KitLog pro

Powered By Kitlog Pro v2.0

BRIAN'S WEB SITE
Work Logs Found: 130
Category Work Time: 688 Hours
 Date
Hours
Work Log Summary

Details

 12-27-2013
10.00
Final Details
Details
       

 12-15-2013
3.00
Moving to the Hangar
Details
       

 12-15-2013
0.40
Fuel tank decals
Details
       

 12-14-2013
3.00
Nearly Final details
Details

 12-10-2013
1.00
Nameplate Install
Details
       

 12-08-2013
2.00
EXPERIMENTAL Decal / Travel Struts
Details
       

 12-07-2013
2.00
Wingtip/Light Install
Details
       

 12-06-2013
2.00
Windshield Assembly
Details
       

 12-06-2013
10.00
Elevator / Rudder / Stabilizer / Trim assembly
Details
       

 12-06-2013
0.50
Battery Change in the ELT
Details
       

 12-04-2013
4.00
Final wiring hook ups
Details
       

 11-30-2013
5.00
Flaps / Ailerons Assembly
Details
       

 11-21-2013
5.00
Painting 4
Details
       

 11-20-2013
10.00
Painting 3
Details
       

 11-19-2013
10.00
Painting 2
Details
       

 11-18-2013
30.00
Painting the Plane
Details
       

 11-09-2013
10.00
Interior Carpet, Sanding
Details

 11-01-2013
8.00
Interior Carpet, Cowling Work, Sanding
Details
       

 10-26-2013
10.00
Finished Primer, Started Interior Carpet
Details
       

 10-19-2013
2.00
Sanding / Cowling Work
Details

 10-18-2013
7.00
Engine oil check door / Panel cover
Details
       

 10-11-2013
7.00
Cowling Work
Details
       

 10-04-2013
2.50
Engine Cowling
Details
       

 10-01-2013
15.00
Finished Tapes, Started Priming
Details
       

 09-29-2013
2.00
Pre-Paint Inspection
Details

 09-21-2013
6.00
Tapes and Prop
Details
       

 09-15-2013
2.00
Brake line finalization
Details
       

 09-07-2013
8.00
Re-installation of the Engine
Details
       

 09-05-2013
2.00
Fabric Tapes
Details
       

 09-01-2013
2.00
Fabric Patches
Details
       

 08-31-2013
6.00
Covered Pilot Side
Details
       

 08-27-2013
1.00
Secured Battery
Details
       

 08-26-2013
7.00
Fuselage Covering
Details
       

 08-24-2013
2.00
Brake Line Install
Details
       

 08-17-2013
3.00
Passenger side fabric
Details
       

 08-16-2013
3.75
Bottom Skin
Details
       

 08-13-2013
2.50
Misc Install
Details
     

 08-07-2013
10.00
Wing mounting, cables trimmed, etc.
Details
       

 07-11-2013
3.00
Windshield Install
Details
       

 06-21-2013
3.00
Windshield Fitting
Details
       

 06-16-2013
5.00
Interior Fabric
Details
       

 06-13-2013
1.00
Primed the Turtle Deck
Details
       

 06-10-2013
3.00
Turtle Deck Fitting
Details
       

 06-08-2013
2.00
Windshield Bracket Mounting
Details
       

 05-29-2013
2.00
Windshield Work
Details
       

 05-23-2013
3.00
Flap Gap Seals
Details
       

 05-18-2013
4.00
Prep wingtips for paint
Details
       

 05-17-2013
6.00
Wing Primer
Details
       

 05-11-2013
10.00
Tapes
Details
       

 05-03-2013
8.00
Wing work
Details
       

 04-28-2013
8.00
Covering a wing
Details
       

 04-13-2013
8.00
Prep work for covering the second wing
Details
       

 04-10-2013
2.00
Electrical system inspection
Details

 04-06-2013
8.00
More Panel Updates
Details
       

 02-10-2013
3.00
Wideband O2 Sensor Install
Details
       

 02-04-2013
8.00
Panel Install and Hook-up
Details
       

 04-14-2012
15.00
Electrical System
Details
       

 04-07-2012
15.00
Mounted Engine
Details
       

 03-03-2012
2.50
Battery and ELT
Details
       

 02-27-2012
0.50
Radiator Prep
Details
       

 02-27-2012
1.50
Mounted the ELT
Details
       

 02-27-2012
2.00
Installed fuel pumps
Details
       

 02-27-2012
0.25
Engine mount
Details
     

 02-17-2012
0.10
Engine part 2
Details
       

 02-17-2012
1.00
Engine Arrived
Details
       

 12-23-2011
5.00
Panel Layout/Fitting
Details
       

 11-13-2011
15.00
Compass Install
Details
       

 10-09-2011
15.00
Started Right Wing
Details

 09-18-2011
4.00
Painted the wing with primer
Details
       

 09-17-2011
5.00
Finished Taping Wing
Details

 09-10-2011
15.00
Covered, Stitched, Taped
Details

 08-28-2011
4.00
Covered the Bottom of a Wing
Details
       

 08-20-2011
2.00
Pre Cover Inspection
Details

 08-13-2011
4.00
Prepared Left Wing for Covering
Details

 07-31-2011
10.00
Wing Cable Runs and misc
Details
       

 07-23-2011
5.00
Pulleys, Brackets, Pitot work
Details
       

 07-16-2011
5.00
Wing Fabric Plates
Details
       

 07-10-2011
15.00
First coat of EkoPrime
Details
       

 06-19-2011
10.00
Finished Covering the Ailerons and Flaps
Details
       

 06-09-2011
4.00
Finished Perimeter Tapes on the Tail Feathers
Details

 06-07-2011
3.00
Perimeter tapes on the Horizontal Stabilizers
Details
     

 06-05-2011
9.00
Perimeter Tapes and Wing Tips
Details
     

 05-30-2011
8.00
Finishing Tapes
Details

 05-28-2011
12.00
Fabric Stitches
Details
       

 05-03-2011
20.00
Covered Tail Feathers
Details
       

 04-27-2011
10.00
Covered the Rudder
Details
       

 04-13-2011
3.00
Aileron Pulleys
Details
       

 04-10-2011
4.00
Finished Fabric Job on Ailerons and Flaps
Details
     

 04-09-2011
5.00
Ailerons/FlapsTapes and Patches
Details
       

 04-07-2011
4.00
Covered the last Flap
Details

 04-02-2011
5.00
Prep for Fabric
Details

 04-01-2011
4.00
Preparing aileron and flap for covering
Details

 03-31-2011
3.00
Leading edge work
Details

 03-30-2011
1.50
Glued Leading Edge to Flap/Aileron
Details

 03-29-2011
7.00
Aileron/Flap leading edge work
Details

 03-27-2011
5.50
Worked on the left aileron/flap
Details
       

 03-26-2011
7.50
Covered Flap and Aileron
Details
       

 03-21-2011
3.50
Made fabric plates for flap and aileron
Details
       

 03-20-2011
6.00
Finished aileron and coated wood in polyurethane
Details
       

 03-19-2011
5.00
Flap work
Details
       

 03-16-2011
4.00
Fit flaps to wing
Details
       

 03-11-2011
2.00
False Ribs fitted to Flaps
Details
       

 03-09-2011
3.00
Fitted leading edge to ailerons/flaps
Details
       

 03-06-2011
6.00
Flap/Aileron Hinge and Bellcrank Installation
Details
       

 03-01-2011
2.25
Drilled holes in Aileron/Flap hinges
Details
       

 02-27-2011
4.00
Finished Trailing Edge and Constructed Wing "Holde
Details
       

 02-16-2011
2.50
Preparing wings for flaps and ailerons
Details
       

 02-12-2011
8.00
Trailing Edge - Main Wings
Details
       

 02-08-2011
1.50
Rear Inspection Panel
Details
     

 02-06-2011
5.00
Construct the Pilot side door
Details
       

 02-03-2011
5.00
Construct the Passenger Door
Details
       

 01-29-2011
3.50
Trailing edge install for the ailerons and flaps
Details
       

 01-29-2011
3.50
Header Tank and Trim Installation
Details
       

 01-26-2011
4.00
Bottom Stringer, Rear Windshield Bracket and Heade
Details
       

 01-23-2011
2.00
Left Side Stringer and Flap Selector
Details
       

 01-22-2011
2.00
Top and Right Side Stringer Installation
Details
       

 01-19-2011
2.50
Installed Seats
Details
       

 01-18-2011
2.50
Assembled Seats
Details
       

 01-16-2011
5.00
Finished the Elevator
Details
       

 01-15-2011
8.00
Rudder/Elevator Work
Details
       

 01-09-2011
6.00
Nearly Finished Rudder/Brakes
Details
       

 01-06-2011
2.50
Worked on the rudder
Details
       

 01-01-2011
3.00
Mounted Fin and Rudder Assembly
Details
       

 01-01-2011
1.50
Installed Main Wheels and Floor Panels
Details
       

 12-31-2010
4.50
Finished Main Gear and Assembled Wheels/Brakes
Details
       

 12-30-2010
4.00
Finish Nose Wheel and Mount Main Legs
Details
       

 12-29-2010
0.75
Attached Nose Wheel Shocks
     

 12-28-2010
1.00
Attach Nose Wheel Leg
Details
       

 12-27-2010
2.00
Kit inspection
Details

 12-26-2010
1.00
Unpacking and Inventory
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.