Date
|
Hours
|
Work Log Summary
|
Details
|
05-26-2009
|
1.00
|
PICTURES OF FINISHED PLANE
|
|
|
|
05-26-2009
|
68.00
|
final assembly
|
Details
|
|
|
05-26-2009
|
3.00
|
FAA INSPECTION!!!
|
Details
|
|
|
05-17-2009
|
12.00
|
Put wings on
|
Details
|
|
|
05-17-2009
|
1.00
|
Moved plane to hangar in Wahpeton
|
Details
|
|
|
05-16-2009
|
2.00
|
Moved plane to hangar
|
Details
|
|
|
05-08-2009
|
3.00
|
Started the engine
|
|
|
|
05-02-2009
|
8.00
|
Paint, protective tape, and baffling
|
Details
|
|
|
05-01-2009
|
6.00
|
Finished installing the tail and tail light
|
Details
|
|
|
04-29-2009
|
5.00
|
Installed panel
|
Details
|
|
|
04-28-2009
|
12.00
|
Sanded cowl and painted it
|
Details
|
|
|
04-27-2009
|
6.00
|
Sanding pinholes out of cowling
|
|
|
|
04-25-2009
|
8.00
|
Painted fuse
|
Details
|
|
|
04-15-2009
|
5.00
|
Painted elevators
|
Details
|
|
|
04-13-2009
|
6.00
|
Painted horizontal stabilizer
|
Details
|
|
|
04-11-2009
|
6.00
|
Painted flaps
|
Details
|
|
|
04-10-2009
|
3.00
|
Painted left aileron
|
|
|
|
04-09-2009
|
4.00
|
Sanded wing tip and finished right wing
|
|
|
|
04-09-2009
|
4.00
|
Painted right aileron
|
Details
|
|
|
04-07-2009
|
6.00
|
Stripped and sanded wing
|
|
|
|
04-06-2009
|
4.00
|
Stripped wing
|
|
|
|
04-05-2009
|
9.00
|
Painted white on right wing
|
Details
|
|
|
04-04-2009
|
5.00
|
Painted orange on right wing
|
Details
|
|
|
04-03-2009
|
3.00
|
Painted trim tab
|
Details
|
|
|
04-02-2009
|
4.00
|
Primed right wing
|
Details
|
|
|
03-30-2009
|
3.00
|
Cowl
|
Details
|
|
|
03-28-2009
|
2.00
|
Lower cowl mount
|
Details
|
|
|
03-27-2009
|
3.00
|
Oil Door
|
Details
|
|
|
03-27-2009
|
5.00
|
Built a paint booth in the shop
|
Details
|
|
|
03-16-2009
|
3.00
|
Body work to right wing tip
|
Details
|
|
|
03-09-2009
|
3.00
|
Left wing tip
|
Details
|
|
|
03-08-2009
|
5.00
|
Installed left wing tip
|
Details
|
|
|
03-07-2009
|
1.00
|
Log catchup page 2
|
Details
|
|
|
03-07-2009
|
60.00
|
Log catchup
|
Details
|
|
|
01-29-2009
|
4.00
|
Primed right elevator
|
Details
|
|
|
01-28-2009
|
4.00
|
Primed vert
|
Details
|
|
|
01-21-2009
|
10.00
|
Canopy and Press plenum
|
Details
|
|
|
01-17-2009
|
7.00
|
Canopy
|
Details
|
|
|
01-14-2009
|
3.00
|
Oil lines and wing tips
|
Details
|
|
|
01-10-2009
|
6.00
|
Plenum and emp fairing
|
Details
|
|
|
01-07-2009
|
4.00
|
Wing tips and baffling
|
Details
|
|
|
01-06-2009
|
3.00
|
Cowl
|
Details
|
|
|
01-03-2009
|
6.00
|
Oil cooler tips and cowl
|
Details
|
|
|
01-02-2009
|
3.00
|
Hor tip and cowl
|
Details
|
|
|
12-29-2008
|
3.00
|
Cowl
|
Details
|
|
|
12-28-2008
|
4.00
|
Cowl
|
Details
|
|
|
12-27-2008
|
4.00
|
Cowl
|
Details
|
|
|
12-26-2008
|
6.00
|
More work with the cowl and tips
|
Details
|
|
|
12-21-2008
|
5.00
|
Work with horiziontal tips and top cowling
|
Details
|
|
|
12-13-2008
|
25.00
|
canopy
|
Details
|
|
|
12-06-2008
|
5.00
|
Rudder pedals
|
Details
|
|
|
10-07-2008
|
12.00
|
Canopy
|
Details
|
|
|
09-21-2008
|
5.00
|
Engine and canopy
|
Details
|
|
|
09-20-2008
|
3.00
|
Windscreen
|
Details
|
|
|
09-17-2008
|
4.00
|
misc.
|
Details
|
|
|
09-16-2008
|
0.30
|
Starter
|
Details
|
|
|
09-13-2008
|
8.00
|
Prop spacer
|
Details
|
|
|
09-12-2008
|
3.00
|
Windscreen
|
Details
|
|
|
09-11-2008
|
6.00
|
Windscreen
|
Details
|
|
|
09-10-2008
|
2.00
|
Windscreen
|
Details
|
|
|
09-09-2008
|
1.00
|
Windscreen
|
Details
|
|
|
09-05-2008
|
30.00
|
Log Catchup
|
Details
|
|
|
09-04-2008
|
3.00
|
Canopy
|
Details
|
|
|
09-03-2008
|
2.00
|
Put Her On Gear
|
Details
|
|
|
09-02-2008
|
4.00
|
Hung Engine
|
Details
|
|
|
08-30-2008
|
6.00
|
Made Fuel Selector Valve Plackard
|
Details
|
|
|
07-25-2008
|
20.00
|
Engine Building
|
Details
|
|
|
05-29-2008
|
2.00
|
ENGINE WAS DELIVERED!!!!!!!!!
|
Details
|
|
|
05-24-2008
|
8.00
|
Fired up radios
|
Details
|
|
|
05-18-2008
|
4.00
|
Fired up Dynon
|
Details
|
|
|
05-02-2008
|
9.00
|
Painted the panel
|
Details
|
|
|
05-01-2008
|
9.00
|
9 hours of wiring
|
Details
|
|
|
04-30-2008
|
5.00
|
More wiring
|
Details
|
|
|
04-28-2008
|
8.00
|
Wiring, flap pot, primed panel
|
Details
|
|
|
04-27-2008
|
5.00
|
Wired and tested the intercom
|
Details
|
|
|
04-26-2008
|
3.00
|
More wiring
|
Details
|
|
|
04-23-2008
|
4.00
|
More wiring and installed Dynon
|
Details
|
|
|
04-22-2008
|
4.00
|
Wiring and install radio stack
|
Details
|
|
|
04-21-2008
|
2.00
|
Cut panel
|
Details
|
|
|
04-20-2008
|
7.00
|
Finished slider and made radio stack
|
Details
|
|
|
04-17-2008
|
5.00
|
Canopy and stick grips
|
Details
|
|
|
04-15-2008
|
4.00
|
Canopy work and rudder cap
|
Details
|
|
|
04-13-2008
|
5.00
|
Fitting windscreen
|
Details
|
|
|
04-10-2008
|
4.00
|
Canopy blocks and wiring
|
Details
|
|
|
04-09-2008
|
4.00
|
Vents
|
Details
|
|
|
04-08-2008
|
1.00
|
Canopy
|
Details
|
|
|
04-07-2008
|
4.00
|
Vents
|
Details
|
|
|
04-06-2008
|
5.00
|
Glued canopy to frame
|
Details
|
|
|
04-05-2008
|
8.00
|
Prepared canopy for glue
|
Details
|
|
|
04-03-2008
|
2.00
|
Sampled the sicaflex
|
Details
|
|
|
04-02-2008
|
4.00
|
Worked with wiring and canopy frame
|
Details
|
|
|
04-01-2008
|
4.00
|
Painted rollbar
|
Details
|
|
|
03-29-2008
|
4.00
|
Prepared interior for paint
|
Details
|
|
|
03-28-2008
|
8.00
|
Cut the canopy and clamped it to the frame
|
Details
|
|
|
03-27-2008
|
5.00
|
Prepared canopy frame
|
Details
|
|
|
03-18-2008
|
3.00
|
Received dynon
|
Details
|
|
|
03-10-2008
|
3.00
|
Hooked up rudder pedals
|
Details
|
|
|
03-09-2008
|
4.00
|
Riveted aft top skin
|
Details
|
|
|
03-01-2008
|
8.00
|
Fuel lines, strobe, elt,
|
Details
|
|
|
02-28-2008
|
4.00
|
Inventoried the finish kit
|
|
|
|
02-28-2008
|
2.00
|
Finish kit arrives
|
Details
|
|
|
02-22-2008
|
3.00
|
Dimpled top skins
|
Details
|
|
|
02-21-2008
|
3.00
|
Brakes
|
Details
|
|
|
02-14-2008
|
4.00
|
Static, wires
|
Details
|
|
|
02-05-2008
|
3.50
|
Fuselage and wings
|
Details
|
|
|
01-28-2008
|
3.00
|
Started aligning the wings.
|
Details
|
|
|
01-27-2008
|
6.00
|
Installed wings
|
Details
|
|
|
01-26-2008
|
9.00
|
Prepared for wings
|
Details
|
|
|
01-24-2008
|
4.00
|
Prepared and installed the main gear mounts
|
Details
|
|
|
01-22-2008
|
3.00
|
Installed flap controller
|
Details
|
|
|
01-20-2008
|
5.00
|
Cockpit
|
Details
|
|
|
01-19-2008
|
11.00
|
Primed and assembled seats
|
Details
|
|
|
01-16-2008
|
4.00
|
Started making seats and floors
|
Details
|
|
|
01-09-2008
|
4.00
|
Installed steps and prepared the tunnel cover
|
Details
|
|
|
01-08-2008
|
1.00
|
Primed baggage side covers and steps
|
Details
|
|
|
01-07-2008
|
4.00
|
Drilled steps and fitted skin stiffiners
|
Details
|
|
|
01-01-2008
|
6.00
|
Drill the aft fuselage deck
|
Details
|
|
|
12-27-2007
|
4.00
|
Finished riveting the lower fuse
|
Details
|
|
|
12-26-2007
|
4.00
|
Shot some rivets in the fuse
|
Details
|
|
|
12-17-2007
|
4.00
|
Started shooting rivets in fuse
|
Details
|
|
|
12-16-2007
|
7.00
|
Reassembled fuselage
|
Details
|
|
|
12-15-2007
|
6.00
|
More prep
|
Details
|
|
|
12-13-2007
|
2.00
|
Countersinking longerons
|
Details
|
|
|
12-11-2007
|
4.00
|
More preparation of parts
|
Details
|
|
|
12-10-2007
|
3.00
|
Dimpled bottom skin
|
Details
|
|
|
12-09-2007
|
5.00
|
Took apart fuse
|
Details
|
|
|
12-08-2007
|
6.00
|
Framed up the baggage area
|
Details
|
|
|
12-06-2007
|
3.00
|
Drilled floor stiffeners to skin
|
Details
|
|
|
12-02-2007
|
8.00
|
Assemble rudder pedals and install.
|
Details
|
|
|
11-29-2007
|
3.00
|
Rudder pedals
|
Details
|
|
|
11-11-2007
|
4.00
|
Bottom skin
|
Details
|
|
|
11-10-2007
|
2.00
|
F-9101
|
Details
|
|
|
09-08-2007
|
1.00
|
Clean shop
|
|
|
|
09-07-2007
|
10.00
|
9/7-10/7 miscellaneous forward fuse
|
Details
|
|
|
09-04-2007
|
4.00
|
Added firewall and foward floor pan
|
Details
|
|
|
09-01-2007
|
2.00
|
Drilled longerons
|
Details
|
|
|
08-31-2007
|
4.00
|
Added main longerons to the fuse
|
Details
|
|
|
08-29-2007
|
4.00
|
Bent conical bends in fuse bottom
|
Details
|
|
|
08-28-2007
|
5.00
|
Installed longerons and arm rests
|
Details
|
|
|
08-27-2007
|
5.00
|
Installed floor and forward side skins
|
Details
|
|
|
08-13-2007
|
4.00
|
Riveted skin to seat ribs
|
Details
|
|
|
08-11-2007
|
8.00
|
Dimpled and primed center fuse bottom skin
|
Details
|
|
|
08-10-2007
|
4.00
|
Prepared seat ribs for primer
|
Details
|
|
|
07-26-2007
|
4.00
|
Drilled center fuselage
|
Details
|
|
|
07-25-2007
|
5.00
|
Pre-assembly of center section
|
Details
|
|
|
07-16-2007
|
3.00
|
Started preping seat ribs
|
Details
|
|
|
07-05-2007
|
3.50
|
Rivet skins
|
Details
|
|
|
07-02-2007
|
2.00
|
Riveting tailcone
|
Details
|
|
|
06-25-2007
|
5.00
|
Dimpled tail cone
|
|
|
|
06-13-2007
|
4.00
|
Primed tailcone parts
|
Details
|
|
|
06-07-2007
|
5.00
|
Assembled and drilled tailcone
|
Details
|
|
|
05-26-2007
|
5.00
|
Primed rest of bulkheads, bent stringers
|
Details
|
|
|
05-18-2007
|
3.00
|
Assembled F-705 bulkhead
|
Details
|
|
|
05-17-2007
|
4.00
|
F-705 bulkhead
|
Details
|
|
|
05-06-2007
|
3.00
|
Worked on next bulkhead
|
Details
|
|
|
05-05-2007
|
5.00
|
Finished preparing the center bulkhead
|
Details
|
|
|
04-15-2007
|
6.00
|
Make parts for center section
|
Details
|
|
|
04-14-2007
|
5.00
|
Started assembling the center section
|
Details
|
|
|
04-13-2007
|
5.00
|
Riveted firewall
|
Details
|
|
|
04-10-2007
|
6.00
|
Finished drilling firewall
|
Details
|
|
|
04-09-2007
|
2.00
|
Finished making reinforcement plates for the firew
|
Details
|
|
|
04-07-2007
|
9.00
|
Finished inventory and started the firewall
|
Details
|
|
|
04-05-2007
|
5.00
|
Hauled home and inventoried fuselage
|
Details
|
|
|
03-24-2007
|
12.00
|
Finished wings totally
|
Details
|
|
|
03-17-2007
|
6.00
|
Finished the right wing
|
|
|
|
03-16-2007
|
8.00
|
Riveted right bottom skins
|
Details
|
|
|
03-15-2007
|
8.00
|
Prepared bottom skins
|
Details
|
|
|
03-14-2007
|
4.00
|
Dimpled bottom wing skins
|
Details
|
|
|
03-13-2007
|
6.00
|
Installed right flap and aileron
|
Details
|
|
|
03-11-2007
|
5.00
|
Finished left wing except for skins.
|
Details
|
|
|
03-10-2007
|
11.00
|
Mounted left flap and aileron
|
Details
|
|
|
03-08-2007
|
6.00
|
Primed parts for right flap
|
Details
|
|
|
03-06-2007
|
6.00
|
Finished drilling right flap
|
Details
|
|
|
03-04-2007
|
5.00
|
Riveted skins to left flap
|
Details
|
|
|
03-03-2007
|
4.00
|
Rivet left flap skeleton
|
Details
|
|
|
03-03-2007
|
0.00
|
Powdercoat gun
|
Details
|
|
|
02-28-2007
|
4.00
|
Dimpled and primed the left flap skeleton
|
Details
|
|
|
02-24-2007
|
3.00
|
Built some saw horses
|
Details
|
|
|
02-23-2007
|
4.00
|
Drilled left flap
|
Details
|
|
|
02-13-2007
|
4.00
|
Pre-assembled left flap skeleton
|
|
|
|
02-10-2007
|
6.00
|
Finished table to build ailerons
|
|
|
|
02-06-2007
|
4.00
|
Riveted the left aileron
|
|
|
|
02-05-2007
|
4.00
|
Riveted right aileron and primed left
|
Details
|
|
|
02-04-2007
|
6.00
|
Finished clecoing right aileron
|
Details
|
|
|
02-03-2007
|
6.00
|
Drove to Madison SD.
|
Details
|
|
|
01-27-2007
|
8.00
|
Start ailerons
|
Details
|
|
|
01-25-2007
|
3.00
|
Riveted gap fairings and hinges
|
Details
|
|
|
01-24-2007
|
3.00
|
Riveted on aileron hinges and primed flap hinges
|
Details
|
|
|
01-23-2007
|
4.50
|
Drilled left wing hinges
|
Details
|
|
|
01-20-2007
|
6.00
|
Finished right wing
|
Details
|
|
|
01-19-2007
|
4.00
|
Drilled hinge support brackets
|
Details
|
|
|
01-17-2007
|
4.00
|
Riveted hinge brackets
|
Details
|
|
|
01-16-2007
|
3.00
|
Rivet the stiffeners to the skin
|
Details
|
|
|
01-14-2007
|
8.00
|
Riveted top skin on the right wing
|
Details
|
|
|
01-13-2007
|
12.00
|
Sealed right tank
|
Details
|
|
|
01-13-2007
|
5.00
|
Riveted leading edge (Right)
|
Details
|
|
|
01-06-2007
|
9.00
|
Prepared right fuel tank for sealant
|
Details
|
|
|
01-05-2007
|
4.00
|
tank
|
Details
|
|
|
01-03-2007
|
4.00
|
Brackets and baffle
|
|
|
|
01-01-2007
|
3.00
|
Right fuel tank
|
Details
|
|
|
12-31-2006
|
2.50
|
Right leading edge
|
Details
|
|
|
12-30-2006
|
4.50
|
Wing skins and stringer right wing
|
Details
|
|
|
12-28-2006
|
5.00
|
Rivet right wing skeleton
|
Details
|
|
|
12-27-2006
|
6.00
|
Started right wing
|
Details
|
|
|
12-19-2006
|
5.00
|
Riveted top skins and stringers
|
Details
|
|
|
12-17-2006
|
6.00
|
Riveted the leading edge
|
Details
|
|
|
12-16-2006
|
4.00
|
Prime leading edge and top skins
|
Details
|
|
|
12-14-2006
|
5.00
|
Dimpled skins and ribs for the leading edge
|
Details
|
|
|
12-11-2006
|
5.00
|
Finished left fuel tank
|
Details
|
|
|
12-10-2006
|
5.00
|
More fuel tank crap
|
Details
|
|
|
12-09-2006
|
8.00
|
More fuel tank fun
|
Details
|
|
|
12-08-2006
|
3.00
|
Started tank assembly
|
Details
|
|
|
12-07-2006
|
4.00
|
Cleaned up tank parts
|
|
|
|
12-05-2006
|
4.00
|
Deburred and dimpled tank
|
Details
|
|
|
11-26-2006
|
5.00
|
Drilled fuel tank
|
Details
|
|
|
11-25-2006
|
7.00
|
Pre-assembly of tank
|
Details
|
|
|
11-24-2006
|
10.00
|
Drilled left wing skins fitted L.E.
|
Details
|
|
|
11-19-2006
|
7.00
|
Assembled the left wing skeleton
|
Details
|
|
|
11-18-2006
|
9.00
|
Prime rear spars
|
Details
|
|
|
11-14-2006
|
2.50
|
Start rear spar
|
Details
|
|
|
11-14-2006
|
2.50
|
Finished main spar prep
|
Details
|
|
|
11-12-2006
|
3.00
|
Prep main spars
|
Details
|
|
|
11-09-2006
|
5.50
|
Prep main spars
|
Details
|
|
|
11-07-2006
|
4.00
|
Prep main spars
|
Details
|
|
|
10-07-2006
|
2.00
|
Inventoried wing kit
|
Details
|
|
|
09-02-2006
|
5.00
|
Finished elevators
|
Details
|
|
|
08-31-2006
|
3.00
|
Work on trim tab
|
Details
|
|
|
08-23-2006
|
2.00
|
Finish elevator t.e.
|
Details
|
|
|
08-12-2006
|
7.00
|
Primed and began assembly on left elevator
|
Details
|
|
|
08-11-2006
|
3.00
|
Pre-assembly of left elevator
|
|
|
|
08-07-2006
|
0.20
|
Ordered wing kit from vans
|
Details
|
|
|
07-30-2006
|
6.00
|
Rivet right elevator
|
Details
|
|
|
07-29-2006
|
5.00
|
Finished rudder, started right elevator
|
Details
|
|
|
07-26-2006
|
5.00
|
Prime and start riveting rudder
|
Details
|
|
|
07-25-2006
|
5.00
|
Pre-assembly of rudder
|
Details
|
|
|
07-24-2006
|
8.00
|
Riveted rudder stiffeners
|
Details
|
|
|
07-15-2006
|
5.00
|
fitted ribs to rudder
|
Details
|
|
|
07-08-2006
|
5.00
|
Riveted vert together
|
Details
|
|
|
07-06-2006
|
3.00
|
Prepared vert for primer
|
Details
|
|
|
06-09-2006
|
4.10
|
Finished hor stab
|
Details
|
|
|
06-07-2006
|
0.00
|
Gerry Beck's P-51a Mustang flew for the first time
|
|
|
|
06-05-2006
|
4.00
|
finished right horizontal stab
|
Details
|
|
|
06-04-2006
|
5.50
|
Start riveting
|
Details
|
|
|
06-03-2006
|
4.00
|
Prime
|
Details
|
|
|
06-01-2006
|
6.00
|
Prep for primer
|
Details
|
|
|
05-30-2006
|
6.00
|
Countersink dimple hor stab
|
Details
|
|
|
05-25-2006
|
6.00
|
Horizontal subassembly and deburring
|
Details
|
|
|
05-20-2006
|
6.00
|
Cleco horizontal together
|
Details
|
|
|
05-17-2006
|
4.00
|
Deburring
|
Details
|
|
|
05-15-2006
|
4.00
|
Inventoried Empennage
|
Details
|
|