Work Logs Found:
160
Category Work Time:
1748 Hours
Date
Hours
Work Log Summary
Details
05-26-2007
0.00
On Floats
Details
05-12-2007
0.00
Valdez Short Field Competition
Details
03-28-2007
1.00
Test Flight
Details
03-20-2007
12.00
Ready for FAA Inspection
Details
03-19-2007
4.00
Finally got the strut forks
03-16-2007
10.00
Jury Struts
Details
03-14-2007
1.00
Leather Seats
Details
03-11-2007
4.00
Shoulder harnesses and Tires
Details
01-16-2007
16.00
Finishing up
Details
01-15-2007
20.00
Made Lift Struts
Details
01-14-2007
8.00
Landing light covers, flaps, ailerons back on
01-09-2007
16.00
Put tail feathers bck on
01-08-2007
8.00
Marker lights installed
01-07-2007
16.00
Tank cover - Sky light
Details
01-06-2007
16.00
Put on Wings and Prop
Details
12-31-2006
3.00
Outside with the Fuselage
Details
12-23-2006
10.00
Completed Fuselage
12-23-2006
4.00
Bushwheels and skis
Details
12-21-2006
12.00
Finished Cowling Installation
12-19-2006
12.00
Windsheild
Details
12-18-2006
12.00
Doors
Details
12-16-2006
8.00
Skylight
12-15-2006
1.00
Logo completed
Details
12-15-2006
12.00
Engine install
Details
12-11-2006
4.00
Hung rear passenger door
12-10-2006
6.00
Put on boot cowl / started on windshield
12-09-2006
2.00
Made carb heat shroud
Details
12-08-2006
6.00
Hung engine (cont.)
12-07-2006
6.00
Hung Engine
12-06-2006
1.00
Finished Logo
Details
12-05-2006
6.00
Firewall Preperation
Details
12-04-2006
4.00
Pulled engine off N6174D
Details
12-03-2006
6.00
More Painting - Flaps / Ailerons / Parts
12-02-2006
6.00
More painting
12-01-2006
6.00
Painted Doors/Cowling/Rudder
Details
11-29-2006
2.00
Masked rudder
11-28-2006
6.00
Masked cowling and doors
11-26-2006
6.00
Hung cowling and doors.
11-24-2006
12.00
Stripped and painted nose bowl, spinner, and cowl
Details
11-20-2006
12.00
Primed and painted boot cowl, doors, insp. covers
Details
11-19-2006
4.00
Painted Firewall
Details
11-18-2006
4.00
Firewall
Details
11-16-2006
4.00
AOSS shock struts from Burl's Aircraft
11-15-2006
4.00
White on Tail Feathers
11-13-2006
4.00
Sprayed Silver Tail Feathers/Flaps/Ailerons
11-11-2006
2.00
Sprayed Poly Brush Tail Feathers/Flaps/Ailerons
11-10-2006
12.00
Tail Feathers / Flaps / Ailerons
11-09-2006
12.00
Tail feathers / Flaps / Ailerons
11-08-2006
12.00
Poly brush / stitched / taped flaps and ailerons.
11-07-2006
8.00
Poly brush / stitched / taped flaps and ailerons.
Details
11-06-2006
12.00
Covered Tail Feathers / Flaps / Ailerons
11-05-2006
4.00
Stinson Maroon on Wings
11-04-2006
6.00
White on wings
11-03-2006
8.00
Silver on wings
11-02-2006
12.00
Inspection Covers and Tape on Wings
Details
10-30-2006
6.00
Wing Stitching - second knot (cont.)
Details
10-28-2006
6.00
Wing Stitching - second knot (cont.)
Details
10-27-2006
6.00
Wing Stitching - second knot
Details
10-26-2006
6.00
Wing Stitching - First stitch
Details
10-24-2006
12.00
Poly Brush on Wings
Details
10-21-2006
12.00
Wing Covering
Details
10-20-2006
8.00
Tank Covers
Details
10-19-2006
12.00
Tank covers
10-15-2006
4.00
Remote compass installation
10-12-2006
16.00
Wing tips, landing light covers
Details
10-09-2006
12.00
Final panel installation
Details
10-05-2006
12.00
Fuselage and landing gear painted
Details
10-03-2006
8.00
Logo
Details
10-02-2006
8.00
Masked fuselage
Details
09-27-2006
6.00
White on Fuselage
Details
09-25-2006
6.00
Silver on Fuselage
Details
09-24-2006
12.00
Second coat of pink
Details
09-22-2006
15.00
Fuselage fabric
Details
09-20-2006
10.00
Fuelage fabric
Details
09-13-2006
12.00
Cowling
Details
09-12-2006
12.00
Radio Box installation
Details
09-11-2006
15.00
Intrument installation
09-10-2006
12.00
Pulselite / Landing light wiring
Details
09-08-2006
15.00
Map Light installation
09-08-2006
8.00
Instument Wiring
Details
09-07-2006
12.00
Instrument Wiring
09-06-2006
16.00
Elevator cables
09-02-2006
12.00
Instrument installation and wiring
09-01-2006
6.00
Battery Box Installation
Details
08-22-2006
8.00
Elevator balance cables
Details
08-21-2006
12.00
Jack Screw and Elevator Balance Cables
08-19-2006
8.00
Installed ELT
Details
08-18-2006
12.00
Wired circuit breakers and switches
08-16-2006
16.00
Battery Installed
08-14-2006
8.00
Panel Intallation
08-12-2006
8.00
Panel installation
08-09-2006
8.00
More Insulation
08-07-2006
8.00
Insulation
08-04-2006
8.00
Interior panels
07-24-2006
8.00
Stringers
07-01-2006
8.00
Interio fabric / Panels
06-28-2006
8.00
Interior fabric
06-27-2006
8.00
Interior fabric
Details
06-26-2006
16.00
Head Liner Fabric
06-24-2006
8.00
Doors
06-23-2006
12.00
Pilot Door
Details
06-21-2006
16.00
Right Side Door
Details
06-16-2006
12.00
Welding Skylight and Doors
Details
06-13-2006
8.00
Skylight Superstructure
06-12-2006
8.00
Skylight Superstructure
06-11-2006
8.00
Skylight Superstructure
Details
06-07-2006
12.00
Brake lines / Master Cylinder
Details
06-06-2006
8.00
More Fuel Lines
06-05-2006
12.00
Fuel Flow Meter
Details
06-02-2006
8.00
Fuel Valve
Details
06-01-2006
12.00
Fuel Line Instalation
Details
05-28-2006
10.00
Raised Top Deck Structure (front)
05-26-2006
10.00
Fuel lines and selector valves
Details
05-25-2006
10.00
Fuel lines and selector valve
Details
05-23-2006
10.00
Raised Top Deck
05-22-2006
10.00
Raising Top Deck
Details
05-17-2006
12.00
Re-install floor boards and side panels
Details
05-16-2006
8.00
Flap handle
05-15-2006
6.00
Fuselage cables and pulleys - yoke
05-12-2006
10.00
Brakes
05-08-2006
10.00
Yokes - brakes
05-07-2006
15.00
Control Cable Routing
Details
05-03-2006
6.00
Hung Right wing
04-28-2006
1.00
Alaska Airmen's Association Trade Show
Details
04-27-2006
3.00
Hang right wing
04-24-2006
15.00
Flap and Aileron Controls
04-20-2006
6.00
Aileron Cables
04-06-2006
3.00
Aileron Bell Crank
04-04-2006
6.00
Flap Bell Cranks
03-15-2006
12.00
False Spar
Details
03-11-2006
21.00
Contol hinges on wings
Details
03-03-2006
24.00
Control surfaces (cont.)
Details
03-02-2006
24.00
Lay out control surfaces
Details
03-01-2006
21.00
Leading edge installation
Details
02-25-2006
12.00
Wired wings
Details
02-21-2006
18.00
Wing storage hatch
Details
02-11-2006
27.00
Landing lights
Details
02-08-2006
14.00
Tank installation
Details
02-07-2006
14.00
Tank straps and tank installation
Details
02-05-2006
12.00
Tank Bay riveting
Details
02-04-2006
12.00
Squaring Tank Bay
02-03-2006
12.00
Tank Bay installation
Details
01-30-2006
9.00
Tie Down Rings - Jury stut attach fittings
Details
01-25-2006
10.00
Strut Attach Fittings
01-19-2006
18.00
Wing Attach Fittings
Details
01-16-2006
12.00
Tail Rib rivets
01-15-2006
27.00
Rib Installation
Details
01-12-2006
4.00
Spars laid out
01-10-2006
14.00
Compression Members & Fittings
Details
01-04-2006
30.00
Compression members and spars
Details
01-01-2006
0.00
Super Cub rib comparision
Details
01-30-2005
9.00
Lower strut attach fittings.
Details
01-20-2005
36.00
Tail section welding
Details
01-03-2005
36.00
Doors
Details
12-17-2004
54.00
Rear Gear Fittings
Details
12-10-2004
42.00
Float Fittings
Details
11-22-2004
36.00
Cable brakets - Stringer tabs
Details
11-10-2004
60.00
Forward Gear Fittings
Details
10-15-2004
6.00
Fuselage project
Details
12-31-1969
1.00
Logo
Details
SITE NAVIGATION
Contact Builder
Davis Special Home
Category
# Logs
# Hours
All
160
1748
Avionics
9
95
Empennage
13
94
Engine
6
36
Fuselage
85
972
Wings
47
551