
Details
     

 09-12-2012
3.00
Continue construction of avionics shelf
Details
     

 09-07-2012
2.00
Finished lightening holes in battery hold-down
Details

 09-06-2012
3.00
Lightening holes in Battery hold-downs
Details
     

 09-05-2012
3.00
Added third upper angle for Avionics Shelf
Details
     

 09-04-2012
3.00
Continue manufacture Avionics Shelf
Details
       

 09-02-2012
3.00
Fabricated GADAHRS Tray
Details
       

 08-15-2012
5.00
Fuselage Static System
Details
       

 08-01-2012
4.00
Primed various parts
Details

 07-30-2012
6.00
Drilled attach angles for avionics ribs
Details
     

 07-29-2012
6.00
Dimpled holes for additional shelves
Details

 07-28-2012
5.00
Finished fabricating inertia reel mounting
Details
       

 07-27-2012
4.00
Fabricated Inertia Reel Fixture
Details
       

 07-25-2012
3.00
Continued fabricating avionics rib
Details
     

 07-24-2012
2.00
Drilled aft avionics ribs
Details
     

 07-21-2012
2.00
Drilled third AHRS bracket rib
Details
     

 07-19-2012
2.00
Drilled second AHARS bracket shelf
Details
     

 07-19-2012
1.00
Drilled RH brake cylinder holes
Details

 07-18-2012
2.00
Drilled holes for brake calinder (LH)
Details
     

 07-17-2012
2.00
Fabricated left F-6119 rudder cable link
Details
     

 07-16-2012
2.00
Fabricated right F-6119 rudder cabel link
Details
       

 07-15-2012
4.00
Added second AHARS rib
Details
     

 07-14-2012
4.00
Deburred and dimpled fwd fuselage parts
Details

 07-13-2012
1.00
Drilled F-7108B angle
Details

 07-13-2012
3.00
Drilled and deburred F-7106 fwd top skin
Details
     

 07-11-2012
1.00
Fitted Instrument Panel angles
Details

 07-09-2012
2.00
Fitted F-7108C angle
Details
     

 07-04-2012
1.00
Trial fit of the inertia reel bracket
Details
       

 07-03-2012
1.00
Drilled fuel pump doubler plate
Details
       

 07-01-2012
6.00
Finished design of Inertia Reel Mount
Details
       

 06-30-2012
7.00
Design of Inertia Reel Mount
Details
       

 06-24-2012
3.00
Rivetted seat backs
Details
     

 06-23-2012
5.00
Primed and rivetted elevator pushrods
Details
       

 06-22-2012
2.00
Primed more parts
Details

 06-21-2012
2.00
Rivetted several small parts
Details

 06-20-2012
3.00
Primed parts
Details

 06-19-2012
3.00
Priming parts
Details
       

 06-18-2012
3.00
Modified rudder stops for maximum rudder travel
Details
       

 06-16-2012
0.00
Trial fit of fuel pump switch
Details
       

 06-16-2012
5.00
Fitted elevator and rudder
Details
       

 06-12-2012
1.00
Dimpled and screwed clamp for rudder cable tube
Details
     

 06-10-2012
3.00
Fabricated F-782D and fitted F-7114
Details
     

 05-30-2012
4.00
Started construction of aileron trim
Details
       

 05-28-2012
3.00
Drilled angles for upper fwd fuselage
Details
     

 05-27-2012
4.00
Started construction for fwd fuselage
Details
       

 05-27-2012
3.00
Installed nutplates for seat rib access plate
Details
       

 05-26-2012
5.00
(Temporarily) installed control system
Details
       

 05-21-2012
1.00
Rivetting remaining nutplates for baggage and seat
Details

 05-20-2012
1.00
Cut AN832-4D union for vent
Details
     

 05-19-2012
2.00
Deburred and dimpled F-7112 skin
Details

 05-18-2012
3.00
Drilled all holes on F-7112 top skin to size
Details

 05-17-2012
1.00
Drilled holes in the F-766B flap angle
Details
     

 05-15-2012
1.00
Clecko'ed forward top skin to fuselage
Details
     

 05-13-2012
6.00
Continued work on the electric flap
Details
       

 05-12-2012
1.00
Drilled holes for F-6111 reinforcing rib
Details
     

 05-12-2012
2.00
Drilled and installed nutplates for F-680
Details
     

 05-11-2012
3.00
Continued on electric flap assembly
Details
     

 05-09-2012
2.00
Continued on electric flap assembly
Details
     

 05-08-2012
3.00
Started on electrical flap installation
Details
     

 05-06-2012
5.00
Continued work on F-982 center cabin cover
Details
       

 05-05-2012
4.00
Started construction on F-982 center cabin cover
Details
     

 05-01-2012
4.00
More nutplates for baggage floor
Details
     

 04-29-2012
4.00
Nutplates for seat and baggage floor
Details
       

 04-28-2012
3.00
Nutplates for seat floor
Details

 03-07-2012
1.00
Test fit of seat and rudder pedals
Details
     

 02-29-2012
2.00
Rivetted nutplates on aft seat ribs
Details
       

 02-26-2012
1.00
Installed nutplates for tunnel cover on seat ribs
Details

 02-26-2012
1.00
Drilled upper seat back angle
Details

 02-26-2012
5.00
Drilled and dimpled nutplates for aft seat floor
Details
       

 02-25-2012
2.00
Drilled right bushing and rudder pedal brace
Details
       

 02-25-2012
5.00
Deburred all seat back components
Details
       

 02-19-2012
6.00
Continued fabricating seat backs
Details
       

 02-18-2012
4.00
Fabricating seat backs
Details
     

 02-18-2012
1.00
Enlarged lightening hole in F-916 set ribs
Details
     

 02-18-2012
1.00
Dimpled holes in F-976
Details
       

 02-13-2012
2.00
Rivetted brake pedals
Details
       

 02-12-2012
4.00
Drilled rudder pedal bearing blocks
Details
       

 02-11-2012
4.00
Fabricated F-6117 brake pedals
Details
     

 02-02-2012
1.00
Rivetted seat adjustment components to frame
Details
     

 02-02-2012
0.00
Rivetted AHARS bracket together
Details
     

 02-02-2012
1.00
Drilled strobe/ELT bracket
Details
       

 02-01-2012
3.00
Primed AHARS bracket parts
Details
       

 01-29-2012
2.00
Drilled wiring holes in F-706
Details
       

 01-29-2012
3.00
Drilled AHARS bracket to fuselage
Details
       

 01-28-2012
2.00
Drilled seat adjustment components
Details
     

 01-26-2012
1.00
Fabricated elevator bellcrank spacers
Details
       

 01-23-2012
1.00
Rivetted up elevator stop and vert. stab. attach
Details
       

 01-18-2012
1.00
Fabricated F-635 bellcrank parts
Details

 01-17-2012
25.00
Fabricated F-705K, F-705L and F-705J
Details

 01-15-2012
2.00
Deburred attachment holes of VS
Details

 01-14-2012
4.00
Fitted and drilled VS
Details
       

 01-13-2012
0.00
Trimmed VS-702
Details
     

 01-13-2012
2.00
Rivetted F-601TD brake plate
Details
       

 01-12-2012
3.00
Drilled HS rear spar to fuselage
Details
     

 01-10-2012
3.00
Drilled horizontal stabilizer forward attachment
Details
       

 01-09-2012
3.00
Rivetted F-712 aft bulkhead
Details
       

 01-08-2012
3.00
Fabricated F-601TD brake plate
Details
       

 01-06-2012
1.00
Rivetted tail spring mount to aft bulkhead
Details
     

 01-04-2012
3.00
Welded nutplate on WD-409
Details
       

 01-03-2012
2.00
Drilled keeper rivets on tailspring mount
Details
     

 01-01-2012
3.00
Drilled hole in tail spring mount for tail spring
Details
     

 12-20-2011
2.00
Drilled fwd end of WD-409
Details
       

 12-08-2011
0.00
Removed fuel tank sealant for fitting fuel tempera
Details
     

 12-07-2011
2.00
Fitted fuel temperature probe in right tank
Details
     

 12-06-2011
2.00
Primed wing access plates
Details
     

 12-04-2011
5.00
Deburred and dimpled holes in right wing
Details
       

 12-03-2011
3.00
Deburred right lower outboard wing skin
Details

 12-02-2011
3.00
Matchdrilled right lower outboard wing skin
Details
     

 11-30-2011
3.00
Finished right fuel trap
Details
       

 11-29-2011
3.00
Finished manufacture of right fuel return in fuel
Details
     

 11-27-2011
3.00
Installed wiring conduit in right wing
Details
       

 11-26-2011
4.00
Manufactured flap brass bushings
Details
       

 11-23-2011
2.00
Installed landing light
Details
       

 11-21-2011
2.00
Rivetted landing light strips
Details
       

 11-20-2011
0.00
Scuffed and degreased stall warner parts
Details

 11-19-2011
3.00
Finished left fuel return line
Details
       

 11-17-2011
3.00
Built fuel return lines
Details
       

 11-15-2011
2.00
Drilled and CS left lens
Details
       

 11-13-2011
3.00
Return line in tank v1
Details
       

 11-06-2011
3.00
Dimpled Wing Acces Plates
Details
     

 11-03-2011
2.00
Bevelled lower wing skins
Details
     

 11-02-2011
2.00
Dimpled outboard lower wing skin
Details
     

 11-01-2011
5.00
Deburred wing skin, installed conduit
Details
     

 10-30-2011
3.00
Matchdrilled wing skin
Details

 10-29-2011
2.00
Cut hole for pitot mast in wing skin
Details
       

 10-23-2011
3.00
Drilled conduit holes in ribs
Details
       

 09-21-2011
4.00
Made access hatch for stall warning
Details
       

 09-19-2011
1.00
Drilled stall warning sub-assembly
Details
     

 09-18-2011
3.00
Rivetted right gap fairings
Details
     

 09-18-2011
3.00
Drilled and rivetted nutplates in right ribs
Details
       

 09-17-2011
5.00
Rivetted aileron hinges, cut landing light hole
Details
       

 09-16-2011
1.00
Scuffed right gap fairings
Details

 09-15-2011
2.00
Deburred and dimpled right gap fairings
Details
     

 09-14-2011
5.00
Enlarged left rear aileron pushrod hole
Details
     

 09-13-2011
1.00
Match-drilled right aileron attachment brackets
Details

 09-11-2011
3.00
Drilled holes for coax cable
Details
       

 09-10-2011
2.00
Rivetted aileron stops to aileron hinge brackets
Details
       

 09-10-2011
2.00
Final fit for landing light
Details
       

 09-08-2011
2.00
Glued retaining strips to Lens
Details
     

 09-06-2011
2.00
Drilled lens
Details
       

 09-05-2011
3.00
Rivetted both reflector mounts
Details
       

 09-04-2011
8.00
Drilled and primed landing light parts
Details
       

 09-03-2011
4.00
Installed nutplates in nose ribs
Details
       

 09-01-2011
5.00
Cut landing light hole to size, drilled ribs
Details
       

 08-31-2011
1.00
Deburred deflector mounts
Details

 08-30-2011
2.00
Started Wing Cut-out for Landing Light
Details
       

 08-27-2011
1.00
Cut and bent trim tab hinge pin
Details
       

 08-26-2011
1.00
Prepared W-918 for welding
Details
       

 08-22-2011
2.00
Enlarged rear spar hole for aileron pushrod
Details

 08-21-2011
4.00
Rivetted right rudder and aileron gap fairings
Details
       

 08-19-2011
4.00
Primed and rivetted Gap Fairings
Details
       

 08-18-2011
2.00
Rivetted W-913 and installed on rear spar
Details
       

 08-17-2011
2.00
Drilled, deburred and primed W-913
Details
     

 08-16-2011
2.00
Rivetted W-918 aileron pushrod
Details
       

 08-10-2011
1.00
Rivetted outboard aileron hinge bracket
Details
       

 08-03-2011
2.00
Rivetted W-917 aileron pushrods
Details
     

 08-02-2011
6.00
Primed aileron pushrods
Details
       

 08-01-2011
2.00
Drilled and dimpled right aileron gap fairing
Details
       

 07-31-2011
3.00
Cut bellcrank, drilled/dimpled flap gap fairing
Details
       

 07-30-2011
2.00
Cut bellcrank and bellcrank bushing
Details
     

 07-29-2011
3.00
Cut and drilled aileron pushrods
Details
       

 07-28-2011
6.00
Attached aileron brackets on right aileron
Details
       

 07-27-2011
4.00
Attached aileron brackets on left aileron
Details
       

 07-26-2011
3.00
Fabricated aileron hinge brackets (sort of)
Details
       

 07-25-2011
3.00
Primed aileron hinge brackets
Details
     

 07-24-2011
3.00
Drilled and deburred W-913 and W-914
Details
     

 07-23-2011
2.00
Fabricated one A-914
Details
       

 05-30-2011
1.00
Trimmed glass cloth from right HS tip
Details
     

 05-29-2011
4.00
Plugged the left HS and VS tips
Details
       

 05-26-2011
2.00
Drilled nutplate holes elevator fairing
Details
       

 05-23-2011
1.00
Cut glassed elevator tips, fitted HS tips
Details
       

 05-22-2011
4.00
Glassed the inside elevator and rudder tips
Details
       

 05-19-2011
1.00
Started drilling elevator tips
Details
       

 05-16-2011
1.00
Drilled elevator horn, continued with fairing work
Details
       

 05-15-2011
3.00
Fibreglass work
Details
       

 05-11-2011
2.00
Glassed rudder bottom cut-out
Details
     

 05-10-2011
2.00
Fitting tips
Details

 05-08-2011
3.00
Set rod end bearing
Details
       

 05-07-2011
3.00
Rivetted right elevator trailing edge
Details
       

 05-05-2011
2.00
Finished rivetting left elevator
Details
       

 05-04-2011
5.00
Fitted Rudder and VS Tips
Details
       

 05-03-2011
4.00
Glued elevator trailing edge and trim ribs
Details
       

 05-02-2011
1.00
Fitted Rudder Tip
Details
     

 04-30-2011
3.00
Rivetted bottom of trim tab spar
Details
       

 04-29-2011
2.00
Drilled trim tab hinge
Details
     

 04-28-2011
2.00
Drilled trim tab spar
Details
       

 04-27-2011
2.00
Reinforced trim tab horn; Drilled trailing edge
Details
       

 04-26-2011
2.00
Drilled and deburred elevator piano hinge
Details
       

 04-24-2011
4.00
Closed up left elevator (almost)
Details
       

 04-22-2011
3.00
Bent trim tab end ribs
Details
     

 04-21-2011
4.00
Cut foam ribs, started bending trim tab end ribs
Details
       

 04-20-2011
3.00
Rivetted stiffeners and spar to left elevator
Details
       

 04-17-2011
4.00
Rivetted Trim Servo Brackets, Started on Trimtab
Details
       

 04-16-2011
2.00
Drilled electric pitch trim to cover plate
Details
     

 04-14-2011
3.00
Dimpled and CS right elevator trailing edge
Details
       

 04-13-2011
2.00
Drilled right elevator trailing edge
Details
     

 04-12-2011
2.00
Rivetted right elevator ribs to skin
Details
       

 04-11-2011
2.00
Rivetted lower right elevator skin to spar
Details
       

 04-10-2011
4.00
Rivetted top elevator skin to right spar
Details
       

 04-09-2011
4.00
Rivetted right elevator horn
Details
     

 04-08-2011
3.00
Rivetted tiprib, counterbalance rib and -skin
Details
     

 04-07-2011
2.00
Backrivetted stiffeners to left and right elevator
Details
     

 04-06-2011
1.00
Primed left elevator parts
Details
     

 04-05-2011
2.00
Scuffed right elevator parts
Details

 04-04-2011
2.00
Dimpled elevator skins; Fitted rudder
Details
       

 04-03-2011
3.00
Dimpled/CS left elevator spars and root rib
Details
       

 04-02-2011
3.00
Deburring left elevator holes
Details
     

 04-01-2011
3.00
Completing the leading edge of the rudder
Details
       

 03-31-2011
3.00
Matchdrilled ribs and spars of the left elevator
Details

 03-30-2011
3.00
Rivetted rudder trailing edge
Details
       

 03-29-2011
3.00
Trimmed elevator counterweights
Details
     

 03-28-2011
3.00
Bonded rudder trailing edge
Details
       

 03-27-2011
4.00
Primed (right) elevator parts
Details
     

 03-26-2011
4.00
Rivetted rudder
Details
     

 03-25-2011
2.00
Scuffed elevator stiffeners
Details
     

 03-23-2011
3.00
Began rivetting rudder
Details
     

 03-21-2011
2.00
Aligned right elevator control horn
Details
     

 03-20-2011
5.00
Matchdrilled right elevator skin to spar and ribs
Details
       

 03-19-2011
8.00
Dimpled elevator stiffeners
Details

 03-17-2011
2.00
Deburred and dimpled both elevator skins
Details
     

 03-16-2011
3.00
Matchdrilled and deburred elevator stiffeners
Details
     

 03-15-2011
3.00
Matchdrilled right elevator stiffeners
Details
       

 03-14-2011
2.00
Fabricated elevator stiffeners
Details
     

 03-13-2011
3.00
Rivetted rudder reinforcement plates
Details
     

 03-12-2011
2.00
Finished rivetting the VS
Details
     

 03-11-2011
5.00
Rivetted the rear and front VS spar
Details
       

 03-10-2011
2.00
Primed rudder
Details
       

 03-09-2011
3.00
Scuffed and degreased rudder
Details

 03-08-2011
4.00
Dimpled and CS rudder
Details
       

 03-07-2011
5.00
Deburred rudder
Details
       

 03-06-2011
4.00
Matchdrilled the rudder trailing edge
Details
     

 03-04-2011
3.00
Matchdrilled rudder
Details
     

 03-03-2011
4.00
Prepared rudder ribs, backriveted rudder stiffener
Details
       

 03-02-2011
4.00
Primed VS and rudder stiffeners
Details
     

 03-01-2011
2.00
Deburred and dimpled R-915 stiffeners
Details
       

 02-28-2011
2.00
Deburred R-915 stiffeners
Details
     

 02-27-2011
4.00
Fabricated R-915 stiffeners
Details
     

 02-24-2011
1.00
Finished HS
Details
       

 02-23-2011
3.00
Closed the HS
Details
       

 02-22-2011
3.00
Rivetted left HS ribs and forward spar
Details
       

 02-21-2011
4.00
Rivetted right HS ribs and forward spar to skin
Details
       

 02-19-2011
4.00
Rivetted HS noseribs and ribs
Details
       

 02-18-2011
5.00
Rivetted HS spars
Details
       

 02-17-2011
2.00
Primed HS (again)
Details
       

 02-14-2011
2.00
Scuffed VS spars and spar doubler
Details

 02-12-2011
3.00
Repaired extra CS hole in HS spar
Details
       

 02-10-2011
4.00
Deburred, dimpled and CS the VS
Details
       

 02-09-2011
4.00
Matchdrilled the VS
Details
     

 02-08-2011
3.00
Started on the Vertical Stabilizer
Details
     

 02-07-2011
2.00
Degreased and Primed the HS parts
Details
       

 02-06-2011
3.00
Scuffed all HS parts
Details
     

 02-05-2011
4.00
Deburred, dimpled, countersunk the right HS
Details
       

 02-04-2011
3.00
Matchdrilled right HS, Drilled HS-908 angles
Details
       

 02-02-2011
2.00
Cleckoed right HS skin to ribs and spars
Details
       

 02-01-2011
4.00
Dimpled left HS skin, CS spars and doubler
Details
       

 01-31-2011
2.00
Dimpled HS ribs and countersunk spar flanges
Details
       

 01-29-2011
2.00
Deburred skin holes.
Details
     

 01-28-2011
3.00
Match drilled skin to skeleton
Details
     

 01-27-2011
4.00
Cleckoed the left HS skin
Details
       

 01-26-2011
2.00
Matchdrilled ribs and spars
Details
       

 01-25-2011
2.00
Deburred and straightened HS-904 Main Ribs
Details
       

 01-24-2011
4.00
Match-drilled the rear HS spar; Deburred HS ribs
Details
     

 01-23-2011
4.00
Fabricated HS-908-L
Details
       

 01-22-2011
1.00
Matchdrill fwd HS spar and spar doubler
Details
       

 01-14-2011
3.00
Started Training Project Wing Section










Copyright © 2001-2024 Matronics. All Rights Reserved.