KitLog pro

Powered By Kitlog Pro v2.0

CON'S WEB SITE
Work Logs Found: 375
Category Work Time: 1588 Hours
 Date
Hours
Work Log Summary

Details

 07-28-2019
8.00
Mounted Radio, Transponder, Backup Battery
Details
       

 07-27-2019
5.00
Mounted ADSB & Labeled Wires
Details
     

 12-08-2017
3.00
Received Panel and Began Installing Components
Details
       

 11-10-2017
4.00
Lower Rudder Fairing Platenuts
Details
       

 11-05-2017
5.00
Mounted ELT & Continued Wiring
Details
       

 11-02-2017
1.00
Mounted Defrost Fans to Glareshield
Details
       

 11-01-2017
2.00
Glareshield Cover and Edge Trim
Details
       

 10-30-2017
2.00
Cut Holes for Defrost Fans
Details
       

 10-18-2017
1.50
Canopy Frame Latch Guides
Details

 10-16-2017
2.00
Finished Canopy Frame Handle, Latch Guides
Details
       

 10-15-2017
11.00
Glareshield Cover, Canopy Frame Handle
Details
       

 10-11-2017
3.00
Canopy Frame Latch Adjustment and Splice Plate
Details
       

 10-09-2017
2.50
Final Trim Side Skirts, Dimple and Countersink
Details
       

 10-08-2017
7.00
Canopy Frame and Side Skirts
Details
       

 10-07-2017
11.00
Final Fit Forward Canopy to Frame
Details
       

 10-02-2017
1.00
Drilled Out Hole in Aft Bulkhead for Tail Light
Details

 10-01-2017
4.00
Wiring for Elevator Trim
Details
       

 09-30-2017
8.00
Ran Strobe Wire to Tail, Installed Fuel Lines
Details
       

 09-25-2017
2.00
Antenna Doublers
Details
     

 09-24-2017
3.00
Lower Empennage Fairings & Static Tubing
Details
       

 09-23-2017
5.00
Made the Big Cut
Details
       

 09-20-2017
2.00
Right Rudder Stop
Details

 09-18-2017
1.50
Taped Canopy to Fuse to Mark Cut Line
Details
     

 09-17-2017
4.00
Lower Empennage Fairings Again
Details

 09-16-2017
7.00
More Empennage Fairings
Details
       

 09-09-2017
2.00
Lower Rudder Cap
Details
       

 09-08-2017
3.00
Empennage Fairing
Details
       

 09-07-2017
4.00
Rudder Stops
Details
       

 09-06-2017
5.00
Rudder Cable Fairings, ADAHRS Shelf Installed
Details
       

 09-05-2017
10.00
Platenuts on HS and VS, Mounted Vert Stab
Details
       

 09-04-2017
8.00
Static Line and Mounting Vertical Stab
Details
       

 09-03-2017
12.00
Main Landing Gear, Aborted Floorboards
Details
       

 09-02-2017
6.00
Started Working on Landing Gear
Details
       

 08-27-2017
2.50
Floorboards, Static Lines, Copilot Stick SB
Details
       

 08-26-2017
2.50
More VP-X Wiring
Details

 05-08-2017
3.00
New EMS, MAP Sensor Tubing, Forest of Tabs
Details
       

 05-06-2017
2.00
Revised Load Planning Worksheet
Details

 05-05-2017
2.00
Load Planning Worksheet Review by Vertical Power
Details

 05-04-2017
3.00
Mounting EMS and MAP Sensor
Details
       

 05-03-2017
2.00
First Draft of Load Planning Worksheet
Details

 05-02-2017
2.00
EMS Arrived, VP-X Load Planning Worksheet
Details

 04-30-2017
3.00
More Canopy Cutting
Details
       

 04-30-2017
4.00
Firewall Pass Thru and VP-X & EMS Mounting Tray
Details
       

 04-29-2017
5.00
Wings to Hangar, Preparation for Wiring
Details
       

 04-28-2017
7.00
Riveted Canopy Frame and Braces
Details
       

 04-25-2017
11.00
Canopy Frame, Skin, Strut Attachment
Details
       

 04-20-2017
3.75
Canopy Cuts part 2
Details
       

 04-19-2017
4.00
Canopy Cutting
Details
       

 01-20-2017
7.00
Amp Shunt and Current Limiter
Details
     

 01-12-2017
8.00
Built Shelf for ADAHRS
Details
       

 01-11-2017
8.00
Flap Position Sensor and Fuselage Center Caps
Details
       

 01-10-2017
0.10
Ordered Vetterman Exhaust
Details

 01-08-2017
3.00
Battery Cables,Transducers, Platenuts
Details
       

 01-08-2017
1.00
Added RAM Mounts to Cockpit Sides
Details
       

 01-06-2017
3.00
Visit from Joe and More Canopy Frame
Details
       

 01-03-2017
6.50
Firewall Recess, Heat Vent
Details
       

 01-02-2017
6.50
Canopy Frame Finish Paint and Bracing
Details
       

 12-29-2016
3.00
Primed Canopy Frame, Elevator Pushrod
Details
     

 12-28-2016
3.00
More Canopy Frame
Details

 11-17-2016
6.00
Transducer Manifold & Injection Firewall Doubler
Details
       

 11-16-2016
4.00
Platenuts in Rear Fuselage for Access Plates
Details
     

 11-16-2016
3.50
More Servo Wiring, VP-X Pro Mount
Details
       

 11-16-2016
1.50
Battery Hold Down and Spacers
Details
       

 11-13-2016
3.00
Safety Wire the Servos, Crimped Connectors
Details
       

 11-13-2016
2.00
Remove Engine Mount, Install Manifold
Details
     

 11-13-2016
5.25
Center Channel, Forward Section Riveted
Details
       

 11-12-2016
1.00
Riveted the F-732 Channel
Details
       

 11-12-2016
1.50
Installed Roll Servo in Right Wing
Details
     

 11-11-2016
4.75
Installed Dynon Pitch Servo
Details
       

 11-08-2016
4.00
Canopy Frame Reinforcement Bracing
Details
       

 10-30-2016
7.00
Canopy Frame & Skin, Rudder Cable Fairing
Details
       

 10-29-2016
4.00
Canopy Frame Rails
       

 06-12-2016
7.00
Advancing to the Rear
Details
       

 06-08-2016
2.00
Airflow Performance Tubing
Details

 06-01-2016
0.50
Installing Fuel Lines on Fuel Pump and Filter
Details
     

 06-01-2016
4.50
Aft Bow of Canopy Frame
Details
       

 05-31-2016
0.00
Received Fuel Lines
Details
       

 05-30-2016
1.00
C-704 Splice Plate, Aft Canopy Frame Bow
Details
     

 05-29-2016
6.50
Even More Canopy Frame Work
Details
       

 05-28-2016
3.00
More Canopy Frame
Details
       

 05-19-2016
4.00
Seatbelt Attachments, Fuel Injection
Details
       

 05-11-2016
0.50
Cabin Vent Hose
Details
     

 05-10-2016
2.00
Cabin Heat Vent & Diodes
Details
       

 05-05-2016
1.00
Whole Lot of Nothin'
Details
       

 05-04-2016
2.50
More Canopy Frame Work
Details
       

 05-01-2016
9.50
Canopy Frame and Skin, Aft Canopy Latch
Details
       

 04-30-2016
4.00
Canopy Latch
Details
       

 04-27-2016
1.00
Cut Holes in Side Skin for Canopy Release
Details
       

 04-26-2016
2.50
Engine Mount
Details
       

 04-26-2016
1.75
Drilling Canopy Hinge Blocks to the Ribs pt. 2
Details
       

 04-25-2016
2.00
Tailwheel Installation
Details
     

 04-21-2016
4.00
Vertical Stabilizer Fiberglass Cap and F-712D
Details
       

 04-17-2016
1.50
Mounted Tubes and Tires
Details
     

 09-06-2015
4.00
Battery Box and Contactors
Details
       

 06-21-2015
1.00
Canopy Blocks
Details

 06-21-2015
4.50
Battery Box contd.
Details
       

 06-20-2015
1.00
Battery Box
Details
     

 06-20-2015
7.75
Air Vent Installation
Details
       

 06-17-2015
1.00
NACA Vents
Details
       

 06-14-2015
8.75
Front Deck Work
Details
       

 06-07-2015
4.00
F-771 Forward Top Skin
Details
       

 02-01-2015
4.00
Attach Angles for Instrument Panel
Details
       

 01-11-2015
1.25
Instrument Panel/Tailwheel
Details
       

 10-12-2014
5.50
Forward Cabin Panel Seal Supports
Details
       

 10-11-2014
2.00
Control Column to Bellcrank Pushrod
Details
       

 08-17-2014
3.25
Weather Seal
Details
       

 08-16-2014
9.00
More Cabin Frame & Forward Cabin
Details
       

 08-11-2014
1.50
Forward Cabin
Details
       

 08-10-2014
9.00
More Cabin Frame
Details
       

 08-03-2014
9.00
Cabin Frame
Details
       

 08-02-2014
4.75
Pushrods
Details
       

 08-02-2014
3.25
Installed the Horizontal Stabilizer
Details
       

 08-01-2014
2.00
Drilled Hole in Rudder Horns
Details
       

 08-01-2014
4.00
Brake Lines Installed
Details
       

 07-27-2014
1.75
Back at the Brake Lines
Details
       

 06-29-2014
3.50
Brakes
Details
       

 06-28-2014
2.50
Static Ports
Details
       

 06-08-2014
3.00
Rudder Bar Installation
Details
       

 06-07-2014
9.50
Fuel Pump, Andair Fuel Selector Valve
Details
       

 06-05-2014
2.25
F-782D Angles & F-7114 Gussets
Details
       

 06-04-2014
0.75
Right Vent Line
Details
     

 06-01-2014
5.00
Left Vent Line
Details
     

 05-28-2014
5.00
More Electric Flaps
Details
       

 05-26-2014
2.00
Electric Flaps Odds & Ends
Details
       

 05-25-2014
11.75
More Tunnel Cover, Forward Covers, Flaps
Details
       

 05-24-2014
10.50
Forward Covers, Electric Flaps
Details
       

 05-22-2014
2.50
Tunnel Cover
Details
     

 05-20-2014
1.25
Right Rear Seat Floor Riveted
Details
       

 05-19-2014
2.75
Forward Baggage Sidewall, Aft Seat Floors
Details
       

 05-18-2014
5.50
Seatbelt Wear Blocks, Baggage Walls
Details
       

 05-17-2014
10.00
Aileron Trim, Baggage Walls & Floors
Details
       

 05-12-2014
1.50
Baggage Bulkhead Platenuts
Details

 05-11-2014
8.00
Canopy Deck Rails, Baggage Bulkheads
Details
       

 05-04-2014
11.00
Aft Seat Floors and Seat Backs
Details
       

 05-03-2014
9.00
Baggage Compartment & Seats
Details
       

 04-27-2014
9.25
Top Skins
Details
       

 04-20-2014
7.50
Riveted the Aft Deck to the Fuselage
Details
       

 04-19-2014
7.00
Preparing to Drill the Aft Deck
Details
       

 04-14-2014
1.75
More Fuse Riveting and Spacer Fabrication
Details
     

 04-13-2014
20.00
Flipped the Canoe
Details
       

 03-22-2014
14.00
More Riveting on Fuselage
Details
       

 03-20-2014
0.50
Finish Kit Arrived
Details
       

 03-15-2014
4.50
Back to Work-Fuselage Riveting
Details
       

 03-12-2014
0.00
Finish Kit Has Shipped
Details

 03-11-2014
0.00
Engine Arrived
Details
       

 02-24-2014
1.00
Edged Finished Aft Canopy Deck
Details

 02-23-2014
10.00
Reassemble Fusleage for Riveting
Details
       

 02-22-2014
8.00
Primed Fuselage, Painted Interior
Details
       

 02-09-2014
5.50
CountersinkLongerons, Etch for Priming
Details
       

 02-07-2014
1.50
Deburr and Dimple Aft Fuse
Details

 02-06-2014
0.75
Finished Dimpling Side Skins
Details

 02-05-2014
1.50
Dimpled F706 and Side Skins
Details

 02-04-2014
1.25
Deburring Side Skins
Details
     

 02-03-2014
1.50
Devinyl, Edge Finish, Deburr
Details

 02-02-2014
6.50
Master Cylinders, Brake Pedals, Deburring
Details
       

 02-01-2014
7.25
Brake Pedals, Deburring
Details
       

 01-31-2014
0.00
Ordered (Modified) Firewall Forward Kit
Details

 01-30-2014
0.00
Prop Arrived
Details

 01-29-2014
1.00
Prepping Fuselage for Disassembly
Details

 01-27-2014
1.75
Framing the Baggage Area
Details
       

 01-25-2014
5.00
Rudder Brace, Floor Stiffeners
Details
       

 01-17-2014
0.00
Ordered the Engine
Details

 01-14-2014
0.00
Ordered the Finish Kit
Details

 01-04-2014
8.00
Drilled Rudder Pedal Attachment Holes
Details
       

 01-01-2014
6.00
Continued Rudder and Brake Pedal Fabrication
Details
       

 12-30-2013
1.50
Began Constructing Rudder and Brake Pedals
Details

 12-29-2013
7.00
F-684 Gussets Drilled, Forward Bulkheads
Details
       

 12-25-2013
3.00
F-717R&L Lower Longerons, F-684 Gussets
Details
       

 12-24-2013
3.00
F-904L Attach Straps and F-719R&L Stiffeners
Details
       

 12-15-2013
6.00
Drilled Side Skins and Firewall
Details
     

 12-08-2013
13.00
Joined Center and Aft Fuselage Assemblies
Details
       

 12-04-2013
0.75
More Solo Aft Fuse Riveting
Details

 12-02-2013
1.00
More Riveting on Aft Fuselage
Details

 11-25-2013
9.50
Notched Longerons, Installed ELT and Strobe Mounts
Details
       

 11-24-2013
11.00
Riveted Aft Fuselage, Bent Longerons
Details
       

 11-23-2013
12.00
Primed and Began Riveting Aft Fuselage
Details
       

 11-20-2013
2.00
More Outer Seat Ribs, Misc Fuselage Fabrication
Details
       

 11-18-2013
2.25
Drill Baggage and Seat Skins
Details
       

 11-17-2013
10.50
Debur Aft Fuselage, Rivet Center Fuselage
Details
       

 11-16-2013
0.75
F-638 Seatback Brace Mulligan
Details

 11-13-2013
1.75
Began Prepping Aft Fuse for Priming
Details

 11-12-2013
1.00
Crotch Strap Bracket Redux
Details
       

 11-11-2013
1.50
Strobe Powerpack and ELT Mounts
Details
       

 11-10-2013
6.75
Seat Backs continued
Details
       

 11-09-2013
10.00
Prime and Begin Riveting Center Fuselage
Details
       

 11-08-2013
1.75
F-638 Seat Back Braces
Details
       

 11-07-2013
1.50
Seat Back Braces
Details
       

 11-06-2013
0.50
Center Fuselage Assembly Ready for Priming
Details
     

 11-05-2013
1.25
Dimpled Bottom Skin
Details

 11-04-2013
1.50
Center Fuse Deburring, Dimpling
Details

 11-03-2013
7.00
More Center Fuselage Work
Details
       

 11-02-2013
3.50
More Center Fuse and Crotch Strap Brackets
Details
       

 11-01-2013
3.00
Center Section Corner Ribs and Drilling
Details
       

 10-29-2013
3.50
More Center Fuselage Assembly Construction
Details
       

 10-27-2013
2.50
Modified Seat Ribs
Details
       

 10-21-2013
1.75
Finish Drilling Aft Fuselage Assembly
Details
     

 10-20-2013
10.50
Aft Fuselage Assembly
Details
       

 10-19-2013
10.25
Assembling the Bulkheads
Details
       

 10-13-2013
8.50
More Bulkhead Preparation
Details
       

 09-23-2013
2.00
More F-705 Bulkhead
Details
     

 09-22-2013
11.75
Began Assembling F-705 Bulkhead
Details
       

 09-21-2013
9.50
Yet More F-704 Bulkhead
Details
       

 09-19-2013
1.25
More F-704 Bulkhead Construction
Details
     

 09-18-2013
1.25
More F-633 Control Mount Fabrication
Details
     

 09-17-2013
2.25
More F704 Bulkhead
Details
     

 09-16-2013
2.75
Began Assembling the F-704 Bulkhead
Details
       

 09-15-2013
9.00
Finished Firewall
Details
       

 09-14-2013
7.75
Began Firewall Construction
Details
       

 09-13-2013
3.50
Fuselage Inventory
Details
       

 09-04-2013
0.25
More Horizontal Stabilizer Tips
Details

 09-02-2013
1.50
Horizontal Stabilizer Tips
Details
       

 09-01-2013
1.50
Finished Riveting Bottom Skins
Details
       

 08-31-2013
4.00
Light Wiring, Bottom Skin Riveting
Details
       

 08-25-2013
3.00
Wingtip Lenses
Details
       

 08-24-2013
3.00
Even More Bottom Skin Riveting
Details
       

 08-16-2013
0.00
Confirmation from Van's Aircraft
Details

 08-11-2013
11.00
More Bottom Skin Riveting, Taxi Light Install
Details
       

 08-03-2013
6.50
More Bottom Skin Riveting
Details
       

 07-28-2013
5.25
More Right Wing Inboard Bottom Skin
Details
       

 07-27-2013
4.00
Right Wing Landing Light, Bottom Skin
Details
       

 07-14-2013
4.50
Right Wing Flap Hinge Drilled
Details
       

 07-13-2013
0.00
Ordered Fuselage Kit
Details

 07-08-2013
2.00
Small Aileron Pushrods, Countersunk Left Flap Brac
Details
       

 07-07-2013
2.00
Drilled Left Flap Hinge to Wing
Details
       

 07-06-2013
8.50
More Aileron Pushrods, Flap Hinge Modification
Details
       

 07-04-2013
2.00
Aileron Push Rods
Details
     

 06-24-2013
0.00
Squeezer Failure
Details

 06-23-2013
8.25
Primed and Riveted Flaps
Details
       

 06-22-2013
7.00
More Flap Work
Details
       

 06-20-2013
3.00
Bent FL706B and Drilled FL706A to Spar
Details
       

 06-19-2013
3.00
Rivet Right Aileron
Details
       

 06-18-2013
3.50
Debur and Prime Right Aileron
Details
       

 06-17-2013
1.50
Right Aileron Prep
Details

 06-16-2013
12.00
Drill Pitot Tube, Left Aileron
Details
       

 06-09-2013
9.50
Aileron and Flap Gap Seals
Details
       

 06-08-2013
3.00
Rivet Aileron Brackets
Details
       

 05-27-2013
4.00
Rivet Bottom Edge of Top Skins
Details
     

 05-19-2013
3.00
Finished Wing Cradles
Details
       

 04-30-2013
2.00
More Construction of Wing Cradles
Details

 04-28-2013
2.00
Started Construction of Wing Cradles
Details
     

 04-28-2013
6.50
Rivet Left Wing Top Skins
Details
       

 04-25-2013
1.00
Debur Aileron, Flap and Gap Seals
Details

 04-21-2013
7.00
Left Aileron and Right Flap
Details
       

 04-06-2013
5.00
Started Flaps
Details

 04-04-2013
0.00
Whole Lotta Nothing
Details

 04-03-2013
2.50
Leak Test Left Tank, Rivet Top Skins
Details
       

 04-02-2013
1.00
Riveted Platenuts to Right Bottom Skin Access Area
Details
     

 04-01-2013
1.50
Right Wing Top Skin Riveting to Rear Spar
Details

 03-31-2013
11.75
Riveted Right Wing Top Skins
Details
       

 03-30-2013
7.00
Primed Skins, Leak Test Right Tank
Details
       

 03-29-2013
2.00
Finished Dimpling Wing Skins
Details

 03-26-2013
2.00
Aileron Brackets
Details
     

 03-25-2013
1.50
Dimpled Skins
Details

 03-24-2013
12.00
Left Wing Leading Edge
Details
       

 03-23-2013
13.00
Pitot Mast, Aileron Brackets, Aileron Dimpling
Details
       

 03-20-2013
2.00
Countersink Left Main Spar, Dimple Skins
Details

 03-19-2013
3.50
Leak Tested Tanks
Details

 03-18-2013
0.50
Countersunk Left Top Spar
Details
     

 03-17-2013
11.00
Riveted Right Leading Edge to Wing
Details
       

 03-16-2013
12.00
Primed and Riveted Right Leading Edge
Details
     

 03-15-2013
1.50
Dimpled Right Leading Edge, Countersunk Spar
Details

 03-14-2013
2.00
Right Leading Edge Prep for Priming
Details

 03-12-2013
5.00
Left Wing Top Skins
Details

 03-11-2013
3.00
Right Wing Top Skins
Details

 03-10-2013
8.75
Left Tank Rear Baffle
Details
     

 03-09-2013
2.00
Left Tank Flop Tube
Details

 03-08-2013
6.00
Left Tank Capacitance Plates and End Ribs
Details
       

 03-06-2013
2.00
Left Leading Edge Landing Light
Details
     

 03-05-2013
1.50
Leading Edge Landing Light Prep
Details
     

 03-04-2013
3.00
Left Leading Edge Landing Light Nutplates
Details
     

 03-03-2013
9.75
Sealed Right Tank Access Plate
Details
       

 03-02-2013
9.75
Right Tank Flop Tube & Rear Baffle
Details

 03-01-2013
1.75
Left Fuel Tank
Details

 02-28-2013
4.25
Capacitance Plates and End Ribs
Details
       

 02-27-2013
3.50
Fuel Tank Capacitance Plates
Details
       

 02-26-2013
2.25
Sealed BNC Connectors and Vent Tube Fittings
Details
     

 02-25-2013
2.25
Fuel Tank Vent Lines
Details
       

 02-24-2013
7.25
Rivet Interior Ribs of Left Tank
Details

 02-23-2013
8.50
Left Tank Work, Joint Plates and Stall Warning
Details
       

 02-19-2013
2.00
Outboard Tank Rib Reinforcement Plates
Details
 

 02-18-2013
6.50
Anti-Hang Up Brackets
Details
 

 02-17-2013
9.25
Left Tank Stiffeners
Details
     

 11-25-2012
6.00
Left Tank Attach Bracket, Rivet Right Tank Ribs
Details
       

 11-24-2012
8.00
Construct Trap Doors and Begin Sealing Ribs
Details
     

 11-23-2012
4.00
Fuel Tank Root Rib Access Plates & Rings
Details
     

 11-22-2012
2.50
Fuel Tank Drain, Cap and Vent Tube Clip
Details
       

 11-20-2012
3.00
Right Fuel Tank Stiffeners
Details
     

 11-18-2012
1.00
Install Snap Bushings, Prep Right Tank
Details

 08-25-2012
6.50
Right Tank Work contd.
Details
       

 08-11-2012
4.75
Aileron Stiffeners, Capacitance Plate
Details
       

 08-05-2012
8.75
Left Tank
Details
       

 08-04-2012
8.75
Z Brackets, Countersinking Skins
Details
       

 08-01-2012
4.00
Fuel Tank Assembly
Details
     

 07-30-2012
2.00
Mount Z-Brackets
Details
     

 07-29-2012
4.00
Construct Z-Brackets
Details
       

 07-22-2012
12.00
Leading Edge Joint Plate Assembly
Details
     

 07-21-2012
11.00
Hung Left Wing on Stand
Details
       

 07-20-2012
4.00
Devinyl the Bottom Wing Skins
Details

 07-17-2012
0.25
Adjusted Wing Stands & Checked for Twist
Details

 07-16-2012
2.50
Final Drilled Right Wing Skins
Details

 07-15-2012
11.00
Assembling Right Wing Structure
Details
       

 07-14-2012
1.50
Mounted Wing Stand Braces
Details
     

 07-13-2012
1.50
Wing stands cont.
Details

 07-12-2012
2.00
Build Wing Stands
Details
     

 07-10-2012
3.00
Stall Warning Assembly
Details
       

 07-08-2012
12.00
Leading Edge
Details
       

 07-07-2012
6.50
Rear Spar, Wing Stands, Leading Edge Cradle
Details
       

 06-26-2012
2.25
Drill Ribs to Spars
Details
     

 06-24-2012
2.00
Drilled Conduit Holes in Ribs
Details
       

 06-20-2012
1.50
Prepare Wing Access Plates
Details
     

 06-02-2012
5.00
Rear Spar, Tie Downs, Rib Prep
Details

 05-13-2012
9.25
Tie Down Brackets, Bellcrank Brackets
Details
       

 05-12-2012
2.50
More Rear Spar Work
Details
       

 05-07-2012
2.50
Rear Spars
Details
       

 05-06-2012
10.00
Main Spars contd.
Details
       

 05-05-2012
3.75
Main Spars contd.
Details
       

 05-04-2012
3.25
Countersink Tank Attach Holes
Details

 05-03-2012
1.50
Debur Ribs
Details

 05-02-2012
4.50
Inventory Wing Kit
Details
       

 02-26-2012
1.50
Rudder Tip
Details
       

 02-25-2012
0.50
More Empennage Tip Preparation
Details
       

 02-19-2012
0.50
Expoxy Rivet Washers to Fiberglass
Details
     

 02-18-2012
3.25
Elevator Tips
Details

 02-13-2012
0.00
Received Order Confirmation from Van's
Details

 02-11-2012
0.25
Crimp D-Sub Pins to Elevator Trim Servo
Details
     

 02-05-2012
1.50
Temporarily Mounted Elevators to Horizontal Stab
Details

 01-31-2012
0.00
Ordered Wing Kit
Details

 01-16-2012
2.00
Trim Tab and Servo Install
Details
       

 01-05-2012
0.25
Blind Rivets in Left Elevator
Details

 12-26-2011
4.00
Rolled Leading Edge of Left Elevator
Details
       

 12-24-2011
8.00
Riveting Left Elevator and Building Trim Tab
Details
       

 12-23-2011
1.00
Reorientation
Details

 03-28-2011
0.50
Trim Tab Servo, Counterbalance Weight
Details

 03-01-2011
3.00
Finished Leading Edge of Right Elevator
Details
       

 02-25-2011
1.50
Elevator Trim Servo
Details
       

 02-24-2011
10.00
Continuing Right and Left Elevators
Details
       

 02-19-2011
3.00
Riveting the Right Elevator part 1
Details
     

 02-18-2011
2.00
Primed Understructure for Right Elevator
Details
     

 02-17-2011
0.50
Trimming Right Elevator Conterbalance
Details
     

 02-16-2011
5.00
Preparing Right and Left Elevators
Details
       

 02-15-2011
7.00
Rolled Leading Edge of Rudder
Details
       

 02-10-2011
1.50
Rivet Trailing Edge of Rudder
Details
     

 02-04-2011
2.50
ProSeal Rudder Trailing Edge, Final Drill, Deburr
Details
       

 02-03-2011
0.50
Riveted Skins to Rudder Horn and Bottom Rib
Details
       

 02-02-2011
2.00
Begin Riveting Rudder Skins to Skeleton
Details
       

 02-01-2011
1.00
Finish Fabricating Elevator Stiffeners
Details
       

 01-28-2011
1.00
Elevator Skin Edge Finishing
Details

 01-27-2011
1.00
Left Elevator Stiffeners
Details

 01-26-2011
7.00
Prime Rudder Skeleton, More Elevator Stiffeners
Details
       

 01-25-2011
0.50
Finished Dimpling Rudder Ribs
Details
       

 01-24-2011
2.00
Trimming Elevator Stiffeners contd.
Details

 01-23-2011
7.00
Trimming Elevator Stiffeners, Finishing HS
Details
     

 01-18-2011
3.00
Building the Rudder Skeleton contd.
Details
     

 01-17-2011
5.00
Begin Building Rudder Skeleton
Details
       

 01-13-2011
6.00
Finish Vertical Stabilizer, Back-Rivet Rudder Skin
Details
       

 01-12-2011
7.00
Riveting the VS Rear Spar and Skin
Details
       

 01-10-2011
1.50
Dimpled Rudder Skin, Countersunk VS Spar
Details
     

 01-08-2011
4.00
Finishing Rudder Stiffeners, Final Drill to Skin
Details
     

 01-07-2011
3.00
VS Rear Spar and Rudder Stiffeners
Details
     

 01-06-2011
1.00
Continued Fabrication of Rudder Stiffeners
Details
     

 01-05-2011
1.50
Trimming Rudder Stiffeners
Details
     

 01-04-2011
8.00
Drilling the Vertical Stabilizer
Details
       

 12-31-2010
2.00
Riveting the Right Side HS Skin
Details
     

 12-30-2010
8.00
Began Riveting the Horizontal Stabilizer
Details
       

 12-29-2010
2.50
Prep and Prime HS Parts
Details

 12-27-2010
0.50
Primed HS-710 and HS-714
Details
     

 12-25-2010
11.00
Drilling Horizontal Stabilizer
Details
       

 12-24-2010
0.50
Fluting ribs
Details

 12-17-2010
4.00
Drilling the Horizontal Stabilizer
Details
       

 12-16-2010
3.00
Front Spar Assembly contd.
Details
       

 12-15-2010
1.00
HS Rear Spar Assembly contd.
Details
     

 12-15-2010
2.00
Begin front spar assembly
Details
     

 12-13-2010
2.50
Rear Spar Assembly
Details
     

 12-11-2010
2.00
Begin inventory of empennage kit.
Details

 04-27-2010
12.00
Construct EAA tables
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.