 02-27-2008
40.00
Completed main gear fairings, pants, intersect fai
Details

 02-13-2008
6.00
Installed the nose wheel pant & gear fairing
Details

 12-22-2007
3.00
Blocked air Cyl. 1/Fuel sender/Wheel pants
Details

 12-18-2007
3.00
Addressing high CHT's
Details
       

 12-11-2007
2.00
First flight!!!!!!!!!!!!!!!!!!!
Details
       

 12-10-2007
4.50
Buttoning everything up after inspection
Details
       

 12-08-2007
2.50
Got air worthiness certificate for N 417CT
Details
     

 12-07-2007
3.00
Condition inspection proir to DAR visit
Details

 12-06-2007
3.50
Final checklist before DAR inspection
Details
       

 12-04-2007
4.00
1st. engine run for N417 CT
Details
       

 12-03-2007
3.50
Nose gear tube changed- Starter & solenoid rewired
Details
       

 12-01-2007
4.00
Wiring & plumbing completed - Engine pre-oiled
Details
       

 11-30-2007
3.50
All probes wired-prop safety wired
Details
       

 11-29-2007
2.00
Installation of more upholstery
Details
       

 11-28-2007
4.00
Engine wiring-painted outside of cowl
Details
       

 11-27-2007
3.50
Cowl pins, cowl epoxied, left wing root fairing
Details
       

 11-26-2007
4.00
Weight & balance
Details

 11-25-2007
1.50
Begun installing interior
Details
       

 11-24-2007
3.00
Emptied fuel tanks-Put on inspection covers
Details
       

 11-23-2007
3.00
Installed oil door on cowl
Details
       

 11-22-2007
3.50
Installed man pressure, throttle & mixture cables
Details
       

 11-21-2007
4.00
Spinner finished-Starter wiring completed
Details
       

 11-20-2007
3.50
Worked on spinner & starter wiring
Details
       

 11-19-2007
4.00
Beginning spinner installation
Details
       

 11-17-2007
4.00
Plumbed fuel & oil-Wired alternator/starter
Details
       

 11-16-2007
3.00
Spinner installation begun
Details
       

 11-15-2007
3.00
Fuel & oil press. wired;Seat belts installed
Details
       

 11-14-2007
3.00
Carb heat muff & man pressure installed
Details
       

 11-13-2007
4.00
Hung exhaust & carb heat cable-Wired both mags
Details
       

 11-12-2007
4.00
Nut plates- hinge pins on cowl
Details

 11-09-2007
3.50
Hanging tail pipes-Installing cowl with hinges
Details
       

 11-08-2007
4.00
Cowl hinges, air box seals installed-Air scoop epo
Details
       

 11-07-2007
3.00
Fit cowl to air box/Fit side hinges
Details

 11-06-2007
3.50
Scoop glassed, cowl hinges, wing tip filled, etc
Details
       

 11-05-2007
4.00
Sanded air scoop, laid micro & fiber glass
Details
       

 11-02-2007
2.50
Air scoop fiberglassed-air box sealed
Details
     

 11-01-2007
3.50
Air box riveted-Foam ramp cut to shape
Details
       

 10-31-2007
3.00
Carb heat door, lever, & intake-Foam sealed in pla
Details
       

 10-30-2007
3.00
Foam fit to air intake-Manifold pressure installat
Details
       

 10-29-2007
1.00
Worked on air filter seal
Details

 10-26-2007
2.50
Air gasket remade using pro-seal-Mag blast tubes
Details
       

 10-25-2007
3.00
Cut & fit carb heat inlet & door
Details
       

 10-24-2007
3.50
Air box fit, drilled, & carb heat door fabricated
Details
       

 10-23-2007
4.00
Nut plates on top plate-Top plate fluted & bent
Details
       

 10-22-2007
3.50
Started work on filtered air box
Details

 10-19-2007
4.00
All air seals finished-Air filter removed from pla
Details
       

 10-18-2007
2.50
Worked on air seals on right nose
Details

 10-16-2007
3.00
Started on air box-glassed the gaps in inlet ramps
Details
       

 10-15-2007
2.50
Inlet ramps glassed in top cowl
Details

 10-12-2007
3.00
Front seals under construction
Details
       

 10-11-2007
3.00
Air seals on sides worked on
Details
       

 10-10-2007
3.50
Begun attaching air seals, some metal work
Details
     

 10-09-2007
3.50
More baffle work
Details
     

 10-08-2007
3.00
Baffles & more baffles
Details

 10-05-2007
3.50
Rear baffles riveted to side baffles
Details
       

 10-04-2007
4.00
Left side-floor-front baffles completed & mounted
Details
       

 10-03-2007
3.50
Left frnt, side and floor baffles assembled & rive
Details
     

 10-02-2007
3.00
Oil cooler mounting
Details
       

 10-01-2007
3.50
Oil cooler mounting begun
Details
       

 09-28-2007
3.50
Cowl nose filling-Fuel pump overflow-Baffle floor
Details
       

 09-27-2007
3.50
Air exit bracket - oil cooler brace worked on
Details
       

 09-26-2007
4.00
Exit air bracket - cabin heat muff
Details
       

 09-25-2007
4.00
Exit air atach brackets fabricated
Details
     

 09-21-2007
3.50
Side covers 904 bulkhead-Camlocks installed
Details
       

 09-20-2007
3.50
Installed cam lock receivers-Oil cooler brace dril
Details
       

 09-19-2007
3.00
Finished wind screen-Installed some cowl hinges
Details
     

 09-18-2007
3.00
Air inlet ramp installation/wind screen fairing wo
Details
       

 09-17-2007
4.00
Baffles trimmed last time?-Oil cooler brace-EIS pr
Details
       

 09-14-2007
3.00
Wind screen fairing-Fnt. bulkhead trimming
Details
       

 09-13-2007
3.50
Forward bulkhead fit to both floors
Details
       

 09-12-2007
3.50
Worked on Rt baffle floor/ wind screen
Details
       

 09-11-2007
3.00
More baffle work- Angles on Rt. & Lt. floors
Details
     

 09-10-2007
3.50
Baffle floors and forward side fitting
Details
       

 09-07-2007
3.00
Struggled with left & right baffle floors
Details
     

 09-06-2007
3.00
More baffle work
Details
       

 09-05-2007
3.00
Baffle-cowl clearance set on 5 of 6 baffles
Details
       

 09-04-2007
3.00
Worked on rear side and aft baffles
Details
     

 09-03-2007
4.00
Worked on left side and rear baffles
Details
       

 09-02-2007
1.00
Sanded more on wind screen fairings
Details

 09-01-2007
2.00
Added glass to wind screen-Safety wired primer sol
Details
       

 08-31-2007
3.00
Cutting baffles to fit
Details
       

 08-30-2007
3.50
1st go at baffles- Baffling!!!!
Details
       

 08-29-2007
3.00
Drilled all the hinges & camlock hinge strip
Details
     

 08-28-2007
3.00
Drilled side hinges and more fitting of cowl
Details
       

 08-27-2007
3.00
Cowling filed to fit and anchored to the lower hin
Details
     

 08-25-2007
1.50
Sanded on the fairing around the wind screen
Details
       

 08-24-2007
3.00
More fitting on cowl
Details

 08-23-2007
3.50
Fitting cowl continues
Details
       

 08-22-2007
3.00
Fitting of cowls continues
Details
       

 08-21-2007
3.00
Top cowl cut to length-working on lower cowl
Details
       

 08-20-2007
3.00
Modified Camlock Mount
Details
       

 08-16-2007
3.00
Mounted prop, Fit cowl, Rolled N417CT for 1st time
Details
       

 08-15-2007
3.50
Fit spinner- Mounted prop, back plate, & extension
Details
       

 08-14-2007
2.50
Marked spinner for cutting-Filed wind screen fairi
Details
       

 08-13-2007
3.50
Wing root fairing-Micro to wind screen-Prop spacer
Details
       

 08-11-2007
1.50
EAA tech advisor visit
Details

 08-10-2007
2.50
Installed electric primer-#1 piston TDC
Details

 08-09-2007
2.50
Worked on mounting strips for Cowl Camlocks
Details
     

 08-08-2007
3.00
Backing plate-spacer assembly/Camlock mount strip
Details
       

 08-07-2007
3.00
Fuel lines-exhaust hangers
Details
       

 08-06-2007
3.00
Filled wind screen fairing-Cut flange lower cowl
Details
       

 08-02-2007
3.00
Sanded wind screen fairing-Plumbed fuel line
Details

 08-01-2007
3.00
Wind screen-canopy fairing/Elec primer/tach cable
Details
       

 07-31-2007
3.00
Windscreen-canopy fairing; Alternator brace
Details
       

 07-30-2007
3.00
Wind screen-canopy work-Cut FG strips
Details
       

 07-26-2007
3.00
Windscreen fairing fiberglass laid up
Details
     

 07-25-2007
3.00
Windscreen fillet-F-Glass strips cut-Practiced lay
Details
       

 07-24-2007
2.50
Wind screen washed, sanded, taped
Details
     

 07-23-2007
2.50
Clipped windscreen to forward deck
Details
       

 07-20-2007
3.00
Dog house fixed-Made clips for wind screen
Details
       

 07-19-2007
3.00
Wind screen fitted in place-Practiced with epoxy
Details
       

 07-18-2007
3.00
Fit canopy latch & altered side skirts to fit
Details
     

 07-17-2007
3.00
All rivets in canopy
Details
       

 07-16-2007
4.00
Canopy partially riveted
Details
       

 07-13-2007
3.00
Dog house installed-Skins dimpled ready for riveti
Details
       

 07-12-2007
3.50
Canopy skirts mated, drilled, & trimmed
Details
       

 07-11-2007
3.50
Fitting of rear skirts AGAIN-Angle mount for prime
Details
     

 07-10-2007
2.50
Rear skirt tweaked-Glare shield painted
Details
     

 07-09-2007
4.00
Treaked & drilled both rear skirts
Details
       

 07-06-2007
3.00
Rear skirts again-Pierre Smith's visit in his RV6
Details
       

 07-05-2007
3.00
Fitting right rear skirt
Details

 07-04-2007
2.50
Fitting left rear skirt
Details
     

 07-03-2007
3.50
Right side skirts completed
Details
       

 07-02-2007
3.50
Left side canopy skirts
Details

 06-29-2007
4.00
Lt. side skirts drilled- Lt. PTT & auto pilot swit
Details
       

 06-28-2007
4.00
Rt canopy brace fabricated & outer skirt drilled
Details
       

 06-27-2007
2.50
Canopy block and clip drilled & installed
Details
     

 06-26-2007
3.50
Installed rear canopy block-ready for drilling
Details
     

 06-25-2007
3.50
Tapped roll bar-Mounted canopy handle
Details
     

 06-22-2007
3.50
Drilled, countersunk & enlarged holes in wind scre
Details
     

 06-21-2007
3.50
Worked on canopy handle & ELT antenna installatio
Details
       

 06-20-2007
3.00
More fitting of wind screen
Details
     

 06-19-2007
3.50
Final fitting wind screen-drilled rollers to frnt.
Details
       

 06-18-2007
3.50
Drilled canopy-Cut windscreen to size-Began its fi
Details
       

 06-16-2007
0.50
Programmed EIS
Details
     

 06-15-2007
3.00
Shortened front canopy bow-countersunk canopy
Details
       

 06-14-2007
1.50
Riveted fuse skin
Details

 06-13-2007
3.50
Elevator end caps riveted-Canopy center strap dril
Details
       

 06-12-2007
3.50
Attached canopy rail-fit canopy & frame
Details
       

 06-11-2007
3.50
Drilled canopy and frame
Details
     

 06-09-2007
3.00
Vern Darley for EAA inspection-Transition training
Details
       

 06-08-2007
3.00
Canopy final trimming-1st fitting
Details
       

 06-07-2007
3.00
Finished Big Cut!!!!!
Details
       

 06-06-2007
3.00
Cut the canopy to fit the rear and side bows
Details
       

 06-05-2007
2.50
Beginning cutting canopy
Details
       

 06-04-2007
3.50
Canopy bow tweaking-marking canopy center line
Details
       

 06-01-2007
3.50
Canopy frame in track - Tracks drilled & clecoed
Details
       

 05-31-2007
3.00
Altered shape of canopy frame again & again!
Details
       

 05-30-2007
4.00
Panel connected-Canopy frame first fitting
Details
       

 05-29-2007
3.50
Panel back in-Canopy slide & spacer drilled
Details
       

 05-28-2007
3.00
Canopy track cu t- 661 clip attached canopy frame
Details
       

 05-26-2007
3.00
Alternator, exhaust pipes, & carb installed
Details
     

 05-25-2007
3.00
Forward skin riveting completed!
Details
       

 05-24-2007
4.00
Forward deck rivets half done!
Details
       

 05-23-2007
3.00
Engine hung!!!!
Details
     

 05-23-2007
3.50
Doubler for GPS antenna, riveted panel brackets
Details
       

 05-22-2007
4.00
Bled brakes, fit GPS antenna and forward skin
Details
       

 05-21-2007
3.50
Roll bar & brace fitting, drilling & painting
Details

 05-17-2007
3.50
Shims made-Roll bar clamped & drilled
Details
     

 05-16-2007
4.00
Finished aft skin-Began roll bar installation
Details
       

 05-15-2007
4.00
Finished riveting aft skin, formed F6111 stiffiner
Details
     

 05-14-2007
3.00
Started riveting "forward" aft skin
Details
     

 05-11-2007
3.00
Riveted forward deck structures
Details
       

 05-10-2007
3.50
Unhooking the panel wiring and removing it
Details
       

 05-09-2007
3.50
Fueled 417CT for 1st-Calibrated fuel guages
Details
       

 05-08-2007
3.00
Tying up wiring and antennae on right side
Details
     

 05-07-2007
4.00
Organizing wiring and plumbing
Details

 05-04-2007
4.00
Plumbing complete-Check list complete on avionics
Details
       

 05-03-2007
4.00
All antennae wired-Begun "plumbing"
Details
       

 05-02-2007
4.00
Lt. wing tip- OAT probe- BNC connectors mounted
Details

 05-01-2007
4.00
Enuciator lights-Marker beacon-1st BNC connector
Details
       

 04-30-2007
4.00
Nav-Wing tip wired & mounted-Com 1&2 antennas
Details
       

 04-27-2007
4.00
Nav antenna-ELT-Nav lights-Heated pitot wired
Details
       

 04-26-2007
3.50
Mounted transponder antenna & heater cable-lens
Details
       

 04-25-2007
4.00
Nutplate for lens-EIS wires routed thru firewall
Details
       

 04-24-2007
3.50
Fitting lens to wing tips-Wiring GRT EIS
Details
       

 04-23-2007
3.50
Fitting wing tip lens-Wired G396/Rt. PTT switch
Details
       

 04-22-2007
3.00
Reinstalled flap switch-Wiring continues
Details

 04-14-2007
0.50
Corrected some write-ups from Vern's inspection
Details
       

 04-13-2007
4.00
Air vents prosealed in-Firewall connections covere
Details
       

 04-12-2007
3.50
Clamp for airvent-Wiring harness-Nav,strobes wired
Details
       

 04-11-2007
4.00
AHRS shelf finished-More wiring
Details
       

 04-10-2007
4.00
More AHRS work-Wiring of magnetometer etc
Details
     

 04-09-2007
4.50
Installed Rt. strobe-Made mount for GRT AHRS
Details
       

 04-08-2007
1.00
Battery mounted- Panel now on battery master
Details
       

 04-06-2007
35.00
Riveted rib & installed Rt. wing tip strobe
Details
       

 04-05-2007
3.50
Rewired pitch servo-Checked flap position switch
Details

 04-04-2007
3.50
Powered up panel=finished fitting rudder bottom
Details
       

 04-03-2007
4.00
Wired main plug to panel-Modified rudder bottom
Details
       

 04-02-2007
4.00
Installed ground block-Crimping & installing pins
Details
       

 04-01-2007
1.00
Safety wired gascolator-ran wiring through firewal
Details
       

 03-31-2007
1.00
EAA tech conselor inspection-1hr. transition train
Details

 03-30-2007
4.00
Routed wires to panel
Details

 03-29-2007
4.00
Strobe power supply wired- Throttle quad finished
Details
       

 03-28-2007
3.50
Ran strobe wires-Installed throtle quad
Details
       

 03-27-2007
3.50
Wired AOA flap switch-Battery ground-pitot routing
Details
       

 03-26-2007
3.50
Installed ELT-Drilled firewall for P leads, alt, &
Details
       

 03-23-2007
3.50
Installed aileron trim-Begin ELT install
Details
       

 03-22-2007
3.50
Aileron trim-Right stick wiring-Routing strobe wir
Details

 03-21-2007
3.50
Static system-aileron trim-contol stick wiring
Details
       

 03-20-2007
4.00
Reamed forward skin & installed panel angles
Details
       

 03-19-2007
4.00
Panel, front deck, and skin mounted
Details
       

 03-18-2007
0.25
Flightline seats in for 1st. time
Details
     

 03-16-2007
3.00
Riveted the angles on the edge of panel
Details
     

 03-15-2007
3.50
Completed radio stack alteration-Double rudder gro
Details
       

 03-14-2007
4.00
Cut center subpanel-re-installed pitch servo
Details
       

 03-13-2007
3.00
Moved instrument panel-Worked on subpanel
Details
       

 03-12-2007
4.00
Cabin heat valve/frwd. deck installation
Details
       

 03-09-2007
4.00
Gascolator & doubler, fuel line, wing gap seal
Details
       

 03-08-2007
3.50
Installed relays, battery box & gascolator doubler
Details
       

 03-07-2007
3.00
Worked on battery box & relays
Details
     

 03-06-2007
4.00
Nutplates battery ground-oil sensor line-Battery b
Details
     

 03-05-2007
3.50
Rudder bottom nutplates-Firewall blanket
Details
       

 03-01-2007
2.50
Polished nose axle-mounted nose tire
Details

 02-28-2007
4.00
Installed brake lines, engine mount, & nose gear
Details
       

 02-27-2007
4.00
Cut firewall penetrations-Riveted firewall recess
Details
     

 02-26-2007
4.00
Mounted wheels - worked on firewall
Details
       

 02-21-2007
3.50
Drilled left axle and enlarged both holes to #27
Details
       

 02-20-2007
3.00
Raised fuse by engine mount-Drilled rt axle
Details

 02-19-2007
3.50
Btm. cowl hinges-engine mount & nose gear fitting
Details
       

 02-16-2007
3.00
Modified engine mount- Readied cowl hinges
Details
       

 02-15-2007
3.00
Tapped wing tie down/ Engine mount mounted
Details
       

 02-14-2007
2.50
Wired & tested tail nav & strobe-Wing jack problem
Details
     

 02-13-2007
3.00
Primed-Honed main axles-Mounted plates to axle
Details
       

 02-12-2007
2.00
Panel fitting work-Nutplates main fairing brackets
Details
     

 02-09-2007
4.00
Brake parts installed & primed
Details
       

 02-08-2007
4.00
Clecoed forward deck structure-Modified saw horse
Details
       

 02-07-2007
4.00
Parts for front deck-wiring of tail strobe
Details
       

 02-06-2007
4.00
Flap control box wired- Routed strobe wires
Details
       

 02-05-2007
3.50
Wiring flap control switch & magnetometer
Details
       

 02-02-2007
4.00
Wiring and routing left wing & pitch servo
Details
       

 02-01-2007
4.00
Installed pitch servo-Rt wing wiring thru spar box
Details
       

 01-31-2007
4.00
Mounted GRT magnetometer
Details
       

 01-30-2007
3.00
Dimppled tail inspection port & fairing -Primed th
Details
       

 01-29-2007
3.50
Drilled, tapped, fit empennage gap fairings
Details
       

 01-26-2007
5.00
Brake pedals & lines-rudder cables
Details
       

 01-25-2007
4.00
Rudder stop-mount rudder and cables
Details
       

 01-24-2007
4.00
Empennage fairing fitting--glass & rudder work
Details
     

 01-23-2007
4.00
Empennage end caps fitted & fairing cut to size
Details
       

 01-22-2007
3.00
Fiberglass work wing and tail tips
Details
       

 01-19-2007
3.00
Glass work-Mounting rudder strobe
Details
       

 01-18-2007
3.50
Anchored rudder cable in/Ran strobe wires to tail
Details
       

 01-17-2007
4.50
Mounted tail & fairing/Ran rudder cables/Fibergals
Details
       

 01-16-2007
3.50
Installed rudder stops/nut plates/end cap rudder
Details
       

 01-15-2007
3.50
Riveted rear bulkhead to skin/Inventoried finish k
Details
       

 01-11-2007
4.50
New elev up stop/vert stab on/Check by A&P
Details
       

 01-10-2007
3.50
Remade elev up stop/Fit rudder bottom
Details
       

 01-09-2007
3.00
Reinforced vert & stab tips
Details
       

 01-08-2007
4.00
Closed with glass vert & horz tips
Details
       

 01-05-2007
4.00
Installing hoz & vert stab & elevator tips
Details
       

 01-04-2007
4.00
Removed vert stab/Riveted etc/push rod installed
Details
       

 01-03-2007
4.00
Drilled attach angle/tiedown bracket/Mounted rudde
Details
       

 01-02-2007
4.00
Vert stab installed & aligned
Details
       

 12-29-2006
4.00
Vert stab attach angle installed /several parts ma
Details
       

 12-28-2006
4.00
Trim cable installed/vert stab attach plate drille
Details
       

 12-27-2006
3.50
Installed rear elev. pushrod/trim cable
Details
       

 12-26-2006
4.00
Installed rudder pedals-Worked on elev push rods
Details
       

 12-22-2006
4.00
Finished brake lines-torqued horz. stab bolts
Details
       

 12-21-2006
4.00
Drilled attach horns horz stab/Fixed fuel & brake
Details
       

 12-20-2006
4.00
Setup horz stabilizer & drilled it
Details
       

 12-19-2006
0.50
We couldn't wait til tomorrow to see horz stab on
Details
       

 12-19-2006
4.00
Drilled elev. horns; corrected clearance nose elev
Details
       

 12-18-2006
4.00
Installed control sticks & grips & connected to a
Details
       

 12-15-2006
4.50
Completed fuel vent lines-Problem with fuel line?
Details
       

 12-14-2006
3.50
Fuel & Vent Lines
Details
       

 12-13-2006
4.00
Torqued all wing spar bolts-Added fuel tank bracke
Details
     

 12-12-2006
4.00
Torqued spar box nuts
Details
     

 12-11-2006
4.00
Wings back on/Bolts in spar/Fuel-vent lines in
Details
       

 12-08-2006
3.00
Fabricated fuel lines
Details
       

 12-07-2006
3.00
Lt wing tip riveted-nut plated
Details

 12-06-2006
4.00
Finished rt. wing tip-Fit & drilled lt. wing tip
Details
       

 12-05-2006
4.00
Continued work on right wing tip
Details
       

 12-04-2006
3.50
Worked on right wing tip
Details

 11-30-2006
4.00
Nuts to nut plates-Fitting Rt wing tip
Details
       

 11-29-2006
3.50
More nut plates-Stick boot rings fabricated
Details
       

 11-28-2006
3.50
More nut plates right wing
Details
     

 11-27-2006
4.00
Installed plate nuts left wing root
Details
       

 11-25-2006
3.00
Installed dimpled nut plates-wing root
Details
     

 11-24-2006
3.50
Took off wings/Drilled & riveted nut plates
Details
       

 11-23-2006
2.00
Worked on static port-Primed wing gap fairing
Details

 11-22-2006
3.50
Finished the fuel line to aux pump/installed stati
Details
       

 11-19-2006
1.50
Made bend up to fuel pump...finally
Details
     

 11-17-2006
3.00
Fabrication of fuel line to aux pump a fiasco
Details
     

 11-16-2006
3.00
Assembled fuel valve & selector; mounted aux. fuel
Details
       

 11-15-2006
4.00
Final CAD Aerotronics panel-Fit wing gap fairings
Details
       

 11-14-2006
4.00
Inventoried finish kit-wing gap fairing-instrument
Details
       

 11-13-2006
3.50
Finish kit recieved "upside down"-Studied wiring
Details
       

 11-11-2006
2.00
AOA flap switch & flap position switch installed
Details
       

 11-10-2006
3.00
Built saw horse/dolly-Mounted AOA flap switch
Details
       

 11-09-2006
6.00
Mounted lt flap & AOA flap switch bracket-Drilled
Details
       

 11-08-2006
0.50
2. Rigged travel of the RT flap and matched it to
Details
       

 11-08-2006
3.50
1.Shaped rt flap rod hole; Installed & adjusted rt
Details
       

 11-07-2006
4.00
Bent, fabricated & attached fuel tank attach angle
Details
       

 11-06-2006
3.00
Started work on fuel tank attach angle
Details

 11-02-2006
4.00
Drilled both rear spars to final size-drilled bott
Details
       

 11-01-2006
1.50
Planned drilling rear spar to size
Details
       

 10-31-2006
3.50
Both rear spars step drilled without drift to 1/4"
Details
       

 10-27-2006
3.50
Prepared to drill rear spar
Details
       

 10-26-2006
4.50
Both wings put on for 1st. time!!!!!
Details
       

 10-25-2006
3.00
Sanded center section gussets-Reinstalling gear we
Details
       

 10-24-2006
3.50
Tried to get bolts in center section
Details

 10-23-2006
4.50
Closed Rt. wing/Unloaded O-320/Leveled fuse
Details
       

 10-20-2006
4.00
Riveted 1/3 right bottom skin-Access panels fixed
Details
       

 10-19-2006
4.50
Pulled AOA tubing thru conduit/Preped wing skin
Details
       

 10-18-2006
4.00
Final wiring of pitot/Installed AOA Rt. Wing
Details
       

 10-17-2006
4.00
Finished closing LEFT wing/Mounted main gear legs
Details
       

 10-16-2006
4.00
Closing left wing continues
Details
       

 10-13-2006
4.00
Pitot wiring installed-Began riveting left wing sk
Details
       

 10-12-2006
4.00
Wiring of pitot controller/Primed left bottom wing
Details
       

 10-11-2006
4.00
Roll servo finished/Pitot tube, nut plates etc ins
Details
       

 10-10-2006
4.00
Worked on pitot installation
Details
       

 10-09-2006
4.00
Dimpled bottom skin & ribs/Fit pitot & backing pla
Details
       

 10-08-2006
1.00
Safety wired roll servo & stripped paint on seat b
Details
     

 10-07-2006
1.00
Safety wiring roll servo/Stripped paint off seat b
Details
       

 10-06-2006
4.00
Installed Lt. bottom inboard wing skin/Worked on p
Details
       

 10-05-2006
3.00
Installing roll servo (parts missing) and Gretz pi
Details
       

 10-04-2006
3.50
Nut plates on seat back brace, repainted some part
Details
       

 10-03-2006
3.50
Connected flap motor to flap rod & safety wired it
Details
       

 10-02-2006
3.50
Worked on flap actuator channel
Details
     

 09-28-2006
2.50
Assembled, primed & riveted flap motor componets/D
Details
       

 09-27-2006
4.00
Fabricated multiple parts for flap actuator/Rivete
Details
       

 09-26-2006
4.00
Working on flap actuator cover and mechanism
Details
       

 09-25-2006
3.50
Center floor cover, heater box, & fuel selector/tr
Details
       

 09-24-2006
0.50
Riveted and painted and put control rod tunnel in
Details
     

 09-23-2006
1.00
Drilled & primed control rod tunnel Started on hea
Details
       

 09-22-2006
3.50
Both seat backs completed--Control rod tunnel fabr
Details
       

 09-21-2006
2.50
Left seat assembled & riveted-Right primed ready t
Details
       

 09-20-2006
4.00
Both seat backs now completely assembled-Left prim
Details
       

 09-19-2006
3.50
Layed out & drilled holes in angles, hinges etc. l
Details
     

 09-18-2006
4.00
Fabricated seat back parts all day long! 400 hr ma
Details
       

 09-15-2006
3.50
Cabin floors completely installed-Began on seat ba
Details
       

 09-14-2006
3.50
Finished installing baggage floors Started on forw
Details
     

 09-13-2006
3.50
Baggage floors & side panels being permanently ins
Details
       

 09-12-2006
3.50
Drilled/riveted strobe-Riveted pitch mounting plat
Details
       

 09-11-2006
4.00
Fitted the pitch survo plate/Drilled out rivets/Dr
Details
     

 09-10-2006
1.50
Fashioned mount for Strobe power supply
Details

 09-08-2006
3.00
Riveted midline brace under aft skin
Details
       

 09-07-2006
3.50
Reamed, deburred, dimpled, & scuffed aft top skin
Details
       

 09-06-2006
4.00
assembled & mounted elevator bell crank/Mounted af
Details
       

 09-05-2006
3.00
Finished rudder pedal assembly; Began elevator bel
Details
       

 09-04-2006
3.50
Mounted rudder pedals, blocks & brace
Details
       

 09-01-2006
3.00
Assebled/riveted rt. brake pedal and both rudders
Details

 08-31-2006
2.50
Assembled left brake pedals and both rudders-Rivet
Details
       

 08-30-2006
3.50
Riveted both external steps in place/Started assem
Details
       

 08-29-2006
3.50
Tanks closed!!!!!
Details
       

 08-28-2006
3.50
Retorqued pickup tube/Finished riveting 705 bulkhe
Details
       

 08-25-2006
4.00
Sealed fuel end plate rivets & nutplates with Pros
Details
       

 08-23-2006
3.00
Tried to figure out how the pitot tube woud mount
Details
       

 08-22-2006
3.00
Drilled block Rt. Step/Prepared float for fuel gua
Details
       

 08-21-2006
3.50
Anchored conduit right wing/Ran strobe wires in bo
Details
       

 08-19-2006
3.00
Ran wires in wings/Anchored conduit left wing/Adde
Details
       

 08-16-2006
1.50
Catching up loose ends
Details
       

 08-15-2006
3.50
Finished rt. gear mount/Drilled & mounted nylon bl
Details
       

 08-14-2006
3.50
Rt. step clecoed up--Rt gear mount bolted to cente
Details
       

 08-11-2006
3.00
Longer bolts exchanged rt. landing gear mount - ho
Details
       

 08-10-2006
3.50
Drilled rivet holes in left step/bolted up landing
Details
     

 08-09-2006
3.00
Hole cut for right step...over my objections
Details
       

 08-07-2006
3.50
Cut hole for and fit left landing gear bracket
Details
       

 08-04-2006
3.00
Finished elongating hole in fuse to drop landing g
Details
       

 08-03-2006
2.50
Fashioning hole for rt. landing gear weldment
Details
       

 08-02-2006
3.50
Drilled holes in flange of external step and in pl
Details
       

 08-01-2006
3.50
Installing right external step
Details
       

 07-31-2006
3.50
Finished work on 705 bulkhead
Details
       

 07-30-2006
1.00
Ground down bucking bar/Drove a few rivets
Details

 07-28-2006
3.00
Shot rivets today - Worked better than squeezer
Details
       

 07-27-2006
4.00
Machined radius in the 757S; Riveted; Drilled out
Details
       

 07-26-2006
3.50
Drilled out pop rivets in 705 bulkhead-Riveted ang
Details
       

 07-25-2006
3.50
F705k riveted; baggage floor and sidewall removed
Details
       

 07-24-2006
4.00
Assembling components of 705 Bulkhead
Details
       

 07-21-2006
4.00
Permanently installed control column mount/Began a
Details
       

 07-20-2006
4.00
Finished Firewall Recess/Assembled Control Sticks
Details
       

 07-19-2006
4.00
Finished hanging left flap-Installed firewall rece
Details
       

 07-18-2006
5.00
Hung right flap and added 1st part to fuselage
Details
       

 07-13-2006
3.50
Hung right aileron alot easier than the left
Details
       

 07-12-2006
4.00
Left aileron and all push rods mounted and aileron
Details
       

 07-11-2006
4.00
Finished cutting & riveting aileron push rods- Dri
Details
       

 07-10-2006
1.00
Cut and riveted control stick/ aileron push rod
Details
     

 07-09-2006
0.50
Set up fan in shop / Unloaded back-ordered flaps a
Details
       

 07-07-2006
3.00
Finished landing light/Assembled & installed both
Details
       

 07-06-2006
3.50
Drilled the landing light lens, added many nut pla
Details

 07-05-2006
3.50
Cut landing light lens - Fitting reflector
Details
       

 07-03-2006
3.50
Cutout for landing light/Shaping reflector/Attachi
Details
       

 07-01-2006
2.00
Practiced cutting with rotary tool/Another coat of
Details
     

 06-30-2006
5.00
Aileron Bell Crank/Aileron Push Rods/All Gap Fairi
Details
       

 06-28-2006
4.00
Riveted flap gaps/Primed push rods/Started on Bell
Details

 06-26-2006
4.00
Readied right flap gap seal- Riveted rt. aileron g
Details
       

 06-24-2006
2.00
Right aileron gap fairing drilled, deburred, dimpl
Details
       

 06-23-2006
2.50
Dimpled & Primed Flap Fairing & Riveted Aileron Fa
Details
       

 06-22-2006
4.00
Aileron hinges riveted! Aileron gap fairing ready
Details
       

 06-21-2006
2.00
Problem with riveting on aileron hinges
Details
     

 06-20-2006
3.00
Assembled right inboard aileron hinge
Details
       

 06-19-2006
3.00
Left inboard aileron hinge Plans table
Details
     

 06-17-2006
2.00
Drove #4 rivets today; best yet
Details
     

 06-16-2006
1.50
Drilling rivets in aileron hinge bracket
Details

 06-12-2006
3.00
Riveted aileron hinge brackets
Details

 06-10-2006
5.00
Completed outboard aileron hinge bracket/ dimple t
Details
       

 06-09-2006
4.00
Worked on Aileron hinge bracket
Details

 06-07-2006
2.00
Tried to rivet the aileron hinge brackets
Details

 06-06-2006
4.50
Aileron hinge brackets
Details
       

 06-05-2006
8.00
Adding more parts bins, storage and inventoring
Details
       

 06-03-2006
5.50
Building Bins and Inventoring kit
Details
     

 05-31-2006
4.50
Continue inventoring 7 began making bins for parts
Details
       

 05-30-2006
4.00
QB finally came Brought by Partain's van
Details
       

 05-27-2006
2.00
Practicing riveting and drilling rivets
Details
       

 05-19-2006
2.00
Installed the bolts on the bearings
Details
       

 05-18-2006
6.00
Turned in rod end bearings after getting tool and
Details
     

 05-16-2006
6.00
Added air conditioner to little office Added rod e
Details

 05-15-2006
4.00
Filed down counterwieghts
Details
     

 05-12-2006
6.00
Added counterbalance
Details
       

 05-11-2006
1.50
unloaded crate
Details
     

 05-10-2006
1.50
Moved to Hagar
Details
       

 05-03-2006
3.00
Trimmed the elevator counter weights
Details
       

 04-25-2006
1.00
Setup drill press and worked with it
Details

 04-23-2006
3.00
Tools are here and I practiced riveting
Details

 04-23-2006
1.00
Practiced riveting and Dimpling
Details

 04-22-2006
2.00
Practiced riveting again Better
Details

 04-21-2006
3.00
Built saw horses to rest fuselage on when it comes
Details

 04-20-2006
5.00
Day 2 on Work table
Details

 04-19-2006
5.00
Building work table
Details
     

 04-13-2006
6.00
Day 2 building wing stand Looks good
Details
     

 04-12-2006
7.00
Built wing stand from plans on net
Details
       

 04-07-2006
5.00
Drove up from Waycross to pick up kit
Details

 03-27-2006
4.00
Day 8 at Alexander's in Griffin
Details
     

 03-26-2006
12.00
Day 7 at Alexander's in Griffin
Details

 03-25-2006
12.00
Day 6 Alexander's
Details

 03-24-2006
12.00
Day 5 Alexanders
Details

 03-23-2006
12.00
Day 4 Alexander's
Details
     

 03-22-2006
11.00
3rd day at Alexander's
Details
     

 03-21-2006
11.00
2nd day in Griffin at Alexander's
Details
     

 03-20-2006
11.00
1st day in Griffin
Details
     