KitLog pro

Powered By Kitlog Pro v2.0

James Roberts RV8 Build
Work Logs Found: 132
Category Work Time: 582 Hours
 Date
Hours
Work Log Summary

Details

 04-18-2020
4.00
Starting vertical stabiliser
Details
       

 04-17-2020
2.50
First flush rivets
Details
       

 04-12-2020
5.00
Spray painting day
Details
       

 04-11-2020
3.00
Dimpling time
Details
       

 04-09-2020
6.00
Deburring
Details

 04-04-2020
3.00
Deburring and prepping for primer
Details
       

 04-03-2020
2.00
Drilling to final size the right hand HS
Details
       

 04-01-2020
1.00
VA 146 final riveting
Details
       

 03-30-2020
2.00
Isham Tools Arrived
Details
       

 03-29-2020
2.00
Deburring
Details

 03-19-2020
2.00
Horizontal Stabiliser
Details
       

 03-15-2020
4.00
Horizontal Stabiliser Front Spar
Details
       

 03-14-2020
5.00
Horizontal Stabiliser
Details
       

 03-07-2020
2.00
Horizontal stabiliser spar clean up
Details
     

 03-03-2020
2.00
Inventory
Details
       

 03-01-2020
0.00
SAAA Membership
Details
     

 02-23-2020
4.00
Building Workbench
Details

 05-18-2014
0.50
Rear Spar 45 degree Angle and Bell Crank
Details
       

 05-18-2014
1.50
Nose ribs
Details
       

 05-04-2014
2.00
Attaching rear ribs to rear spar
Details
       

 03-02-2014
3.00
Right Rear Spar
Details
       

 02-23-2014
1.00
Rib 4
Details
       

 02-08-2014
1.00
Aileron Bell crank installation
Details
       

 02-07-2014
2.00
Wing Spar Riveting
Details

 02-04-2014
3.00
Spar upgrades
Details

 01-31-2014
2.00
Wing rib reinforcement
Details
       

 01-23-2014
4.00
Upgrading the wing spars
Details

 01-21-2014
1.50
Right aileron mass balance arm
Details
       

 01-19-2014
2.00
Right aileron counter balance
Details
       

 01-15-2014
0.50
Right aileron piano hinge installation
Details
       

 01-13-2014
3.00
Finishing wings construction table
Details
       

 01-07-2014
3.00
Building the wings construction table
Details
     

 01-01-2014
3.50
Aileron Trim Tab
Details
       

 12-31-2013
3.50
Attaching the elevator to the horizontal stabilise
Details
       

 12-29-2013
1.00
Inspection of Elevator prior to closing up
Details
       

 12-29-2013
2.00
Final assembly of elevator
Details
       

 12-28-2013
3.00
Working on right aileron
Details
       

 12-27-2013
3.00
Right aileron
Details
       

 12-26-2013
4.00
Installing elevator trim tab and other work
Details
       

 04-30-2013
1.00
Build Number Approval by CAA
Details

 04-02-2013
3.00
Control Stick and Centre Console
Details
       

 03-20-2013
3.00
Rear canopy fastening
Details
       

 02-10-2013
3.00
Canopy Side Fairing
Details
       

 01-05-2013
3.00
Front canopy fibreglass fairing
Details
       

 01-01-2013
1.00
Authorised Person
Details

 12-27-2012
1.00
Heel support modifcation
Details
       

 12-25-2012
2.00
Practice canopy fairing lay ups
Details
     

 12-24-2012
2.00
Seat backs
Details
       

 12-23-2012
3.00
Forward cowling access hatches
Details
       

 12-23-2012
3.00
Canopy arm fairings
Details
       

 12-07-2012
3.00
Canopy hoop covering
Details
       

 12-01-2012
3.00
Rudder pedals (brakes)
Details
       

 12-01-2012
1.00
Front hoop finishing
Details
       

 05-05-2012
1.00
Garage reorganisation
Details
       

 10-22-2011
3.00
Riveting of top rear fuselage skin
Details

 10-15-2011
4.00
Painting of inside of top fuselage skin
Details
       

 08-13-2011
4.00

     

 07-27-2011
5.00
Painting of baggage shelf etc
Details
       

 07-19-2011
4.00
Upper right longeron and splice
Details
       

 07-19-2011
3.00
Canopy scratch repairs started
Details
       

 07-16-2011
4.00
Rear bulkhead painting
Details
       

 07-02-2011
4.00
Left hand upper splice and longeron
Details
       

 06-04-2011
1.00
Attaching Rear Canopy to Rear Hoop
Details
       

 05-29-2011
3.00
Roll Over Bar and Rear Canopy
Details
       

 05-28-2011
20.00
Rear Canopy Hoop Final Bends
Details
       

 02-27-2011
0.50
More canopy work.
Details
       

 02-26-2011
5.00
Canopy and forward fuselage work.
Details
       

 02-18-2011
5.00
Rear Canopy Hoop and others
Details

 02-17-2011
5.00
Forward Canopy Flashing
Details
       

 02-15-2011
3.00
Designing instrument panel.
Details
     

 02-01-2011
7.00
Forward canopy hoop (again)
Details
       

 01-27-2011
1.00
Remaking Canopy Hoop Jig
Details
       

 01-23-2011
2.50
More air vent work
Details
       

 01-22-2011
2.50
More air vent work
Details
       

 01-20-2011
2.00
Centre Console Work
       

 01-14-2011
4.00
Additional air vents
Details
       

 01-10-2011
3.50
Bending the forward canopy hoop
Details
       

 01-02-2011
4.00
View of Aircraft to date
Details
       

 08-27-2010
5.00
Rollover protection installation
Details
       

 08-09-2010
16.00
Upgrading canopy locking mechanism
Details
       

 08-09-2010
1.00
More canopy latching system upgrade pictures
Details
       

 08-06-2010
24.00
Spar Installation and Cabin upgrades
Details
       

 06-26-2010
5.00
Horizontal Stabiliser Installation
Details
       

 05-10-2010
4.00
Installing bulkhead skin
Details
       

 05-04-2010
4.00
Various installations.
       

 05-04-2010
8.00
Anti-Oil Canning L Angles and T Brace
       

 04-17-2010
2.00
Rolling chassis!
       

 04-11-2010
12.00
Nosewheel installation
       

 04-05-2010
36.00
Installation of Landing Gear
Details
       

 03-22-2010
36.00
Upgrading the main spar
Details
       

 03-13-2010
12.00
The upgrade arrives.
Details
       

 03-13-2010
1.00
Dreaming of flying...
Details
       

 02-28-2010
12.00
Final assembly of forward fuselage
Details
       

 02-23-2010
8.00
Final riveting of rear fuselage
Details
       

 01-03-2010
5.00
Installing baggage shelf braces
       

 11-18-2009
5.00
Various installations in cabin
Details
       

 10-25-2009
3.00
Installation of air inlets
       

 10-24-2009
5.00
Installation of dual control sticks
       

 10-18-2009
3.00
Torque tube installation
       

 10-10-2009
2.00
Seat pan access hatches
       

 08-29-2009
2.00
Seat belt attach points
       

 08-26-2009
4.00
Seat pan and centre supports
       

 08-23-2009
7.00
Centre console arm rest
       

 08-15-2009
3.00
Installation of seat backs
       

 08-15-2009
5.00
Baggage Shelf
       

 08-10-2009
3.00
Seat Pan (Left) and Baggage Shelf
       

 08-07-2009
4.00
Installation of seat pan (right) and Engine Mount
       

 07-23-2009
4.00
Repeating the exercise for the right skin.
       

 07-19-2009
5.00
Profiling the front edge of the side skin
       

 07-19-2009
4.00
Constructing internal brace for front side skin
       

 07-18-2009
5.00
Installation of Spar Uprights
Details
       

 07-14-2009
4.00
Difficulties aligning Side Skin with Spar
Details
       

 07-13-2009
4.00
Installation of the forward fuselage side skin
       

 07-13-2009
3.00
Aligning Left Side Skin
       

 07-12-2009
3.00
Drilling side skin to fuselage side
       

 07-04-2009
4.00
Installation of bulkheads
       

 07-04-2009
4.00
Final Installation of Side skins
       

 06-28-2009
5.00
Side skin installation
       

 06-21-2009
5.00
Installation of Rear Carry Through Spar
Details
       

 06-19-2009
2.00
Installation of Gear Attach Points
       

 06-17-2009
7.00
Installation of side skins
Details
       

 06-14-2009
2.00
More balancing
Details
       

 06-14-2009
2.00
Instrument Panel Installation
Details
       

 06-14-2009
2.00
Installing back rest
Details
       

 06-13-2009
3.00
More balancing
Details
       

 06-04-2009
3.00
More balancing
Details
       

 06-03-2009
3.00
Upper Engine Mount Attach Points
Details
       

 05-31-2009
9.00
Balancing Act
Details
       

 01-23-2009
5.00
Constructing the Elevator Horn (Take II)
Details
       

 10-11-2008
8.00
Installation of Upper Longerons
Details
       

 10-10-2008
8.00
Nose Wheel Strut Installation
Details
       

 09-21-2008
8.00
Constructing the Firewall
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.