Date
|
Hours
|
Work Log Summary
|
Details
|
12-27-2013
|
10.00
|
Final Details
|
Details
|
|
|
12-15-2013
|
3.00
|
Moving to the Hangar
|
Details
|
|
|
12-15-2013
|
0.40
|
Fuel tank decals
|
Details
|
|
|
12-14-2013
|
3.00
|
Nearly Final details
|
Details
|
|
|
12-10-2013
|
1.00
|
Nameplate Install
|
Details
|
|
|
12-08-2013
|
2.00
|
EXPERIMENTAL Decal / Travel Struts
|
Details
|
|
|
12-07-2013
|
2.00
|
Wingtip/Light Install
|
Details
|
|
|
12-06-2013
|
2.00
|
Windshield Assembly
|
Details
|
|
|
12-06-2013
|
10.00
|
Elevator / Rudder / Stabilizer / Trim assembly
|
Details
|
|
|
12-06-2013
|
0.50
|
Battery Change in the ELT
|
Details
|
|
|
12-04-2013
|
4.00
|
Final wiring hook ups
|
Details
|
|
|
11-30-2013
|
5.00
|
Flaps / Ailerons Assembly
|
Details
|
|
|
11-21-2013
|
5.00
|
Painting 4
|
Details
|
|
|
11-20-2013
|
10.00
|
Painting 3
|
Details
|
|
|
11-19-2013
|
10.00
|
Painting 2
|
Details
|
|
|
11-18-2013
|
30.00
|
Painting the Plane
|
Details
|
|
|
11-09-2013
|
10.00
|
Interior Carpet, Sanding
|
Details
|
|
|
11-01-2013
|
8.00
|
Interior Carpet, Cowling Work, Sanding
|
Details
|
|
|
10-26-2013
|
10.00
|
Finished Primer, Started Interior Carpet
|
Details
|
|
|
10-19-2013
|
2.00
|
Sanding / Cowling Work
|
Details
|
|
|
10-18-2013
|
7.00
|
Engine oil check door / Panel cover
|
Details
|
|
|
10-11-2013
|
7.00
|
Cowling Work
|
Details
|
|
|
10-04-2013
|
2.50
|
Engine Cowling
|
Details
|
|
|
10-01-2013
|
15.00
|
Finished Tapes, Started Priming
|
Details
|
|
|
09-29-2013
|
2.00
|
Pre-Paint Inspection
|
Details
|
|
|
09-21-2013
|
6.00
|
Tapes and Prop
|
Details
|
|
|
09-15-2013
|
2.00
|
Brake line finalization
|
Details
|
|
|
09-07-2013
|
8.00
|
Re-installation of the Engine
|
Details
|
|
|
09-05-2013
|
2.00
|
Fabric Tapes
|
Details
|
|
|
09-01-2013
|
2.00
|
Fabric Patches
|
Details
|
|
|
08-31-2013
|
6.00
|
Covered Pilot Side
|
Details
|
|
|
08-27-2013
|
1.00
|
Secured Battery
|
Details
|
|
|
08-26-2013
|
7.00
|
Fuselage Covering
|
Details
|
|
|
08-24-2013
|
2.00
|
Brake Line Install
|
Details
|
|
|
08-17-2013
|
3.00
|
Passenger side fabric
|
Details
|
|
|
08-16-2013
|
3.75
|
Bottom Skin
|
Details
|
|
|
08-13-2013
|
2.50
|
Misc Install
|
Details
|
|
|
08-07-2013
|
10.00
|
Wing mounting, cables trimmed, etc.
|
Details
|
|
|
07-11-2013
|
3.00
|
Windshield Install
|
Details
|
|
|
06-21-2013
|
3.00
|
Windshield Fitting
|
Details
|
|
|
06-16-2013
|
5.00
|
Interior Fabric
|
Details
|
|
|
06-13-2013
|
1.00
|
Primed the Turtle Deck
|
Details
|
|
|
06-10-2013
|
3.00
|
Turtle Deck Fitting
|
Details
|
|
|
06-08-2013
|
2.00
|
Windshield Bracket Mounting
|
Details
|
|
|
05-29-2013
|
2.00
|
Windshield Work
|
Details
|
|
|
05-23-2013
|
3.00
|
Flap Gap Seals
|
Details
|
|
|
05-18-2013
|
4.00
|
Prep wingtips for paint
|
Details
|
|
|
05-17-2013
|
6.00
|
Wing Primer
|
Details
|
|
|
05-11-2013
|
10.00
|
Tapes
|
Details
|
|
|
05-03-2013
|
8.00
|
Wing work
|
Details
|
|
|
04-28-2013
|
8.00
|
Covering a wing
|
Details
|
|
|
04-13-2013
|
8.00
|
Prep work for covering the second wing
|
Details
|
|
|
04-10-2013
|
2.00
|
Electrical system inspection
|
Details
|
|
|
04-06-2013
|
8.00
|
More Panel Updates
|
Details
|
|
|
02-10-2013
|
3.00
|
Wideband O2 Sensor Install
|
Details
|
|
|
02-04-2013
|
8.00
|
Panel Install and Hook-up
|
Details
|
|
|
04-14-2012
|
15.00
|
Electrical System
|
Details
|
|
|
04-07-2012
|
15.00
|
Mounted Engine
|
Details
|
|
|
03-03-2012
|
2.50
|
Battery and ELT
|
Details
|
|
|
02-27-2012
|
0.50
|
Radiator Prep
|
Details
|
|
|
02-27-2012
|
1.50
|
Mounted the ELT
|
Details
|
|
|
02-27-2012
|
2.00
|
Installed fuel pumps
|
Details
|
|
|
02-27-2012
|
0.25
|
Engine mount
|
Details
|
|
|
02-17-2012
|
0.10
|
Engine part 2
|
Details
|
|
|
02-17-2012
|
1.00
|
Engine Arrived
|
Details
|
|
|
12-23-2011
|
5.00
|
Panel Layout/Fitting
|
Details
|
|
|
11-13-2011
|
15.00
|
Compass Install
|
Details
|
|
|
10-09-2011
|
15.00
|
Started Right Wing
|
Details
|
|
|
09-18-2011
|
4.00
|
Painted the wing with primer
|
Details
|
|
|
09-17-2011
|
5.00
|
Finished Taping Wing
|
Details
|
|
|
09-10-2011
|
15.00
|
Covered, Stitched, Taped
|
Details
|
|
|
08-28-2011
|
4.00
|
Covered the Bottom of a Wing
|
Details
|
|
|
08-20-2011
|
2.00
|
Pre Cover Inspection
|
Details
|
|
|
08-13-2011
|
4.00
|
Prepared Left Wing for Covering
|
Details
|
|
|
07-31-2011
|
10.00
|
Wing Cable Runs and misc
|
Details
|
|
|
07-23-2011
|
5.00
|
Pulleys, Brackets, Pitot work
|
Details
|
|
|
07-16-2011
|
5.00
|
Wing Fabric Plates
|
Details
|
|
|
07-10-2011
|
15.00
|
First coat of EkoPrime
|
Details
|
|
|
06-19-2011
|
10.00
|
Finished Covering the Ailerons and Flaps
|
Details
|
|
|
06-09-2011
|
4.00
|
Finished Perimeter Tapes on the Tail Feathers
|
Details
|
|
|
06-07-2011
|
3.00
|
Perimeter tapes on the Horizontal Stabilizers
|
Details
|
|
|
06-05-2011
|
9.00
|
Perimeter Tapes and Wing Tips
|
Details
|
|
|
05-30-2011
|
8.00
|
Finishing Tapes
|
Details
|
|
|
05-28-2011
|
12.00
|
Fabric Stitches
|
Details
|
|
|
05-03-2011
|
20.00
|
Covered Tail Feathers
|
Details
|
|
|
04-27-2011
|
10.00
|
Covered the Rudder
|
Details
|
|
|
04-13-2011
|
3.00
|
Aileron Pulleys
|
Details
|
|
|
04-10-2011
|
4.00
|
Finished Fabric Job on Ailerons and Flaps
|
Details
|
|
|
04-09-2011
|
5.00
|
Ailerons/FlapsTapes and Patches
|
Details
|
|
|
04-07-2011
|
4.00
|
Covered the last Flap
|
Details
|
|
|
04-02-2011
|
5.00
|
Prep for Fabric
|
Details
|
|
|
04-01-2011
|
4.00
|
Preparing aileron and flap for covering
|
Details
|
|
|
03-31-2011
|
3.00
|
Leading edge work
|
Details
|
|
|
03-30-2011
|
1.50
|
Glued Leading Edge to Flap/Aileron
|
Details
|
|
|
03-29-2011
|
7.00
|
Aileron/Flap leading edge work
|
Details
|
|
|
03-27-2011
|
5.50
|
Worked on the left aileron/flap
|
Details
|
|
|
03-26-2011
|
7.50
|
Covered Flap and Aileron
|
Details
|
|
|
03-21-2011
|
3.50
|
Made fabric plates for flap and aileron
|
Details
|
|
|
03-20-2011
|
6.00
|
Finished aileron and coated wood in polyurethane
|
Details
|
|
|
03-19-2011
|
5.00
|
Flap work
|
Details
|
|
|
03-16-2011
|
4.00
|
Fit flaps to wing
|
Details
|
|
|
03-11-2011
|
2.00
|
False Ribs fitted to Flaps
|
Details
|
|
|
03-09-2011
|
3.00
|
Fitted leading edge to ailerons/flaps
|
Details
|
|
|
03-06-2011
|
6.00
|
Flap/Aileron Hinge and Bellcrank Installation
|
Details
|
|
|
03-01-2011
|
2.25
|
Drilled holes in Aileron/Flap hinges
|
Details
|
|
|
02-27-2011
|
4.00
|
Finished Trailing Edge and Constructed Wing "Holde
|
Details
|
|
|
02-16-2011
|
2.50
|
Preparing wings for flaps and ailerons
|
Details
|
|
|
02-12-2011
|
8.00
|
Trailing Edge - Main Wings
|
Details
|
|
|
02-08-2011
|
1.50
|
Rear Inspection Panel
|
Details
|
|
|
02-06-2011
|
5.00
|
Construct the Pilot side door
|
Details
|
|
|
02-03-2011
|
5.00
|
Construct the Passenger Door
|
Details
|
|
|
01-29-2011
|
3.50
|
Trailing edge install for the ailerons and flaps
|
Details
|
|
|
01-29-2011
|
3.50
|
Header Tank and Trim Installation
|
Details
|
|
|
01-26-2011
|
4.00
|
Bottom Stringer, Rear Windshield Bracket and Heade
|
Details
|
|
|
01-23-2011
|
2.00
|
Left Side Stringer and Flap Selector
|
Details
|
|
|
01-22-2011
|
2.00
|
Top and Right Side Stringer Installation
|
Details
|
|
|
01-19-2011
|
2.50
|
Installed Seats
|
Details
|
|
|
01-18-2011
|
2.50
|
Assembled Seats
|
Details
|
|
|
01-16-2011
|
5.00
|
Finished the Elevator
|
Details
|
|
|
01-15-2011
|
8.00
|
Rudder/Elevator Work
|
Details
|
|
|
01-09-2011
|
6.00
|
Nearly Finished Rudder/Brakes
|
Details
|
|
|
01-06-2011
|
2.50
|
Worked on the rudder
|
Details
|
|
|
01-01-2011
|
3.00
|
Mounted Fin and Rudder Assembly
|
Details
|
|
|
01-01-2011
|
1.50
|
Installed Main Wheels and Floor Panels
|
Details
|
|
|
12-31-2010
|
4.50
|
Finished Main Gear and Assembled Wheels/Brakes
|
Details
|
|
|
12-30-2010
|
4.00
|
Finish Nose Wheel and Mount Main Legs
|
Details
|
|
|
12-29-2010
|
0.75
|
Attached Nose Wheel Shocks
|
|
|
|
12-28-2010
|
1.00
|
Attach Nose Wheel Leg
|
Details
|
|
|
12-27-2010
|
2.00
|
Kit inspection
|
Details
|
|
|
12-26-2010
|
1.00
|
Unpacking and Inventory
|
Details
|
|