KitLog pro

Powered By Kitlog Pro v2.0

EDWARD'S WEB SITE
Work Logs Found: 194
Category Work Time: 798 Hours
 Date
Hours
Work Log Summary

Details

 10-03-2011
4.00
added reinforcement between longerons and wing rea
Details
     

 10-02-2011
4.00
connected aileron push rodes and ran Nav light wir
Details
       

 10-01-2011
4.00
Layed out angle songeron extension for canopy slid
Details
       

 09-28-2011
4.00
covered port and stbd arm rests with cork and fabr
Details
     

 09-27-2011
3.00
Continued work on seat belt brackets
Details
     

 09-26-2011
4.00
fabricated port seat belt bracket
Details
     

 09-24-2011
3.00
Drilled F-7 and mounted to F-6
Details
       

 09-23-2011
6.00
rebuilt F-12
Details
       

 09-20-2011
4.00
continued fitting upper edge to fin skin
Details
       

 09-18-2011
2.00
fit fin skin to spar and began drilling
Details
     

 09-15-2011
4.00
dimpled upper skin, clamped all and riveted
Details
       

 09-14-2011
5.00
Fit upper rudder skin and drilled
Details
       

 09-13-2011
4.00
began fabrication of aft pos lijght mount
Details
       

 09-12-2011
2.00
fit bottom skin to rudder and drilled
Details
       

 09-11-2011
4.00
Continued lay up of rudder spar, ribs and lower sk
Details
       

 09-11-2011
0.10
additional pics
Details
       

 09-10-2011
4.00
layout and cut bottom rudder skins
Details
       

 08-06-2011
3.00
cut fin and rudder skins and shaped each
Details
     

 08-04-2011
4.00
began mounting fin fwd spar
Details
       

 08-01-2011
3.50
shaped rudder lower rib
Details
       

 08-01-2011
2.00
routed stbd rudder cable.
Details
       

 07-28-2011
4.00
fabbed rudder hinges and ift to rudder and fin spa
Details
       

 07-25-2011
4.00
painted panel cover, cut inst panel
Details
       

 07-21-2011
5.00
cut elevator push rod to length and fit end fittin
Details
       

 07-20-2011
4.00
shaped inst panel template
Details
     

 07-19-2011
5.00
cut bows and inst. panel cover
Details
       

 07-15-2011
2.00
added non skid to cockpit floor
Details
     

 07-14-2011
4.00
fabricated stbd armrest and side panels
Details
       

 07-13-2011
4.00
fabricated port cockpit armrest and side panel
Details
       

 07-12-2011
4.00
made aft rudder cable clamps and routed port cable
Details
       

 07-12-2011
0.10
additional pics of rudder cable installation
Details
       

 07-10-2011
0.10
rudder pedal addtnl pics
Details
       

 07-10-2011
5.00
located rudder pedals and checked layout
Details
       

 07-09-2011
2.00
drilled rudder pedal mount plate
Details
       

 06-05-2011
3.00
remade aft side skin with new access panel
Details
       

 06-04-2011
4.00
made aft port side skin and access panel
Details
       

 06-03-2011
4.00
riveted cntr bottom and side skins in place
Details
       

 06-02-2011
8.00
constructed splice section for bottom skin
Details
       

 05-31-2011
5.00
cut fit and drilled port side skin
Details
     

 05-30-2011
4.00
fit and shaped cntr bottom skin
Details
       

 05-26-2011
5.00
rivet stabilizer
Details
       

 05-25-2011
3.00
drill and dimple stabilizer skins and frame
Details
       

 05-22-2011
4.00
shaping 2nd stabiliser skin
Details
       

 05-21-2011
5.00
assemble spar tip ribs and shape 1st skin
Details
       

 05-20-2011
4.00
added braces to aft longerons and added fixed nuts
Details
     

 05-19-2011
4.00
riveted spars
Details
       

 05-18-2011
6.00
shaping stabilizer spars
Details
       

 05-16-2011
4.00
shaped horizontal brace for stabilizer area
Details
       

 05-15-2011
6.00
set up shop a/c
Details
       

 05-14-2011
6.00
riveting aft bottom skin
Details
       

 05-13-2011
5.00
drill and clamp bottom skin
Details
       

 05-12-2011
6.00
riveting top skin
Details
       

 05-11-2011
0.10
photo of longeron splice plates
       

 05-11-2011
0.10
more photos of top skin assy
Details
       

 05-11-2011
5.00
locate F8 and F9 and start top skin
Details
       

 05-10-2011
0.10
more pictures of rear fuselage set up
Details
       

 05-10-2011
0.10
more pics of rear fuslage set up
Details
       

 05-10-2011
0.10
more fuselage set up photos
Details
       

 05-10-2011
6.00
continued set up of assy fixture for rear fuselage
Details
       

 05-09-2011
1.50
shaped bottom flanges
Details
       

 05-09-2011
0.10
more bottom skin photos
       

 05-09-2011
6.00
made assembly fixture for rear fuselage
Details
       

 05-09-2011
0.50
bending bottom skin flanges
Details
       

 03-27-2011
4.00
added fwd floor
Details
     

 03-26-2011
3.00
added floor supports
Details
       

 03-24-2011
2.00
added side angle supports at cockpit seat area
Details
       

 03-23-2011
5.00
riveted fwd bottom skin
Details
       

 03-22-2011
6.00
Bent and fit center bottom
Details
       

 03-21-2011
4.00
fit forward bottom in place
Details
       

 03-21-2011
0.10
additional pics
       

 03-20-2011
3.00
Flipped fuselage onto sawhorse to fit bottom skin
Details
       

 03-19-2011
6.00
Backdrilled and bolted F-5 and riveted
Details
       

 03-18-2011
3.00
Riveted F-3 in place
Details
       

 03-17-2011
7.00
finished firewall connection
Details
       

 03-17-2011
0.10
additional assy pics
       

 03-16-2011
6.00
began clamping and assembling firewall to longeron
Details
       

 03-14-2011
6.00
Received 1 1/2" angle cut upper longerons
Details
       

 03-14-2011
2.50
cut and shaped rudder control horn
Details
       

 03-13-2011
6.00
revised and attached lower longerons
Details
       

 03-12-2011
5.00
Fit F-10 bearings and mounted yoke
Details
       

 03-11-2011
2.00
drilled and shaped firewall side angles
Details
       

 03-10-2011
1.50
Mounted longeron feet
Details
       

 03-10-2011
2.00
more longeron foot pics
Details
       

 03-09-2011
5.00
Cut 3/!6" x 1 1/2" x 1 1/2" angle for lower longer
Details
       

 03-08-2011
5.00
cut .020. center wing skin
Details
       

 03-08-2011
0.10
additional pics of F-6
       

 03-07-2011
5.00
completed access hole in floor
Details
       

 03-05-2011
6.00
Removed temporary cntr wing floor
Details
       

 01-25-2011
0.50
attached AN366F-428A nuts to wing rear spars
Details

 01-24-2011
5.00
created dual wing cradle
Details
       

 01-23-2011
8.00
completed riveting cntr ribs and cut cntr temporar
Details
       

 01-22-2011
8.00
completed left wing and began cntr section
Details
       

 01-21-2011
8.00
began fit up of left leading edge
Details
       

 01-20-2011
7.00
riveted both elevators
Details
       

 01-18-2011
7.50
drilled and clecoed left elevator
Details
       

 01-17-2011
3.50
cut final horizontal stab blank
Details
       

 01-16-2011
5.00
dimpled aileron and riveted
Details
       

 01-15-2011
7.00
dimpled top skins
Details
       

 01-14-2011
6.00
drilled inboard top left wing skin
Details
       

 01-13-2011
8.00
fabricated pitot tube mounting plate
Details
       

 01-12-2011
7.00
drilled wing ribs to match bottom skin
Details
       

 01-11-2011
8.00
fit left wing ribs and rear spar
Details
       

 01-10-2011
6.50
fit leading edge to left wing
Details
       

 01-09-2011
3.50
fabricated clamps and installed tubing and wiring
Details
       

 01-08-2011
2.50
drilled rib angles and attached wing front ribs
Details
       

 01-07-2011
5.00
Layed out fuselage bottom and top panels
Details
       

 01-07-2011
2.00
layed out and cut wing leading edge and bent curve
Details
       

 01-06-2011
3.00
began laying out wing front ribs for assy
Details
       

 01-05-2011
3.00
unpacked AZ parts and prepared wing spar
Details
       

 01-05-2011
2.00
finished brake assy and set up storage as well
Details
       

 01-04-2011
7.00
finished bending brake layout
Details
       

 01-02-2011
4.00
started 8' brake assembly
Details
       

 11-14-2010
4.00
Rermade F-12 and tail wheel bracket
Details
       

 11-13-2010
5.00
Completed F-12 bulkhead
Details
       

 11-10-2010
3.00
riveted fin spar
Details
       

 11-09-2010
5.00
Fabricated Fin spar
Details
       

 11-06-2010
4.00
cut and formed cntr wing root ribs and one skin
Details
     

 11-05-2010
3.00
cut stabilizer fairings
Details
       

 11-04-2010
4.00
fabbed air vent door and attached to box
Details
       

 11-03-2010
6.00
formed fin top edge
Details
       

 11-03-2010
0.10
additional pics of fin edge forming
Details
       

 11-02-2010
2.00
made first try for fin top edge
Details
       

 11-02-2010
0.01
Fin spar dwg details
Details
       

 10-30-2010
4.00
Fabricated rudder spar
Details
       

 10-29-2010
4.00
Fin front spar
Details
       

 09-12-2010
5.50
Redrew and recut main fuel tank body
Details
       

 09-11-2010
3.00
Made fuel tank bends
Details
     

 09-10-2010
3.00
Layed out and cut out first two fuel tank blanks
Details
     

 09-09-2010
4.00
located, adapted and attached 2" inlet to carb hea
Details
       

 09-08-2010
4.00
Recut and redid the carb heat box
Details
       

 09-07-2010
5.00
carb heat box
Details
     

 09-06-2010
3.00
layed out and cut .020 carb heat box
Details
     

 09-05-2010
3.00
cut 0.020 heat shrouds, cut and shaped .032 inspec
Details
       

 09-04-2010
4.00
sorted and packed components for ship to Fla
Details
       

 09-03-2010
3.00
Cut, drilled and shaped F2 and F4
Details
       

 09-02-2010
5.00
Cut shpaed and assembled F6
Details
       

 09-01-2010
4.00
Shaped F3, F5 bending forms
Details
       

 08-31-2010
5.00
finished rudder ribs and cut gussets
Details
       

 08-30-2010
5.00
poured couterbalance lead
Details
       

 08-29-2010
4.00
Continued working on Stabilizer
Details
       

 08-28-2010
5.00
cut and formed stabilizer ribs
Details
       

 08-24-2010
4.00
drilled, riveted and completed brake
Details
       

 08-23-2010
3.00
cut angle for bending brake
Details
       

 07-25-2010
3.00
Added notes to pdf manual
Details
       

 07-22-2010
3.00
added notes and highlights to manual pdf
Details
       

 07-20-2010
3.00
Combined pdf pages into one file
Details
       

 07-17-2010
0.50
ordered floating nuts
Details

 07-11-2010
5.00
Cut C-3 thru C-6 seat supports
Details
       

 07-10-2010
3.00
Homemade bending brake
Details
       

 07-08-2010
4.00
Formed F-7 and F-12
Details
     

 07-07-2010
3.00
cut F-7 and F-12 shaping patterns
Details

 07-06-2010
5.00
Worked on F-8, F-9, F-10
Details
       

 07-05-2010
6.50
cut F-7 cut and formed floor supports
Details
       

 07-04-2010
6.00
Formed Bulkhead F-9
Details
       

 07-03-2010
6.00
Formed F-8
Details
       

 07-02-2010
4.00
Cut 1.5" ANGLE and installed to Firewall
Details
       

 06-26-2010
6.00
Cut and formed firewall
Details
       

 06-25-2010
4.00
Transferred bulkhead patterns to poster board
Details
       

 06-19-2010
3.00
Scanned manual to memory stick
Details
       

 06-12-2010
1.00
First EAA technical consultation
Details
       

 05-07-2010
1.50
Reviewed previous logbook entries and added info
Details

 05-02-2010
5.00
trimmed bellcrank support to eliminate interferenc
Details
       

 04-30-2010
4.00
riveted aileron hinges in place
Details
       

 04-29-2010
7.00
cut and threaded bellcrank control rods
Details
       

 04-26-2010
7.00
Fabricated bellcranks and revised aileron hinges
Details
       

 04-25-2010
5.00
Fabricate bellcrank blanks
Details
       

 04-20-2010
7.00
shaped, drilled and riveted rt. aileron
Details
     

 04-19-2010
6.00
trimmed right aileron blank and cut hinges
Details
       

 04-18-2010
2.00
Measured and evaluated right aileron
Details
     

 04-16-2010
4.00
Completed forming left wing front ribs and center
Details
     

 04-15-2010
6.00
Finished shaping left wing and center rib blanks.
Details
       

 04-14-2010
7.00
Cut wing and center secrion rib blanks and began f
Details
     

 04-06-2010
5.00
Formed dimplig blocks for wing spar ribs
Details
     

 02-20-2010
5.50
cut forming pattern for wing ribs
Details
     

 02-19-2010
3.00
Laminated hardwood to 1 1/4" for dimpling dies
Details

 02-18-2010
2.00
Purchased wood supplies to make forming blocks
Details

 02-16-2010
6.50
made cut patterns and forming dies
Details
       

 02-16-2010
2.00
Added vise to bench
Details
     

 02-15-2010
4.50
Match drilled rib attachment angles to left spar
Details
       

 02-14-2010
7.00
Removed left spar rib attachment angles
Details
       

 02-14-2010
2.00
Mounted belt sander to tool cart
Details

 02-08-2010
2.50
sorted and stowed bolts and nuts recv'd on EF002
Details

 02-08-2010
1.00
Mount rib attachment angles
Details
       

 02-02-2010
6.00
Completed match drilling rib attach angles
Details
       

 02-01-2010
7.00
Cut replacement rib attachement angles
Details
       

 01-28-2010
8.00
Added light over work table
Details

 01-12-2010
8.00
Built bridge table between 1 & 2
Details
       

 01-10-2010
6.00
Assembled tool cart for sander and bandsaw
Details
     

 12-14-2009
2.00
Selected and ordered repair materials
Details
     

 12-13-2009
1.00
Reviewed P. Beck email
Details
       

 12-12-2009
6.00
Examined salvaged spars for needed repairs
Details
       

 12-06-2009
8.00
built assembly tables
Details
       

 12-05-2009
8.00
built assembly table
Details
     

 12-04-2009
8.00
Built assembly table
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.