KitLog pro

Powered By Kitlog Pro v2.0

Mikes Web Site
Work Logs Found: 90
Category Work Time: 258 Hours
 Date
Hours
Work Log Summary

Details

 02-26-2007
12.70
*&^9(*& gear legs :)
Details

 01-30-2007
6.00
canopy frame
Details
       

 01-29-2007
1.25
left elevator
Details
       

 01-29-2007
3.75
install fuselage bow (roll bar)
Details
       

 01-28-2007
1.75
left elevator
Details
     

 01-27-2007
1.00
mid fuse covers
Details

 01-25-2007
1.50
painting
Details

 01-24-2007
4.50
painting of roll bar
Details
       

 01-23-2007
1.20
side console gotcha big time
Details
       

 01-22-2007
4.80
rudder stop install
Details
       

 01-21-2007
0.75
elevator push rod manufactor
Details

 01-20-2007
2.25
rudder stops
Details
     

 01-20-2007
1.00
elevator bell crank
Details
     

 01-20-2007
1.75
controls
Details
       

 01-18-2007
0.75
installed tail strobe power source
Details

 01-16-2007
1.20
fiberglass work
Details
       

 01-15-2007
2.30
elevator stop
Details

 01-13-2007
4.75
installed empennage onto fuse
Details
       

 01-09-2007
0.75
paint interior of fuse
Details
     

 01-08-2007
2.75
fuse painting
Details
       

 01-07-2007
2.75
interior fitting
Details
       

 01-01-2007
0.01
Happy New Year
Details

 12-30-2006
2.75
interior covers and consoles
Details

 12-29-2006
1.75
cabin covers and consoles
Details

 12-22-2006
3.00
rear baggage and battery tray
Details

 12-21-2006
2.50
mid cabin covers
Details

 12-20-2006
5.00
more fuselage panels
Details

 12-16-2006
0.50
finished nutplating the right rear fuse cover
Details
     

 12-14-2006
3.25
Rear Seatback installation
Details
       

 12-13-2006
2.75
more freakin nutplates
Details
       

 12-12-2006
6.75
drilling, prepping and installing nutplates
Details
       

 11-20-2006
0.75
Pre-cover inspection
Details

 10-11-2006
6.25
installed rudder pedals
Details

 10-10-2006
6.25
front seat back
Details

 10-09-2006
1.50
installed flap control bar and control bar
Details
     

 10-09-2006
2.75
contol bar rear seat bracket.
Details
     

 10-08-2006
2.80
more floors fitting
Details

 10-08-2006
1.75
installed the hinges for the seats front and back
     

 10-06-2006
2.75
floor install
Details
       

 10-05-2006
1.75
rudder cable runs
Details

 10-01-2006
2.75
left wing work
Details
     

 09-29-2006
2.25
fished wires into right wing
Details
       

 09-18-2006
2.25
wing flap bracket
Details
     

 09-18-2006
0.75
right wing aileron flap bracket
Details
     

 09-18-2006
2.25
fuel sender install
Details

 09-17-2006
1.50
aileron gap seal
Details
     

 09-16-2006
5.60
aileron attach brackets
Details
     

 09-15-2006
2.50
push rods etc
Details

 09-09-2006
3.50
trim tab
Details

 09-08-2006
6.70
left elevator
Details

 09-07-2006
5.20
started left elevator and trim tab
Details

 09-07-2006
3.50
re-organized the shop for all the new parts

 09-04-2006
3.50
more inventory
     

 09-03-2006
2.50
Unloaded the kit
       

 09-02-2006
13.00
drove home
Details

 09-01-2006
4.50
driving to Erie Pa to pickup QB kit
Details

 08-31-2006
3.25
right elevator
Details
     

 08-31-2006
2.75
"tight space " dimpling tool
Details
       

 08-30-2006
2.25
Wing stand
Details
       

 08-30-2006
2.50
right elevator
Details

 08-28-2006
4.25
elevators
Details
       

 08-27-2006
0.80
elevators
Details

 08-24-2006
3.75
elevators
Details

 08-23-2006
2.30
more rudder work
Details
       

 08-17-2006
1.75
Rudder
Details
     

 07-14-2006
0.75
finished sorting details on QB wing and Fuse order
Details

 07-07-2006
1.50
Finished HS
Details
     

 07-06-2006
2.75
HS
Details
     

 07-02-2006
0.25
HS left side
Details

 06-28-2006
2.50
HS riveting
Details
     

 06-27-2006
2.00
rudder skeleton
Details
     

 06-22-2006
2.25
Rudder
Details
       

 06-19-2006
1.25
drilled rudder skins
Details

 06-16-2006
3.25
Rudder
Details
     

 06-16-2006
2.00
DRDT-2 dimpling table
Details
     

 06-15-2006
5.25
Vertical Stab
Details
       

 06-13-2006
4.00
Vertical Stab
Details
       

 06-13-2006
0.75
oops
Details

 06-12-2006
1.00
rear spar finished
Details

 06-12-2006
6.25
more HS
Details
       

 06-11-2006
0.25
prepare ribs
Details

 06-11-2006
2.50
Front Spar Assembly
Details

 06-11-2006
2.50
drilling the HS
Details
       

 06-09-2006
2.00
rear HS spar work
Details
       

 06-08-2006
2.00
more fitting, drilling ,deburing cleco
Details

 06-08-2006
0.75
fitted rear spar and hinge
Details
       

 05-27-2006
2.50
flying surface test project

 05-24-2006
8.25
Tool Box practice kit
Details

 05-01-2006
0.25
Ordered empennage kit via fax
Details

 04-29-2006
0.75
inventoried tools
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.