Work Logs Found: 468
Category Work Time: 2641 Hours
 Date
Hours
Work Log Summary

Details

 06-17-2011
1.00
Airworthiness Certificate!
Details
     

 06-16-2011
5.00
Airworthiness Inspection Preparation
Details
       

 06-15-2011
8.50
Placards, glove box, etc
Details
       

 06-14-2011
9.00
Weigh airplane, calibrate fuel
Details
       

 06-13-2011
9.00
Canard, Elevator push tube, prepare for weight
Details
       

 06-12-2011
5.00
Nose gear washers, Cowl nut plates
Details
       

 06-11-2011
8.50
Seat belts, roll servo, gear swing
Details
       

 06-10-2011
8.00
Roll servo hardpoints, seatbelts
Details
       

 06-09-2011
8.00
Gear swinging, inspections
Details

 06-08-2011
7.00
Heater ducting, gear doors, gear cables, etec
Details
       

 06-02-2011
7.00
Heater controls, doors, heater tubing
Details
       

 06-01-2011
3.50
Reattach under cowling flight controls
Details

 06-01-2011
4.00
Cooling plenum
Details
       

 05-31-2011
7.50
Cowling, plenum,
Details
       

 05-30-2011
5.00
Heater controls
Details
       

 05-30-2011
4.50
Cowling, Pitch trim, elevator
Details
       

 05-29-2011
4.00
Secure wireing
Details

 05-29-2011
4.00
Cowling
Details

 05-28-2011
4.50
Secure electrical wireing
Details
       

 05-28-2011
4.00
Cowling
Details
       

 05-27-2011
4.25
Trim interior pieces
Details
     

 05-27-2011
4.25
Cowling
Details
       

 05-26-2011
4.00
Trim interior parts for upholstery
Details
       

 05-26-2011
4.00
Cowling
Details
       

 05-25-2011
8.00
Cowling
Details

 05-01-2011
0.00
Upholstery
Details
       

 05-01-2011
8.00
Cowling, Nose cover
Details
       

 04-30-2011
8.00
Cowling
Details
       

 04-29-2011
10.50
Cowling
Details
       

 04-28-2011
10.50
Cowling
Details
       

 04-27-2011
8.00
Cowling
Details
       

 04-26-2011
3.50
Redo Center Seat Support
Details
       

 04-26-2011
4.50
Cowling
Details
       

 04-08-2011
6.00
Interior ready for upholstery
Details
       

 04-07-2011
12.00
Vanity/Baggage panel, cargo tiedown rings
Details
       

 04-06-2011
7.50
Vanity/Baggage panels
Details
     

 04-05-2011
7.50
Cargo tie downs, door posts
Details
       

 04-03-2011
11.25
Rear Seat, Overhead plenum
Details
       

 04-02-2011
9.00
Vanity/Baggage panel, door sils, overhead
Details
       

 04-01-2011
9.50
Door sils, Vanity/Baggage panel
Details
       

 03-31-2011
8.00
Vanity/Baggage panels, door sils
Details
       

 03-29-2011
9.00
Overhead plenum, Vanity panels
Details
       

 03-28-2011
7.00
Seat belt hardpoints, misc
Details
       

 03-26-2011
4.00
Miscellaneous
Details

 03-25-2011
6.00
Overhead lights, vents, and vanity panel
Details
     

 03-24-2011
6.00
Set up engine fuel pressures
Details

 03-23-2011
7.00
More Miscelaneous work
Details

 03-22-2011
6.00
Miscellaneous work

 03-21-2011
6.00
Preoiler CB, sump drain, etc
Details
       

 03-19-2011
4.00
Setup EFIS and EIS
Details

 03-19-2011
2.00
Reinstall Aileron
Details

 03-18-2011
6.00
Start engine
Details
     

 03-17-2011
4.00
Setup EIS
Details

 03-17-2011
3.50
Balance ailerons
Details
       

 03-17-2011
1.50
Add Fuel
Details

 03-14-2011
5.00
Wireing and "power up"
Details
       

 03-14-2011
4.00
Balance elevators
Details

 03-13-2011
8.50
Control balance, fuel s/o valves, etc
Details
       

 03-12-2011
7.50
Wireing, etc
Details

 03-11-2011
8.00
Install Pitot/static system
Details
       

 03-10-2011
3.00
Miscellaneous wireing
Details

 03-10-2011
3.00
Install pitot tube and static port
Details

 03-09-2011
7.50
More Wireing
Details
       

 03-08-2011
6.50
ELT, Stick, Wireing
Details
       

 03-07-2011
2.50
Oil-Air separator
Details
     

 03-07-2011
5.00
ELT install
Details
       

 03-04-2011
8.00
Cut exhaust pipes and cowling hole
Details
       

 03-03-2011
2.50
Install com panel
Details
       

 03-03-2011
5.00
Engine exhaust, elevator ends
Details
       

 03-02-2011
6.50
Stby alternator, route coax, treat elevator ends
Details
       

 03-01-2011
4.00
Miscellaneous Electrical
Details
       

 03-01-2011
2.50
Air/Oil seperator
Details
       

 02-28-2011
3.00
Tighten up connections
Details

 02-28-2011
4.00
Starter replacement, wireing connectors
Details
       

 02-25-2011
4.00
Install pilot seat
Details
       

 02-25-2011
2.00
Install GS Shelf
Details
     

 02-24-2011
6.00
Wireing and Pilot seat mount
Details
       

 02-23-2011
4.00
Wireing
Details
       

 02-23-2011
4.00
Move Pilot seat forward
Details
     

 02-22-2011
7.50
Wireing
Details
       

 02-21-2011
6.50
Wireing and magnetometer install
Details
     

 02-19-2011
8.00
Magnetometer installation
Details
       

 02-18-2011
6.00
Magnetometer installation
Details
       

 02-17-2011
3.00
Secure starter cables
Details
       

 02-17-2011
4.00
Fuel SO Valve
Details
       

 02-16-2011
7.00
Fuel Shutoff Valve
Details
       

 02-15-2011
7.00
Door warning switches, secure wireing
Details
       

 02-14-2011
6.50
CHT/EGT, secure wires,
Details
       

 02-11-2011
7.00
Trim and secure wireing
Details
       

 02-10-2011
3.50
Roll trim, secure wireing
Details
       

 02-07-2011
0.00
New Digs
Details
       

 02-05-2011
8.00
Install roll servo, AHRS
Details
       

 02-03-2011
7.50
Engine drain lines, control cables, pitot tube
Details

 02-02-2011
7.50
Engine mounts, Prop mounted
Details
       

 02-01-2011
7.50
Enging mounts, Landing light, Pitch servo
Details
       

 01-31-2011
5.50
Fuel pump, Landing light, Engine drain lines
Details

 01-30-2011
4.50
Landing light, Prop backplate
Details
       

 01-29-2011
7.50
Prop backplate, Landing light
Details
       

 01-28-2011
4.50
Prepare spinner, Electrical
Details
       

 01-27-2011
7.50
Wireing, Accessory shelf, Pitch trim
Details
       

 01-26-2011
6.50
Wireing
Details
     

 01-25-2011
5.50
Wireing
Details
       

 01-24-2011
6.00
Ran Electrical wires
Details
       

 01-19-2011
5.50
Install trim servo
Details
       

 01-18-2011
7.00
Placement of peripheral electrical components
Details

 01-17-2011
7.00
Install Electrical platform for peripheries
Details
       

 01-14-2011
6.00
Secure Engine control cables
Details

 01-13-2011
5.50
Fit Seats, Plan upholstery
Details
       

 01-12-2011
7.00
Engine control cables
Details
       

 01-11-2011
6.00
Install engine control cables
Details
       

 01-10-2011
6.00
Install Panel
Details
       

 01-07-2011
6.50
Seats, Keel cover, comm panel
Details
       

 01-06-2011
5.00
Install fuel pump, clean windshield, etc
Details
       

 01-05-2011
7.00

Details
       

 01-04-2011
6.00
Com Panel Install
Details

 12-30-2010
5.00
Install Fuel pump and filter plus other
Details

 12-29-2010
7.00
Com Panel, Overhead plenum
Details
       

 12-28-2010
6.00
Door micro switches, etc
Details
       

 12-27-2010
6.50
Install Firewall Electrical components
Details
       

 12-23-2010
7.00
Install Cht and egt sensors
Details
       

 12-22-2010
6.00
Install Prop Governor
Details
       

 12-21-2010
6.50
Tac pickup on Mag
Details
       

 12-20-2010
7.50
Seat Intallation
Details
       

 12-17-2010
7.50
Install rear seats
Details
     

 12-16-2010
7.00
Install rear seats
Details
       

 12-15-2010
6.00
Install rear seats
Details
     

 12-14-2010
2.00
Rear seat install
Details

 12-14-2010
5.00
Elevator push tube
Details
       

 12-13-2010
5.00
Concentric torque tube and counter weights
Details

 12-10-2010
6.50
Secure hoses and wireing on engine
Details
       

 12-09-2010
7.00
Started wireing
Details
       

 12-08-2010
7.50
Run EI leads, Place lights in overhead
Details
     

 12-07-2010
5.00
Install more plumbing, plugs, and Mag leads
Details
       

 12-07-2010
3.00
Adjust copilot seat
Details
       

 12-06-2010
7.00
Engine Fuel/Pressure lines
Details
     

 12-03-2010
6.50
Fuel and oil lines
Details
       

 12-02-2010
6.50
Fuel and oil lines
Details
       

 12-01-2010
7.50
Throttle bracket and drain lines
Details
       

 11-30-2010
7.50
Fabricate throttle cable bracket
Details
     

 11-29-2010
7.50
Mixture and Throttle Bracket
Details
       

 11-24-2010
7.50
Fuel lines
Details
       

 11-23-2010
7.50
Install fuel lines
Details
       

 11-22-2010
7.00
Install Electroair CSTW
Details
       

 11-20-2010
3.50
Intercylinder baffles
Details
       

 11-19-2010
7.50
Intercylinder baffles
Details

 11-18-2010
4.00
Pre-oiler and firewall components
Details
       

 11-09-2010
6.50
Intercylinder Baffles
Details
       

 11-08-2010
2.00
Engine Baffling
Details

 11-07-2010
1.00
test
Details

 11-06-2010
8.50
Rudder and Ailerons
Details
       

 11-05-2010
8.00
Rigging ailerons
Details

 11-04-2010
8.00
Rudders and Ailerons
Details
       

 11-02-2010
8.00
Pilot side rudder cable
Details
       

 11-01-2010
6.00
Rig pilot side aileron
Details
       

 10-30-2010
4.50
Aileron bellcrank bracketw
Details
       

 10-29-2010
4.00
Rudder installation
Details
       

 10-29-2010
3.50
Install aileron bell crank assemply
Details
     

 10-28-2010
7.50
Install rudder and hinges
Details
       

 10-27-2010
7.00
Install torque tubes on ailerons
Details

 10-26-2010
8.00
Install aileron hinges
Details
       

 10-25-2010
8.15
Rudder hinges and wells
Details
       

 10-25-2010
4.00
glass in Glide Slope antenna
Details
       

 10-23-2010
6.00
Mount aileron
Details
       

 10-22-2010
8.00
Install piano hinge on airlerons
Details
       

 10-21-2010
4.00
Install firewall material on wing
Details
     

 10-19-2010
7.00
Cooling Plenum
Details
       

 10-14-2010
6.50
12.3.4
Details
       

 10-13-2010
7.50
Cooling plenum
Details
       

 10-12-2010
7.00
Cooling Plenum
Details
       

 10-11-2010
8.00
Brake bleeding
Details

 10-09-2010
8.00
Cooling plenum and doors
Details
       

 10-08-2010
11.00
Plenum and doors
Details
       

 10-07-2010
9.00
5.3.3
Details
       

 10-06-2010
8.00
Engine cooling plenum
Details

 10-05-2010
8.00
Wheels and brakes installed
Details

 10-04-2010
8.50
Install gear micro switches
Details

 10-02-2010
7.00
Reinstall fuel lines
Details
     

 10-01-2010
5.00
Nose gear doors, hydraulic lines
Details
       

 09-30-2010
8.75
Repair hydraulic pump
Details
     

 09-29-2010
9.00
Fuel and vent lines
Details
       

 09-28-2010
8.00
Fuel lines in cabin
Details

 09-24-2010
9.00
Install brake lines, sockets
Details
       

 09-23-2010
9.00
Permanent hardware in gear retraction system
Details
       

 09-22-2010
8.00
More gear tweaking
Details

 09-21-2010
9.00
Tweaking Gear retraction system
Details
     

 09-20-2010
8.50
Main gear cable installation
Details
       

 09-18-2010
8.50
Install nose gear closer
Details
       

 09-17-2010
10.00
Secure Hydraulic lines
Details
       

 09-16-2010
9.25
Hydraulic plumbinmg
Details
       

 09-15-2010
8.25
Hydraulic line fabrication
Details
       

 09-14-2010
8.25
Fitting Mishler's nose gear closer
Details
       

 09-13-2010
9.50
Gear socket install, relief forms for fuel dump an
Details
       

 09-12-2010
4.00
Prime nose gear leg. Install doors
Details
       

 09-12-2010
2.50
Mold for fuel shutoff valve control
Details
       

 09-10-2010
5.50
Remove nose gear leg and prepare for priming
Details
     

 09-10-2010
3.50
Outboard end strake reinforcement
Details
       

 09-09-2010
8.00
Primed wings and fuselage.
Details
       

 09-08-2010
9.25
Prepare fuselage and wings for final prime
Details
       

 09-07-2010
8.00
Fill with bondo and sand
Details
     

 09-06-2010
7.50
Sand and fill wings and fuselage
Details

 09-03-2010
8.50
Primed, guide coated, sanded
Details
       

 09-02-2010
8.25
More finishing
Details
       

 09-01-2010
9.00
Sanding and prep for prime
Details

 08-31-2010
9.00
Sanding and filling
Details
       

 08-30-2010
11.00
Wings on finish work
Details
       

 08-28-2010
5.00
Sanded top of strake and fuselage
Details
       

 08-28-2010
5.00
Install sump tank, glass bulkheads
Details
     

 08-27-2010
9.00
Strake cutouts
Details
       

 08-26-2010
3.50
Treat strake cutouts
Details
       

 08-26-2010
3.00
Sump tank capacity and mounting tabs
Details

 08-26-2010
2.00
Sanding Wings
Details
     

 08-25-2010
8.00
Sanding and filling wings
Details

 08-24-2010
3.00
Glass sump tank
Details
     

 08-24-2010
6.50
Finishing wings
Details
     

 08-23-2010
4.00
Hard coat wings
Details
     

 08-23-2010
3.00
Cut corners off sump tank
Details
       

 08-21-2010
3.50
Sump tank
Details
     

 08-21-2010
5.00
Sanding and filling upper wings
Details
     

 08-20-2010
8.00
Sanding and filling upper wings
Details
     

 08-20-2010
5.00
Leak check CP fuel tanks
Details
       

 08-20-2010
1.50
Instrument panel
Details

 08-19-2010
8.50
Fitting panel
Details
       

 08-19-2010
5.00
Finishing
Details
     

 08-18-2010
3.25
Panel
Details
     

 08-18-2010
5.25
Determine Hub lenght for Aero Composite prop
Details
       

 08-17-2010
2.50
Modify Panel
Details

 08-17-2010
6.00
Hang engine
Details
     

 08-16-2010
8.50
Enging Mount and Cowling
Details
       

 08-14-2010
12.00
Install Firewall
Details
       

 08-13-2010
8.00
wetsand, install gear legs, check for leaks
Details
       

 08-12-2010
9.00
wet sand and fuel tank leaks
Details
       

 08-11-2010
8.00
Filling, last prime, fuel tank leak checks
Details
       

 08-10-2010
11.50
More sanding
Details
     

 08-09-2010
10.00
More sanding
Details
       

 08-07-2010
10.75
CP wing/strake finishing
Details
       

 08-06-2010
9.00
Sanded CP lowerwing/strake
Details
       

 08-05-2010
11.00
CP wing and strake bottom
Details
       

 08-04-2010
6.50
Finishing CP lower wing and strake
Details
     

 07-29-2010
8.25
Sanding
Details
       

 07-28-2010
8.25
Sanding
Details
       

 07-27-2010
9.75
Sanding
Details
       

 07-26-2010
8.50
Sanding
Details
       

 07-24-2010
9.50
Sanding wings
Details
       

 07-23-2010
8.25
Sand wing bottom and gear legs
Details
       

 07-22-2010
8.00
Sanding
Details
       

 07-21-2010
5.50
Micro pilot wing bottom
Details
     

 07-21-2010
3.50
Install brake lines down gear leg
Details
       

 07-20-2010
8.00
More sanding
Details
       

 07-19-2010
8.00
Remove Bad Micro
Details
       

 07-17-2010
8.00
Micro wing bottom
Details
       

 07-16-2010
6.00
Prepping bottom of pilot wing/strake
Details
       

 07-16-2010
2.50
Install landing light lense
Details
     

 07-15-2010
2.00
Install plastic instrument panel
Details
       

 07-15-2010
6.00
Install overhead fresh air duct
Details
       

 07-14-2010
4.00
Modify overhead fresh air duct
Details
     

 07-14-2010
5.50
Finish gear doors
Details
       

 07-13-2010
7.00
Fuel vent system
Details
       

 07-13-2010
2.50
CP gear door
Details
       

 07-08-2010
4.00
Overhead "instrument" panel
Details
     

 07-08-2010
4.75
Gear door fitting
Details
       

 07-06-2010
3.00
overhead "instrument" panel
Details
     

 07-06-2010
3.50
Gear doors
Details
       

 07-05-2010
3.50
Glassed in Eng cooling NACA vents
Details
     

 07-05-2010
6.50
Fitting gear doors
Details
       

 07-03-2010
7.75
Gear doors
Details
       

 07-02-2010
9.00
Gear doors
Details
       

 07-01-2010
8.00
Prepare main gear doors
Details
       

 06-30-2010
8.00
Glass inside wheel wells/cut gear leg
Details
       

 06-29-2010
7.50
Preparing wheel well
Details
       

 06-28-2010
6.00
Strake glassing
Details
       

 06-26-2010
8.25
Glass in Slant fuel bulkheads
Details
       

 06-25-2010
8.00
Jeffco slant baggage bulkheads
Details
       

 06-24-2010
6.50
More fuel system glassing
Details
       

 06-23-2010
2.00
Windscreen protection
Details
     

 06-23-2010
1.50
Sanded wheel well area
Details
       

 06-23-2010
5.00
Glass Main spar to strake and bulkhead
Details
       

 06-22-2010
0.50
The Big Flip
Details
       

 06-22-2010
4.00
Prepare sump tank
Details
       

 06-22-2010
3.00
Door/strake
Details

 06-21-2010
8.00
Install Leading edge strake tips
Details
       

 06-18-2010
5.00
Seats, Strake
Details
       

 06-09-2010
4.00
Install seats
Details
       

 06-09-2010
4.00
Glass top strake to fuselage
Details
       

 06-09-2010
2.00
Glass in pilot wheel/gear well
Details
     

 06-09-2010
2.00
Glass in CP seat hardpoints
Details
     

 06-09-2010
2.00
Glass in CP fuel sight guage
Details
     

 06-07-2010
7.50
Seat Installation
Details
       

 06-04-2010
6.50
Seat construction and hard points
Details
     

 06-03-2010
2.00
Reshaping Glare shield attaching flanges
Details
       

 06-03-2010
7.00
Pilot seat rail hard points
Details
       

 06-02-2010
1.00
Reattach stiffening bar to panel
Details
     

 06-02-2010
6.00
Pilot seat construction
Details
       

 06-01-2010
3.00
Slot on Glareshield for panel
Details
       

 06-01-2010
5.00
Assemble pilot seat
Details
       

 05-31-2010
4.50
Glass underside of wheel well
Details
       

 05-31-2010
4.00
Build upper flange onto panel
Details
       

 05-29-2010
6.75
Glare shield fitting
Details
       

 05-28-2010
3.00
Wing Strake cutout
Details

 05-28-2010
5.00
Panel flange treatment
Details
       

 05-22-2010
4.00
Panel
Details
       

 05-21-2010
7.00
Panel
Details
       

 05-20-2010
8.00
Panel fitting
Details
       

 05-13-2010
6.00
Fixing copilot strake cover
Details
       

 05-12-2010
8.00
Pilot Strake Covered!
Details
       

 05-11-2010
6.00
Copilot Stake Covered!
Details
       

 05-10-2010
7.50
Strake Prep
Details
       

 05-01-2010
9.50
Jeffco and glassing strakes
Details
       

 04-30-2010
7.00
Jeffco CP Strakes
Details
       

 04-29-2010
8.00
Glassing Bulkheads and Baffles
Details
       

 04-27-2010
10.50
Sight guage and bulkheads
Details
       

 04-26-2010
8.00
Sight guage and bulkheads
Details
       

 04-14-2010
7.00
Bulkheads and Jeffco
Details
       

 04-13-2010
11.00
Bulkheads
Details
       

 04-12-2010
6.50
Bulkheads and hardpoints
Details
       

 04-09-2010
7.00
Bulkheads and Baffles
Details
       

 04-08-2010
9.00
Hard points and bulkheads
Details
       

 04-07-2010
4.00
Fuel system hardpoints
Details
       

 04-07-2010
2.00
Copilot strake window
Details
     

 03-16-2010
7.00
Copilot strake window, baffles
Details
       

 03-15-2010
7.50
Install fuel caps, more bulkheads
Details
       

 03-12-2010
8.00
Jeffco, fuel sender, copilot baffles
Details
       

 03-11-2010
8.00
Glass in Baffles, Sight guages
Details
       

 03-10-2010
3.00
Fuel strake bulkheads
Details
       

 03-10-2010
4.00
Fuel Sight Guages
Details
     

 03-05-2010
7.00
Install strake window, fuel sender bracket
Details
       

 03-04-2010
6.00
Cut rabbit in plexiglass, Mounted fuel sender brac
Details
       

 03-03-2010
8.00
Install baggage area windows
Details
       

 03-02-2010
9.00
Epoxy fuel system hardpoints, glass bulkheads
Details
     

 02-26-2010
8.00
More bulkhead work
Details
       

 02-25-2010
9.50
Copilot wheel well
Details
       

 02-24-2010
8.00
Fuel Fittings, sight guages
Details
       

 02-23-2010
9.00
Fitted copilot wheel/gear well
Details
       

 02-22-2010
10.00
Glass in bulkheads
Details
       

 02-19-2010
8.00
Shape and cleanup bulkhead flanges
Details
       

 02-18-2010
8.00
Built Flanges for bulkheads
Details
       

 02-17-2010
8.00
Cutting and installing copilot wheelwell
Details
       

 02-16-2010
8.00
Fitting copilot wheel well
Details
       

 02-15-2010
8.00
Copilot Wheel Well
Details
       

 02-12-2010
8.00
Strake baggage area bulkheads
Details
       

 02-11-2010
6.00
Fuel System Baffles
Details
       

 01-28-2010
9.00
Bulkhead fitting
Details
       

 01-27-2010
8.00
Install bulkheads
Details
       

 01-26-2010
8.50
Fitting Bulkheads
Details
       

 01-25-2010
6.50
Form flange for wheel well
Details
       

 01-18-2010
8.00
Modify wheel well
Details
       

 01-15-2010
8.00
Fit wheel wells and mod wheel well
Details
       

 01-14-2010
9.00
Cutting well to fit gear
Details
       

 01-13-2010
9.00
Cut gear well holes
Details
       

 01-12-2010
4.50
Cut gear holes in lower strake
Details
       

 01-12-2010
3.00
Adjust tow-in of tires
Details

 01-11-2010
6.00
Glass in lower strake
Details
       

 01-04-2010
4.50
Adhere Lower Strake to Main Spar
Details
       

 12-31-2009
5.50
Final fit of lower strakes
Details
       

 12-30-2009
6.00
Glass aft part of lower strake
Details
       

 12-29-2009
7.50
Hang wings, fit lower strakes
Details
       

 12-28-2009
8.00
Prepare fuselage and strakes
Details
       

 12-09-2009
8.00
Fuselage prep for strakes
Details
       

 12-08-2009
4.00
Lower Strake alignment
Details
       

 12-08-2009
3.50
Cut out Strake bulkheads
Details
       

 12-07-2009
5.00
Install Oil cooler duct and fresh air scoop
Details
       

 12-07-2009
2.00
Install new gas springs
Details

 12-04-2009
8.00
Oil cooler duct
Details
       

 12-03-2009
8.00
Install Oil cooler and Fresh air vent
Details
       

 12-02-2009
8.00
Nose Cooler Duct
Details
       

 12-01-2009
7.00
Fit Doors
Details

 11-30-2009
8.00
Install Door Gas Springs
Details
       

 11-20-2009
8.00
Install door gas springs
Details
       

 11-19-2009
7.00
Fit Doors
Details
       

 11-17-2009
4.00
Window Protection
Details

 11-17-2009
4.00
Fit Doors
Details
       

 11-16-2009
0.00
Service Center Workplace setup
Details
       

 11-11-2009
0.00
Move to Sebastian
Details
       

 10-10-2009
1.00
Glass in Oil cooler Nose NACA scoop
Details
       

 10-09-2009
6.00
Flapper valve for oil cooler
Details
       

 10-08-2009
5.00
Fabricate Flapper Valve for oil cooler
Details
     

 10-07-2009
1.50
Install Hydraulic Pump
Details
       

 10-06-2009
4.00
Install Gear Contol system
Details
       

 10-05-2009
6.00
Install gear contol system
Details
       

 08-28-2009
1.00
Install Battery Shelf
Details

 08-27-2009
5.00
Build Battery Tray
Details
       

 08-09-2009
1.00
Build Battery Tray
Details
       

 08-07-2009
5.00
Rudder Pedal/Toe Brake
Details
       

 08-03-2009
5.50
Rudder Pedal/Toe Brake
Details
       

 07-26-2009
2.00
Nose Gear Guides finished
Details
       

 07-25-2009
5.00
Glass in Nose Gear Guides
Details
       

 07-24-2009
7.00
Nose gear guides
Details
       

 07-23-2009
5.50
Prepare Nose Gear Guides
Details

 07-23-2009
1.50
Glassed MG bushing on firewall
Details
       

 07-22-2009
2.00
Rudder Pedal/Toe Brake
Details
       

 07-21-2009
5.00
Rudder Pedal/Toe Brke
Details
       

 05-14-2009
7.00
Mount nutplates on fuselage tabs and canard
Details
       

 05-12-2009
3.50
Trim Canard and fuselage tabs
Details
       

 05-07-2009
3.50
Fuselage tabs for Canard attachment
Details
       

 05-06-2009
3.50
Fuselage attach tabs for Canard
Details
     

 04-24-2009
6.00
Build canard attach points.
Details
       

 11-04-2008
7.50
Fuselage edge treatment for doghouse
Details
       

 11-03-2008
4.50
Dog house edge treatment
Details
     

 10-30-2008
5.00
Prepare MG pulley holes
Details

 10-29-2008
8.00
Mount MG pulleys
Details
       

 09-03-2008
6.50
Cut holes for gear legs
Details
       

 08-19-2008
7.00
MG Pulley instalation
Details
       

 06-02-2008
5.50
Notch bulkheads for gear legs
Details
       

 06-02-2008
2.00
Locating position for MG pulley system
Details
       

 06-01-2008
2.00
Main Gear Knurled bushings.
Details
       

 05-31-2008
6.00
Triax MG knurled bushings / build gear sockets
Details
       

 05-30-2008
3.00
Fabricate Aluminum spacers for Main Gear
Details
       

 05-29-2008
2.50
Grind top of gear legs make shims
Details
       

 05-27-2008
8.00
Install main gear bushings
Details
       

 05-18-2008
5.00
Glass in Transverse bulkhead
Details
       

 05-17-2008
7.50
Build Transverse bulkheads
Details
     

 05-15-2008
3.00
Enlarge hole for Pilot gear leg
Details

 05-14-2008
4.00
Enlarging Pax side gear hole
Details
       

 05-12-2008
4.00
Clean up gear bulkhead/firewall/spar reinforcement
Details
       

 05-08-2008
6.00
Gear bulkhead/firewall/spar reinforcing
Details
       

 05-07-2008
8.00
Gear bulkhead/Firewall/Main spar reinforcements
Details
       

 04-25-2008
4.00
Glassing Main Spar in
Details
       

 04-24-2008
6.00
Main (Center) Spar Installatin
Details
       

 04-23-2008
8.00
Level Airplane
Details
       

 02-09-2008
2.00
Lower aileron torque tube
Details
       

 02-06-2008
3.50
Lower Aileron torque tube
Details

 02-05-2008
3.00
Lower Aileron torque tube
Details
       

 01-29-2008
5.00
Lower Aileron Torque tube
Details

 11-28-2007
0.00
"Hangar" setup
Details
       

 10-13-2007
0.00
Aircraft Delivery
Details
       

 10-06-2007
1.00
Trim canard mod for air intrusion
Details

 10-06-2007
1.50
Clean up NG hinge tabs
Details

 10-05-2007
2.50
Reinforce nose gear tabs
Details
       

 10-05-2007
3.00
Drill hole in fuselage for torque tube
Details

 10-05-2007
0.50
Cut nose gear door into 2 halves
Details
     

 10-05-2007
1.50
Cut fuselage for main spar
Details

 10-04-2007
3.00
Install nose gear doors
Details
       

 10-04-2007
1.50
Install NG captivator
Details
       

 10-04-2007
3.00
Install Canard
Details
       

 10-04-2007
2.00
Glass end rib on canard tips
Details
       

 10-03-2007
3.00
Prepare Nose gear door
Details
     

 10-03-2007
1.50
Prepare canard for installation
       

 10-03-2007
2.00
Install overcenter linkage
Details
       

 10-03-2007
4.00
Install canard wing tips
Details

 10-02-2007
2.50
Installed elevator counterweights
Details

 10-02-2007
3.00
Install nose gear
Details
       

 10-02-2007
2.00
Glass fuel baffle material
Details
       

 10-02-2007
0.50
Cut canard bulkhead slot for Nose Gear
Details
     

 10-01-2007
3.00
Install Canard hinge arms and center hinge
Details
       

 10-01-2007
2.50
Canard attachment reinforcement
Details
       

 09-28-2007
2.50
Keel stiffening layups
Details
       

 09-28-2007
1.00
Install nut plates for keel NG access
Details
       

 09-28-2007
1.50
Fabricate oil cooler duct
Details
     

 09-27-2007
2.50
Install MG & NG Hydraulic cylinders
Details
       

 09-27-2007
1.50
Install Keel
Details
       

 09-27-2007
2.50
Install elevator hinges
Details
       

 09-27-2007
2.50
Install Canard hinge arms
Details
       

 09-26-2007
1.50
Prepare for Engine cooling NACA scoops
Details
     

 09-26-2007
1.50
Install oil cooler NACA scoop
Details
       

 09-26-2007
1.00
Install Marker Beacon Antenna
Details
       

 09-26-2007
2.00
Glue Engine cooling NACA ducts in
Details
       

 09-26-2007
1.00
Glass Nose gear access hole in keel
Details
     

 09-26-2007
0.50
Cut hole for oil cooler NACA duct
Details
       

 09-25-2007
2.00
Keel nose gear access hole
Details
     

 09-25-2007
0.50
Install upper aileron torque tube
       

 09-25-2007
2.00
Install lower Aileron torque tube
Details
     

 09-25-2007
0.50
Drill control stick access holes
Details
     

 09-25-2007
1.00
Cut out landing light and nose gear holes.
Details
     

 09-25-2007
4.00
Cut engine cooling and fresh air NACA scoop holes
Details
     

 09-24-2007
1.00
Remove Keel from fast Build Fuselage
Details
       

 09-24-2007
2.00
Glass wooden hard points onto keel
Details
       

 09-24-2007
1.50
Front Aileron Torque tube
Details
       

 09-24-2007
0.50
Cut out nose access cover
Details
     

 09-24-2007
2.50
Cut out dog house
Details
     